CN105972215A - Manufacturing method for high-speed rail hub bearing sealing ring - Google Patents

Manufacturing method for high-speed rail hub bearing sealing ring Download PDF

Info

Publication number
CN105972215A
CN105972215A CN201610297820.0A CN201610297820A CN105972215A CN 105972215 A CN105972215 A CN 105972215A CN 201610297820 A CN201610297820 A CN 201610297820A CN 105972215 A CN105972215 A CN 105972215A
Authority
CN
China
Prior art keywords
sealing ring
sucting tube
hub bearing
wind sucting
high ferro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610297820.0A
Other languages
Chinese (zh)
Other versions
CN105972215B (en
Inventor
谢云州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiangyu seal Co.,Ltd.
Original Assignee
XIANGYU SEAL PARTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIANGYU SEAL PARTS CO Ltd filed Critical XIANGYU SEAL PARTS CO Ltd
Priority to CN201610297820.0A priority Critical patent/CN105972215B/en
Publication of CN105972215A publication Critical patent/CN105972215A/en
Application granted granted Critical
Publication of CN105972215B publication Critical patent/CN105972215B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/16Sealings between relatively-moving surfaces
    • F16J15/32Sealings between relatively-moving surfaces with elastic sealings, e.g. O-rings
    • F16J15/328Manufacturing methods specially adapted for elastic sealings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D1/00Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor
    • B26D1/01Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work
    • B26D1/04Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member
    • B26D1/06Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member wherein the cutting member reciprocates
    • B26D1/08Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member wherein the cutting member reciprocates of the guillotine type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/18Means for removing cut-out material or waste
    • B26D7/1845Means for removing cut-out material or waste by non mechanical means
    • B26D7/1863Means for removing cut-out material or waste by non mechanical means by suction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/22Safety devices specially adapted for cutting machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/26Means for mounting or adjusting the cutting member; Means for adjusting the stroke of the cutting member
    • B26D7/2614Means for mounting the cutting member
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L21/00Compositions of unspecified rubbers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/72Sealings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/72Sealings
    • F16C33/76Sealings of ball or roller bearings
    • F16C33/78Sealings of ball or roller bearings with a diaphragm, disc, or ring, with or without resilient members
    • F16C33/7816Details of the sealing or parts thereof, e.g. geometry, material
    • F16C33/7833Special methods of manufacture

Abstract

The invention provides a manufacturing method for a high-speed rail hub bearing sealing ring, and belongs to the technical field of machines. The manufacturing method solves the problems that an existing sealing ring manufacturing method is poor in manufacturing efficiency, short in service life and the like. The manufacturing method for the high-speed rail hub bearing sealing ring is characterized by comprising the following steps that a, raw materials are prepared and comprise, by weight percent, 70%-75% of rubber, 1.5% of accelerant, 10%-20% of carbon black, 5%-8% of calcium carbonate, 2%-3% of zinc oxide, 1.5% of polyethylene wax, 1% of talcum powder and 5%-9% of iron powder; b, vulcanization forming is conducted, the raw materials prepared in the step a are poured in a vulcanizing machine, and the raw materials become a sealing strip under the action of the vulcanizing machine; c, the sealing strip is cut into the sealing ring, and the sealing strip is cut into small sections through a rubber cutting machine; and d, the sealing strip cut into the small sections is machined through a die, and then the high-speed rail hub bearing sealing ring is obtained. The manufacturing method is high in manufacturing efficiency, and the service life of the sealing ring manufactured through the manufacturing method is long.

Description

The manufacture method of high ferro hub bearing sealing ring
Technical field
The invention belongs to field of mechanical technique, relate to a kind of high ferro hub bearing sealing ring, A kind of manufacture method of high ferro hub bearing sealing ring.
Background technology
The circular cowling that sealing ring is made up of one or several part, is fixed on one of bearing On lasso or packing ring and with another lasso or washer contacts or form narrow labyrinth clearance, anti- Only lubricating oil spills and foreign object invades.Sealing ring be a kind of cross section be circular rubber ring, Because its cross section is O type, therefore it is called O RunddichtringO.It it is hydraulic and pneumatic transmission system In most popular one.
At present, China's high ferro cause is flourish, is also required to use on the wheel hub of high ferro To sealing ring, at present, on market, the manufacture method of the sealing ring of high ferro wheel hub all compares Loaded down with trivial details, and the sealing ring made is the shortest for service life, does not utilize high ferro cause Development.
Summary of the invention
The present invention be directed to the problems referred to above that existing technology exists, it is provided that a kind of high iron tyre The manufacture method of hub bearing sealed ring, it is high that this manufacture method has make efficiency, and this system The feature that sealing ring service life of making as method is longer.
The purpose of the present invention can be realized by following technical proposal:
The manufacture method of high ferro hub bearing sealing ring, it is characterised in that the method includes Following steps: a, prepare raw material, prepare following material by weight: rubber 70%-75%, Accelerator 1.5%, white carbon black 10%-20%, calcium carbonate 5%-8%, zinc oxide 2%-3%, poly-second Alkene wax 1.5%, Pulvis Talci 1%, iron powder 5%-9%;Above material percentage ratio sum is percentage One of hundred;
B, sulfidization molding;The raw material prepared in step a is poured in vulcanizer, at sulfur Under the effect of change machine, raw material is become a sealing strip;
C, cut into sealing ring;Sealing strip is cut into a bit of by bale splitter;
D, by mould the sealing strip cutting into segment is processed cost high ferro hub spindle Hold sealing ring.
The described bale splitter in step c includes base, and described base is provided with conveying Band, the both sides of described base are respectively arranged with a column, arrange between two described columns There is a cross bar;Described bale splitter also includes:
Cutter sweep, described cutter sweep includes mounting seat, described mounting seat and cross bar it Between be provided with the driving source that drives this mounting seat to lift, the two ends of described mounting seat are divided Elastic component connection Tong Guo not have the movable block for installing cutter head, described elastic component is along vertically Direction is arranged;
Cutter head, described cutter head includes the tool rest that a cross section is square, the two of described tool rest End rotation is arranged on two described movable blocks, and can relative consolidate between tool rest with movable block Determining and get loose, four sides of described tool rest are respectively arranged with variform cutter;
Dust exhaust apparatus, described dust exhaust apparatus includes wind sucting tube, fixing suction nozzle and mobile suction Trachea, described wind sucting tube is arranged on base, and the inner of described fixing suction nozzle is with described Wind sucting tube is connected, and the outer end of described fixing suction nozzle is towards the lower section of described cutter head, institute Stating mobile suction nozzle is flexible pipe, and this inner moving suction nozzle is connected with wind sucting tube, This outer end moving suction nozzle is free end;
Wind-force adjustment structure, described wind-force adjustment structure includes being arranged in described wind sucting tube Fixed disk and rotation dish, described fixed disk is fixed on the end of wind sucting tube, described rotation Dish rotates and is arranged on described fixed disk, and described fixed disk and rotation dish offer respectively Air inlet and external admission hole in several, described interior air inlet is connected with the inner chamber of wind sucting tube Logical, described external admission hole is towards the air inlet stating wind sucting tube.
Sealing strip can be delivered to below cutter sweep by conveyer belt, drive source to drive peace Dress seat declines, and band dynamic cutter head synchronizes to decline, thus is cut off by sealing strip.Due to flexible Part, therefore when cutting, sealing strip is cut off when contacting with conveyer belt by cutter, elastic component Can deform upon, cutter can be avoided to cause abrasion because of the rigid collision between conveyer belt, Improve cutting-tool's used life;Owing to the tool rest in cutter head is to rotate to be arranged on movable block , and four sides of tool rest are provided with different cutters, therefore can according to actual needs, Rotate tool rest and select corresponding cutter, thus improve the versatility of bale splitter;Due to design Having dust exhaust apparatus, the fixing suction nozzle in dust exhaust apparatus can siphon away the waste material of cut place, and Mobile suction nozzle is available for operator and grips the place moving to need cleaning, thus improves whole The tidiness of machine, it is to avoid clamping stagnation occurs in the motion vice division chief of machine;Owing to bale splitter designing There is wind-force adjustment structure, can as required during use, rotary motion dish, air inlet in regulation Intersect area between hole with external admission hole, thus play energy-conserving action.
As a kind of scheme, described driving source includes the cylinder vertically arranged, institute The cylinder body stating cylinder is fixed on cross bar, the piston rod of described cylinder and described mounting seat phase Connect.
Alternatively, described driving source includes electric magnet, the basis of described electric magnet Body is fixed on described cross bar, and the mandrel of described electric magnet is connected with described mounting seat.
Described elastic component includes that stage clip, the upper end of described stage clip are fixed in mounting seat, institute The lower end stating stage clip is connected with described movable block.
Described cutter sweep also includes guide rod, the upper end of described guide rod through described stage clip and Being fixed in mounting seat, the lower end of described guide rod is positioned at stage clip.
As a kind of scheme, described movable block offers installing hole, the two of described tool rest End is provided with rotation and is arranged at the damping shaft in described through hole.
Alternatively, the two ends of tool rest are respectively by a rotational pin and described movement Block is rotationally connected, and is arranged with ratchet on described rotational pin, and described movable block is provided with The ratchet being meshed with described ratchet.
It is provided with circular scale on described movable block, described ratchet is provided with and described ring The pointer that shape scale is corresponding.
The side opening of described tool rest is provided with screwed hole, described cutter offers and described spiral shell In the bar hole that pit is corresponding, described screwed hole and bar hole corresponding thereto simultaneously It is plugged with fastening bolt.
The sidewall of described base is provided with a semiorbicular elastic jaw, described wind sucting tube energy Enough it is connected in described elastic jaw.
The bottom of described wind sucting tube offers and also sets up on rubbish pour spout, and this wind sucting tube There is the cover plate for closing this rubbish pour spout.
Described cover plate is rounded, and one end of described cover plate is articulated with on described wind sucting tube, institute The other end stating cover plate removably connects with wind sucting tube.
The sidewall of described wind sucting tube is provided with transparent observation along the length direction of wind sucting tube Window.
The lateral wall of described fixed disk is arranged with a sealing ring, makes described fixed disk and air draught Formed between the medial wall of cylinder and seal.
Several grooves are offered on the lateral wall of described rotation dish.
The circle centre position of described rotation dish is vertically and fixedly provided with a circular shaft, the lower end set of described circular shaft Being provided with a polygonal resilient sleeve, the circle centre position of described fixed disk is vertically and fixedly provided with an axle sleeve, Described axle sleeve is sheathed on described polygonal resilient sleeve.
A gap is offered on the sidewall of described polygonal resilient sleeve.
Compared with prior art, the invention have the advantages that
1, rubber 70%-75%, accelerator 1.5%, white carbon black 10%-20%, calcium carbonate are used 5%-8%, zinc oxide 2%-3%, Tissuemat E 1.5%, Pulvis Talci 1%, iron powder 5%-9% The service life of made sealing ring is longer.
2, owing to being provided with elastic component, therefore cutting time, cutter by sealing strip cut off with During conveyer belt contact, elastic component can deform upon, between cutter can be avoided because of conveyer belt Rigid collision and cause abrasion, improve cutting-tool's used life;
3, being to rotate to be arranged on movable block due to tool rest, and four sides of tool rest set It is equipped with different cutters, therefore can rotate tool rest and select corresponding cutter according to actual needs Tool, thus improve the versatility of bale splitter;
4, owing to being designed with dust exhaust apparatus, the fixing suction nozzle in dust exhaust apparatus can siphon away to be cut Cut the waste material at place, and mobile suction nozzle is available for operator and grips the ground moving to need cleaning Side, thus improve the tidiness of complete machine, it is to avoid there is clamping stagnation in the motion vice division chief of machine;
5, owing to being designed with wind-force adjustment structure, can as required during use, rotary motion Dish, intersects area between air inlet with external admission hole in regulation, thus plays energy-conservation work With.
Accompanying drawing explanation
Fig. 1 is the structural representation of bale splitter in embodiment.
Fig. 2 is the structural representation of cutter sweep in embodiment.
Fig. 3 is the schematic diagram of wind-force adjustment structure in embodiment.
In figure, 1, base;2, column;3, cross bar;4, mounting seat;5, movable block; 6, tool rest;7, cutter;8, wind sucting tube;9, fixing suction nozzle;10, air-breathing is moved Pipe;11, fixed disk;12, rotation dish;13, interior air inlet;14, external admission hole; 15, cylinder;16, stage clip;17, guide rod;18, rotational pin;19, ratchet;20、 Ratchet;21, circular scale;22, pointer;23, bar hole;24, fastening bolt; 25, elastic jaw;26, rubbish pour spout;27, cover plate;28, observation window;29、 Groove;30, circular shaft;31, polygonal resilient sleeve;32, axle sleeve;33, gap; 34, conveyer belt.
Detailed description of the invention
The following is the specific embodiment of the present invention and combine accompanying drawing, the technical side to the present invention Case is further described, but the present invention is not limited to these embodiments.
The manufacture method of high ferro hub bearing sealing ring, the method comprises the following steps: a, Prepare raw material, prepare following material by weight: rubber 70%-75%, accelerator 1.5%, White carbon black 10%-20%, calcium carbonate 5%-8%, zinc oxide 2%-3%, Tissuemat E 1.5% are sliding Stone powder 1%, iron powder 5%-9%;Above material percentage ratio sum is one of percentage hundred;
B, sulfidization molding;The raw material prepared in step a is poured in vulcanizer, at sulfur Under the effect of change machine, raw material is become a sealing strip;
C, cut into sealing ring;Sealing strip is cut into a bit of by bale splitter;
D, by mould the sealing strip cutting into segment is processed cost high ferro hub spindle Hold sealing ring.
In the present embodiment, rubber 72%, accelerator 1.5%, white carbon black 10%, calcium carbonate 5%, zinc oxide 3%, Tissuemat E 1.5%, Pulvis Talci 1%, iron powder 6%.
As shown in Figure 1, Figure 2, Figure 3 shows, the bale splitter in step c includes base 1, the end Being provided with conveyer belt 34 on seat 1, the both sides of base 1 are respectively arranged with a column 2, and two A cross bar 3 it is provided with between root post 2.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes: cutter sweep, cutting dress Put and include mounting seat 4, be provided with between mounting seat 4 and cross bar 3 driving this installation Seat 4 lifting driving sources, the two ends of mounting seat 4 respectively by elastic component connect have for Installing the movable block 5 of cutter head, elastic component is vertically arranged.
Specifically, in the present embodiment, driving source includes the cylinder vertically arranged 15, the cylinder body of cylinder 15 is fixed on cross bar 3, the piston rod of cylinder 15 and mounting seat 4 are connected.As other scheme, driving source includes electric magnet, and the body of electric magnet is solid On cross bar 3, the mandrel of electric magnet is connected with mounting seat 4.
As preferably, elastic component includes that stage clip 16, the upper end of stage clip 16 are fixed on installation On seat 4, the lower end of stage clip 16 is connected with movable block 5;Cutter sweep also includes guide rod 17, the upper end of guide rod 17 is through stage clip 16 and is fixed in mounting seat 4, guide rod 17 Lower end be positioned at stage clip 16.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes cutter head, and cutter head includes one section The tool rest 6 that face is square, the two ends of tool rest 6 rotate and are arranged on two movable blocks 5, And can be relatively fixed and get loose between tool rest 6 and movable block 5, four sides of tool rest 6 It is respectively arranged with variform cutter 7.
Specifically, in the present embodiment, the two ends of tool rest 6 are respectively by a rotational pin 18 It is rotationally connected with movable block 5, and on rotational pin 18, is arranged with ratchet 19, movable block 5 On be provided with the ratchet 20 being meshed with ratchet 19.As other scheme, movable block 5 On offer installing hole, the two ends of tool rest 6 are provided with and rotate the damping that is arranged in through hole Axle.
As further preferably, movable block 5 is provided with circular scale 21, ratchet 19 On be provided with the pointer 22 corresponding with circular scale 21;Offer and spiral shell on cutter 7 In the bar hole 23 that pit is corresponding, screwed hole and bar hole corresponding thereto 23 together Time be plugged with fastening bolt 24.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes dust exhaust apparatus, dust exhaust apparatus Including wind sucting tube 8, fixing suction nozzle 9 and mobile suction nozzle 10, wind sucting tube 8 is arranged at On base 1, the inner of fixing suction nozzle 9 is connected with wind sucting tube 8, fixing suction nozzle The outer end of 9 is towards the lower section of cutter head, and mobile suction nozzle 10 is flexible pipe, and this moves air-breathing The inner of pipe 10 is connected with wind sucting tube 8, and this outer end moving suction nozzle 10 is unsettled End.
Specifically, the sidewall of base 1 is provided with a semiorbicular elastic jaw 25, inhales Air duct 8 can be connected in elastic jaw 25;The bottom of wind sucting tube 8 offers rubbish and inclines It is additionally provided with for closing this rubbish pour spout 26 on mouth 26, and this wind sucting tube 8 Cover plate 27;Cover plate 27 is rounded, and one end of cover plate 27 is articulated with on wind sucting tube 8, lid The other end of plate 27 removably connects with wind sucting tube 8;The sidewall of wind sucting tube 8 is along wind sucting tube The length direction of 8 is provided with transparent observation window 28.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes wind-force adjustment structure, wind-force Adjustment structure includes fixed disk 11 and the rotation dish 12 being arranged in wind sucting tube 8, fixing Dish 11 is fixed on the end of wind sucting tube 8, and rotation dish 12 rotates and is arranged at fixed disk 11 On, in fixed disk 11 and rotation dish 12 offer respectively, air inlet 13 is with outer Air inlet 14, interior air inlet 13 and the intracavity inter-connection of wind sucting tube 8, external admission hole 14 Towards the air inlet stating wind sucting tube 8.The lateral wall of fixed disk 11 is arranged with a sealing ring, Make to be formed between the medial wall of fixed disk 11 and wind sucting tube 8 to seal;Outside rotation dish 12 Several grooves 29 are offered on sidewall.The circle centre position of rotation dish 12 is vertically and fixedly provided with one Circular shaft 30, the lower end of circular shaft 30 is arranged with a polygonal resilient sleeve 31, fixed disk 11 Circle centre position be vertically and fixedly provided with an axle sleeve 32, axle sleeve 32 is sheathed on polygonal resilient sleeve On 31;A gap 33 is offered on the sidewall of polygonal resilient sleeve 31.The present invention's Operation principle is as follows: in the application, support member, base plate and bottle cap riser three combine shape Become a framework triangular in shape and adjacent be the most all hinged, can basis The riko cover demand of differing heights bottle cap, rotates handwheel and drives screw mandrel to rotate, thus drive frame Body slides relative to connecting plate, thus regulates the length that support member is overall, and then regulation bottle cap Corner dimension between riser and base plate, so that this capping machine can adapt to different high The riko cover demand of degree bottle cap.
Sealing strip, when cutting, can be delivered under cutter sweep by bale splitter by conveyer belt Side, drives source to drive mounting seat to decline, and band dynamic cutter head synchronizes to decline, thus by sealing strip Cut off.
Specific embodiment described herein is only to present invention spirit theory for example Bright.Those skilled in the art can be to described specific embodiment Make various amendment or supplement or use similar mode to substitute, but without departing from The spirit of the present invention or surmount scope defined in appended claims.

Claims (10)

1. the manufacture method of high ferro hub bearing sealing ring, it is characterised in that the method bag Include following steps: a, prepare raw material, prepare following material by weight: rubber 70%-75%, Accelerator 1.5%, white carbon black 10%-20%, calcium carbonate 5%-8%, zinc oxide 2%-3%, poly-second Alkene wax 1.5%, Pulvis Talci 1%, iron powder 5%-9%;Above material percentage ratio sum is percentage One of hundred;
B, sulfidization molding;The raw material prepared in step a is poured in vulcanizer, at sulfur Under the effect of change machine, raw material is become a sealing strip;Described bale splitter includes base (1), Being provided with conveyer belt (34) on described base (1), the both sides of described base (1) are respectively It is provided with a column (2), between two described columns (2), is provided with a cross bar (3); It is characterized in that, described bale splitter also includes: cutter sweep, and described cutter sweep includes Mounting seat (4), is provided with between described mounting seat (4) and cross bar (3) driving The driving source that this mounting seat (4) lifts, the two ends of described mounting seat (4) are passed through respectively Elastic component connects the movable block (5) for installing cutter head, and described elastic component is along vertically side To setting;Cutter head, described cutter head includes the tool rest (6) that a cross section is square, described The two ends of tool rest (6) rotate and are arranged on two described movable blocks (5), and tool rest (6) And movable block can be relatively fixed and get loose between (5), four sides of described tool rest (6) Face is respectively arranged with variform cutter (7);Dust exhaust apparatus, described dust exhaust apparatus bag Include wind sucting tube (8), fixing suction nozzle (9) and mobile suction nozzle (10), described air draught Cylinder (8) is arranged on base (1), and the inner of described fixing suction nozzle (9) is with described Wind sucting tube (8) is connected, and the outer end of described fixing suction nozzle (9) is towards described cutter head Lower section, described mobile suction nozzle (10) is flexible pipe, and this moves suction nozzle (10) The inner be connected with wind sucting tube (8), this outer end moving suction nozzle (10) is unsettled End;Wind-force adjustment structure, described wind-force adjustment structure includes being arranged at described wind sucting tube (8) Interior fixed disk (11) and rotation dish (12), described fixed disk (11) is fixed on air draught The end of cylinder (8), described rotation dish (12) rotates and is arranged at described fixed disk (11) On, enter in described fixed disk (11) and rotation dish (12) offer several respectively Pore (13) and external admission hole (14), described interior air inlet (13) and wind sucting tube (8) Intracavity inter-connection, described external admission hole (14) is towards the air inlet stating wind sucting tube (8);
C, cut into sealing ring;Sealing strip is cut into a bit of by bale splitter;
D, by mould the sealing strip cutting into segment is processed cost high ferro hub spindle Hold sealing ring.
The manufacture method of high ferro hub bearing sealing ring the most according to claim 1, It is characterized in that, described driving source includes the cylinder (15) vertically arranged, described The cylinder body of cylinder (15) is fixed on cross bar (3), the piston rod of described cylinder (15) It is connected with described mounting seat (4).
The manufacture method of high ferro hub bearing sealing ring the most according to claim 1, It is characterized in that, described driving source includes that electric magnet, the body of described electric magnet are fixed on On described cross bar (3), the mandrel of described electric magnet is connected with described mounting seat (4).
4. according to the system of the high ferro hub bearing sealing ring described in claim 1 or 2 or 3 Make method, it is characterised in that described elastic component includes stage clip (16), described stage clip (16) Upper end be fixed in mounting seat (4), the lower end of described stage clip (16) and described movement Block (5) is connected;Described cutter sweep also includes guide rod (17), described guide rod (17) Upper end through described stage clip (16) and being fixed in mounting seat (4), described guide rod (17) Lower end be positioned at stage clip (16).
The manufacture method of high ferro hub bearing sealing ring the most according to claim 1, It is characterized in that, described movable block (5) offers installing hole, described tool rest (6) Two ends be provided with rotation be arranged at the damping shaft in described through hole.
The manufacture method of high ferro hub bearing sealing ring the most according to claim 1, It is characterized in that, the two ends of tool rest (6) are respectively by a rotational pin (18) and described shifting Motion block (5) is rotationally connected, and is arranged with ratchet (19) on described rotational pin (18), The ratchet (20) being meshed with described ratchet (19) it is provided with on described movable block (5).
The manufacture method of high ferro hub bearing sealing ring the most according to claim 6, It is characterized in that, described movable block (5) is provided with circular scale (21), described spine It is provided with the pointer (22) corresponding with described circular scale (21) on wheel (19);Institute State and on cutter (7), offer the bar hole (23) corresponding with described screwed hole, described It is plugged with fastening bolt (24) in screwed hole and bar hole (23) corresponding thereto simultaneously.
The manufacture method of high ferro hub bearing sealing ring the most according to claim 1, It is characterized in that, the sidewall of described base (1) is provided with a semiorbicular elastic jaw (25) in, described wind sucting tube (8) can be connected in described elastic jaw (25);Institute The bottom stating wind sucting tube (8) offers rubbish pour spout (26), and this wind sucting tube (8) On be additionally provided with the cover plate (27) for closing this rubbish pour spout (26);Described cover plate (27) rounded, one end of described cover plate (27) is articulated with on described wind sucting tube (8), The other end of described cover plate (27) removably connects with wind sucting tube (8);Described wind sucting tube (8) sidewall is provided with transparent observation window (28) along the length direction of wind sucting tube (8).
9. according to the making side of the high ferro hub bearing sealing ring described in claim 1 or 4 Method, it is characterised in that the lateral wall of described fixed disk (11) is arranged with a sealing ring, Make to be formed between the medial wall of described fixed disk (11) and wind sucting tube (8) to seal;Described Several grooves (29) are offered on the lateral wall of rotation dish (12).
The manufacture method of high ferro hub bearing sealing ring the most according to claim 9, It is characterized in that, the circle centre position of described rotation dish (12) is vertically and fixedly provided with a circular shaft (30), The lower end of described circular shaft (30) is arranged with a polygonal resilient sleeve (31), described fixing The circle centre position of dish (11) is vertically and fixedly provided with an axle sleeve (32), and described axle sleeve (32) is sheathed On described polygonal resilient sleeve (31);Described polygonal resilient sleeve (31) A gap (33) is offered on sidewall.
CN201610297820.0A 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring Active CN105972215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610297820.0A CN105972215B (en) 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610297820.0A CN105972215B (en) 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring

Publications (2)

Publication Number Publication Date
CN105972215A true CN105972215A (en) 2016-09-28
CN105972215B CN105972215B (en) 2017-12-22

Family

ID=56991981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610297820.0A Active CN105972215B (en) 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring

Country Status (1)

Country Link
CN (1) CN105972215B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0976510B1 (en) * 1998-07-29 2005-03-30 Aichele Werkzeuge GmbH Rotary cutting device
CN104151737A (en) * 2014-07-30 2014-11-19 广州亮健文具有限公司 Preparation method of composite board
CN204566193U (en) * 2015-04-08 2015-08-19 河北长丰橡塑制品有限公司 Weather strip for automobile end device for excising
CN104910454A (en) * 2015-06-05 2015-09-16 浙江翔宇密封件有限公司 Automobile hub bearing seal ring and manufacturing technique thereof
CN104987561A (en) * 2015-07-09 2015-10-21 安徽嘉阳塑胶有限公司 Production method for thermoplastic elastomer based on ethylene propylene rubber reclaimed rubber
CN204712108U (en) * 2015-06-11 2015-10-21 河北贵航鸿图汽车零部件有限公司 A kind of sealing strip cutter sweep of improvement
CN105237826A (en) * 2015-11-11 2016-01-13 鲁一军 Seal ring manufacturing technology
CN204976844U (en) * 2015-08-05 2016-01-20 领胜电子科技(成都)有限公司 Automatic cross cutting machine of wasting discharge

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0976510B1 (en) * 1998-07-29 2005-03-30 Aichele Werkzeuge GmbH Rotary cutting device
CN104151737A (en) * 2014-07-30 2014-11-19 广州亮健文具有限公司 Preparation method of composite board
CN204566193U (en) * 2015-04-08 2015-08-19 河北长丰橡塑制品有限公司 Weather strip for automobile end device for excising
CN104910454A (en) * 2015-06-05 2015-09-16 浙江翔宇密封件有限公司 Automobile hub bearing seal ring and manufacturing technique thereof
CN204712108U (en) * 2015-06-11 2015-10-21 河北贵航鸿图汽车零部件有限公司 A kind of sealing strip cutter sweep of improvement
CN104987561A (en) * 2015-07-09 2015-10-21 安徽嘉阳塑胶有限公司 Production method for thermoplastic elastomer based on ethylene propylene rubber reclaimed rubber
CN204976844U (en) * 2015-08-05 2016-01-20 领胜电子科技(成都)有限公司 Automatic cross cutting machine of wasting discharge
CN105237826A (en) * 2015-11-11 2016-01-13 鲁一军 Seal ring manufacturing technology

Also Published As

Publication number Publication date
CN105972215B (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN206843013U (en) A kind of efficient cap rotating device of plastic bottle closure
CN211165158U (en) Prevent unedged injection mold of thimble
CN113458863B (en) Use method of machine tool spindle
CN105835102A (en) Rubber cutting machine for sealing rings
CN101347847A (en) Electric miter saw
CN105922314B (en) A kind of bale splitter of improved sealing ring
CN101670639B (en) Fully automatic moulding press for moulding small plastic parts
CN105922305A (en) Manufacturing method for low-temperature-resistance bearing seal rings
CN206858109U (en) A kind of plastic bottle AutoCappingmachine
CN207508627U (en) Piston assembly assembly equipment after a kind of
CN105972215A (en) Manufacturing method for high-speed rail hub bearing sealing ring
CN105840663A (en) Manufacturing method for bearing sealing rings of automobile transmissions
CN202447541U (en) Edge covering driving mechanism of edge covering machine
CN210362531U (en) High-speed rotary melting machine for floating ball sealing cover
CN209209081U (en) A kind of powder of lacquer putty for use on automatic filling machine
CN104827139B (en) The bin device of bushing automatic tapping machine
CN207645380U (en) The Dumpage type extra-high tension unit of automatic opening
CN206937744U (en) A kind of extruded mould dust arrester
CN104259409B (en) A kind of ingot mould endoporus sweeps grinding machine
CN209125912U (en) A kind of bottleneck trimming device
CN2792745Y (en) Vulcanizing segmented mould of tyre
CN204171314U (en) A kind of ingot mould endoporus sweeps grinding machine
CN107804716A (en) A kind of Dumpage type extra-high tension unit of automatic opening
CN204209077U (en) A kind of ingot mould endoporus sweeps mill apparatus
CN205572508U (en) Cutting device in bale splitter of sealing washer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.26 Xinxing Road, Haining Agricultural Comprehensive Development Zone, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Xiangyu seal Co.,Ltd.

Address before: No.26 Xinxing Road, Haining Agricultural Comprehensive Development Zone, Jiaxing City, Zhejiang Province

Patentee before: XIANGYU SEAL PARTS Co.,Ltd.

CP01 Change in the name or title of a patent holder