CN105971301B - A kind of gap provisions for grouting for building - Google Patents

A kind of gap provisions for grouting for building Download PDF

Info

Publication number
CN105971301B
CN105971301B CN201610310008.7A CN201610310008A CN105971301B CN 105971301 B CN105971301 B CN 105971301B CN 201610310008 A CN201610310008 A CN 201610310008A CN 105971301 B CN105971301 B CN 105971301B
Authority
CN
China
Prior art keywords
shower nozzle
grouting
building
gap
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610310008.7A
Other languages
Chinese (zh)
Other versions
CN105971301A (en
Inventor
范含晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongxing Building Materials Technology Co ltd
Original Assignee
Wenling Jinpeng Daily Commodity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenling Jinpeng Daily Commodity Co Ltd filed Critical Wenling Jinpeng Daily Commodity Co Ltd
Priority to CN201610310008.7A priority Critical patent/CN105971301B/en
Publication of CN105971301A publication Critical patent/CN105971301A/en
Application granted granted Critical
Publication of CN105971301B publication Critical patent/CN105971301B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Abstract

A kind of gap provisions for grouting for building, for building gap(1)It is in the milk, including pedestal(9)And pass through supporting device for sluing mechanisms(88)And with the pedestal(9)Rear wall connection nozzle connecting device(8), wherein, the nozzle connecting device(8)Including clamping cavity with slip(80)Sprinkler rotation drive shell(89), it is described to slide clamping cavity(80)In be sliding combined with shower nozzle motion driving sliding block(6).

Description

A kind of gap provisions for grouting for building
Technical field
The present invention relates to building field, specially a kind of gap provisions for grouting for building.
Background technology
In building field, it usually needs to being in the milk at the gap or gap of building, to strengthen building entirety Steadiness and avoid the later stage of building from damaging.The length in these gaps is often shorter but quantity is more, therefore is unsuitable for The walking mechanism of long stroke carries out automatic filling.It can use and wave the gap perfusion that reciprocating perfusion carries out short stroke.But This has the following problems.Because the bearing of trend in gap is straight longitudinally, and it is then circular arc to wave reciprocating Shape, this causes the perfusion distance for gap(Irrigate the spacing between shower nozzle and gap)Change.Perfusion beginning and At the end of irrigate it is in larger distance and perfusion centre position perfusion it is in small distance.This gives the behaviour of pouring quality and filling process Cause difficulty.
The content of the invention
It is of the prior art above-mentioned scarce for overcoming it is an object of the invention to provide a kind of gap provisions for grouting for building Fall into.
According to the present invention, a kind of gap provisions for grouting for building, for building gap be in the milk, including pedestal and By supporting device for sluing mechanisms and the nozzle connecting device that is connected with the rear wall of the pedestal, wherein, the nozzle connecting device bag Include and shower nozzle motion driving is sliding combined with clamping cavity with the sprinkler rotation drive shell for sliding clamping cavity, described slide Sliding block, the shower nozzle, which moves, drives the fluid passage that fore-and-aft direction extension is provided with sliding block to connect with grouting Showerhead Fluid Logical, the upper side of the shower nozzle motion driving sliding block located at described by sliding the top pressure spring in clamping cavity to be compressed Effect is so as to be installed on the end for the top pressure arm for moving the downside of driving sliding block in the shower nozzle and integrally protruding using rotation The top pressure roller at place is fixedly arranged on the internal face in the curved profile portion at the lower wall of the pedestal to be resisted against, the sprinkler rotation It is described so as to drive to be engaged with the gear driven by rotating motor that the bottom of drive shell is provided with gear wheel segment Sprinkler rotation drive shell is rotated, and the rotating motor is fixedly connected with the pedestal, and the shower nozzle motion driving is slided Two relative lateral surfaces of the left and right of block coordinate respectively with two or so the relative medial surfaces slided in clamping cavity from And slideably driven by the rotation of the sprinkler rotation drive shell, the front end of the fluid passage extends through the shower nozzle The antetheca of drive shell is rotated to be connected with grouting source, wherein, the curve shape of the internal face in the curved profile portion is ellipse Shape section, the curve shape of the outside wall surface relative with the internal face in the curved profile portion is circular segments, thus, works as institute When stating grouting shower nozzle and being in on the orthogonal direction in the building gap, the curved profile portion connects with the top pressure roller Touch wall thickness possessed by opening position and be less than wall thickness possessed by two side positions of the contact position.
By such scheme, as a result of the shower nozzle motion driving sliding block that can be slided in the lumen, profile portion is utilized Regulation driving left and right, can be at the position that the oval circular arc relative to outside of inner side is lifted up(As both ends)Form wall At thick thickening, therefore can be at the beginning and end of perfusion by shower nozzle ejection forward, so as to compensate due to arc swing and shape Into at the beginning and end of shower nozzle perfusion apart from it is excessive the problem of, and can perfusion centre position make it that shower nozzle is relative Recession, so that perfusion is apart from relatively reduced.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the gap provisions for grouting for building of the present invention;
Fig. 2 is schematic cross-section of the device at arrow locations in Fig. 1.
Embodiment
With reference to Fig. 1-2, the present invention is described in detail.
A kind of gap provisions for grouting for building according to an embodiment of the invention, for being in the milk to building gap 1, wrap Include pedestal 9 and by supporting device for sluing mechanisms 88 and the nozzle connecting device 8 that is connected with the rear wall of the pedestal 9, wherein, it is described Nozzle connecting device 8 is included with the sprinkler rotation drive shell 89 for sliding clamping cavity 80, described to slide in clamping cavity 80 Shower nozzle motion driving sliding block 6 is sliding combined with, the fluid that fore-and-aft direction extension is provided with the shower nozzle motion driving sliding block 6 leads to To be in fluid communication with grouting shower nozzle 66, the upper side of the shower nozzle motion driving sliding block 6 passes through located at the slip clamp in road 60 Hold the top pressure spring 83 in cavity 80 and compressed effect and move driving sliding block 6 in the shower nozzle so as to be installed on using rotation Downside and the top pressure roller 62 of the end of top pressure arm 61 that integrally protrudes is fixedly arranged on the lower wall of the pedestal 9 to be resisted against On the internal face 912 in the curved profile portion 91 at place, the bottom of the sprinkler rotation drive shell 89 is provided with gear wheel segment 81 and used It is described to be engaged with the gear 71 driven by rotating motor 72 so as to drive the sprinkler rotation drive shell 89 to rotate Rotating motor 72 is fixedly connected with the pedestal 9, and the shower nozzle motion drives two relative outsides of the left and right of sliding block 6 Face coordinates so as to slideably by the shower nozzle with two or so the relative medial surfaces slided in clamping cavity 80 respectively The rotation driving of drive shell 89 is rotated, the front end of the fluid passage 60 extends through the sprinkler rotation drive shell 89 Antetheca to be connected with grouting source, wherein, the curve shape of the internal face 912 in the curved profile portion 91 is oval section, institute The curve shape for stating the outside wall surface 911 relative with the internal face 912 in curved profile portion 91 is circular segments, thus, works as institute When stating on the direction that grouting shower nozzle 66 is in orthogonal with the building gap 1, the curved profile portion 91 is rolled with the top pressure Wall thickness 100 is less than wall thickness possessed by two side positions of the contact position possessed by the contact position of wheel 62.
It is valuably or exemplary, wherein, when the grouting shower nozzle 66 is on vertical direction, the curved profile portion 91 There is minimum wall thickness (MINI W.) with the contact position of the top pressure roller 62.
It is valuably or exemplary, wherein, the curve shape of the internal face 912 is with the vertical direction of minimum wall thickness (MINI W.) opening position Axis and it is symmetrical.
By such scheme, as a result of the shower nozzle motion driving sliding block that can be slided in the lumen, profile portion is utilized Regulation driving left and right, can be that both ends form wall thickness at the position that the oval circular arc relative to outside of inner side is lifted up At thickening, therefore it can be formed at the beginning and end of perfusion by shower nozzle ejection forward so as to compensate due to arc swing At the beginning and end of shower nozzle perfusion apart from it is excessive the problem of, and can perfusion centre position cause shower nozzle relatively after Remove, so that perfusion is apart from relatively reduced.Whole device is simple and reliable for structure, stable and easy to use, Neng Gouyou Effect solves above mentioned problem of the prior art, improves pouring quality.
Those skilled in the art can be clear and definite, can in the case of the overall spirit of the present invention and design is not departed from To make the various modifications for above example.It is each fallen within protection scope of the present invention.The protection scheme of the present invention It is defined by claims appended hereto.

Claims (3)

  1. A kind of 1. gap provisions for grouting for building, for building gap(1)It is in the milk, it is characterised in that:Including pedestal(9) And pass through supporting device for sluing mechanisms(88)And with the pedestal(9)Rear wall connection nozzle connecting device(8), wherein, it is described Nozzle connecting device(8)Including clamping cavity with slip(80)Sprinkler rotation drive shell(89), it is described to slide clamping sky Chamber(80)In be sliding combined with shower nozzle motion driving sliding block(6), the shower nozzle motion driving sliding block(6)Inside it is provided with fore-and-aft direction The fluid passage of extension(60)To be in the milk shower nozzle(66)It is in fluid communication, the shower nozzle motion driving sliding block(6)Upper side By sliding clamping cavity located at described(80)In top pressure spring(83)And effect is compressed, so as to be installed on using rotation The shower nozzle motion driving sliding block(6)Downside and the top pressure arm that integrally protrudes(61)End top pressure roller(62)Come It is resisted against and is fixedly arranged on the pedestal(9)Lower wall at curved profile portion(91)Internal face(912)On, the sprinkler rotation drives Dynamic housing(89)Bottom be provided with gear wheel segment(81)To with by rotating motor(72)The gear of driving(71)Nibble Close so as to drive the sprinkler rotation drive shell(89)Rotate, the rotating motor(72)With the pedestal(9)Gu Fixed connection, the shower nozzle motion driving sliding block(6)Relative two lateral surfaces in left and right slide clamping cavity with described respectively (80)In two or so relative medial surfaces coordinate so as to slideably by the sprinkler rotation drive shell(89)Rotation Driving, the fluid passage(60)Front end extend through the sprinkler rotation drive shell(89)Antetheca with grouting source connect Connect, wherein, the curved profile portion(91)Internal face(912)Curve shape be oval section, the curved profile portion (91)With the internal face(912)Relative outside wall surface(911)Curve shape be circular segments, thus, when the grouting Shower nozzle(66)In with the building gap(1)When on orthogonal direction, the curved profile portion(91)Rolled with the top pressure Wheel(62)Contact position at possessed by wall thickness(100)Less than wall thickness possessed by two side positions of the contact position.
  2. A kind of 2. gap provisions for grouting for building according to claim 1, it is characterised in that:When the grouting shower nozzle(66) When on vertical direction, the curved profile portion(91)With the top pressure roller(62)Contact position there is minimum wall thickness (MINI W.).
  3. A kind of 3. gap provisions for grouting for building according to claim 1 or 2, it is characterised in that:The internal face(912) Curve shape it is symmetrical with the axis of the vertical direction of minimum wall thickness (MINI W.) opening position.
CN201610310008.7A 2016-05-11 2016-05-11 A kind of gap provisions for grouting for building Active CN105971301B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610310008.7A CN105971301B (en) 2016-05-11 2016-05-11 A kind of gap provisions for grouting for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610310008.7A CN105971301B (en) 2016-05-11 2016-05-11 A kind of gap provisions for grouting for building

Publications (2)

Publication Number Publication Date
CN105971301A CN105971301A (en) 2016-09-28
CN105971301B true CN105971301B (en) 2018-01-16

Family

ID=56992915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610310008.7A Active CN105971301B (en) 2016-05-11 2016-05-11 A kind of gap provisions for grouting for building

Country Status (1)

Country Link
CN (1) CN105971301B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026987B (en) * 2021-03-22 2022-04-26 中国建筑第五工程局有限公司 Anti-leakage method for controlling stress crack of steel-concrete main structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04310362A (en) * 1991-04-03 1992-11-02 Howa Mach Ltd Polishing device for floor surface polishing machine or the like
DE19853179A1 (en) * 1998-11-19 2000-05-25 Desoi Gmbh Discharge device for hose used to inject sealing material into buildings, comprises detachable coupling piece connectable to suction nozzle, drainage line and far end of hose
JP2003343092A (en) * 2002-05-30 2003-12-03 Shimizu Corp Construction method for base-isolating existing building
WO2014012142A1 (en) * 2012-07-18 2014-01-23 Naylor Family Holdings Pty Ltd Atf Brett Naylor Investment Trust Repair assembly

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6732485B2 (en) * 2001-10-26 2004-05-11 Miles L. Lett Method and device for structural reinforcement
US7302779B2 (en) * 2003-07-17 2007-12-04 Jay Endre Method and apparatus for masonry chimney flue repair

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04310362A (en) * 1991-04-03 1992-11-02 Howa Mach Ltd Polishing device for floor surface polishing machine or the like
DE19853179A1 (en) * 1998-11-19 2000-05-25 Desoi Gmbh Discharge device for hose used to inject sealing material into buildings, comprises detachable coupling piece connectable to suction nozzle, drainage line and far end of hose
JP2003343092A (en) * 2002-05-30 2003-12-03 Shimizu Corp Construction method for base-isolating existing building
WO2014012142A1 (en) * 2012-07-18 2014-01-23 Naylor Family Holdings Pty Ltd Atf Brett Naylor Investment Trust Repair assembly

Also Published As

Publication number Publication date
CN105971301A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105971301B (en) A kind of gap provisions for grouting for building
CN105926973B (en) A kind of building gap provisions for grouting with LED spotlight
CN105822082B (en) A kind of controllable gap provisions for grouting
CN105822085B (en) A kind of building gap provisions for grouting of convenient use
CN105822081B (en) A kind of modified builds gap provisions for grouting
CN106013830B (en) It is a kind of to build the gap provisions for grouting used
CN105735670B (en) A kind of gap provisions for grouting for building with rotary connecting joint
CN105926970B (en) It is a kind of can noise reduction building gap provisions for grouting
CN105926969B (en) A kind of adjustable gap provisions for grouting for building
CN105888284B (en) A kind of gap provisions for grouting for building with control valve for fluids
CN105888285B (en) A kind of gap grouting system for building
CN105926971B (en) A kind of shock-absorbing type builds gap provisions for grouting
CN105952177B (en) A kind of damping provisions for grouting for building gap
CN105908951B (en) A kind of durable gap provisions for grouting
CN105804430B (en) A kind of heat radiating type builds gap provisions for grouting
CN105822084B (en) One kind building gap provisions for grouting
CN105822086B (en) A kind of provisions for grouting for building gap
CN105926966B (en) A kind of building gap provisions for grouting of dust removal
CN105926968B (en) It is a kind of with control valve for fluids and can noise reduction provisions for grouting
CN105908950B (en) A kind of gap provisions for grouting of dust removal damping
CN105952176B (en) A kind of controllable shock-absorbing type building gap provisions for grouting
CN105926965B (en) One kind building provisions for grouting
CN105926972B (en) A kind of building gap provisions for grouting with ventilating fan
CN105822087B (en) A kind of provisions for grouting for building gap
CN105839942B (en) It is a kind of can lamplight pointing building gap provisions for grouting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Fan Hanjing

Inventor before: Yuan Pengnuan

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171220

Address after: Taizhou City, Zhejiang province 317523 Guangming Village Zeguo town of Wenling city B District No. 28

Applicant after: WENLING JINPENG COMMODITY Co.,Ltd.

Address before: No. 276, four Tong Road, Shang Xi Town, Yiwu City, Jinhua, Zhejiang

Applicant before: YIWU MOYA OPTOELECTRONIC TECHNOLOGY CO.,LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201231

Address after: 251800 no.377, Gongye 2nd Road, economic development zone, Yangxin County, Binzhou City, Shandong Province

Patentee after: Shandong xinkaiyuan Technology Innovation Development Co.,Ltd.

Address before: 317523 No. 28, B District, Guangming Village, Ze Guo Town, Wenling City, Taizhou, Zhejiang.

Patentee before: WENLING JINPENG COMMODITY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220810

Address after: 251800 No. 333, Gongye 3rd road, economic development zone, Yangxin County, Binzhou City, Shandong Province

Patentee after: Shandong Zhongxing Building Materials Technology Co.,Ltd.

Address before: 251800 no.377, Gongye 2nd Road, economic development zone, Yangxin County, Binzhou City, Shandong Province

Patentee before: Shandong xinkaiyuan Technology Innovation Development Co.,Ltd.

TR01 Transfer of patent right