CN105971296B - A kind of method of Fast Installation upper layer and lower layer precast concrete column - Google Patents

A kind of method of Fast Installation upper layer and lower layer precast concrete column Download PDF

Info

Publication number
CN105971296B
CN105971296B CN201610357652.XA CN201610357652A CN105971296B CN 105971296 B CN105971296 B CN 105971296B CN 201610357652 A CN201610357652 A CN 201610357652A CN 105971296 B CN105971296 B CN 105971296B
Authority
CN
China
Prior art keywords
precast concrete
concrete column
lower layer
upper layer
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610357652.XA
Other languages
Chinese (zh)
Other versions
CN105971296A (en
Inventor
费权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Pengjian Precast Concrete Elements Co Ltd
SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Original Assignee
Shenzhen Pengjian Precast Concrete Elements Co Ltd
SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Pengjian Precast Concrete Elements Co Ltd, SHENZHEN PENGCHENG BUILDING GROUP CO Ltd filed Critical Shenzhen Pengjian Precast Concrete Elements Co Ltd
Priority to CN201610357652.XA priority Critical patent/CN105971296B/en
Publication of CN105971296A publication Critical patent/CN105971296A/en
Application granted granted Critical
Publication of CN105971296B publication Critical patent/CN105971296B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Abstract

A kind of method of Fast Installation upper layer and lower layer precast concrete column, when being intended to overcome bilevel precast concrete column installation in the prior art, the corresponding position of the grouting end bar and grout sleeve that cannot intuitively judge, it is easy to happen dislocation and the low disadvantage of operating efficiency, a kind of method of Fast Installation upper layer and lower layer precast concrete column is provided, following steps are specifically included:A. in the grouting end bar of lower layer's precast concrete column upper surface, select a reinforcing bar as spacer bar;B. addition and mark of the spacer bar with position correspondence in the precast concrete column of upper layer;C., upper layer precast concrete column is lifted on to the top of lower layer's precast concrete column, the placement position that when lifting identifies meets the position correspondence with spacer bar;D. lower layer's precast concrete column is inserted into the precast concrete column of upper layer, completes location and installation.The present invention has many advantages, such as rapid, efficient, is suitble to use when installing upper layer and lower layer precast concrete column.

Description

A kind of method of Fast Installation upper layer and lower layer precast concrete column
Technical field
The present invention relates to building industrialization field more particularly to a kind of sides of Fast Installation upper layer and lower layer precast concrete column Method.
Background technology
When carrying out bilevel precast concrete column installation, need the grouting end bar of lower layer's precast concrete column It is inserted into the grout sleeve of upper layer precast concrete column.Since grout sleeve is embedded in the precast concrete column of upper layer, Bu Nengzhi The corresponding position of judgement the grouting end bar and grout sleeve of sight, bilevel precast concrete column are easy to happen mistake when installing Position.In order to ensure to be in the milk, end bar is corresponded with grout sleeve, in hoisting process, is required a great deal of time in confirmation Whether lower two layers of precast concrete is put by corresponding position, and operating efficiency is low.
Invention content
The present invention overcomes when bilevel precast concrete column installation in the prior art, cannot intuitively judge Be in the milk the corresponding position of end bar and grout sleeve, is easy to happen dislocation and the low disadvantage of operating efficiency, provides a kind of fast The method of speed installation upper layer and lower layer precast concrete column.
The present invention realize goal of the invention the technical solution adopted is that:A kind of Fast Installation upper layer and lower layer precast concrete column Method, including adjacent both sides precast concrete column and installation are made, specifically include following steps:
A. lower layer's precast concrete column is made, in the grouting end bar of lower layer's precast concrete column upper surface, selects one For the reinforcing bar with distinguishing characteristics as spacer bar, the distinguishing characteristics is the own of reinforcing bar ontology to root compared with other reinforcing bars Feature or the feature artificially identified;
B. upper layer precast concrete column is made, the installation position according to the grouting end bar of lower layer's precast concrete column is pre-buried The grout sleeve of corresponding upper layer precast concrete column, position when correctly being installed based on upper layer and lower layer precast concrete column are closed System, addition and mark of the spacer bar described in step A with position correspondence in the precast concrete column of upper layer;
C., upper layer precast concrete column described in step B is lifted on to the upper of lower layer's precast concrete column described in step A Just, the placement position identified when lifting meets the position correspondence of spacer bar described in step B;
D., the grouting end bar of lower layer's precast concrete column described in step C is inserted into the grouting of upper layer precast concrete column In sleeve, location and installation is completed.
The beneficial effects of the invention are as follows:Due to being added in the precast concrete column of upper layer and lower layer precast concrete column Spacer bar has the mark of position correspondence, only it needs to be determined that mark is put in correct position when lifting.With it is existing For the grouting end bar that cannot intuitively judge having compared with the corresponding position of grout sleeve, the present invention can intuitively see mark Knowledge and spacer bar, the position relationship of the two is unique.After spacer bar is inserted into, other grouting end bars also can it is accurate, Quickly it is inserted into grout sleeve.While ensureing accurate installation, operating efficiency is greatly improved, is had rapidly, efficiently The advantages that.
The invention will be further described with specific implementation mode below in conjunction with the accompanying drawings:
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Fig. 2 is the scheme of installation one of the present invention.
Fig. 3 is the scheme of installation two of the present invention.
In attached drawing, 1 it is lower layer's precast concrete column, 2 is spacer bar, 3 is mark, 4 is upper layer precast concrete column, 5 It is grout sleeve for other grouting end bars, 6.
Specific implementation mode
As shown in Fig. 1, the method for a kind of Fast Installation upper layer and lower layer precast concrete column of the present embodiment, including make Adjacent both sides precast concrete column and installation, specifically include following steps:
A. lower layer's precast concrete column is made, in the grouting end bar of lower layer's precast concrete column upper surface, selects one For the reinforcing bar with distinguishing characteristics as spacer bar, the distinguishing characteristics is the own of reinforcing bar ontology to root compared with other reinforcing bars Feature or the feature artificially identified.Compared with artificial mark, selects the unique characteristics of reinforcing bar ontology as distinguishing characteristics, be more convenient Spacer bar is picked out rapidly in erecting bed.The preferred distinguishing characteristics of the present embodiment is the length in reserve of spacer bar than other Reinforcing bar is long, can be when making grouting end bar to realize this feature, and the length in reserve of spacer bar is longer than other reinforcing bars 10cm;
B. upper layer precast concrete column is made, the installation position according to the grouting end bar of lower layer's precast concrete column is pre-buried The grout sleeve of corresponding upper layer precast concrete column, position when correctly being installed based on upper layer and lower layer precast concrete column are closed System, addition and mark of the spacer bar described in step A with position correspondence in the precast concrete column of upper layer.In order to straight That sees sees that spacer bar and the correspondence of mark, the present embodiment preferably identify the grouting being arranged with spacer bar grafting On the pre-buried position of sleeve;
C., upper layer precast concrete column described in step B is lifted on to the upper of lower layer's precast concrete column described in step A Just, the placement position identified when lifting meets the position correspondence of spacer bar described in step B.Because of spacer bar and mark Between correspondence be that position relationship when correctly being installed based on upper layer and lower layer precast concrete column is determined, in subsequent peace During dress, unique correct installation site can be found by this correspondence;
D., the grouting end bar of lower layer's precast concrete column described in step C is inserted into the grouting of upper layer precast concrete column In sleeve, location and installation is completed.
According to the method for the present invention, when making the grouting end bar of lower layer's precast concrete column 1, a reserved length is made Spend than other long spacer bars 2 of grouting end bars 5, the length of other grouting end bars 5 is almost the same, spacer bar 2 it is pre- Stay length that can be longer than other grouting about 10cm of end bar 5, convenient for may recognize that spacer bar 2 at a glance.Make upper layer concrete When earth pillar 4, according to the pre-buried corresponding upper layer precast concrete in installation position of the grouting end bar of lower layer's precast concrete column 1 The grout sleeve 6 of column 4.Upper layer precast concrete column 4 after processing is completed, in the pre-buried of the grout sleeve 6 with 2 grafting of spacer bar Setting mark 3 on position.Together by the lifting of upper layer and lower layer precast concrete column, when lifting mark 3 it is opposite with spacer bar 2 It should be arranged.Finally, by upper layer and lower layer precast concrete column grafting.Since spacer bar 2 is higher than other grouting end bars 5, During grafting, spacer bar 2 can be first with 6 grafting of grout sleeve, and after a hole is accurately positioned, other grouting end bars 5 are just It can accurately be inserted into corresponding grout sleeve 6.Using the method, can constantly be superimposed upwards multiple prefabricated Concrete column greatly improves operating efficiency while ensureing accurate installation.

Claims (3)

1. a kind of method of Fast Installation upper layer and lower layer precast concrete column, including make adjacent two layers precast concrete column and peace Dress, which is characterized in that specifically include following steps:
A. make lower layer precast concrete column, in the grouting end bar of lower layer's precast concrete column upper surface, select one with Other reinforcing bars compare the reinforcing bar with distinguishing characteristics as spacer bar, and the distinguishing characteristics is the own feature of reinforcing bar ontology Or the feature artificially identified;
B. upper layer precast concrete column is made, the installation position according to the grouting end bar of lower layer's precast concrete column is pre-buried opposite The grout sleeve for the upper layer precast concrete column answered, position relationship when correctly being installed based on upper layer and lower layer precast concrete column, Addition has the mark of position correspondence with the spacer bar described in step A in the precast concrete column of upper layer;
C., upper layer precast concrete column described in step B is lifted on to the top of lower layer's precast concrete column described in step A, is hung The placement position identified when dress meets the position correspondence of spacer bar described in step B;
D., the grouting end bar of lower layer's precast concrete column described in step C is inserted into the grout sleeve of upper layer precast concrete column It is interior, complete location and installation.
2. a kind of method of Fast Installation upper layer and lower layer precast concrete column according to claim 1, which is characterized in that step Distinguishing characteristics described in rapid A is that the length in reserve of spacer bar is longer than other reinforcing bars.
3. a kind of method of Fast Installation upper layer and lower layer precast concrete column according to claim 1 or 2, feature exist In the mark is arranged on the pre-buried position of the grout sleeve with spacer bar grafting.
CN201610357652.XA 2016-05-26 2016-05-26 A kind of method of Fast Installation upper layer and lower layer precast concrete column Active CN105971296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610357652.XA CN105971296B (en) 2016-05-26 2016-05-26 A kind of method of Fast Installation upper layer and lower layer precast concrete column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610357652.XA CN105971296B (en) 2016-05-26 2016-05-26 A kind of method of Fast Installation upper layer and lower layer precast concrete column

Publications (2)

Publication Number Publication Date
CN105971296A CN105971296A (en) 2016-09-28
CN105971296B true CN105971296B (en) 2018-07-31

Family

ID=56956705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610357652.XA Active CN105971296B (en) 2016-05-26 2016-05-26 A kind of method of Fast Installation upper layer and lower layer precast concrete column

Country Status (1)

Country Link
CN (1) CN105971296B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106865387A (en) * 2017-03-09 2017-06-20 广东易佳梯科技有限公司 A kind of elevator hoistways prefabricated component

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493554A (en) * 2011-12-13 2012-06-13 北京城建中南土木工程集团有限公司 Abutting joint device of steel lattice column, and construction method of same
CN103306378A (en) * 2013-06-19 2013-09-18 泰兴市第一建筑安装工程有限公司 Construction method of multidirectional through concrete filled steel tubular column beam joint provided with steel corbels and ring beam
EP2414604B1 (en) * 2009-03-30 2014-09-10 Deer Park Engineering Limited Building construction method
CN104032967A (en) * 2014-06-30 2014-09-10 龙信建设集团有限公司 Hoisting construction method for prefabricated assembly-type frame structure members
CN204626993U (en) * 2015-05-19 2015-09-09 重庆交通建设(集团)有限责任公司 Cage of reinforcement positioner
CN204753815U (en) * 2015-05-29 2015-11-11 沈阳建筑大学 Simple and easy assembly quality of assembled precast concrete post

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2414604B1 (en) * 2009-03-30 2014-09-10 Deer Park Engineering Limited Building construction method
CN102493554A (en) * 2011-12-13 2012-06-13 北京城建中南土木工程集团有限公司 Abutting joint device of steel lattice column, and construction method of same
CN103306378A (en) * 2013-06-19 2013-09-18 泰兴市第一建筑安装工程有限公司 Construction method of multidirectional through concrete filled steel tubular column beam joint provided with steel corbels and ring beam
CN104032967A (en) * 2014-06-30 2014-09-10 龙信建设集团有限公司 Hoisting construction method for prefabricated assembly-type frame structure members
CN204626993U (en) * 2015-05-19 2015-09-09 重庆交通建设(集团)有限责任公司 Cage of reinforcement positioner
CN204753815U (en) * 2015-05-29 2015-11-11 沈阳建筑大学 Simple and easy assembly quality of assembled precast concrete post

Also Published As

Publication number Publication date
CN105971296A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
CN204098021U (en) A kind of deposited reinforced concrete pile reinforcing cage locator
CN105971296B (en) A kind of method of Fast Installation upper layer and lower layer precast concrete column
CA2693890A1 (en) A block wall system
CN109208921A (en) The localization method of building element assembled sleeve embedded bar
CN208844555U (en) Pulling-resistant type concrete tubular pile
CN102926553A (en) Method for reinforcing row-lock wall through adopting wire entanglement and cement mortar
CN106930278A (en) A kind of method that compromise joint pipe is used for support pile occlusion
CN207003803U (en) The single through hole precast shear wall of high-rise assembled and its assembling structure
CN109386009A (en) Equipment anchor bolt buries the construction tool and method of reserving hole
CN205414234U (en) Semi -automatic reinforcing bar bidirectionally curved device
CN108222285A (en) A kind of assembly concrete member reinforcing steel bar magnetic suspension connects localization method
CN205557857U (en) Troweling structure for treatment on junction part of concrete wall column and filler wall
CN205206299U (en) Outer wall body concrete placement template fixing device in upper strata of crossing department of floor
CN204531184U (en) For fixing the locator card of steel plastic compount anti-crack net in reinforced concrete wallboard
CN108086309B (en) Mini pile reinforcement cage installation method
CN104121423B (en) Construction method of U-shaped pipe diameter limit clamp in pore way embedment
CN209443601U (en) A kind of novel anchoring piece, the cast-in-situ wall containing steel wire frame plate
CN106087705B (en) Concrete hole post processing construction and its construction method
CN103953056A (en) Construction method for high-rise foundation
EP3009569B1 (en) Gabion
CN209195010U (en) U-bolt service sleeve constructing device
CN103982204A (en) Funneling construction method of high and large chamber
CN212801697U (en) Protection device of cast-in-place concrete pile detecting tube
CN215558280U (en) Hanging device for cast-in-place pile reinforcement cage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Ma Li

Inventor after: Zhang Chengliang

Inventor after: He Dongjin

Inventor after: Fei Quan

Inventor after: Cai Xijie

Inventor after: Wu Ziquan

Inventor before: Fei Quan

CB03 Change of inventor or designer information