CN105971013A - Pin-connected panel utility tunnel - Google Patents

Pin-connected panel utility tunnel Download PDF

Info

Publication number
CN105971013A
CN105971013A CN201610544863.4A CN201610544863A CN105971013A CN 105971013 A CN105971013 A CN 105971013A CN 201610544863 A CN201610544863 A CN 201610544863A CN 105971013 A CN105971013 A CN 105971013A
Authority
CN
China
Prior art keywords
pipe gallery
piping lane
pin
connected panel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610544863.4A
Other languages
Chinese (zh)
Inventor
张宗亮
曹以南
马仁超
崔稚
余俊阳
吴德新
王处军
李�荣
生永贞
易春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Kunming Engineering Corp Ltd
Original Assignee
PowerChina Kunming Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Kunming Engineering Corp Ltd filed Critical PowerChina Kunming Engineering Corp Ltd
Priority to CN201610544863.4A priority Critical patent/CN105971013A/en
Publication of CN105971013A publication Critical patent/CN105971013A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Pin-connected panel utility tunnel relates to municipal construction, especially a short, little pin-connected panel utility tunnel to environmental impact of on-the-spot construction period. The spliced type comprehensive pipe gallery is characterized by being formed by connecting at least one section of pipe gallery, wherein the pipe gallery is prefabricated in a factory, the interior of the pipe gallery is of a steel pipe welding structure, the exterior of the pipe gallery is formed by pouring concrete, the steel pipe welding structure comprises a plurality of circular pipes, the circular pipes are arranged in parallel, and reinforcing steel bars are welded between every two adjacent circular pipes. The assembled comprehensive pipe gallery is simple in structure, scientific in design and convenient to use, and during field construction, a pipe gallery prefabricated in a factory is directly sent into a tunnel and is assembled in the tunnel, so that the construction efficiency is improved; prefabricated piping lane of mill adopts the steel reinforced concrete structure, increases its bulk strength through inside ring canal, recycles steel bar welding between every ring canal, has effectively improved the holistic intensity of piping lane, increases life.

Description

Pin-connected panel pipe gallery
Technical field
The present invention relates to urban construction, the pin-connected panel pipe gallery that a kind of the site operation phase is short, effect on environment is little.
Background technology
Pipe gallery refers to build a tunnel space in the underground in city, is concentrated by the various municipal pipelines such as plumbing, combustion gas, electric power, communication and lays.This mode is by various pipeline centralized arrangement, facilitate pipeline performance management and plant maintenance, can avoid causing owing to burying underground or keep in repair pipeline road surface to repeat the trouble that excavation is brought, and the soil corrosion failure to pipeline can be avoided, thus also be extended the service life of pipeline.
Traditional pipe gallery typically uses armored concrete box version, scene one-piece casting during construction.Owing to pipe gallery is typically built in below the major trunk roads in city, using the construction method of on-the-spot one-piece casting, construction speed is slow, and difficulty of construction is big, and body's structure quality is wayward.Construction occupies road for a long time, and the traffic to city causes huge interference.Urban environment can be caused certain destruction by the airborne dust of construction time, noise etc..
Summary of the invention
The construction method being exactly existing pipe gallery and using on-the-spot one-piece casting to be solved by this invention, construction speed occupies road slowly, for a long time, the problem affecting urban transportation, it is provided that the pin-connected panel pipe gallery that a kind of the site operation phase is short, effect on environment is little.
The pin-connected panel pipe gallery of the present invention, it is characterized in that this pipe gallery is connected and composed by minimum one section of piping lane, piping lane is prefabricated in the factory, its internal employing steel-pipe welding structure, outside concrete casting forms, its steel-pipe welding structure includes that several endless tube, several endless tubes be arranged in parallel, is welded with reinforcing bar between adjacent two endless tubes.
Described endless tube includes face, four, upper and lower, left and right, and each between adjacent two endless tubes is minimum is welded with three reinforcing bars, improves the connectivity robustness between endless tube.
It is additionally provided with tongue and groove on described piping lane termination inwall, places sealing gasket in tongue and groove, improve, by sealing gasket, the seal that piping lane connects.
It is additionally provided with longitudinal stretch-draw hole on the end face of described piping lane termination, when adjacent two piping lanes connect, utilizes longitudinal stretch-draw hole to be attached, improve the tightness connected.
The pin-connected panel pipe gallery of the present invention, simple in construction, design science, easy to use, during site operation, directly the piping lane of prefabrication is sent into tunnel, carry out in tunnel assembling, improve efficiency of construction;The piping lane of prefabrication uses steel and concrete structure, increases its bulk strength by internal endless tube, recycles reinforcement welding, is effectively increased the intensity that piping lane is overall, increase service life between each endless tube.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Fig. 2 is steel-pipe welding structural representation of the present invention.
Fig. 3 is external structure schematic diagram of the present invention.
Wherein, endless tube 1, reinforcing bar 2, tongue and groove 3, stretch-draw hole 4.
Detailed description of the invention
Embodiment 1: a kind of pin-connected panel pipe gallery, this pipe gallery is connected and composed by minimum one section of piping lane, piping lane is prefabricated in the factory, its internal employing steel-pipe welding structure, outside concrete casting forms, its steel-pipe welding structure includes that several endless tube 1, several endless tubes 1 be arranged in parallel, is welded with reinforcing bar 2 between adjacent two endless tubes 1.Endless tube 1 includes face, four, upper and lower, left and right, and each between adjacent two endless tubes 1 is minimum is welded with three reinforcing bars 2, improves the connectivity robustness between endless tube 1.It is additionally provided with tongue and groove 3 on the inwall of piping lane termination, places sealing gasket in tongue and groove 3, improve, by sealing gasket, the seal that piping lane connects.It is additionally provided with longitudinal stretch-draw hole 4 on the end face of piping lane termination, when adjacent two piping lanes connect, utilizes longitudinal stretch-draw hole 4 to be attached, improve the tightness connected.

Claims (4)

1. a pin-connected panel pipe gallery, it is characterized in that this pipe gallery is connected and composed by minimum one section of piping lane, piping lane is prefabricated in the factory, its internal employing steel-pipe welding structure, outside concrete casting forms, its steel-pipe welding structure includes that several endless tube (1), several endless tubes (1) be arranged in parallel, is welded with reinforcing bar (2) between adjacent two endless tubes (1).
2. pin-connected panel pipe gallery as claimed in claim 1, it is characterized in that described endless tube (1) includes face, four, upper and lower, left and right, between adjacent two endless tubes (1) each is minimum is welded with three reinforcing bars (2), improves the connectivity robustness between endless tube (1).
3. pin-connected panel pipe gallery as claimed in claim 1, it is characterised in that be additionally provided with tongue and groove (3) on described piping lane termination inwall, places sealing gasket, improves, by sealing gasket, the seal that piping lane connects in tongue and groove (3).
4. pin-connected panel pipe gallery as claimed in claim 1, it is characterised in that be additionally provided with longitudinal stretch-draw hole (4) on the end face of described piping lane termination, when adjacent two piping lanes connect, utilizes longitudinal stretch-draw hole (4) to be attached, improves the tightness connected.
CN201610544863.4A 2016-07-12 2016-07-12 Pin-connected panel utility tunnel Pending CN105971013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610544863.4A CN105971013A (en) 2016-07-12 2016-07-12 Pin-connected panel utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610544863.4A CN105971013A (en) 2016-07-12 2016-07-12 Pin-connected panel utility tunnel

Publications (1)

Publication Number Publication Date
CN105971013A true CN105971013A (en) 2016-09-28

Family

ID=56951497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610544863.4A Pending CN105971013A (en) 2016-07-12 2016-07-12 Pin-connected panel utility tunnel

Country Status (1)

Country Link
CN (1) CN105971013A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759482A (en) * 2017-01-06 2017-05-31 重庆微轨科技有限公司 A kind of overall stainless steel structure type underground pipe gallery
CN108385725A (en) * 2018-04-28 2018-08-10 安徽砼宇特构科技有限公司 A kind of strong concrete piping lane

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100704609B1 (en) * 2006-01-25 2007-04-10 양학래 Structure of the precast concrete box culvert with complex functions
CN203798263U (en) * 2014-04-28 2014-08-27 中铁一局集团有限公司 Bamboo reinforced stone-retaining device for blasting protection
CN204530682U (en) * 2015-04-22 2015-08-05 中冶成都勘察研究总院有限公司 A kind of mechanical hole perfusion post
CN204626231U (en) * 2015-05-08 2015-09-09 中国电建集团贵阳勘测设计研究院有限公司 A steel pipe concrete box bridge that is used for high fill district anti large deformation
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN105507346A (en) * 2016-02-02 2016-04-20 济南汇富住宅工业有限公司 Prefabricated underground pipe gallery
CN205776350U (en) * 2016-07-12 2016-12-07 中国电建集团昆明勘测设计研究院有限公司 Pin-connected panel utility tunnel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100704609B1 (en) * 2006-01-25 2007-04-10 양학래 Structure of the precast concrete box culvert with complex functions
CN203798263U (en) * 2014-04-28 2014-08-27 中铁一局集团有限公司 Bamboo reinforced stone-retaining device for blasting protection
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN204530682U (en) * 2015-04-22 2015-08-05 中冶成都勘察研究总院有限公司 A kind of mechanical hole perfusion post
CN204626231U (en) * 2015-05-08 2015-09-09 中国电建集团贵阳勘测设计研究院有限公司 A steel pipe concrete box bridge that is used for high fill district anti large deformation
CN105507346A (en) * 2016-02-02 2016-04-20 济南汇富住宅工业有限公司 Prefabricated underground pipe gallery
CN205776350U (en) * 2016-07-12 2016-12-07 中国电建集团昆明勘测设计研究院有限公司 Pin-connected panel utility tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759482A (en) * 2017-01-06 2017-05-31 重庆微轨科技有限公司 A kind of overall stainless steel structure type underground pipe gallery
CN108385725A (en) * 2018-04-28 2018-08-10 安徽砼宇特构科技有限公司 A kind of strong concrete piping lane

Similar Documents

Publication Publication Date Title
CN103643966B (en) A kind of assembling tunnel lining segment
CN204098065U (en) A kind of can the precast assembly pipe gallery of stretch-draw in body
CN203702166U (en) Segment lining ring structure applicable to rectangular tunnel
CN204898721U (en) Steel construction city utility tunnel
CN105256838A (en) Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
WO2017071113A1 (en) Cement-soil mixing pile protected underground pipe gallery
CN105507346A (en) Prefabricated underground pipe gallery
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN104947714A (en) End sealing door structure for immersed tube tunnel
WO2008025200A1 (en) A prestressed concrete pipe unit with a steel socket and a steel spigot and a concrete pipe formed of such concrete pipe units
CN103696443B (en) Precast splice type manhole
CN202298488U (en) Internal supporting structure of bridges, culverts and tunnels
CN105971013A (en) Pin-connected panel utility tunnel
WO2017071111A1 (en) Underground pipe gallery protection structure
CN205839796U (en) Utility tunnel internode connection structure
CN105971014A (en) Steel construction city utility tunnel
CN205776350U (en) Pin-connected panel utility tunnel
CN105971016A (en) Utility tunnel internode connection structure
CN205776351U (en) Burst assembled steel-concrete structure utility tunnel
CN205776352U (en) Steel construction city utility tunnel
CN210380191U (en) Lightweight power communication combination prefabricated cable channel
CN104455889A (en) Integrated underground pipe gallery with compensation device
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN205348225U (en) Prefabricated assembled underground pipe gallery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928