CN105971000A - Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine - Google Patents

Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine Download PDF

Info

Publication number
CN105971000A
CN105971000A CN201610446822.1A CN201610446822A CN105971000A CN 105971000 A CN105971000 A CN 105971000A CN 201610446822 A CN201610446822 A CN 201610446822A CN 105971000 A CN105971000 A CN 105971000A
Authority
CN
China
Prior art keywords
platform
offshore wind
wind turbine
rock
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610446822.1A
Other languages
Chinese (zh)
Inventor
高宏飙
王健
郑则旺
李泽
张乐平
冯小星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Jiangsu Longyuan Offshore Wind Power Co Ltd
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Original Assignee
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD, Jiangsu Marine Longyuan Wind Power Generation Co Ltd filed Critical JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Priority to CN201610446822.1A priority Critical patent/CN105971000A/en
Publication of CN105971000A publication Critical patent/CN105971000A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a temporary construction platform of a rock-socketed single pile foundation of an offshore wind turbine. The temporary construction platform of the rock-socketed single pile foundation of the offshore wind turbine is a jacket structure formed by connecting four auxiliary tubular piles (2) and stay bars (6), and is characterized in that pile distances among the four auxiliary tubular piles (2) are 18 m, and the height of a jacket platform is 20 m; a second platform (5) and a first platform (4) are respectively arranged at positions which are distant from the top end of the jacket structure by 5 m and 2 m, and jacks are respectively mounted on the second platform (5) and the first platform (4) and are used for adjusting perpendicularity of a steel casing (1); a mudmat (3) is arranged at the bottom of the jacket structure; and a limiting component is arranged on the first platform (4), and brackets are shelved on the limiting component and stop the steel casing against sinking. By the temporary construction platform of the rock-socketed single pile foundation of the offshore wind turbine, the problem that the rock-socketed single pile foundation of the offshore wind turbine is difficult to construct on a rock supported sea floor with a shallow surface residual overburden is solved effectively, a powerful support is provided for introduction of an offshore wind turbine rock-socketed single pile foundation technology to the offshore wind powder industry, and project cost is reduced.

Description

A kind of offshore wind turbine embedding rock single-pile foundation temporary construction platform
Technical field
The present invention relates to the blower foundation technical field of construction of offshore wind farm industry, particularly relate to a kind of marine Blower fan embedding rock single-pile foundation temporary construction platform.
Background technology
From the maximum difference of land wind-power electricity generation, Oversea wind power generation is that both locations are different, by It is in sea in the basis of offshore wind farm unit, adds much extra load and uncertain factor, because of And design complex, version also due to different sea situations and diversified.Batholith sea bed offshore wind farm What the fixed basis of unit was the most frequently used has 2 kinds, embedding rock formula single pile, gravity type.Gravity type foundation needs Use the equipments such as large-scale " Scolopendra car " transport in the precasting yard, and large-scale floating crane, and domestic this type of Equipment lacks, the most domestic precedent that there is no the construction of offshore wind turbine foundation embedding rock single pile.
Accordingly, it is desirable to provide a kind of offshore wind turbine embedding rock single-pile foundation temporary construction platform solves above-mentioned asking Topic.
Summary of the invention
In order to solve this problem, the invention discloses a kind of offshore wind turbine embedding rock single-pile foundation temporary construction and put down Platform, it is at top layer eluvium shallower batholith sea bed, uses large-scale embedding rock drilling machine, take " brill-pitching pile- Grouting is fixing " construction time, it is provided that a kind of temporary construction platform shelving large-scale embedding rock drilling machine, for sea Wind-powered electricity generation industry introducing offshore wind turbine embedding rock single-pile foundation technology provides and provides powerful support for.A kind of embedding rock of offshore wind turbine Single-pile foundation temporary construction platform, it is connected and composed by four auxiliary pile tube (2) and strut (6) Jacket structure, it is characterised in that: the pilespacing between described four auxiliary pile tube (2) is 18m, conduit The a height of 20m of body panel;It is respectively provided with platform two in the position of distance jacket structure top 5m and 2m And platform one (4) (5), and it has been respectively mounted jack on platform two (5) and platform one (4), has been used for The perpendicularity of regulation steel pile casting (1);Mud mat (3) it is provided with bottom jacket structure;At platform one (4) arranging limit component on, bracket is shelved on limit component, organizes sinking steel protecting canister.
Embodiments of the present invention are:
1) embedding rock single-pile foundation temporary construction platform location sinking is installed, heavy by platform jacket location Enter four auxiliary pile tube (2);
2) sinking steel pile casting (1), uses vibration hammer to sink to a depthkeeping after carrying out leveling by steady stake platform Degree;
3) setting up rig to push up to steel pile casting (1), continuous drilling is to main body stake designed elevation;
4) in steel pile casting (1), single pile, cement injection mortar are put into;
5) catheterostat, auxiliary pile tube and steel pile casting (1), recycling are reclaimed.
Embedding rock drilling machine is arranged in middle steel pile casting (1) upper end, during for avoiding embedding rock operation, steel pile casting (1) End resistance disappears, and rig can have certain sedimentation phenomenon to occur along with steel pile casting (1), it is desirable to steel pile casting (1) Top arranges bracket, and the Qian Yan job platform the superiors arrange limit component, and bracket is shelved on limit component, Tissue sinking steel protecting canister.
The invention have the benefit that
The present invention utilizes domestic existing construction equipment, uses for reference domestic harbor work's construction technology, in conjunction with implanted Embedding rock single-pile foundation feature, devises top layer eluvium shallower batholith sea bed, shelves large-scale embedding rock drilling machine Temporary construction platform, effectively solves top layer eluvium shallower batholith sea bed, offshore wind turbine embedding rock single pile A difficult problem for foundation construction, introduces offshore wind turbine embedding rock single-pile foundation technology for sea turn electric industry and provides effectively Support, reduce construction costs.
In conjunction with advantages and features of the invention described further below.
Accompanying drawing explanation
Fig. 1 is the organizational structure schematic diagram of the present invention.
Detailed description of the invention
In the following description, a large amount of concrete details is given to provide to the present invention the most thoroughly Understand.It will be apparent, however, to one skilled in the art that the present invention can be without one Or multiple these details and be carried out.In other example, in order to avoid obscuring with the present invention, Technical characteristics more well known in the art are not described.
In order to thoroughly understand the present invention, detailed structure will be proposed in following description.Obviously, this Bright execution is not limited to the specific details that those skilled in the art is familiar with.The present invention's is preferable real Execute example to be described in detail as follows, but in addition to these describe in detail, the present invention can also have other and implement Mode.
Hereinafter embodiments of the invention are described in detail.
With reference to Fig. 1, a kind of offshore wind turbine embedding rock single-pile foundation temporary construction platform, it is by four auxiliary The jacket structure that pile tube (2) and strut (6) connect and compose, it is characterised in that: described four auxiliary Pilespacing between pile tube (2) is 18m, a height of 20m of jacket platform;On distance jacket structure top The position of 5m and 2m is respectively provided with platform two (5) and platform one (4), and platform two (5) peace It is respectively mounted jack on platform one (4), is used for regulating the perpendicularity of steel pile casting (1);Tie at catheterostat Mud mat (3) it is provided with bottom structure;Arranging limit component on platform one (4), bracket is shelved on spacing On component, organize sinking steel protecting canister.
Embodiments of the present invention are:
1) embedding rock single-pile foundation temporary construction platform location sinking is installed, heavy by platform jacket location Enter four auxiliary pile tube (2);
2) sinking steel pile casting (1), uses vibration hammer to sink to certain depth after carrying out leveling by steady stake platform;
3) setting up rig to push up to steel pile casting (1), continuous drilling is to main body stake designed elevation;
4) in steel pile casting (1), single pile, cement injection mortar are put into;
5) catheterostat, auxiliary pile tube and steel pile casting (1), recycling are reclaimed.
Embedding rock drilling machine is arranged in middle steel pile casting (1) upper end, during for avoiding embedding rock operation, steel pile casting (1) End resistance disappears, and rig can have certain sedimentation phenomenon to occur along with steel pile casting (1), it is desirable to steel pile casting (1) Top arranges bracket, and the Qian Yan job platform the superiors arrange limit component, and bracket is shelved on limit component, Tissue sinking steel protecting canister.
Having the beneficial effect that of the present embodiment
The present embodiment utilizes domestic existing construction equipment, uses for reference domestic harbor work's construction technology, in conjunction with implanting Formula embedding rock single-pile foundation feature, devises top layer eluvium shallower batholith sea bed, shelves large-scale embedding rock drilling machine Temporary construction platform, effectively solve top layer eluvium shallower batholith sea bed, offshore wind turbine embedding rock list A difficult problem for pile foundation construction, introduces offshore wind turbine embedding rock single-pile foundation technology for sea turn electric industry and has provided Power is supported, reduces construction costs.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment It is only intended to citing and descriptive purpose, and is not intended to limit the invention to described scope of embodiments In.In addition it will be appreciated by persons skilled in the art that and the invention is not limited in above-described embodiment, root Can also make more kinds of variants and modifications according to the teachings of the present invention, these variants and modifications all fall within this Within inventing scope required for protection.Protection scope of the present invention by the appended claims and etc. Effect scope is defined.

Claims (1)

1. an offshore wind turbine embedding rock single-pile foundation temporary construction platform, it is by four auxiliary pile tube (2) The jacket structure connected and composed with strut (6), it is characterised in that: described four auxiliary pile tube (2) Between pilespacing be 18m, a height of 20m of jacket platform;Distance jacket structure top 5m's and 2m Position is respectively provided with platform two (5) and platform one (4), and on platform two (5) and platform one (4) It is respectively mounted jack, is used for regulating the perpendicularity of steel pile casting (1);It is provided with bottom jacket structure Mud mat (3);Arranging limit component on platform one (4), bracket is shelved on limit component.
CN201610446822.1A 2016-06-16 2016-06-16 Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine Pending CN105971000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610446822.1A CN105971000A (en) 2016-06-16 2016-06-16 Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610446822.1A CN105971000A (en) 2016-06-16 2016-06-16 Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine

Publications (1)

Publication Number Publication Date
CN105971000A true CN105971000A (en) 2016-09-28

Family

ID=57022100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610446822.1A Pending CN105971000A (en) 2016-06-16 2016-06-16 Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine

Country Status (1)

Country Link
CN (1) CN105971000A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400764A (en) * 2016-11-25 2017-02-15 平煤建工集团特殊凿井工程有限公司 Assembled offshore single-pile foundation construction platform and construction process thereof
CN106759433A (en) * 2016-10-31 2017-05-31 江苏华西村海洋工程服务有限公司 Wind-powered electricity generation and the embedding rock construction technology of bridge
CN107142929A (en) * 2017-05-25 2017-09-08 中国电建集团华东勘测设计研究院有限公司 Sea is non-to squeeze into type large diameter single pile foundation structure and its construction method
CN108505522A (en) * 2018-05-21 2018-09-07 中天科技集团海洋工程有限公司 A kind of steady stake platform
CN109098077A (en) * 2018-09-28 2018-12-28 张鑫 One kind material of speedily carrying out rescue work is jettisoninged auxiliary device
CN109098076A (en) * 2018-09-28 2018-12-28 张鑫 A kind of dykes and dams emergency control method
CN109629568A (en) * 2018-12-30 2019-04-16 中交第三航务工程局有限公司江苏分公司 The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
CN110747882A (en) * 2019-10-14 2020-02-04 中国海洋大学 Nail type anti-sinking plate for ocean engineering, jacket and construction method
CN111962543A (en) * 2020-08-12 2020-11-20 中交第三航务工程局有限公司江苏分公司 Rapid connection and separation process of pile stabilizing platform and mother ship
CN111962552A (en) * 2020-08-12 2020-11-20 中交第三航务工程局有限公司江苏分公司 Offshore wind power foundation driving-in type rock-socketed single pile construction process
CN113638386A (en) * 2021-08-19 2021-11-12 中交第三航务工程局有限公司 Offshore wind power single pile socketed foundation construction is with assembled platform
CN113774913A (en) * 2021-09-15 2021-12-10 保利长大工程有限公司港航分公司 Up-down separation type pile stabilizing platform and construction method thereof
CN115198738A (en) * 2022-07-06 2022-10-18 深圳市工勘岩土集团有限公司 Offshore platform steel sleeve reinforcement cage and hydraulic jack combined positioning construction method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201502060U (en) * 2009-08-10 2010-06-09 湖北中建三局建筑工程技术有限责任公司 Bored pile double pile casing system
CN201649118U (en) * 2010-04-07 2010-11-24 中国水电顾问集团华东勘测设计研究院 Foundation structure of jacket-type offshore wind turbine
WO2011023745A1 (en) * 2009-08-27 2011-03-03 Geosea Nv Method of installation of large diameter piles
CN102535510A (en) * 2012-02-27 2012-07-04 广东明阳风电产业集团有限公司 Basic mounting method of offshore fan jacket and integrated jacket device
CN102587405A (en) * 2012-02-27 2012-07-18 广东明阳风电产业集团有限公司 Installation method of guide pipe frame foundation of offshore wind turbine and separated type guide pipe frame device
CN202390846U (en) * 2011-11-28 2012-08-22 江苏海上龙源风力发电有限公司 Single-pile foundation of wind generating set
CN202492848U (en) * 2011-12-14 2012-10-17 中铁大桥局股份有限公司 Invisible attached type low height guide rack
EP2647767A1 (en) * 2012-04-05 2013-10-09 Dcns Off shore foundation of a wind motor.
CN203613551U (en) * 2013-11-20 2014-05-28 天津港航工程有限公司 Precast concrete jacket type offshore wind turbine foundation
CN204370466U (en) * 2014-12-23 2015-06-03 广州华申建设工程管理有限公司 A kind of jacket offshore wind turbine foundation with bracket
CN204370469U (en) * 2014-12-24 2015-06-03 广州华申建设工程管理有限公司 A kind of drilled pile long leg jacket offshore wind turbine foundation
CN204849814U (en) * 2015-07-24 2015-12-09 中国能源建设集团广东省电力设计研究院有限公司 Marine fan
CN105155569A (en) * 2015-08-03 2015-12-16 浙江华蕴海洋工程技术服务有限公司 Construction device and method for offshore wind turbine foundation with piling performed later
CN205917721U (en) * 2016-06-16 2017-02-01 江苏海上龙源风力发电有限公司 Marine fan inlays interim construction platform in rock single pile basis

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201502060U (en) * 2009-08-10 2010-06-09 湖北中建三局建筑工程技术有限责任公司 Bored pile double pile casing system
WO2011023745A1 (en) * 2009-08-27 2011-03-03 Geosea Nv Method of installation of large diameter piles
CN201649118U (en) * 2010-04-07 2010-11-24 中国水电顾问集团华东勘测设计研究院 Foundation structure of jacket-type offshore wind turbine
CN202390846U (en) * 2011-11-28 2012-08-22 江苏海上龙源风力发电有限公司 Single-pile foundation of wind generating set
CN202492848U (en) * 2011-12-14 2012-10-17 中铁大桥局股份有限公司 Invisible attached type low height guide rack
CN102535510A (en) * 2012-02-27 2012-07-04 广东明阳风电产业集团有限公司 Basic mounting method of offshore fan jacket and integrated jacket device
CN102587405A (en) * 2012-02-27 2012-07-18 广东明阳风电产业集团有限公司 Installation method of guide pipe frame foundation of offshore wind turbine and separated type guide pipe frame device
EP2647767A1 (en) * 2012-04-05 2013-10-09 Dcns Off shore foundation of a wind motor.
CN203613551U (en) * 2013-11-20 2014-05-28 天津港航工程有限公司 Precast concrete jacket type offshore wind turbine foundation
CN204370466U (en) * 2014-12-23 2015-06-03 广州华申建设工程管理有限公司 A kind of jacket offshore wind turbine foundation with bracket
CN204370469U (en) * 2014-12-24 2015-06-03 广州华申建设工程管理有限公司 A kind of drilled pile long leg jacket offshore wind turbine foundation
CN204849814U (en) * 2015-07-24 2015-12-09 中国能源建设集团广东省电力设计研究院有限公司 Marine fan
CN105155569A (en) * 2015-08-03 2015-12-16 浙江华蕴海洋工程技术服务有限公司 Construction device and method for offshore wind turbine foundation with piling performed later
CN205917721U (en) * 2016-06-16 2017-02-01 江苏海上龙源风力发电有限公司 Marine fan inlays interim construction platform in rock single pile basis

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759433A (en) * 2016-10-31 2017-05-31 江苏华西村海洋工程服务有限公司 Wind-powered electricity generation and the embedding rock construction technology of bridge
CN106400764B (en) * 2016-11-25 2018-07-17 平煤建工集团特殊凿井工程有限公司 A kind of pin-connected panel sea single-pile foundation construction platform and its construction technology
CN106400764A (en) * 2016-11-25 2017-02-15 平煤建工集团特殊凿井工程有限公司 Assembled offshore single-pile foundation construction platform and construction process thereof
CN107142929A (en) * 2017-05-25 2017-09-08 中国电建集团华东勘测设计研究院有限公司 Sea is non-to squeeze into type large diameter single pile foundation structure and its construction method
CN108505522B (en) * 2018-05-21 2023-12-15 中天科技集团海洋工程有限公司 Pile stabilizing platform
CN108505522A (en) * 2018-05-21 2018-09-07 中天科技集团海洋工程有限公司 A kind of steady stake platform
CN109098077A (en) * 2018-09-28 2018-12-28 张鑫 One kind material of speedily carrying out rescue work is jettisoninged auxiliary device
CN109098076A (en) * 2018-09-28 2018-12-28 张鑫 A kind of dykes and dams emergency control method
CN109629568A (en) * 2018-12-30 2019-04-16 中交第三航务工程局有限公司江苏分公司 The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
CN110747882A (en) * 2019-10-14 2020-02-04 中国海洋大学 Nail type anti-sinking plate for ocean engineering, jacket and construction method
CN111962552A (en) * 2020-08-12 2020-11-20 中交第三航务工程局有限公司江苏分公司 Offshore wind power foundation driving-in type rock-socketed single pile construction process
CN111962543A (en) * 2020-08-12 2020-11-20 中交第三航务工程局有限公司江苏分公司 Rapid connection and separation process of pile stabilizing platform and mother ship
CN113638386A (en) * 2021-08-19 2021-11-12 中交第三航务工程局有限公司 Offshore wind power single pile socketed foundation construction is with assembled platform
CN113638386B (en) * 2021-08-19 2022-09-09 中交第三航务工程局有限公司 Offshore wind power single pile socketed foundation construction is with assembled platform
WO2023020381A1 (en) * 2021-08-19 2023-02-23 中交第三航务工程局有限公司 Fabricated platform for offshore wind power monopile rock-socketed foundation construction
CN113774913A (en) * 2021-09-15 2021-12-10 保利长大工程有限公司港航分公司 Up-down separation type pile stabilizing platform and construction method thereof
CN115198738A (en) * 2022-07-06 2022-10-18 深圳市工勘岩土集团有限公司 Offshore platform steel sleeve reinforcement cage and hydraulic jack combined positioning construction method

Similar Documents

Publication Publication Date Title
CN105971000A (en) Temporary construction platform of rock-socketed single pile foundation of offshore wind turbine
JP4645300B2 (en) Gravity foundation of offshore wind power generator
CN205000355U (en) Box gravity type marine wind power foundation structure
CN104110039B (en) There is pressure dispersing type and arrange the blower foundation of high-strength prestressed anchor pole (rope)
CN101545462B (en) A steel-concrete combined weight type offshore wind fan foundation structure
CN101864765A (en) Two-way stirring based SMW construction method and tri-axial stirring equipment
CN106088140A (en) A kind of batholith sea bed offshore wind turbine embedding rock single-pile foundation construction technique
CN108842807A (en) A kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type
EP2574698B1 (en) Method and device for driving a multiplicity of piles into a seabed
CN102535534A (en) Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation
CN102767303A (en) Precast concrete tower and construction method thereof
Chow et al. Drained cyclic capacity of plate anchors in dense sand: Experimental and theoretical observations
CN205917721U (en) Marine fan inlays interim construction platform in rock single pile basis
CN103643688A (en) Filled earth-free steel sheet pile cofferdam for construction of high-rise pile cap in shallow water area
CN205917724U (en) Do not have marine fan of grout and inlay rock single pile basis
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN105970998A (en) Box type gravitational offshore wind turbine foundation with bulkheads
Zhang et al. Model tests on sinking technique of composite bucket foundations for offshore wind turbines in silty clay
CN105862908A (en) Offshore wind power bottle-shaped gravity foundation
CN204608813U (en) A kind of prestressed anchor embedding rock offshore wind turbine High-Rise Pile Cap Foundation
Iwicki et al. Short review and 3-D FEM analysis of basic types of foundation for offshore wind turbines
CN110670620A (en) Cast-in-place gravity type suction caisson foundation with wing plates
CN102628270B (en) Great-diameter variable section irregularly-shaped resistance-increased steel pipe pile system and construction method thereof
CN202530448U (en) Large-diameter cross section-variable special-shape resistance-increase steel pipe pile system
CN204385743U (en) A kind of pile foundation in deep water steel pile casting construction system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination