CN105965212B - A kind of bimetallic clad steel plate threeway method of manufacturing technology - Google Patents

A kind of bimetallic clad steel plate threeway method of manufacturing technology Download PDF

Info

Publication number
CN105965212B
CN105965212B CN201610471554.9A CN201610471554A CN105965212B CN 105965212 B CN105965212 B CN 105965212B CN 201610471554 A CN201610471554 A CN 201610471554A CN 105965212 B CN105965212 B CN 105965212B
Authority
CN
China
Prior art keywords
pipe
welding
threeway
steel plate
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610471554.9A
Other languages
Chinese (zh)
Other versions
CN105965212A (en
Inventor
祭立柱
韩木杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Hengtong Pipe Fittings Group Co ltd
Original Assignee
HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co Ltd filed Critical HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201610471554.9A priority Critical patent/CN105965212B/en
Publication of CN105965212A publication Critical patent/CN105965212A/en
Application granted granted Critical
Publication of CN105965212B publication Critical patent/CN105965212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Heat Treatment Of Steel (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

A kind of bimetallic clad steel plate threeway method of manufacturing technology, its processing step are:The buying of raw material, recheck;Welding heat treatment simulated experiment, Product Process make a reservation for;Blanking, steel pipe it is prefabricated;Pipe crimping welds;It is compressing;Heat treatment;Inner and outer surfaces processing;Nondestructive inspection;Groove;Acid wash passivation processing;Finished product detection.

Description

A kind of bimetallic clad steel plate threeway method of manufacturing technology
Technical field
The present invention relates to metal tube, the processing of metal tube and pipe-line system technical field is produced with the mode of rolling, especially It is a kind of bimetallic clad steel plate threeway method of manufacturing technology.
Background technology
Before carrying out dual-metal clad steel pipe part (pipe line steel+N08825) trial-production at home, external pipe fitting manufacturing enterprise Produce composite pipe product, and in Turkmenistan natural gas line conveying engineering one phase project, applied, But the nickel base alloy layer of external product, using bead-welding technology, from technical standpoint, there is difficulty, and price is held high It is expensive, delivery cycle is longer, so the second stage of the project petrochina is based oneself upon, support is domestic to have mature experience and good in conventional oil-gas pipeline The Ji Jia suppliers of good achievement carry out the trial-production of new product.
The content of the invention
The object of the present invention is to provide a kind of stable mechanical performance, efficient bimetallic clad steel plate threeway manufacture work Process.
This technique is by studying three universal steel plate constituent analyses, performance point after three-way welding technique and threeway heat treatment Analysis, determines wlding selection, welding condition and heat treatment process, makes the mechanical performance and metallographic of threeway after shaping and heat treatment Tissue meets standard requirement.
Choose suitable wlding and reasonable welding procedure;
Take the heat treatment process of repeated hardening.
Threeway manufacture main technological steps (see Fig. 1):
(1) buying, the reinspection of raw material:
Buying belongs to metallurgical compound Explosion composite steel plate (high-strength steel+Nickel-Based Steel), and the material of buying is carried out Chemistry into
Point, mechanical performance, adhesive strength, corrosion resistance etc. are examined and experiment, while carries out ultrasound examination one by one, examine Survey
Whether base material has peeling with the presence or absence of internal flaw and faying face.
(2) welding heat treatment simulated experiment, Product Process make a reservation for
The test plate (panel) of three pieces of 300mm*600mm is being extracted in qualified sheet stock by rechecking, along long side direction in plate Wide centre outputs the groove of X-type with plasma, and groove is polished the heat affected area that metallic luster removes cutting, this three Welding manner the N06625 welding wires and CHE607GX welding rods that block test plate (panel) is welded according to the welding procedure simulation pipe crimping of assessment of conformity Test piece for welding is welded into, test piece for welding determines the jointly applicable heat treatment temperature of two kinds of materials after Non-Destructive Testing qualification Parameter area is spent, within this range, preferably goes out most suitably used specific heating and heat treatment parameter;
(3) blanking, steel pipe it is prefabricated
According to product and technological requirement, by art work sheet setting-out, cutting stock on the steel plate, Numerical control cutting machine-cut is selected Cut;Design specialized cuts production district, ensures the accurate of material blanking;
(4) pipe crimping welds
According to technological requirement, steel plate is rolled into cylindrical shape on veneer reeling machine, and pipe longitudinal joint is welded, after the circle of school Form the blank of manufacture threeway;Before roll bending, fiberboard on clad surface bedding, avoids occurring coating metal stroke in coiling process Wound and coating are contacted with carbon steel tooling device, are ensured to hold successfully after X-type groove staggered edge free and straight flange phenomenon at counterpart, will be used in groove After the method for Ji Xie Xiu mills removes the heat affected area of thermal cutting, with stainless steel wire wheel by each 50mm inner surfaces in groove and both sides Polishing is clean, the basic unit of pipe, transition zone, coating is successively welded according to the welding procedure of assessment of conformity, during welding Basic unit, transition zone, coating throat thickness are monitored at any time, reach standard requirement, while the heat input and layer of stringent control welding Between temperature, and the degree of gas shield and the successively cleanliness factor of back chipping ensure that welding bead quality reaches highest standard, avoid existing Stomata, slag inclusion shortcoming, source of corrosion is caused to pipe fitting, so not only ensure that deposited metal possessed good mechanical property, but also improve Its erosion-resisting ability;
(5) it is compressing
The three-way pipe billet through Non-Destructive Testing qualification loads in gas heating furnace and heats after welding job is completed, in hydraulic pressure Compression molding is carried out on machine, its overall process process is:Bulge-perforate-redraing branch pipe-the master of flattening-fourth contact-three times Guan Jiaoyuan-go end-round mouth, first will ensure that pipe is heated by predetermined heating schedule in pressing process, control programming rate ≤ 200 DEG C/h, 950 DEG C of ± 10 DEG C of insulations compacting of coming out of the stove in 30 ± 10min minutes is warming up to, base pipe is strictly controlled during bulge The immersion amount of weld seam side tube body, ensures that the tyre bead of placenta of the immersion line with going out branch pipe flushes, and the strictly whole pushing of monitoring Process, control threeway side wall does not allow some indent phenomenons occur, avoids coating metal from fold occur, in forming process, with covering High temperature resistant talcum powder is all coated on all moulds of industrial equipment surfaces of layer contact, can not only play lubricating action, but also can be to avoid pipe Coating is contacted with carbon steel moulds of industrial equipment during part high temperature, and pipe must be placed on outside stove after every time compacting or drawing and treat The temperature of pipe reenters stove and carries out reheating when being down to below AC1, thus avoid deformation position from being continuously in lower critical for a long time Point temperatures above and cause that metal grain degree is thick to wait superheating phenomenon, both there is standard by the control product of process above Round and smooth presentation quality has due good organization's state before heat treatment again, and three-way forming, go after end, school circle to its main ruler It is very little to measure;
(6) it is heat-treated
According to quenching plus tempering heat treatment process, during quenching, charging temperature≤300 DEG C, programming rate is controlled≤200 DEG C/h, kept the temperature when being warming up to 940 DEG C~960 DEG C, soaking time control is cooled down in pure water in 30~45min, and when tempering enters Furnace temperature≤300 DEG C, programming rate are controlled in≤200 DEG C/h, kept the temperature when being warming up to 520 DEG C~560 DEG C, and soaking time control exists 40~60min is cooled down in atmosphere;
(7) inner and outer surfaces are handled
Reconditioning processing is carried out to threeway surfaces externally and internally;Processing grade reaches Sa3.2 grades;
(8) nondestructive inspection
Penetrant inspection and ultrasonic inspection are carried out to threeway tube body;Radiographic inspection and ultrasonic inspection are carried out to weld seam;
(9) groove
Groove is machined out to threeway pipe end, ensures coating inner diameter deviation < 0.5mm, coating wall thickness deviation+2mmm/- 0.5mm.
(10) acid wash passivation is handled
Brushing acid wash passivation processing is carried out to threeway inner wall using acid wash passivation liquid, the cleaning at residual night is carried out after qualified and is done It is dry.
(11) finished product detection
Carry out physical dimension and shape position error detection piece by piece to finished product threeway on platform by standard, while carry out nothing piece by piece Damage detection.And extract sample part and carry out physicochemical property and corrosion resistance detection.
Brief description of the drawings
Fig. 1 is bimetallic clad steel plate threeway manufacturing process process flow chart
Embodiment
The present invention is described in further detail below.
(1) buying, the reinspection of raw material:
The Explosion composite steel plate of Sichuan Jinglei Science & Technology Co., Ltd.'s production is purchased, and chemistry is carried out to the material of buying Component, mechanical performance, adhesive strength, corrosion resistance etc. are examined and experiment, while carries out ultrasound examination one by one, detects basic unit Whether material has peeling with the presence or absence of internal flaw and faying face.
(2) welding heat treatment simulated experiment, Product Process make a reservation for
The test plate (panel) of three pieces of 300mm*600mm is being extracted in qualified sheet stock by rechecking, along long side direction in plate Wide centre outputs the groove of X-type with plasma, and groove is polished the heat affected area that metallic luster removes cutting, this three Welding manner the N06625 welding wires and CHE607GX welding rods that block test plate (panel) is welded according to the welding procedure simulation pipe crimping of assessment of conformity Test piece for welding is welded into, test piece for welding determines the jointly applicable heat treatment temperature of two kinds of materials after Non-Destructive Testing qualification Parameter area is spent, within this range, preferably goes out most suitably used specific heating and heat treatment parameter;
Heat treatment process parameter and the results of property such as following table of test piece for welding:
(3) blanking, steel pipe it is prefabricated
According to product and technological requirement, by art work sheet setting-out, cutting stock on the steel plate, Numerical control cutting machine-cut is selected Cut;Design specialized cuts production district, ensures the accurate of material blanking;
(4) pipe crimping welds
The threeway specification of this trial-production is φ 610 × 610 × 610 × 29mm equal tees, according to design by steel plate big The tubular pipe of 780 × 975mm of φ is rolled on type rolling machine, before roll bending, fiberboard on clad surface bedding, avoids rolling During occur coating metal scratch and coating contacted with carbon steel tooling device.Staggered edge free at counterpart is held after X-type groove in guarantee successfully With straight flange phenomenon.After the method that Yong Ji Xie Xiu in groove are ground removes the heat affected area of thermal cutting, with stainless steel wire wheel by slope Each 50mm inner surfaces polishing in mouthful and both sides is clean, according to the welding procedure of assessment of conformity to the basic unit of pipe, transition zone, coating Successively welded.Basic unit, excessive layer, coating throat thickness are monitored during welding at any time, reaches standard requirement, while stringent control Make the heat input and interlayer temperature of welding, and the degree of gas shield and the successively cleanliness factor of back chipping, guarantee welding bead quality Reach highest standard, avoid, there are the shortcoming such as stomata, slag inclusion, source of corrosion being caused to pipe fitting, so both ensure that deposited metal had Standby good mechanical property, and improve its erosion-resisting ability.The requirement (internal diameter φ 569) alignd according to threeway internal diameter, I Company uses the outside diameter specially designed and produced to be suppressed for the threeway mould of 635mm.
(5) it is compressing
The three-way pipe billet through Non-Destructive Testing qualification loads in gas heating furnace and heats after welding job is completed, in hydraulic pressure Compression molding is carried out on machine, its overall process process is:Bulge-perforate-redraing branch pipe-the master of flattening-fourth contact-three times Guan Jiaoyuan-go end-round mouth, first will ensure that pipe is heated by predetermined heating schedule in pressing process, control programming rate ≤ 200 DEG C/h, 950 DEG C of ± 10 DEG C of insulations compacting of coming out of the stove in 30 ± 10min minutes is warming up to, base pipe is strictly controlled during bulge The immersion amount of weld seam side tube body, ensures that the tyre bead of placenta of the immersion line with going out branch pipe flushes, and the strictly whole pushing of monitoring Process, control threeway side wall does not allow some indent phenomenons occur, avoids coating metal from fold occur, in forming process, with covering High temperature resistant talcum powder is all coated on all moulds of industrial equipment surfaces of layer contact, can not only play lubricating action, but also can be to avoid pipe Coating is contacted with carbon steel moulds of industrial equipment during part high temperature, and pipe must be placed on outside stove after every time compacting or drawing and treat The temperature of pipe reenters stove and carries out reheating when being down to below AC1, thus avoid deformation position from being continuously in lower critical for a long time Point temperatures above and cause that metal grain degree is thick to wait superheating phenomenon, both there is standard by the control product of process above Round and smooth presentation quality has due good organization's state before heat treatment again, and three-way forming, go after end, school circle to its main ruler It is very little to measure;, as a result meet the requirement of machining finished product, measured value see the table below:
Key dimension measured value unit in threeway end after shaping:mm
(6) it is heat-treated
According to quenching plus tempering heat treatment process, during quenching, charging temperature≤300 DEG C, programming rate is controlled≤200 DEG C/h, kept the temperature when being warming up to 940 DEG C~960 DEG C, soaking time control is cooled down in pure water in 30~45min, and when tempering enters Furnace temperature≤300 DEG C, programming rate are controlled in≤200 DEG C/h, kept the temperature when being warming up to 520 DEG C~560 DEG C, and soaking time control exists 40~60min is cooled down in atmosphere;
(7) inner and outer surfaces are handled
Reconditioning processing is carried out to threeway surfaces externally and internally;Processing grade reaches Sa3.2 grades;
(8) nondestructive inspection
Penetrant inspection and ultrasonic inspection are carried out to threeway tube body;Radiographic inspection and ultrasonic inspection are carried out to weld seam;
(9) groove
Groove is machined out to threeway pipe end, ensures coating inner diameter deviation < 0.5mm, coating wall thickness deviation+2mmm/- 0.5mm.
(10) acid wash passivation is handled
Brushing acid wash passivation processing is carried out to threeway inner wall using acid wash passivation liquid, the cleaning at residual night is carried out after qualified and is done It is dry.
(11) finished product detection
Carry out physical dimension and shape position error detection piece by piece to finished product threeway on platform by standard, while carry out nothing piece by piece Damage detection.And extract sample part and carry out physicochemical property and corrosion resistance detection.
Bimetallic clad steel plate system (L415MS+N08825) threeway has passed through China National Petroleum pipeline science The detection evaluation of research institute's testing of materials center (mechanical property) and China University Of Petroleum Beijing's (corrosion resistance test), mechanics properties testing " threeway report number is shown in report:PMC-N1311775-CZHT ", threeway corrosion resistance test report number:2013 oil tell fortune by analysing the component parts of a Chinese character【M】 No. 306, No. 266, No. 267, No. 268, No. 269, No. 270, No. 272, No. 273, No. 274.Product It is reliable and stable to design reasonable quality, has reached the object performance index of similar products at home and abroad.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with this field technology Personage can understand present disclosure and be carried out, and it is not intended to limit the scope of the present invention, all according to this hair The equivalent change or modification that bright Spirit Essence is made, effect is similar, should all cover within the scope of the present invention.

Claims (6)

1. a kind of bimetallic clad steel plate threeway method of manufacturing technology, it is characterised in that its processing step is:
(1) buying, the reinspection of raw material:
Buying belongs to metallurgical compound Explosion composite steel plate, and the raw material Explosion composite steel plate of buying is carried out chemical composition, The inspection and experiment of mechanical performance, adhesive strength, corrosion resistance, while ultrasound examination is carried out one by one, detect base material Whether there is peeling with the presence or absence of internal flaw and faying face;
(2) welding heat treatment simulated experiment, Product Process make a reservation for
The test plate (panel) of three pieces of 300mm*600mm is being extracted in qualified sheet stock by rechecking, it is wide in plate along long side direction Centre outputs the groove of X-type with plasma, and groove is polished to the heat affected area of metallic luster removal cutting, this three pieces examinations Plate is welded according to the welding manner of the welding procedure simulation pipe crimping welding of assessment of conformity with N06625 welding wires and CHE607GX welding rods As test piece for welding, test piece for welding determines the jointly applicable heat treatment temperature ginseng of two kinds of materials after Non-Destructive Testing qualification Number scope;
(3) blanking, steel pipe it is prefabricated
According to product and technological requirement, by art work sheet setting-out, cutting stock on the steel plate;
(4) pipe crimping welds
According to technological requirement, steel plate is rolled into cylindrical shape on veneer reeling machine, and pipe longitudinal joint is welded, is formed after the circle of school Manufacture the blank of threeway;Before roll bending, fiberboard on clad surface bedding, avoid occurring in coiling process coating metal scratch and Coating is contacted with carbon steel tooling device, and staggered edge free and straight flange phenomenon at counterpart are held after X-type groove in guarantee successfully, will be in groove with machinery After the method for Xiu mills removes the heat affected area of thermal cutting, each 50mm inner surfaces in groove and both sides are polished with stainless steel wire wheel Totally, the basic unit of pipe, transition zone, coating are successively welded according to the welding procedure of assessment of conformity, during welding at any time Monitor basic unit, transition zone, coating throat thickness;
(5) it is compressing
The three-way pipe billet through Non-Destructive Testing qualification loads in gas heating furnace and heats after welding job is completed, on a hydraulic press Carry out compression molding;
(6) it is heat-treated
According to quenching plus tempering heat treatment process, during quenching, charging temperature≤300 DEG C, programming rate control in≤200 DEG C/h, Kept the temperature when being warming up to 940 DEG C~960 DEG C, soaking time control is cooled down in pure water in 30~45min, and when tempering enters furnace temperature ≤ 300 DEG C of degree, programming rate control are kept the temperature when being warming up to 520 DEG C~560 DEG C in≤200 DEG C/h, soaking time control 40~ 60min is cooled down in atmosphere;
(7) inner and outer surfaces are handled
Reconditioning processing is carried out to threeway surfaces externally and internally;Processing grade reaches Sa3.2 grades;
(8) nondestructive inspection
Penetrant inspection and ultrasonic inspection are carried out to threeway tube body;Radiographic inspection and ultrasonic inspection are carried out to weld seam;
(9) groove
Groove is machined out to threeway pipe end, ensures coating inner diameter deviation < 0.5mm, coating wall thickness deviation+2mm/-0.5mm;
(10) acid wash passivation is handled
Brushing acid wash passivation processing is carried out to threeway inner wall using acid wash passivation liquid, the cleaning and drying at residual night are carried out after qualified;
(11) finished product detection
Carry out physical dimension and shape position error detection piece by piece to finished product threeway on platform by standard, while carry out lossless inspection piece by piece Survey;And extract sample part and carry out physicochemical property and corrosion resistance detection.
A kind of 2. bimetallic clad steel plate threeway method of manufacturing technology according to claim 1, it is characterised in that step (1) the Explosion composite steel plate in is mutually compound using high-strength steel and Nickel-Based Steel.
A kind of 3. bimetallic clad steel plate threeway method of manufacturing technology according to claim 1, it is characterised in that step (2) the jointly applicable heat treatment temperature parameter area of with good grounds two kinds of materials is further included in, determines most suitably used specific heating And the step of heat treatment parameter.
A kind of 4. bimetallic clad steel plate threeway method of manufacturing technology according to claim 1, it is characterised in that step (3) cutting described in selects numerical control cutting machine to be cut in cutting production district, ensures the accurate cutting of material blanking.
A kind of 5. bimetallic clad steel plate threeway method of manufacturing technology according to claim 1, it is characterised in that step (4) to the heat input and interlayer temperature of welding, and the degree of gas shield and the successively cleaning of back chipping in welding process in Degree is detected and controls.
A kind of 6. bimetallic clad steel plate threeway method of manufacturing technology according to claim 1, it is characterised in that step (5) process of compression molding includes in:Bulge-perforate-redraing the branch pipe of flattening-fourth contact-three times-supervisor school circle- Remove end-round mouth, first will ensure that pipe is heated by predetermined heating schedule in pressing process, control programming rate≤200 DEG C/ H, is warming up to 950 DEG C ± 10 DEG C, keeps the temperature compacting of coming out of the stove in 30 ± 10min minutes, and base pipe weld seam one is strictly controlled during bulge The immersion amount of side pipe body, ensures that the tyre bead of placenta of the immersion line with going out branch pipe flushes, and the strictly whole pushing process of monitoring, control Threeway side wall processed does not allow some indent phenomenons occur, avoids coating metal from fold occur, in forming process, with coating contacts High temperature resistant talcum powder is all coated on all moulds of industrial equipment surfaces, and pipe must be placed on after every time compacting or drawing Stove is reentered outside stove when the temperature of pipe is down to below AC1 and carries out reheating, three-way forming, go to end, school main to its after justifying Size measures.
CN201610471554.9A 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology Active CN105965212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610471554.9A CN105965212B (en) 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610471554.9A CN105965212B (en) 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology

Publications (2)

Publication Number Publication Date
CN105965212A CN105965212A (en) 2016-09-28
CN105965212B true CN105965212B (en) 2018-04-20

Family

ID=57019188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610471554.9A Active CN105965212B (en) 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology

Country Status (1)

Country Link
CN (1) CN105965212B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107009100B (en) * 2017-05-11 2019-10-11 山东电力建设第一工程公司 A kind of novel major diameter skew T production method
CN108942085B (en) * 2017-05-17 2020-09-04 中科智远信息科技有限公司 Radar fixing frame hole forming process
CN108723721A (en) * 2018-06-11 2018-11-02 江阴中南重工有限公司 Sandwich is molded the manufacturing method of threeway
CN108561641A (en) * 2018-06-20 2018-09-21 长兴云腾新能源科技有限公司 A kind of manufacturing process of semiconductor high-cleanness stainless steel pipe fitting
CN111015077A (en) * 2018-10-10 2020-04-17 江苏升创管业有限公司 Manufacturing process of handrail tube for rail transit
CN109514197B (en) * 2018-11-27 2021-01-15 泉州市精英阀业有限公司 Manufacturing method of automatic closing furnace body valve
CN109487117A (en) * 2018-12-29 2019-03-19 江苏万源新材料股份有限公司 A kind of production technology of reducing copper threeway
CN109465610B (en) * 2019-01-10 2020-04-17 河北恒通管件集团有限公司 Process for manufacturing low-temperature die pressing tee joint by utilizing X80 steel plate
CN109732295A (en) * 2019-02-26 2019-05-10 无锡市星达石化配件有限公司 A kind of pipeline spigot-and-socket pipe fitting method for shaping
WO2020214926A1 (en) 2019-04-17 2020-10-22 Dmc Global Inc. Method and system of identifying a bond boundary between a sound bond and a weak bond in a multilayer article
CN114227148B (en) * 2021-11-17 2024-07-19 山东天晟机械装备股份有限公司 Machining device and machining process for special steel plate of hydraulic support structural member
CN115555805B (en) * 2022-09-30 2024-09-13 陕西飞机工业有限责任公司 Digital manufacturing method of large-diameter aircraft conduit
CN117961446B (en) * 2024-03-28 2024-06-21 河北汇中管道装备有限公司 Bimetal composite pipe fitting and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284671A (en) * 2010-06-21 2011-12-21 中国石油天然气集团公司 Manufacturing process method for high-steel-grade large-aperture thick-wall tee joint
CN103317306A (en) * 2013-06-09 2013-09-25 宝鸡石油钢管有限责任公司 Spiral seam thermometal composite welded pipe manufacturing method
CN103350320A (en) * 2012-12-27 2013-10-16 华东理工大学 Production method of corrosion-resistant bimetal composite pipe
CN103722346A (en) * 2013-12-25 2014-04-16 江苏玉龙钢管股份有限公司 Corrosion-resistant metallurgical composite bimetal longitudinal submerged-arc welded steel pipe and method for manufacturing same
CN105171349A (en) * 2015-09-14 2015-12-23 上海海隆复合钢管制造有限公司 Preparation method for hydraulic pressure composite thermometal oil pipe
CN105690910A (en) * 2016-01-15 2016-06-22 宝山钢铁股份有限公司 9Ni steel and stainless steel composite steel plate for LNG storage tank and movable vessel and manufacturing method of composite steel plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284671A (en) * 2010-06-21 2011-12-21 中国石油天然气集团公司 Manufacturing process method for high-steel-grade large-aperture thick-wall tee joint
CN103350320A (en) * 2012-12-27 2013-10-16 华东理工大学 Production method of corrosion-resistant bimetal composite pipe
CN103317306A (en) * 2013-06-09 2013-09-25 宝鸡石油钢管有限责任公司 Spiral seam thermometal composite welded pipe manufacturing method
CN103722346A (en) * 2013-12-25 2014-04-16 江苏玉龙钢管股份有限公司 Corrosion-resistant metallurgical composite bimetal longitudinal submerged-arc welded steel pipe and method for manufacturing same
CN105171349A (en) * 2015-09-14 2015-12-23 上海海隆复合钢管制造有限公司 Preparation method for hydraulic pressure composite thermometal oil pipe
CN105690910A (en) * 2016-01-15 2016-06-22 宝山钢铁股份有限公司 9Ni steel and stainless steel composite steel plate for LNG storage tank and movable vessel and manufacturing method of composite steel plate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
双金属复合管件及管道预制成套工艺研究;赵红玉等;《华北六省区锻压技术文集(2012)》;20121024;第239-244页 *
双金属复合钢管制备工艺及性能研究;林阳;《中国优秀硕士学位论文全文数据库(工程科技I辑)》;20130630;正文第8页至第31页 *

Also Published As

Publication number Publication date
CN105965212A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105965212B (en) A kind of bimetallic clad steel plate threeway method of manufacturing technology
CN106112389B (en) A kind of bimetallic clad steel plate elbow method of manufacturing technology
CN106938285B (en) A kind of manufacturing method of stainless steel square tube
CN105115802B (en) CTOD experimental methods are reprocessed in a kind of welding
CN104858555A (en) Pressure pipeline welding process
CN102284671B (en) Manufacturing process method for high-steel-grade large-aperture thick-wall tee joint
CN101811154A (en) Method for producing hot-bending elbow
CN108226210B (en) Thermal simulation method for preparing stainless steel/carbon steel composite ribbed steel bar
CN113084459B (en) Continuous intelligent forming process for stainless steel straight welded pipe
Ohta et al. Fatigue strength improvement of lap joints of thin steel plate using low-transformation-temperature welding wire
CN102784853B (en) Manufacturing method of composite board seal head made from high-strength austenite nickel-iron-chromium alloy and austenite stainless steel
CN105414902A (en) Manufacturing method of closure head of nuclear equipment
CN105864427A (en) Ultrahigh pressure container and manufacturing method
CN106140865B (en) The preparation method of seamless steel pipe
CN115890039A (en) Welding manufacturing method of steam turbine hollow blade
CN117758254A (en) Laser cladding repair method and device for surface damage of part and part
Han et al. Root cause analysis for cracked pipe in auxiliary system in nuclear power plant
JP4593399B2 (en) Manufacturing method of UO steel pipe excellent in low temperature crack resistance and UO steel pipe
CN100392153C (en) Process of composite stainless steel / copper double metal rod
Aslani et al. Spiral welded tubes-imperfections, residual stresses, and buckling characteristics
Cipière et al. Thermal fatigue experience in French piping: influence of surface condition and weld local geometry
CN112810203B (en) Forming process of large conical end socket with folded edge and service life calculating method of large conical end socket
Yuan et al. Safety analysis of 200 m3 LPG spherical tank manufactured by the dieless hydro-bulging technology
Dinovitzer et al. Heat affected zone softening susceptibility test
NL2032614B1 (en) Process for manufacturing low-temperature die-pressing tee joint by x80 steel plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee after: Hebei Hengtong Group Yupeng Heavy Engineering Technology Co.,Ltd.

Address before: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee before: HEBEI YUPENG HEAVY INDUSTRY TECHNOLOGY Co.,Ltd.

Address after: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee after: HEBEI YUPENG HEAVY INDUSTRY TECHNOLOGY Co.,Ltd.

Address before: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee before: HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210611

Address after: 061000 houhan village, Hanji Town, Yanshan County, Cangzhou City, Hebei Province

Patentee after: Hebei Hengtong Pipe Fittings Group Co.,Ltd.

Address before: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee before: Hebei Hengtong Group Yupeng Heavy Engineering Technology Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A manufacturing process method for tees made of bimetallic composite steel plates

Granted publication date: 20180420

Pledgee: Bank of China Limited by Share Ltd. Cangzhou branch

Pledgor: Hebei Hengtong Pipe Fittings Group Co.,Ltd.

Registration number: Y2024980035567