CN105933321A - Subway construction information system - Google Patents

Subway construction information system Download PDF

Info

Publication number
CN105933321A
CN105933321A CN201610371611.6A CN201610371611A CN105933321A CN 105933321 A CN105933321 A CN 105933321A CN 201610371611 A CN201610371611 A CN 201610371611A CN 105933321 A CN105933321 A CN 105933321A
Authority
CN
China
Prior art keywords
construction
information
controller
mobile terminal
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610371611.6A
Other languages
Chinese (zh)
Inventor
王峰
王一峰
史书刚
石凤杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COMMUNICATIONS ELECTROMECHANICAL ENGINEERING BUREAU Co Ltd
Original Assignee
CHINA COMMUNICATIONS ELECTROMECHANICAL ENGINEERING BUREAU Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COMMUNICATIONS ELECTROMECHANICAL ENGINEERING BUREAU Co Ltd filed Critical CHINA COMMUNICATIONS ELECTROMECHANICAL ENGINEERING BUREAU Co Ltd
Priority to CN201610371611.6A priority Critical patent/CN105933321A/en
Publication of CN105933321A publication Critical patent/CN105933321A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L65/00Network arrangements, protocols or services for supporting real-time applications in data packet communication
    • H04L65/40Support for services or applications
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • G06Q50/40

Abstract

The invention provides a subway construction information system. The system comprises a plurality of wireless signal emitting terminals, a plurality of mobile terminals, and a controller, wherein the plurality of mobile terminals are carried to the responsible construction sites by construction units responsible for each sub-line; when the mobile terminal is carried to the construction site, a positioning module is used for positioning the construction site and transmitting the position information of the construction site to the controller through a wireless transmission module; a construction drawing for the subway construction is pre-stored in the controller; the controller receives the position information and then obtains the construction document of the construction region and the construction information corresponding to the construction document from the construction drawing; the controller is used for feeding back the construction document and the construction information to the corresponding mobile terminal. Through the adoption of the subway construction information system provided by the invention, each construction unit can understand the engineering construction condition in real time, and the units can conveniently form fast, accurate and efficient contact.

Description

Subway work information system
Technical field
The invention belongs to subway field, particularly to a kind of subway work information system.
Background technology
Subway is a kind of form of railway transportation, and subway operates to main City Rail Transit System in underground, Subway is the biggest fortune of a kind of electric propulsion progressively developing formation along the form of ground rail system Amount urban track traffic pattern, its circuit is generally laid in subterranean tunnel, have beyond down town, System of laying ground or overpass is forwarded to from underground.
Subway has become as the transportation mode spreading all over city, builds due to subway more and is located in the ground, its ring Border relative closure, point more than long lines of constructing, is the key character of current subway work.Therefore, subway work During, various information are difficult to transmit timely and effectively, bring a lot of inconvenience for subway construction.
Summary of the invention
It is an object of the invention to solve at least the above or defect, and offer at least will be described later Advantage.
A further object of the invention is many for unit in charge of construction during subway work, and construction information is complicated Situation, utilize wireless communication technology, by the construction drawing of each unit in charge of construction and with construction drawing corresponding to Construction information sends to the mobile terminal of unit in charge of construction, and unit in charge of construction can be by executing on mobile terminal Work information carries out constructing and recording construction progress, is so easy to unit in charge of construction and quickly grasps construction information, with Time, collect the construction progress of each unit in charge of construction, it is simple to grasp the construction situation of whole subway.
In order to realize according to object of the present invention and further advantage, it is provided that a kind of subway work information System, including:
Multiple wireless signal transmission ends, it is arranged on each sub-line road of subway work spaced a predetermined distance;
Multiple mobile terminals, it is by executing that the unit in charge of construction being responsible for each described sub-line road takes that it is responsible for Building site point;Including locating module and wireless transport module on described mobile terminal, described mobile terminal is in institute After stating at job location, described locating module positions described job location, and by the position of described job location Confidence breath is transferred in controller by described wireless transport module;
Controller, it prestores the construction drawing of subway work;Described controller accepts each described movement The described positional information that terminal is uploaded, and transfer each from described construction drawing according to described positional information Construction information corresponding to the construction drawing of the construction area corresponding to described mobile terminal and this construction drawing, Described construction drawing and described construction information are fed back on the described mobile terminal of correspondence by described controller;
Wherein, each described mobile terminal receives described construction drawing and described construction information, and, construction Constructed in described construction site by some position according to the construction information of display on described mobile terminal, meanwhile, Described construction drawing marks its construction progress situation.Unit in charge of construction can obtain it from mobile terminal and need The construction drawing wanted and construction information, construct according to construction information, and meanwhile, unit in charge of construction can move Record its construction progress situation on construction drawing in dynamic terminal, and construction progress situation is uploaded to controller In, in order to controller collects the construction progress situation of all units in charge of construction and obtains the construction situation of whole subway.
Preferably, in described subway work information system, multiple described wireless signal transmission ends, its It is embedded in the underground on each described sub-line road.Wireless signal transmission end is embedded in each subway sub-line road , the most both will not there is damaging the generation of the phenomenon of wireless transmitting terminals because of construction in underground, and, when After subway construction completes, it is not necessary to other sender units are being set, are utilizing wireless transmitting terminals the most permissible As subway signal delivery means.
Preferably, in described subway work information system, each described mobile terminal also includes information Feedback module;
When the Specific construction information of described job location does not corresponds with construction information on described construction drawing, institute State information feedback module and described Specific construction information is fed back to described controller;
Described controller receives described Specific construction information and by described Specific construction information reporting to technology people Member.There will be a lot of emergency situations during the construction of subway, utilize specific environment and the construction of construction On drawing inconsistent, raw material of constructing in work progress can not meet the needs etc. of built environment, work order Position utilizes feedback module that the emergency situations in work progress is fed back to controller, in order to technical staff is timely Process the emergency situations in construction.
Preferably, in described subway work information system, when described technical staff according to described specifically Construction information on construction information and described construction drawing is analyzed, and repaiies according to described Specific construction information When changing described construction drawing, described controller utilizes amended construction drawing to replace original construction drawing, and will Described amended construction drawing sends on corresponding described mobile terminal.
Preferably, in described subway work information system, described mobile terminal also includes image acquisition Module;
Described image capture module is for gathering the Specific construction in construction progress situation and record work progress Information, shown construction progress situation and described Specific construction information are uploaded to institute by described image capture module State in controller.
Preferably, in described subway work information system, described mobile terminal also includes voice module;
Described voice module is for the transmission of voice messaging;
Described voice messaging is uploaded to described controller by described voice module.Voice module is convenient, fast Record condition of construction, as construction in some problem such as instrument or insufficient raw material.
Preferably, in described subway work information system, described voice messaging includes construction progress feelings Produced problem and speech communication in condition, work progress.
Preferably, in described subway work information system, when job location shown in has multiple simultaneously During described unit in charge of construction, execute described in described mobile terminal records corresponding to each described construction site is each The construction information of work station point, and described construction information is uploaded to described controller;
Described controller receives the described construction information not isolabeling of each described unit in charge of construction and is labeled in institute Stating on construction drawing, construction drawing good for standard is sent to each described mobile terminal by described controller.
Beneficial effects of the present invention is as follows:
1, in described subway work information system, the positional information according to each unit in charge of construction will be with its position The construction drawing that confidence manner of breathing is corresponding sends to this unit in charge of construction, in order to unit in charge of construction obtains what it needed in time Construction information.
2, in described subway work information system, unit in charge of construction records its construction progress on mobile terminals Situation, the controller in subway work information system collects the construction progress situation of each unit in charge of construction, and Time, obtain the construction situation of whole subway exactly.
3, in described subway work information system, technology in its work progress is asked by each unit in charge of construction The construction practical problem that topic, Specific construction situation and construction drawing do not correspond etc., feeds back to controller, in order to Technical staff obtains the firsthand information of construction phenomenon in time, analyzes and provide these practical problems of solution Technical scheme.
Detailed description of the invention
The present invention is described in further detail below, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
The invention discloses in a kind of subway work information system, at least include:
Multiple wireless signal transmission ends, it is arranged on each sub-line road of subway work spaced a predetermined distance;
Multiple mobile terminals, it is by executing that the unit in charge of construction being responsible for each described sub-line road takes that it is responsible for Building site point;Including locating module and wireless transport module on described mobile terminal, described mobile terminal is in institute After stating at job location, described locating module positions described job location, and by the position of described job location Confidence breath is transferred in controller by described wireless transport module;
Controller, it prestores the construction drawing of subway work;Described controller accepts each described movement The described positional information that terminal is uploaded, and transfer each from described construction drawing according to described positional information Construction information corresponding to the construction drawing of the construction area corresponding to described mobile terminal and this construction drawing, Described construction drawing and described construction information are fed back on the described mobile terminal of correspondence by described controller;
Wherein, each described mobile terminal receives described construction drawing and described construction information, and, construction Constructed in described construction site by some position according to the construction information of display on described mobile terminal, meanwhile, Described construction drawing marks its construction progress situation.
In such scheme, it is embedded in the underground on each described sub-line road.
In such scheme, each described mobile terminal also includes information feedback module;
When the Specific construction information of described job location does not corresponds with construction information on described construction drawing, institute State information feedback module and described Specific construction information is fed back to described controller;
Described controller receives described Specific construction information and by described Specific construction information reporting to technology people Member.
In such scheme, in described subway work information system, when described technical staff is according to described tool Construction information in body construction information and described construction drawing is analyzed, and according to described Specific construction information When revising described construction drawing, described controller utilizes amended construction drawing to replace original construction drawing, and Described amended construction drawing is sent on corresponding described mobile terminal.
In such scheme, described mobile terminal also includes image capture module;
Described image capture module is for gathering the Specific construction in construction progress situation and record work progress Information, shown construction progress situation and described Specific construction information are uploaded to institute by described image capture module State in controller.
In such scheme, described mobile terminal also includes voice module;
Described voice module is for the transmission of voice messaging;
Described voice messaging is uploaded to described controller by described voice module.
In such scheme, described voice messaging includes produced problem in construction progress situation, work progress And speech communication.
In such scheme, in described subway work information system, when job location shown in has many simultaneously During individual described unit in charge of construction, the described mobile terminal records corresponding to each described construction site is each described The construction information in construction site, and described construction information is uploaded to described controller;
Described controller receives the described construction information not isolabeling of each described unit in charge of construction and is labeled in institute Stating on construction drawing, construction drawing good for standard is sent to each described mobile terminal by described controller.
Although embodiments of the invention are disclosed as above, but it is not restricted to description and embodiment Using listed by, it can be applied to various applicable the field of the invention completely, for being familiar with this area Personnel for, be easily achieved other amendment, therefore without departing substantially from claim and equivalency range Under the general concept limited, the present invention is not limited to specific details.

Claims (8)

1. a subway work information system, it is characterised in that including:
Multiple wireless signal transmission ends, it is arranged on each sub-line road of subway work spaced a predetermined distance;
Multiple mobile terminals, it is by executing that the unit in charge of construction being responsible for each described sub-line road takes that it is responsible for Building site point;Including locating module and wireless transport module on described mobile terminal, described mobile terminal is in institute After stating at job location, described locating module positions described job location, and by the position of described job location Confidence breath is transferred in controller by described wireless transport module;
Controller, it prestores the construction drawing of subway work;Described controller accepts each described movement The described positional information that terminal is uploaded, and transfer each from described construction drawing according to described positional information Construction information corresponding to the construction drawing of the construction area corresponding to described mobile terminal and this construction drawing, Described construction drawing and described construction information are fed back on the described mobile terminal of correspondence by described controller;
Wherein, each described mobile terminal receives described construction drawing and described construction information, and, construction Constructed in described construction site by some position according to the construction information of display on described mobile terminal, meanwhile, Described construction drawing marks its construction progress situation.
2. subway work information system as claimed in claim 1, it is characterised in that multiple described wireless Signal transmitting terminal, it is embedded in the underground on each described sub-line road.
3. subway work information system as claimed in claim 2, it is characterised in that each described movement Terminal also includes information feedback module;
When the Specific construction information of described job location does not corresponds with construction information on described construction drawing, institute State information feedback module and described Specific construction information is fed back to described controller;
Described controller receives described Specific construction information and by described Specific construction information reporting to technology people Member.
4. subway work information system as claimed in claim 3, it is characterised in that as described technology people Member is analyzed according to the construction information on described Specific construction information and described construction drawing, and according to described When Specific construction information revises described construction drawing, it is original that described controller utilizes amended construction drawing to replace Construction drawing, and described amended construction drawing is sent on corresponding described mobile terminal.
5. subway work information system as claimed in claim 4, it is characterised in that described mobile terminal Also include image capture module;
Described image capture module is for gathering the Specific construction in construction progress situation and record work progress Information, shown construction progress situation and described Specific construction information are uploaded to institute by described image capture module State in controller.
6. subway work information system as claimed in claim 5, it is characterised in that described mobile terminal Also include voice module;
Described voice module is for the transmission of voice messaging;
Described voice messaging is uploaded to described controller by described voice module.
7. subway work information system as claimed in claim 6, it is characterised in that described voice messaging Including produced problem and speech communication in construction progress situation, work progress.
8. subway work information system as claimed in claim 7, it is characterised in that when constructing Suo Shi Described mobile terminal when there is multiple described unit in charge of construction in place simultaneously, corresponding to each described construction site Record the construction information in each described construction site, and described construction information is uploaded to described controller;
Described controller receives the described construction information not isolabeling of each described unit in charge of construction and is labeled in institute Stating on construction drawing, construction drawing good for standard is sent to each described mobile terminal by described controller.
CN201610371611.6A 2016-05-30 2016-05-30 Subway construction information system Pending CN105933321A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610371611.6A CN105933321A (en) 2016-05-30 2016-05-30 Subway construction information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610371611.6A CN105933321A (en) 2016-05-30 2016-05-30 Subway construction information system

Publications (1)

Publication Number Publication Date
CN105933321A true CN105933321A (en) 2016-09-07

Family

ID=56841335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610371611.6A Pending CN105933321A (en) 2016-05-30 2016-05-30 Subway construction information system

Country Status (1)

Country Link
CN (1) CN105933321A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107784487A (en) * 2017-11-14 2018-03-09 浙江交工高等级公路养护有限公司 Data processing method and system
CN110598903A (en) * 2019-08-05 2019-12-20 中交机电工程局有限公司 Subway construction information system
CN111050283A (en) * 2019-11-22 2020-04-21 南京金海设计工程有限公司 BIM model-based real-time positioning method for construction site

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1505873A (en) * 2001-04-05 2004-06-16 �Ҵ���˾ Virtual cooperative network formed by local clients in zones without cellular services
US20110227745A1 (en) * 2010-03-19 2011-09-22 Hitachi Solutions, Ltd. Operational management system of agricultural work vehicle
CN103388344A (en) * 2013-07-23 2013-11-13 吴江市同心电子科技有限公司 GSM-based (Global System of Mobile Communication-based) pile foundation construction survey and setting-out system
CN104780223A (en) * 2015-04-30 2015-07-15 广东志高空调有限公司 Whole construction process monitoring system and monitoring method based on cloud computing technology
CN105303304A (en) * 2015-10-15 2016-02-03 贵州省邮电规划设计院有限公司 Method for engineering field management based on handheld terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1505873A (en) * 2001-04-05 2004-06-16 �Ҵ���˾ Virtual cooperative network formed by local clients in zones without cellular services
US20110227745A1 (en) * 2010-03-19 2011-09-22 Hitachi Solutions, Ltd. Operational management system of agricultural work vehicle
CN103388344A (en) * 2013-07-23 2013-11-13 吴江市同心电子科技有限公司 GSM-based (Global System of Mobile Communication-based) pile foundation construction survey and setting-out system
CN104780223A (en) * 2015-04-30 2015-07-15 广东志高空调有限公司 Whole construction process monitoring system and monitoring method based on cloud computing technology
CN105303304A (en) * 2015-10-15 2016-02-03 贵州省邮电规划设计院有限公司 Method for engineering field management based on handheld terminal

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107784487A (en) * 2017-11-14 2018-03-09 浙江交工高等级公路养护有限公司 Data processing method and system
CN110598903A (en) * 2019-08-05 2019-12-20 中交机电工程局有限公司 Subway construction information system
CN110598903B (en) * 2019-08-05 2022-04-22 中交机电工程局有限公司 Subway construction information system
CN111050283A (en) * 2019-11-22 2020-04-21 南京金海设计工程有限公司 BIM model-based real-time positioning method for construction site

Similar Documents

Publication Publication Date Title
EP2907327B1 (en) Method and device for communication between road users and/or pedestrians and a traffic infrastructure on the basis of an ad-hoc wireless motor vehicle communications system for traffic control
CN105933321A (en) Subway construction information system
CN104260762A (en) Precise positioning method and set of mine locomotives
CN107358809A (en) Personalized traffic safety information supplying system and method
CN106408861A (en) Transformer station maintenance monitoring and early warning system
CN103971538B (en) Based on the intelligent parking management system of vehicle-carrying communication
CN106323319A (en) Navigation method system
AU4484401A (en) Method and system for electronically registering and providing information on the use of a public transport facility
CN1212415A (en) Image data transfer system and method
CN103764478B (en) Stopping-time calculation module
WO2019228394A1 (en) Centralized train dispatch control system and control method
CN102644235B (en) Intelligent vehicle for signing and marking lines
CN104422442B (en) A kind of indoor navigation method and system
CN105225559B (en) A kind of multifunction teaching accessory system
CN106672017A (en) Rail transit turnout remote control system based on mobile terminal and method
CN103685534A (en) Wireless communication based vehicle-mounted data intelligent and safe updating method
CN106515789A (en) Multi-function intelligent traffic indicator for railway station platform
CN105791422A (en) Rail transit operation information platform and rail transit positioning method based on platform
CN105059323A (en) Positioning method, device and system based on terrestrial magnetism information
CN108550086A (en) A kind of recognition methods of Station construction speed and system
CN202559220U (en) Intelligent mark and marking line car
CN205211183U (en) Intelligent transportation inducible system
CN106779328A (en) A kind of information-based environmental sanitation management system
CN110856114A (en) Railway platform carriage positioning navigation device
CN107977913A (en) A kind of wisdom for architectural environment identifies system and its control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160907

RJ01 Rejection of invention patent application after publication