CN105931543A - Temporary electricity utilization hazard source identification experience area and application method - Google Patents
Temporary electricity utilization hazard source identification experience area and application method Download PDFInfo
- Publication number
- CN105931543A CN105931543A CN201610536953.9A CN201610536953A CN105931543A CN 105931543 A CN105931543 A CN 105931543A CN 201610536953 A CN201610536953 A CN 201610536953A CN 105931543 A CN105931543 A CN 105931543A
- Authority
- CN
- China
- Prior art keywords
- demonstration platform
- identification
- switch
- demonstration
- protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B23/00—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
- G09B23/06—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
- G09B23/18—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism
- G09B23/188—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for motors; for generators; for power supplies; for power distribution
Landscapes
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Algebra (AREA)
- Power Engineering (AREA)
- Mathematical Optimization (AREA)
- Mathematical Physics (AREA)
- Pure & Applied Mathematics (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Theoretical Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
临时用电危险源识别体验区及使用方法是通过安全用电示范台来展示临时用电要求,是为建筑类大学的体验式教学以及施工企业的农民工进行安全临时用电而设计的,属于职业教育设施领域;临时用电危险源识别体验区由外供电源示范台、三级供电示范台、一机一闸一保护示范台、防雷接地示范台与触电救护示范台组成的;外供电源示范台通过电线连接三级供电示范台;一机一闸一保护示范台处于三级供电示范台的末端,通过电线连接三级供电示范台;触电救护示范台与外供电源示范台、三级供电示范台、一机一闸一保护示范台、防雷接地示范台都通过电线连接;本发明的有益效果是使大学生或农民工通过临时用电体验式教学,对临时用电各种不利环境施工有直接感受。
Temporary power use hazard identification experience area and usage method are to demonstrate temporary power use requirements through the safe power use demonstration platform. In the field of vocational education facilities; the temporary electricity hazard source identification experience area is composed of an external power supply demonstration station, a three-level power supply demonstration station, a machine, a gate and a protection demonstration station, a lightning protection grounding demonstration station, and an electric shock rescue demonstration station; The power supply demonstration platform is connected to the three-level power supply demonstration platform through wires; the one-machine-one-gate-one-protection demonstration platform is at the end of the three-level power supply demonstration platform, and is connected to the three-level power supply demonstration platform through wires; the electric shock rescue demonstration platform and the external power supply demonstration platform, three Level power supply demonstration station, one machine one gate one protection demonstration station, and lightning protection grounding demonstration station are all connected by wires; Environmental construction has a direct feeling.
Description
技术领域technical field
本发明是临时用电危险源识别体验区及使用方法,是通过安全用电示范台来展示临时用电要求的,是为建筑类大学的体验式教学以及施工企业的农民工进行安全临时用电而设计的,属于职业教育设施领域。The present invention is an experience area for identification of dangerous sources of temporary electricity use and a method for using it. It uses a safe electricity use demonstration platform to demonstrate temporary electricity use requirements. It is designed and belongs to the field of vocational education facilities.
背景技术Background technique
临时用电是指基建工地、农田基本建设、农村养殖业和非正常年景的新增抗旱、排涝用电及其他需要在电力部门立户表计之外,新接电源的用电方式,用电时间一般不超过1年。要求凡属于临时性用电,用电单位或个人应向供电所办理申请手续,经同意双方签订供用电协议并装设计量表计后方可用电;凡属临时性用电,均应装设漏电保护器和短路、过载保护;临时用电如需架设线路,则应符合《农村低压电力技术规程》的有关规定;临时性用电不得转供电;用电结束,供电所应拆除临时用电装置,不允许将临时用电直接转为正式用电;供电所对临时性用电的管理应纳入具体责任人的工作考核。管理责任人应加强对其检查和巡逻;临时性客户的内部线路应符合装置标准,并可靠固定;移动电器设备的金属外壳应具备可靠接地,电源线应用完好的绝缘电线,不允许使用破损的电线和合格的电器设备。Temporary power consumption refers to new power consumption methods for infrastructure construction sites, farmland capital construction, rural aquaculture, and abnormal years for drought resistance and flood drainage, and other power consumption that needs to be connected to a new power supply in addition to the establishment of a household meter in the power department. The time is generally not more than 1 year. It is required that for temporary electricity use, the power user unit or individual should apply to the power supply station, and the electricity can only be used after the two parties agree to sign a power supply agreement and install a design meter; all temporary electricity use should be installed Leakage protectors and short-circuit and overload protections shall be installed; if temporary power lines need to be erected, they shall comply with the relevant provisions of the "Rural Low-Voltage Power Technical Regulations"; temporary power use shall not be transferred to power supply; It is not allowed to directly convert temporary power consumption into formal power consumption; the management of temporary power consumption by power supply stations should be included in the work assessment of specific responsible persons. The person in charge of management should strengthen inspections and patrols; the internal wiring of temporary customers should meet the device standards and be reliably fixed; the metal casing of mobile electrical equipment should be reliably grounded, and the power cord should be insulated wires that are in good condition. Damaged wires are not allowed. Electrical wiring and qualified electrical equipment.
临时用电是引起事故多发的重大危险源之一,对于没有实践经验的大学生,和还没有进入工作状态的农民工来说,由于没有临时用电的体验,对临时用电的危险性认识还不足;我国建筑工程内的大学教学一直延用讲授为主的教学方法,近年来我国高等与中等职业教育在教学虽然有所突破,采用了多媒体等信息化教学手段,设置了一些教学情境,但没有根本摆脱以讲授为主的教学模式;为使教育能跟上我国经济发展的步伐,国家决策改造一批应用技术大学,这些大学的教师、设施都是按照精英式培养模式设置的,要想贴近施工教学,难度很大;另一方面,随着我国的工业2025计划的颁布实施,近年来国家加强了对农民工的培训要求,而且对建筑施工企业的检查考核力度加大,可是建筑施工企业很难组织对农民工的临时用电的培训,应用技术大学、高职院校、中职学校目前的设施也不能满足从事建筑业的农民工临时用电的培训要求;Temporary use of electricity is one of the major hazards that cause frequent accidents. For college students who have no practical experience and migrant workers who have not yet entered the working state, because they have no experience in temporary use of electricity, they still have little understanding of the dangers of temporary use of electricity. Insufficient; the university teaching in China's construction engineering has been continuing to use lecture-based teaching methods. Although China's higher and secondary vocational education has made breakthroughs in teaching in recent years, it has adopted multimedia and other information-based teaching methods and set up some teaching situations. It has not fundamentally got rid of the teaching mode based on lectures; in order to make education keep up with the pace of China's economic development, the state has decided to transform a number of universities of applied technology. The teachers and facilities of these universities are all set up according to the elite training mode. It is very difficult to be close to construction teaching; on the other hand, with the promulgation and implementation of China's Industry 2025 plan, the state has strengthened the training requirements for migrant workers in recent years, and the inspection and assessment of construction companies have increased, but construction construction It is difficult for enterprises to organize training on the temporary use of electricity for migrant workers, and the current facilities of applied technology universities, higher vocational colleges, and secondary vocational schools cannot meet the training requirements for temporary use of electricity for migrant workers engaged in the construction industry;
本发明提供的临时用电危险源识别体验区,可为建筑工程中临时用电培训教育提供帮助。The identification experience area for temporary electricity use hazard sources provided by the invention can provide assistance for training and education in temporary electricity use in construction projects.
发明内容Contents of the invention
本方案的具体做法是:采用如图1所示的临时用电危险源识别体验区,是通过安全用电示范台来展示临时用电要求的;临时用电危险源识别体验区由外供电源示范台1、三级供电示范台2、一机一闸一保护示范台3、防雷接地示范台4与触电救护示范台5组成的;外供电源示范台1通过电线连接三级供电示范台2;一机一闸一保护示范台3处于三级供电示范台2的末端,通过电线连接三级供电示范台2;触电救护示范台5与外供电源示范台1、三级供电示范台2、一机一闸一保护示范台3、防雷接地示范台4都通过电线连接。The specific method of this plan is: use the temporary power consumption hazard identification experience area as shown in Figure 1, and demonstrate the temporary power consumption requirements through the safe power consumption demonstration platform; the temporary power consumption hazard source identification experience area is powered by an external power source Demonstration station 1, three-level power supply demonstration station 2, one machine, one gate and one protection demonstration station 3, lightning protection grounding demonstration station 4 and electric shock rescue demonstration station 5; external power supply demonstration station 1 is connected to the three-level power supply demonstration station through wires 2. One machine, one gate, one protection demonstration station 3 is located at the end of the three-level power supply demonstration station 2, and is connected to the three-level power supply demonstration station 2 through wires; the electric shock rescue demonstration station 5 is connected to the external power supply demonstration station 1, and the three-level power supply demonstration station 2 , One machine, one gate, one protection demonstration station 3, and the lightning protection and grounding demonstration station 4 are all connected by wires.
外供电源示范台1是外来电源接入施工现场的规范化设置的展示台,包括外来高压线、总开关、现场变压器、配电柜、配电柜基础、TN-S接零保护系统组成的;外来高压线是连接高压线路与现场变压器的连接线,在线路中设置了总开关;现场变压器与配电柜通过电缆连接;通过变压器的变配电,进入配电柜的电压在220-38-V之间;配电柜与TN-S接零保护系统连接。External power supply demonstration platform 1 is a standardized display platform for external power supply access to the construction site, including external high-voltage lines, main switches, on-site transformers, power distribution cabinets, power distribution cabinet foundations, and TN-S zero protection system; The high-voltage line is the connection line connecting the high-voltage line and the on-site transformer, and a main switch is set in the line; the on-site transformer and the power distribution cabinet are connected by cables; through the transformation and distribution of the transformer, the voltage entering the power distribution cabinet is between 220-38-V room; the power distribution cabinet is connected to the TN-S zero protection system.
三级供电示范台2是现场标准三级配电的展示台,包括配电柜、配电箱与开关箱以及连接线路;配电柜是承接变压器将高压线路变成现场用电线路控制的总配电柜,配电柜可根据现场需要设置若干台配电箱,配电柜与配电箱之间采用导线连接;配电柜与配电箱之间的导线原则上沿着施工现场的建筑围墙敷设,线外必须有绝缘体保护;可采用电线连接,也可采用电缆连接,采用电线连接时,可在工地围墙顶部设电线杆架设,架设高度距墙顶不小于4米;采用电缆连接时,可沿工地围墙墙根敷设;电缆穿过门口、道路时,电缆必须外滔滔管,埋设与门口或道路的地表一下;配电箱位于集中用电的用电器附近,每台配电柜可以根据现场实际需要,配置若干开关箱,每台开关箱与配电箱之间的距离不得大于30米;开关箱是位于用电器附近的电器线路控制设备,开关箱与配电箱之间,开关箱与用电器之间均采用电缆连接,开关箱与用电器之间的距离不大于3米;Three-level power supply demonstration platform 2 is a demonstration platform for on-site standard three-level power distribution, including power distribution cabinets, distribution boxes, switch boxes and connecting lines; Power distribution cabinet, the power distribution cabinet can be equipped with several distribution boxes according to the needs of the site, and the connection between the power distribution cabinet and the distribution box is connected by wires; When laying the fence, there must be insulator protection outside the line; it can be connected by wire or cable. When using wire connection, it can be erected on the top of the fence on the construction site. The height of the erection is not less than 4 meters from the top of the wall; when using cable connection , can be laid along the root of the wall of the construction site; when the cable passes through the doorway or road, the cable must be piped outside and buried below the surface of the doorway or road; the distribution box is located near the electrical appliances for centralized power consumption. According to the actual needs of the site, configure several switch boxes, and the distance between each switch box and the distribution box shall not be greater than 30 meters; Cables are used to connect with the electrical appliances, and the distance between the switch box and the electrical appliances is not more than 3 meters;
配电柜、配电箱、开关箱的外壳优先推荐用钢板制作,配电柜的钢板外壳的厚度不小于3毫米,配电箱的外壳钢板厚度不小于1.5毫米,开关箱的外壳钢板厚度不小于1.2毫米。The shells of power distribution cabinets, distribution boxes, and switch boxes are preferably made of steel plates. The thickness of the steel plate shells of power distribution cabinets is not less than 3 mm, the thickness of the shell steel plates of distribution boxes is not less than 1.5 mm, and the thickness of the shell steel plates of switch boxes is not less than 3 mm. Less than 1.2mm.
一机一闸一保护示范台3是展示开关箱与用电器之间关系的场所;一机一闸一保护示范台3是一台用电器必须配置一个开关柜,一个开关柜也只能配置一台用电器;每个开关柜必须配置一个漏电保护器。One Machine One Gate One Protection Demonstration Station 3 is a place to display the relationship between switch boxes and electrical appliances; One Machine One Gate One Protection Demonstration Station 3 is that one electrical appliance must be equipped with one switch cabinet, and one switch cabinet can only be equipped with one household appliances; each switchgear must be equipped with a leakage protector.
防雷接地示范台4是展示现场需要防雷接地的设施的示范台;展示建筑施工现场的塔吊、井架、升降机、脚手架、配电室、对焊机的根部均设置接地保护;当用电设备的耗能大于100kVA时,接地电阻不得大于4Ω,当用电设备的耗能小于100kVA时,接地电阻不得大于10Ω,有特殊要求时,接地电阻不得大于1Ω。Lightning protection and grounding demonstration platform 4 is a demonstration platform for displaying facilities that require lightning protection and grounding on the site; tower cranes, derricks, elevators, scaffolding, power distribution rooms, and butt welding machines at the construction site are all equipped with grounding protection; when electrical equipment When the energy consumption of the electrical equipment is greater than 100kVA, the grounding resistance shall not be greater than 4Ω. When the energy consumption of the electrical equipment is less than 100kVA, the grounding resistance shall not be greater than 10Ω. When there are special requirements, the grounding resistance shall not be greater than 1Ω.
触电救护示范台5展示的是当有人员触电后实施救护的情景;触电救护示范台5包括触电人员的模型、模拟电路、救援金属棒、救援木棒、模拟软件、开关;线路电压采用12V及以下的安全电压;当需要进行触电救护体验时,接通开关后,模拟电路就有电流显示,同时触电人员模型也闪电火花;如果采用金属棒去挑电线救人,则操作者触电,在安全电压的作用下有麻烫的感觉;如果采用救援木棒施救,则电线被跳开,触电人员的模型脱离危险。What the electric shock ambulance demonstration platform 5 shows is the scene of carrying out rescue after the personnel is electrocuted; The electric shock ambulance demonstration platform 5 comprises the model of the electric shock personnel, analog circuit, rescue metal bar, rescue wooden stick, simulation software, switch; Line voltage adopts 12V and The safe voltage below; when it is necessary to experience electric shock rescue, after the switch is turned on, the analog circuit will display the current, and at the same time, the electric shock personnel model will also spark with lightning; Under the action of the voltage, there will be a feeling of scalding; if a rescue stick is used for rescue, the wire will be jumped away, and the model of the electric shock person will be out of danger.
所述的临时用电危险源识别是,包括对用电设备危险源的识别、对用电线路危险源的识别、带电体设施设置的危险源识别、受带电体威胁的危险原识别以及用电防护的危险源的识别;The temporary electricity hazard identification includes identification of hazard sources of electrical equipment, identification of hazard sources of power lines, identification of hazards installed in charged body facilities, identification of hazards threatened by electrified objects, and identification of electrical hazards. Identification of hazards to be protected against;
对用电设备危险源的识别是,检查用电设备质量是否符合要求,包括变压器、配电柜、配电箱、开关箱以及用电器的质量必须符合各自的产品质量要求,否则就是危险源;The identification of hazard sources for electrical equipment is to check whether the quality of electrical equipment meets the requirements, including the quality of transformers, power distribution cabinets, distribution boxes, switch boxes, and electrical appliances must meet their respective product quality requirements, otherwise it is a source of danger;
对用电线路危险源的识别是,线路是否采用三相五线制,导线直径、质量、绝缘状况、线路设置位置、线路保护情况是否符合规范与标准要求,否则就是危险源;The identification of the hazard source of the power line is whether the line adopts a three-phase five-wire system, whether the wire diameter, quality, insulation condition, line setting position, and line protection meet the requirements of the code and standard, otherwise it is a source of danger;
带电体设施设置的危险源识别是,包括是否按照用电规范要求设置配电箱、开关箱以及漏电保护装置是否符合规范与标准要求,否则就是危险源;The identification of hazards for the installation of live facilities includes whether the distribution boxes, switch boxes and leakage protection devices are installed in accordance with the requirements of the electricity use regulations, whether they meet the requirements of the regulations and standards, otherwise they are sources of hazards;
受带电体威胁的危险源识别是,建筑物距离高压线路是否在安全距离之外,操作人员距离高压线路是否在安全距离之外,塔吊吊装的构件距离高压线路是否在安全距离之外,是否符合规范与标准要求,否则就是危险源;The identification of hazards threatened by live objects is whether the building is at a safe distance from the high-voltage line, whether the operator is at a safe distance from the high-voltage line, whether the components hoisted by the tower crane are at a safe distance from the high-voltage line, and whether it complies with Specification and standard requirements, otherwise it is a source of danger;
用电防护的危险源的识别是,漏电保护设置是否到位,防雷接地保护是否到位,是否符合规范与标准要求,否则就是危险源;The identification of the hazard source of electrical protection is whether the leakage protection setting is in place, whether the lightning protection grounding protection is in place, and whether it meets the requirements of the code and standard, otherwise it is a source of danger;
所述的临时用电危险源识别体验区的建设方法是,检查验收建设单位提供的电压器和配电柜的建设是否符合规范要求及现场使用要求;验收合格后,设置配电箱,架设配电柜到配电箱之间的现场临时线路,设置开关箱,设置开关箱与配电箱之间的线路,设置开关箱与用电器之间的线路;检查所有线路的接头是否完好,送电试车。The construction method of the temporary electricity hazard source identification experience area is to check and accept whether the construction of the transformer and the power distribution cabinet provided by the construction unit meets the requirements of the specification and the requirements for on-site use; For the on-site temporary line between the electric cabinet and the distribution box, set the switch box, set the line between the switch box and the distribution box, and set the line between the switch box and the electrical appliance; test drive.
本发明的有益效果是使大学生或农民工通过临时用电体验式教学,对临时用电各种不利环境施工有直接感受。The beneficial effect of the invention is to enable college students or migrant workers to have a direct experience of construction in various unfavorable environments for temporary electricity use through temporary electricity use experiential teaching.
附图说明Description of drawings
图1 临时用电危险源识别体验区示意图;Figure 1 Schematic diagram of the temporary electricity hazard source identification experience area;
图中:1-外供电源示范台;2-三级供电示范台;3-一机一闸一保护示范台;防雷接地示范台;5-触电救护示范台。In the figure: 1-external power supply demonstration station; 2-three-level power supply demonstration station; 3-one machine, one gate and one protection demonstration station; lightning protection and grounding demonstration station; 5-electric shock rescue demonstration station.
具体实施方式detailed description
实施例Example
某大学自行设计了采用如图1所示的临时用电危险源识别体验区,是通过安全用电示范台来展示临时用电要求的;临时用电危险源识别体验区由外供电源示范台1、三级供电示范台2、一机一闸一保护示范台3、防雷接地示范台4与触电救护示范台5组成的;外供电源示范台1通过电线连接三级供电示范台2;一机一闸一保护示范台3处于三级供电示范台2的末端,通过电线连接三级供电示范台2;触电救护示范台5与外供电源示范台1、三级供电示范台2、一机一闸一保护示范台3、防雷接地示范台4都通过电线连接。A university has designed the temporary electricity hazard identification experience area shown in Figure 1, which demonstrates the temporary electricity requirements through a safe electricity demonstration platform; the temporary electricity hazard identification experience area is provided by an external power supply demonstration platform 1. Three-level power supply demonstration station 2. One machine, one gate and one protection demonstration station 3. Lightning protection grounding demonstration station 4 and electric shock rescue demonstration station 5. The external power supply demonstration station 1 is connected to the three-level power supply demonstration station 2 through wires; One machine, one gate, one protection demonstration station 3 is at the end of the three-level power supply demonstration station 2, and is connected to the three-level power supply demonstration station 2 through wires; the electric shock rescue demonstration station 5 is connected with the external power supply demonstration station 1, the three-level power supply demonstration station 2, one Machine-gate-protection demonstration unit 3 and lightning protection grounding demonstration unit 4 are all connected by wires.
外供电源示范台1是外来电源接入施工现场的规范化设置的展示台,包括外来高压线、总开关、现场变压器、配电柜、配电柜基础、TN-S接零保护系统组成的;外来高压线是连接高压线路与现场变压器的连接线,在线路中设置了总开关;现场变压器与配电柜通过电缆连接;通过变压器的变配电,进入配电柜的电压在220-38-V之间;配电柜与TN-S接零保护系统连接。External power supply demonstration platform 1 is a standardized display platform for external power supply access to the construction site, including external high-voltage lines, main switches, on-site transformers, power distribution cabinets, power distribution cabinet foundations, and TN-S zero protection system; The high-voltage line is the connection line connecting the high-voltage line and the on-site transformer, and a main switch is set in the line; the on-site transformer and the power distribution cabinet are connected by cables; through the transformation and distribution of the transformer, the voltage entering the power distribution cabinet is between 220-38-V room; the power distribution cabinet is connected to the TN-S zero protection system.
三级供电示范台2是现场标准三级配电的展示台,包括配电柜、配电箱与开关箱以及连接线路;配电柜是承接变压器将高压线路变成现场用电线路控制的总配电柜,配电柜可根据现场需要设置若干台配电箱,配电柜与配电箱之间采用导线连接;配电柜与配电箱之间的导线原则上沿着施工现场的建筑围墙敷设,线外必须有绝缘体保护;可采用电线连接,也可采用电缆连接,采用电线连接时,可在工地围墙顶部设电线杆架设,架设高度距墙顶不小于4米;采用电缆连接时,可沿工地围墙墙根敷设;电缆穿过门口、道路时,电缆必须外滔滔管,埋设与门口或道路的地表一下;配电箱位于集中用电的用电器附近,每台配电柜可以根据现场实际需要,配置若干开关箱,每台开关箱与配电箱之间的距离不得大于30米;开关箱是位于用电器附近的电器线路控制设备,开关箱与配电箱之间,开关箱与用电器之间均采用电缆连接,开关箱与用电器之间的距离不大于3米;Three-level power supply demonstration platform 2 is a demonstration platform for on-site standard three-level power distribution, including power distribution cabinets, distribution boxes, switch boxes and connecting lines; Power distribution cabinet, the power distribution cabinet can be equipped with several distribution boxes according to the needs of the site, and the connection between the power distribution cabinet and the distribution box is connected by wires; When laying the fence, there must be insulator protection outside the line; it can be connected by wire or cable. When using wire connection, it can be erected on the top of the fence on the construction site. The height of the erection is not less than 4 meters from the top of the wall; when using cable connection , can be laid along the root of the wall of the construction site; when the cable passes through the doorway or road, the cable must be piped outside and buried below the surface of the doorway or road; the distribution box is located near the electrical appliances for centralized power consumption. According to the actual needs of the site, configure several switch boxes, and the distance between each switch box and the distribution box shall not be greater than 30 meters; Cables are used to connect with the electrical appliances, and the distance between the switch box and the electrical appliances is not more than 3 meters;
配电柜、配电箱、开关箱的外壳用钢板制作,配电柜的钢板外壳的厚度不小于3毫米,配电箱的外壳钢板厚度不小于1.5毫米,开关箱的外壳钢板厚度不小于1.2毫米。The shell of the power distribution cabinet, distribution box and switch box is made of steel plate. The thickness of the steel plate shell of the power distribution cabinet is not less than 3mm, the thickness of the shell steel plate of the distribution box is not less than 1.5mm, and the thickness of the shell steel plate of the switch box is not less than 1.2mm mm.
一机一闸一保护示范台3是展示开关箱与用电器之间关系的场所;一机一闸一保护示范台3是一台用电器必须配置一个开关柜,一个开关柜也只能配置一台用电器;每个开关柜必须配置一个漏电保护器。One Machine One Gate One Protection Demonstration Station 3 is a place to display the relationship between switch boxes and electrical appliances; One Machine One Gate One Protection Demonstration Station 3 is that one electrical appliance must be equipped with one switch cabinet, and one switch cabinet can only be equipped with one household appliances; each switchgear must be equipped with a leakage protector.
防雷接地示范台4是展示现场需要防雷接地的设施的示范台;展示建筑施工现场的塔吊、井架、升降机、脚手架、配电室、对焊机的根部均设置接地保护;当用电设备的耗能大于100kVA时,接地电阻不得大于4Ω,当用电设备的耗能小于100kVA时,接地电阻不得大于10Ω,有特殊要求时,接地电阻不得大于1Ω。Lightning protection and grounding demonstration platform 4 is a demonstration platform for displaying facilities that require lightning protection and grounding on the site; tower cranes, derricks, elevators, scaffolding, power distribution rooms, and butt welding machines at the construction site are all equipped with grounding protection; when electrical equipment When the energy consumption of the electrical equipment is greater than 100kVA, the grounding resistance shall not be greater than 4Ω. When the energy consumption of the electrical equipment is less than 100kVA, the grounding resistance shall not be greater than 10Ω. When there are special requirements, the grounding resistance shall not be greater than 1Ω.
触电救护示范台5展示的是当有人员触电后实施救护的情景;触电救护示范台5包括触电人员的模型、模拟电路、救援金属棒、救援木棒、模拟软件、开关;线路电压采用12V及以下的安全电压;当需要进行触电救护体验时,接通开关后,模拟电路就有电流显示,同时触电人员模型也闪电火花;如果采用金属棒去挑电线救人,则操作者触电,在安全电压的作用下有麻烫的感觉;如果采用救援木棒施救,则电线被跳开,触电人员的模型脱离危险。What the electric shock ambulance demonstration platform 5 shows is the scene of carrying out rescue after the personnel is electrocuted; The electric shock ambulance demonstration platform 5 comprises the model of the electric shock personnel, analog circuit, rescue metal bar, rescue wooden stick, simulation software, switch; Line voltage adopts 12V and The safe voltage below; when it is necessary to experience electric shock rescue, after the switch is turned on, the analog circuit will display the current, and at the same time, the electric shock personnel model will also spark with lightning; Under the action of the voltage, there will be a feeling of scalding; if a rescue stick is used for rescue, the wire will be jumped away, and the model of the electric shock person will be out of danger.
所述的临时用电危险源识别是,包括对用电设备危险源的识别、对用电线路危险源的识别、带电体设施设置的危险源识别、受带电体威胁的危险原识别以及用电防护的危险源的识别;The temporary electricity hazard identification includes identification of hazard sources of electrical equipment, identification of hazard sources of power lines, identification of hazards installed in charged body facilities, identification of hazards threatened by electrified objects, and identification of electrical hazards. Identification of hazards to be protected against;
对用电设备危险源的识别是,检查用电设备质量是否符合要求,包括变压器、配电柜、配电箱、开关箱以及用电器的质量必须符合各自的产品质量要求,否则就是危险源;The identification of hazard sources for electrical equipment is to check whether the quality of electrical equipment meets the requirements, including the quality of transformers, power distribution cabinets, distribution boxes, switch boxes, and electrical appliances must meet their respective product quality requirements, otherwise it is a source of danger;
对用电线路危险源的识别是,线路是否采用三相五线制,导线直径、质量、绝缘状况、线路设置位置、线路保护情况是否符合规范与标准要求,否则就是危险源;The identification of the hazard source of the power line is whether the line adopts a three-phase five-wire system, whether the wire diameter, quality, insulation condition, line setting position, and line protection meet the requirements of the code and standard, otherwise it is a source of danger;
带电体设施设置的危险源识别是,包括是否按照用电规范要求设置配电箱、开关箱以及漏电保护装置是否符合规范与标准要求,否则就是危险源;The identification of hazards for the installation of live facilities includes whether the distribution boxes, switch boxes and leakage protection devices are installed in accordance with the requirements of the electricity use regulations, whether they meet the requirements of the regulations and standards, otherwise they are sources of hazards;
受带电体威胁的危险源识别是,建筑物距离高压线路是否在安全距离之外,操作人员距离高压线路是否在安全距离之外,塔吊吊装的构件距离高压线路是否在安全距离之外,是否符合规范与标准要求,否则就是危险源;The identification of hazards threatened by live objects is whether the building is at a safe distance from the high-voltage line, whether the operator is at a safe distance from the high-voltage line, whether the components hoisted by the tower crane are at a safe distance from the high-voltage line, and whether it complies with Specification and standard requirements, otherwise it is a source of danger;
用电防护的危险源的识别是,漏电保护设置是否到位,防雷接地保护是否到位,是否符合规范与标准要求,否则就是危险源;The identification of the hazard source of electrical protection is whether the leakage protection setting is in place, whether the lightning protection grounding protection is in place, and whether it meets the requirements of the code and standard, otherwise it is a source of danger;
所述的临时用电危险源识别体验区的建设方法是,检查验收建设单位提供的电压器和配电柜的建设是否符合规范要求及现场使用要求;验收合格后,设置配电箱,架设配电柜到配电箱之间的现场临时线路,设置开关箱,设置开关箱与配电箱之间的线路,设置开关箱与用电器之间的线路;检查所有线路的接头是否完好,送电试车。The construction method of the temporary electricity hazard source identification experience area is to check and accept whether the construction of the transformer and the power distribution cabinet provided by the construction unit meets the requirements of the specification and the requirements for on-site use; For the on-site temporary line between the electric cabinet and the distribution box, set the switch box, set the line between the switch box and the distribution box, and set the line between the switch box and the electrical appliance; test drive.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610536953.9A CN105931543A (en) | 2016-07-11 | 2016-07-11 | Temporary electricity utilization hazard source identification experience area and application method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610536953.9A CN105931543A (en) | 2016-07-11 | 2016-07-11 | Temporary electricity utilization hazard source identification experience area and application method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105931543A true CN105931543A (en) | 2016-09-07 |
Family
ID=56827885
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610536953.9A Pending CN105931543A (en) | 2016-07-11 | 2016-07-11 | Temporary electricity utilization hazard source identification experience area and application method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105931543A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114333220A (en) * | 2022-01-21 | 2022-04-12 | 北京天恒安科集团有限公司 | A kind of temporary electricity management method of construction site |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201270412Y (en) * | 2008-08-29 | 2009-07-08 | 苏州二建建筑集团有限公司 | Temporary energy consumption general distribution box leakage protection and control apparatus for construction |
| CN201616628U (en) * | 2010-02-09 | 2010-10-27 | 耿建生 | Distribution box for construction technology |
| CN203135226U (en) * | 2013-03-19 | 2013-08-14 | 朝阳当凯电力开关有限公司 | Three-stage distribution box |
| CN204303227U (en) * | 2014-11-12 | 2015-04-29 | 国家电网公司 | Body sense real training formula Intelligent electric leakage protection system |
| CN204496803U (en) * | 2015-03-31 | 2015-07-22 | 北京维尔森科技发展有限公司 | A kind of relief experience apparatus that gets an electric shock |
| CN204651712U (en) * | 2015-05-27 | 2015-09-16 | 广东威恒输变电工程有限公司 | The interim safety electric power distribution box in a kind of job site and consisting of controller switching equipment |
| CN206021720U (en) * | 2016-07-11 | 2017-03-15 | 江苏建筑职业技术学院 | Temporary electricity experiences area |
-
2016
- 2016-07-11 CN CN201610536953.9A patent/CN105931543A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201270412Y (en) * | 2008-08-29 | 2009-07-08 | 苏州二建建筑集团有限公司 | Temporary energy consumption general distribution box leakage protection and control apparatus for construction |
| CN201616628U (en) * | 2010-02-09 | 2010-10-27 | 耿建生 | Distribution box for construction technology |
| CN203135226U (en) * | 2013-03-19 | 2013-08-14 | 朝阳当凯电力开关有限公司 | Three-stage distribution box |
| CN204303227U (en) * | 2014-11-12 | 2015-04-29 | 国家电网公司 | Body sense real training formula Intelligent electric leakage protection system |
| CN204496803U (en) * | 2015-03-31 | 2015-07-22 | 北京维尔森科技发展有限公司 | A kind of relief experience apparatus that gets an electric shock |
| CN204651712U (en) * | 2015-05-27 | 2015-09-16 | 广东威恒输变电工程有限公司 | The interim safety electric power distribution box in a kind of job site and consisting of controller switching equipment |
| CN206021720U (en) * | 2016-07-11 | 2017-03-15 | 江苏建筑职业技术学院 | Temporary electricity experiences area |
Non-Patent Citations (2)
| Title |
|---|
| "《中华人民共和国行业标准JGJ46-2005施工现场临时用电安全技术规范》" * |
| 《工程质量》 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114333220A (en) * | 2022-01-21 | 2022-04-12 | 北京天恒安科集团有限公司 | A kind of temporary electricity management method of construction site |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109217151A (en) | Electric substation's installation engineering method | |
| CN106057005A (en) | Building power supply and distribution teaching technology simulation training system | |
| Wellman | OSHA arc-flash injury data analysis | |
| CN206021720U (en) | Temporary electricity experiences area | |
| CN203276676U (en) | Training device for safe use of electricity | |
| CN109003531A (en) | There is the Electrician Operation comprehensive training system of intelligent check based on network | |
| CN204046179U (en) | A kind of intelligent Coal Mine Power Distribution System comprehensive experimental device | |
| CN206684282U (en) | A kind of laboratory insulating power supply insulation fault location system | |
| CN204440773U (en) | Three grades of aftercurrent action protecting simulation training systems | |
| CN204303227U (en) | Body sense real training formula Intelligent electric leakage protection system | |
| CN204732699U (en) | Simple and easy and the cabinet of switch cubicle | |
| CN205334787U (en) | Become distribution analog system | |
| CN211046060U (en) | Portable detachable handcart type 10KV high-voltage complete set distribution device examination cabinet | |
| CN202651661U (en) | Hollowed type portable insulation stool of transformer substation | |
| CN208444498U (en) | A pumped-storage power station training base | |
| CN201270412Y (en) | Temporary energy consumption general distribution box leakage protection and control apparatus for construction | |
| CN204667663U (en) | Power transformation secondary standard equalization real training and standardized work flows system | |
| CN220509561U (en) | Real standard platform of limited space safety intelligence | |
| CN102750857B (en) | Somatosensory practical training circuit and device for ground protection of devices | |
| CN203659340U (en) | County scheduling and monitoring integration simulation training system | |
| Pratt | Prevention of electrical accidents with safe personal protective bonding and earthing | |
| Wang | Analysis of the operational risk controls in the electric power plant | |
| CN211456325U (en) | A portable intelligent alarm power box | |
| Siddans | Effectiveness of earth mat when jointing high voltage underground cables (33 kV and above) | |
| Fowler et al. | Electrical Safety: Safety and Health for Electrical Trades–Student Manual (Revised Edition) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160907 |
|
| RJ01 | Rejection of invention patent application after publication |