CN105926459B - A kind of bridge construction steelframe equipment - Google Patents

A kind of bridge construction steelframe equipment Download PDF

Info

Publication number
CN105926459B
CN105926459B CN201610442553.1A CN201610442553A CN105926459B CN 105926459 B CN105926459 B CN 105926459B CN 201610442553 A CN201610442553 A CN 201610442553A CN 105926459 B CN105926459 B CN 105926459B
Authority
CN
China
Prior art keywords
fixed station
fixed
traveling table
hydraulic cylinders
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610442553.1A
Other languages
Chinese (zh)
Other versions
CN105926459A (en
Inventor
李峰辉
马宁
马萌
李玉
陈才俊
李亚龙
杜伟鹏
赵燚
魏永强
辛贝贝
陈贤
袁良东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Transportation Planning Survey Design And Research Institute Co ltd
Original Assignee
Zhengzhou Communications Planning Survey & Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Communications Planning Survey & Design Institute filed Critical Zhengzhou Communications Planning Survey & Design Institute
Priority to CN201610442553.1A priority Critical patent/CN105926459B/en
Publication of CN105926459A publication Critical patent/CN105926459A/en
Application granted granted Critical
Publication of CN105926459B publication Critical patent/CN105926459B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of bridge construction steelframe equipment, including bottom plate, the lower surface of bottom plate is symmetrically arranged with four universal wheels;Fixed station is welded with the right side of the upper surface of bottom plate;The left side of fixed station is connected with leading screw by bearing;The left end of leading screw is provided with motor;Motor is arranged on bottom plate by motor cabinet;Traveling table has been connected through a screw thread in the middle part of leading screw;The lower end of traveling table is symmetrically mounted on two line slide rails;Two hydraulic cylinders are mounted on each step surface of fixed station and each step surface of traveling table;Each hydraulic cylinder on fixed station is installed in a fixed plate;The upper end of a number fixed plate is connected by two upper support columns with the step surface of fixed station the top.The present invention can realize the fast construction function of arch bridge pouring structure, be available for being used for a long time after putting up, and have the advantages that to build that speed is fast, build efficiency high, wide and service life is long using scope.

Description

A kind of bridge construction steelframe equipment
Technical field
The present invention relates to bridge construction field, more particularly to a kind of bridge construction steelframe equipment.
Background technology
In arch bridge architectural process, generally first need to build the basic yoke or bamboo frame structure of arch bridge, generally What is used builds mode manually to build, and the yoke or bamboo frame structure manually built are substantially disposable, reuse Need to build again, therefore speed is slow, build the defects such as efficiency is low, the scope of application is small in the presence of building for the mode manually built, by Exposed to wind and rain outside in the yoke or bamboo frame structure manually built, perishable, the intensity and service life built can seriously drop It is low, if operator works above for a long time, there is very big potential safety hazard, it is careless slightly to will result in security incident.
The content of the invention
In order to solve the above problems, the invention provides a kind of bridge construction steelframe equipment, existing highway bridge can be solved and built Yoke when building or bamboo frame structure exist build that speed is slow, the low, scope of application of building efficiency is small and the problem such as service life, can be real The fast construction function of existing arch bridge pouring structure, is available for being used for a long time after putting up, with building that speed is fast, build efficiency high, Using scope is wide and the advantages of long service life, and without any potential safety hazard, protect operator's healthy.
To achieve these goals, the present invention is realized using following technical scheme:A kind of bridge construction steelframe equipment, bag Bottom plate is included, the lower surface of the bottom plate is symmetrically arranged with four universal wheels, and operating personnel can arbitrarily be moved by four universal wheels The dynamic present invention, it is easy to operate;Fixed station is welded with the right side of the upper surface of the bottom plate;The fixed station is step structure, Gu The left side for determining platform is connected with leading screw by bearing;The left end of the leading screw is provided with motor by shaft coupling;It is described to drive Dynamic motor is arranged on bottom plate by motor cabinet;Traveling table has been connected through a screw thread in the middle part of the leading screw;The traveling table is Step structure, the lower end of traveling table is symmetrically mounted on two line slide rails, and leading screw drives traveling table to come on line slide rail Return is dynamic;Described two line slide rails are separately mounted on bottom plate;Each step surface of the fixed station and traveling table it is each Two hydraulic cylinders are mounted on step surface, because fixed station and traveling table are stepped, therefore installed in fixed station It is also stepped with a hydraulic cylinder on traveling table;Each hydraulic cylinder on the fixed station is installed in a fixation On plate, a fixed plate plays a part of a hydraulic cylinder on sizing fixed station, is fixed while a fixed plate also functions to support The effect of a hydraulic cylinder on platform;The upper end of a number fixed plate passes through two upper support columns and fixed station the top Step surface is connected, and the lower end of a fixed plate is connected by two lower support columns with the step surface of fixed station bottom, A number upper support column and a lower support column play a part of supporting a fixed plate;Each hydraulic pressure on the traveling table Cylinder is installed in No. two fixed plates, and No. two fixed plates play a part of a hydraulic cylinder on sizing traveling table, while No. two solid Fixed board also functions to the effect of a hydraulic cylinder on support traveling table;The upper end of No. two fixed plates passes through two No. two upper supports Post is connected with the step surface of traveling table the top, and No. two fixed plates lower end by two No. two lower support columns and traveling table most The step surface of lower section is connected, and No. two upper support columns and No. two lower support columns play a part of supporting No. two fixed plates;The fixation A hydraulic cylinder upper end on a hydraulic cylinder and traveling table on platform is all symmetrically mounted on two flexible band steels, due to installing A hydraulic cylinder on fixed station and traveling table is stepped so that the flexible band steel being mounted above passes through into bridge arch shape Number the flexible of hydraulic cylinder can control the degree of crook of flexible band steel, so as to have adjusted the shape of institute's bridge construction arch, the scope of application Extensively;Four horizontal stripes are symmetrically welded between described two flexible band steels, horizontal stripe plays a part of connection and fixing flexible band steel;Institute The left and right sides for stating fixed station and traveling table is all symmetrically installed with extension apparatus, the extension apparatus include being welded on fixed station or An ear mount and No. two ear mounts on traveling table side;No. two hydraulic cylinders are provided with by bolt in a number ear mount;It is described The outer wall of No. two hydraulic cylinders is fixed on a location-plate;A number location-plate is arranged on fixed station or traveling table by screw On, the operative orientation of No. two hydraulic cylinders is positioned by a location-plate so that piston rod on No. two hydraulic cylinders can only be along Specific direction is moved;No. three hydraulic cylinders are provided with by bolt in No. two ear mounts;The outer wall of No. three hydraulic cylinders is fixed On No. two location-plates;No. two location-plates are arranged on fixed station or traveling table side wall by screw, pass through No. two positioning Plate positions the operative orientation of No. three hydraulic cylinders so that the piston rod on No. three hydraulic cylinders can only move along specific direction;Institute The top of No. two hydraulic cylinders and the top of No. three hydraulic cylinders is stated all to be arranged on extension board;The extension board by hinge with it is corresponding A number fixed plate or No. two fixed plates are connected, when the bridge arch of required building constructions is long, No. two hydraulic cylinders and No. three hydraulic pressure Cylinder starts simultaneously at task driven extension board and rotated in a fixed plate or No. two fixed plates, have adjusted the length of bridge arch supporting surface Degree;Four fore-sets are symmetrically welded with the upper surface of the extension board, four fore-sets play padded effect so that fore-set can rise To the effect of support shutter;Bridge arch face is extended by extension apparatus so that the present invention is built suitable for different bridge arch length Build;Described two flexible band steels and four extension apparatus upper ends are provided with one layer of shutter, and shutter upper surface is exactly bridge arch Pour face.
As a preferred technical solution of the present invention, each step surface of the fixed station and the step of respective activity platform Face is highly equal so that the degree of crook at flexible band steel two ends is identical, so that the required bending two ends degree for building bridge arch It is identical.
As a preferred technical solution of the present invention, the upper surface of the fore-set is equal with the upper surface of flexible band steel Together, it is ensured that fore-set can play a part of supporting shutter.
In use, building the shape of bridge arch needed for determining first, motor is started working, and motor drives leading screw to delay Slow-speed is moved, and leading screw drives traveling table slowly to be moved on two line slide rails, due to it is slow have adjusted traveling table and fixed station it Between distance, the degree of crook of flexible band steel is also in synchronous change, after the distance between traveling table and fixed station are appropriate, activity A hydraulic cylinder on platform and fixed station starts simultaneously at slow motion, and the degree of crook of the flexible band steel of slow regulation, works as peace again When the degree of crook of bridge arch is built for needed for mounted in the degree of crook of shutter above flexible band steel, a hydraulic cylinder stops work Make, so that the present invention is applied to the construction of different shape bridge arch;Then the length of bridge arch is built needed for determining again, when required The bridge arch length long supporting surface for causing the present invention is built when falling short of, four extension apparatus of traveling table and fixed station both sides are same When start working, No. two hydraulic cylinders and No. three hydraulic cylinders start simultaneously at extension board above work, driving in a fixed plate or Rotated in No. two fixed plates, when the fore-set above extension board is tightly abutted against on shutter, No. two hydraulic cylinders and No. three hydraulic pressure Cylinder is stopped, so as to have adjusted the length of bridge arch supporting surface so that the present invention is practically applicable to the construction of different bridge arch length, solves Yoke or bamboo frame structure during existing highway bridge building, which exist, to be built that speed is slow, builds that efficiency is low, the scope of application is small and use the longevity The problems such as life, can realize the fast construction function of arch bridge pouring structure, be available for being used for a long time after putting up, with building speed It hurry up, build efficiency high, using scope is wide and the advantages of long service life, and because support strength of the present invention is larger, without any peace Full hidden danger, protects operator's healthy.
The beneficial effects of the present invention are:The present invention compared with prior art, first passes through leading screw and drives traveling table slowly to move, The distance between slow regulation traveling table and fixed station, then the small degree of crook that have adjusted flexible band steel passes through work again A hydraulic cylinder on dynamic platform and fixed station adjusts the degree of crook of flexible band steel to the degree of crook of required construction bridge arch simultaneously, So that the present invention is applied to the construction of different shape bridge arch;Cause supporting surface of the invention not when required construction bridge arch length is long When enough long, turned by No. two hydraulic cylinders and No. three hydraulic cylinders to adjust extension board simultaneously in a fixed plate or No. two fixed plates Dynamic, when the fore-set above extension board is tightly abutted against on shutter, No. two hydraulic cylinders and No. three hydraulic cylinders are stopped, so that It has adjusted the length of bridge arch supporting surface so that the present invention is practically applicable to the construction of different bridge arch length, solve existing highway bridge building When yoke or bamboo frame structure exist build that speed is slow, the low, scope of application of building efficiency is small and the problem such as service life, can realize The fast construction function of arch bridge pouring structure, is available for being used for a long time after putting up, and with building that speed is fast, builds efficiency high, makes With scope is wide and the advantages of long service life, and because support strength of the present invention is larger, without any potential safety hazard, protect operation Workman's is healthy.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the present invention;
Fig. 2 is that the present invention removes the structural representation after shutter;
Fig. 3 is that the present invention removes the structural representation after shutter and four extension apparatus;
Fig. 4 is that the present invention removes the full sectional view after shutter and four extension apparatus.
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below Conjunction is specifically illustrating, and the present invention is expanded on further.It should be noted that in the case where not conflicting, embodiment in the application and Feature in embodiment can be combined with each other.
As shown in Figures 1 to 4, a kind of bridge construction steelframe equipment, including bottom plate 1, the lower surface of the bottom plate 1 is symmetrically set Four universal wheels 2 are equipped with, operating personnel can arbitrarily move the present invention by four universal wheels 2, easy to operate;The bottom plate 1 Upper surface on the right side of be welded with fixed station 3;The fixed station 3 is step structure, and the left side of fixed station 3 is connected by bearing There is leading screw 4;The left end of the leading screw 4 is provided with motor 5 by shaft coupling;The motor 5 is installed by motor cabinet On bottom plate 1;The middle part of the leading screw 4 has been connected through a screw thread traveling table 6;The traveling table 6 is step structure, traveling table 6 lower end is symmetrically mounted on two line slide rails 7, and leading screw 4 drives traveling table 6 to move back and forth on line slide rail 7;Described two Individual line slide rail 7 is separately mounted on bottom plate 1;On each step surface of the fixed station 3 and each step surface of traveling table 6 Two hydraulic cylinders 8 are installed, because fixed station 3 and traveling table 6 are stepped, therefore installed in fixed station 3 and activity A hydraulic cylinder 8 on platform 6 is also stepped;Each hydraulic cylinder 8 on the fixed station 3 is installed in a fixed plate On 9, a fixed plate 9 plays a part of a hydraulic cylinder 8 on sizing fixed station 3, while a fixed plate 9 also functions to support admittedly Determine the effect of a hydraulic cylinder 8 on platform 3;The upper end of a number fixed plate 9 passes through two upper support columns 10 and fixed station 3 The step surface of the top is connected, and the lower end of a fixed plate 9 passes through two No. one lower support column 11 and the bottom of fixed station 3 Step surface is connected, and a upper support column 10 and a lower support column 11 play a part of supporting a fixed plate 9;The traveling table Each hydraulic cylinder 8 on 6 is installed in No. two fixed plates 12, and No. two fixed plates 12 play on sizing traveling table 6 No. one The effect of hydraulic cylinder 8, while No. two fixed plates also function to the effect of a hydraulic cylinder 8 on support traveling table 6;No. two fixations The upper end of plate 12 is connected by two No. two upper support columns 13 with the step surface of the top of traveling table 6, and No. two fixed plates 12 Lower end is connected by two No. two lower support columns 14 with the step surface of the bottom of traveling table 6, under No. two upper support columns 13 and No. two Support column 14 plays a part of supporting No. two fixed plates 12;One on a hydraulic cylinder 8 and traveling table 6 on the fixed station 3 Number upper end of hydraulic cylinder 8 is all symmetrically mounted on two flexible band steels 15, due to No. one on fixed station 3 and traveling table 6 Hydraulic cylinder 8 is stepped so that the flexible band steel 15 being mounted above is into bridge arch shape, and flexible by hydraulic cylinder 8 can be with The degree of crook of the flexible band steel 15 of control, so that the shape of institute's bridge construction arch is have adjusted, it is applied widely;Described two flexible band steels Four horizontal stripes 16 are symmetrically welded between 15, horizontal stripe 16 plays a part of connection and fixing flexible band steel 15;The He of fixed station 3 The left and right sides of traveling table 6 is all symmetrically installed with extension apparatus 17, and the extension apparatus 17 includes being welded on fixed station 3 or activity An ear mount 171 and No. two ear mounts 172 on the side of platform 6;No. two hydraulic cylinders are provided with by bolt in a number ear mount 171 173;The outer wall of No. two hydraulic cylinders 173 is fixed on a location-plate 174;A number location-plate 174 is pacified by screw On fixed station 3 or traveling table 6, the operative orientation of No. two hydraulic cylinders 173 is positioned by a location-plate 174 so that two Piston rod on number hydraulic cylinder 173 can only be moved along specific direction;In No. two ear mounts 172 No. three are provided with by bolt Hydraulic cylinder 175;The outer wall of No. three hydraulic cylinders 175 is fixed on No. two location-plates 176;No. two location-plates 176 pass through Screw is arranged on fixed station 3 or the side wall of traveling table 6, and the work side of No. three hydraulic cylinders 175 is positioned by No. two location-plates 176 To so that the piston rod on No. three hydraulic cylinders 175 can only be moved along specific direction;The top of No. two hydraulic cylinders 173 with The top of No. three hydraulic cylinders 175 is all arranged on extension board 177;The extension board 177 passes through hinge and a corresponding fixed plate 9 Or No. two fixed plates 12 are connected, when the bridge arch of required building constructions is long, No. two hydraulic cylinders 173 and No. three hydraulic cylinders 175 Start simultaneously at task driven extension board 177 to rotate in a fixed plate 9 or No. two fixed plates 12, have adjusted bridge arch supporting surface Length;Four fore-sets 178 are symmetrically welded with the upper surface of the extension board 177, four fore-sets 178 play padded effect, Fore-set 178 is enabled to play a part of supporting shutter 18;Bridge arch face is extended by extension apparatus 17 so that the present invention is applicable In the building of different bridge arch length;Described two flexible band steels 15 and four upper ends of extension apparatus 17 are provided with one layer of shutter 18, shutter 18 upper surface is exactly that bridge arch pours face.
Each step surface of the fixed station 3 is highly equal with the step surface of respective activity platform 6 so that flexible 15 liang of band steel The degree of crook at end is identical, so that the required bending two ends degree for building bridge arch is identical.
The upper surface of the fore-set 178 and the upper surface flush of flexible band steel 15, it is ensured that fore-set 178 can play support The effect of shutter 18.
In use, building the shape of bridge arch needed for determining first, motor 5 is started working, and motor 5 drives leading screw 4 slow rotations, leading screw 4 drives traveling table 6 slowly to be moved on two line slide rails 7, and traveling table 6 is have adjusted and solid due to slow Determine the distance between platform 3, the degree of crook of flexible band steel 15 is also in synchronous change, when the distance between traveling table 6 and fixed station 3 After appropriate, a hydraulic cylinder 8 on traveling table 6 and fixed station 3 starts simultaneously at slow motion, again the flexible band steel 15 of slow regulation Degree of crook, when the degree of crook installed in the flexible top shutter 18 of band steel 15 builds the degree of crook of bridge arch for needed for When, a hydraulic cylinder 8 is stopped, so that the present invention is applied to the construction of different shape bridge arch;Then needed for determining again The length of bridge arch is built, when required construction bridge arch length is long causes supporting surface of the invention to fall short of, traveling table 6 and fixation Four extension apparatus 17 of the both sides of platform 3 start simultaneously at work, and No. two hydraulic cylinders 173 and No. three hydraulic cylinders 175 start simultaneously at work, Extension board 177 above driving is rotated in a fixed plate 9 or No. two fixed plates 12, when the fore-set 178 of the top of extension board 177 When being tightly abutted against on shutter 18, No. two hydraulic cylinders 173 and No. three hydraulic cylinders 175 are stopped, so as to have adjusted bridge arch branch The length in support face so that the present invention is practically applicable to the construction of different bridge arch length, solves yoke when existing highway bridge is built or bamboo Frame structure exist build that speed is slow, the low, scope of application of building efficiency is small and the problem such as service life, can realize arch bridge pouring structure Fast construction function, be available for being used for a long time after putting up, with building that speed is fast, build efficiency high, it is wide and make using scope The advantages of using long lifespan, and because support strength of the present invention is larger, without any potential safety hazard, protect the body of operator to be good for Health, has reached purpose.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, the simply explanation present invention of the description in above-described embodiment and specification Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, and these change and changed Enter all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent Define.

Claims (3)

1. a kind of bridge construction steelframe equipment, it is characterised in that:Including bottom plate, the lower surface of the bottom plate is symmetrically arranged with four Universal wheel;Fixed station is welded with the right side of the upper surface of the bottom plate;The fixed station is step structure, the left side of fixed station Leading screw is connected with by bearing;The left end of the leading screw is provided with motor by shaft coupling;The motor passes through electricity Support is arranged on bottom plate;Traveling table has been connected through a screw thread in the middle part of the leading screw;The traveling table is step structure, living The lower end of dynamic platform is symmetrically mounted on two line slide rails;Described two line slide rails are separately mounted on bottom plate;The fixation Two hydraulic cylinders are mounted on each step surface of platform and each step surface of traveling table;It is each on the fixed station A number hydraulic cylinder is installed in a fixed plate;The upper end of a number fixed plate passes through two upper support columns and fixation The step surface of platform the top is connected, and the lower end of a fixed plate passes through two lower support columns and the platform of fixed station bottom Terrace is connected;Each hydraulic cylinder on the traveling table is installed in No. two fixed plates;No. two fixed plates it is upper End is connected by two No. two upper support columns with the step surface of traveling table the top, and the lower end of No. two fixed plates passes through two two Number lower support column is connected with the step surface of traveling table bottom;No. one on a hydraulic cylinder and traveling table on the fixed station Hydraulic cylinder upper end is all symmetrically mounted on two flexible band steels;Four horizontal stripes are symmetrically welded between described two flexible band steels; The left and right sides of the fixed station and traveling table is all symmetrically installed with extension apparatus;The extension apparatus includes being welded on fixed station Or an ear mount and No. two ear mounts on traveling table side;No. two hydraulic cylinders are provided with by bolt in a number ear mount;Institute The outer wall for stating No. two hydraulic cylinders is fixed on a location-plate;A number location-plate is arranged on fixed station or activity by screw On platform;No. three hydraulic cylinders are provided with by bolt in No. two ear mounts;The outer wall of No. three hydraulic cylinders, which is fixed on No. two, to be determined On the plate of position;No. two location-plates are arranged on fixed station or traveling table side wall by screw;The top of No. two hydraulic cylinders All it is arranged on the top of No. three hydraulic cylinders on extension board;The extension board is solid by hinge and a corresponding fixed plate or No. two Fixed board is connected;Four fore-sets are symmetrically welded with the upper surface of the extension board;Described two flexible band steels and four extension dresses Put upper end and one layer of shutter is installed.
2. a kind of bridge construction steelframe equipment according to claim 1, it is characterised in that:Each step of the fixed station Face is highly equal with the step surface of respective activity platform.
3. a kind of bridge construction steelframe equipment according to claim 1, it is characterised in that:The upper surface of the fore-set with it is soft The upper surface flush of property band steel.
CN201610442553.1A 2016-06-21 2016-06-21 A kind of bridge construction steelframe equipment Active CN105926459B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610442553.1A CN105926459B (en) 2016-06-21 2016-06-21 A kind of bridge construction steelframe equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610442553.1A CN105926459B (en) 2016-06-21 2016-06-21 A kind of bridge construction steelframe equipment

Publications (2)

Publication Number Publication Date
CN105926459A CN105926459A (en) 2016-09-07
CN105926459B true CN105926459B (en) 2017-08-25

Family

ID=56830737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610442553.1A Active CN105926459B (en) 2016-06-21 2016-06-21 A kind of bridge construction steelframe equipment

Country Status (1)

Country Link
CN (1) CN105926459B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107245941B (en) * 2017-07-04 2018-10-30 泉州台商投资区五季网络有限公司 A kind of bridge beam slab support device convenient for adjusting
CN108625294B (en) * 2018-06-20 2019-11-01 德通建设集团有限公司 One kind builds a bridge efficient construction equipment
CN108797355B (en) * 2018-06-20 2020-07-10 中国铁建投资集团有限公司 Construction method of arched bridge construction machinery
CN111250564B (en) * 2020-01-20 2022-03-29 河北工业大学 Container floorbar straightening robot
CN111287094A (en) * 2020-03-23 2020-06-16 山东博远重工有限公司 Time-saving and labor-saving inner mold stripping structure of hanging basket
CN112647420A (en) * 2020-12-21 2021-04-13 朱荣超 Supporting equipment for building garden arched bridge
CN114753252A (en) * 2022-01-20 2022-07-15 钟才义 Arched bridge supporting device and method for river channel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201071488Y (en) * 2007-07-19 2008-06-11 王彪 Automatic leveling device of bridging working vehicle
US20110265274A1 (en) * 2010-04-30 2011-11-03 Beijing Wowjoint Machinery Co. Bridge Deck Replacement Machine and the Method of Bridge Deck Replacement Using the Same
CN103243655B (en) * 2013-05-17 2015-03-25 中国人民解放军国防科学技术大学 Assembling highway steel bridge transporting and erecting vehicle
CN103669224B (en) * 2013-12-26 2015-07-15 中铁上海工程局集团有限公司 Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
CN203741727U (en) * 2014-03-26 2014-07-30 中铁二十四局集团安徽工程有限公司 Cast-in-place support for zero section of long cantilever of extradosed cable-stayed bridge

Also Published As

Publication number Publication date
CN105926459A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105926459B (en) A kind of bridge construction steelframe equipment
CN105000482B (en) Tower crane with walking mechanism
CN201610631U (en) Traction and movable type lifting platform for construction
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN105332389B (en) Underground pipe rack erector
CN201386251Y (en) Transverse unit of beam column bracket
CN203654690U (en) Movable disassembly and assembly type overhaul platform
CN104763447B (en) Beret piece combined steel mold trolley
CN111335644A (en) Efficient large-volume concrete vibrating equipment
CN204125842U (en) The jointing of case beam breast board is constructed removable Hanging Basket Mobile workbench
CN205369041U (en) A setting device for bridge construction steelframe equipment
CN106629470B (en) Lift level-sensing device apparatus for examination and repair
CN105063370A (en) Submerged slag conveyor
CN105386601B (en) A kind of telescopic arm structure on laser leveling machine
CN205277444U (en) Disconnect -type underground cavern lining cutting platform truck
CN211874002U (en) LED stage
CN212613611U (en) Construction platform special for steel structure
CN107244615A (en) A kind of novel gantry crane gear and method
CN105926461A (en) Setting device for bridge building steel frame equipment
CN209230857U (en) A kind of lift noise barrier stand column Bolt Torque detection device
CN110080540B (en) Large-span steel structure sliding device and construction method thereof
CN105951604B (en) A kind of bridge pier modular system
CN205951011U (en) Machinery stretch -draw formula steel construction pedestal
CN207239284U (en) A kind of aluminum alloy plate materials fix cutter device
CN207568153U (en) Floor concrete casting operation platform is built in a kind of room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Fenghui

Inventor after: Xin Beibei

Inventor after: Chen Xian

Inventor after: Yuan Liangdong

Inventor after: Ma Ning

Inventor after: Ma Meng

Inventor after: Li Yu

Inventor after: Chen Caijun

Inventor after: Li Yalong

Inventor after: Du Weipeng

Inventor after: Zhao Yi

Inventor after: Wei Yongqiang

Inventor before: Peng Wusi

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170727

Address after: 450015 No. 91 Longhai Middle Road, 27 District, Henan, Zhengzhou

Applicant after: ZHENGZHOU COMMUNICATIONS PLANNING SURVEY & DESIGN INSTITUTE

Address before: 246001, No. 171-52 North st street, Daguan District, Anhui, Anqing

Applicant before: Peng Wusi

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.91, Longhai Middle Road, Erqi District, Zhengzhou City, Henan Province, 450000

Patentee after: Zhengzhou Transportation planning Survey, Design and Research Institute Co.,Ltd.

Address before: No. 91, Longhai Middle Road, Erqi District, Zhengzhou City, Henan Province 450015

Patentee before: ZHENGZHOU COMMUNICATIONS PLANNING SURVEY & DESIGN INSTITUTE