Publication number
CN105926373A
CN105926373A CN201610305776.3A CN201610305776A CN105926373A CN 105926373 A CN105926373 A CN 105926373A CN 201610305776 A CN201610305776 A CN 201610305776A CN 105926373 A CN105926373 A CN 105926373A
Authority
CN
China
Prior art keywords
clamping plate
steel plate
townhouse
buckle
waterstop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610305776.3A
Other languages
Chinese (zh)
Other versions
CN105926373B (en
Inventor
王帅
曾明
王会英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201610305776.3A priority Critical patent/CN105926373B/en
Publication of CN105926373A publication Critical patent/CN105926373A/en
Application granted granted Critical
Publication of CN105926373B publication Critical patent/CN105926373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/007Ballastless track, e.g. concrete slab trackway, or with asphalt layers with interlocking means to withstand horizontal forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a row buckle reinforcement positioning device for the high-speed railway concrete foundation bed end. The row buckle reinforcement positioning device comprises a water stop reinforcement positioning clamping plate. The water stop reinforcement positioning clamping plate comprises a water stop clamping plate upper steel plate body, a water stop clamping plate lower steel plate body is arranged under the water stop clamping plate upper steel plate body, and the water stop clamping plate upper steel plate body and the water stop clamping plate lower steel plate body are each of an equilateral L-shaped plane structure. A dowel bar positioning row buckle stressed rod is arranged under the water stop clamping plate lower steel plate body and uniformly provided with dowel bar positioning row buckles. The dowel bar positioning row buckles are matched with an end mold supporting frame. The row buckle reinforcement positioning device for the high-speed railway concrete foundation bed end has the beneficial effects of being simple in design structure, precise in positioning, flexible in disassembly, reusable, safe, efficient, high in practicability, free of geographical limitation, easy to manufacture, convenient to operate and low in manufacturing cost and using cost.

Description

A kind of high-speed railway concrete bedding end townhouse buckle reinforces positioner
Technical field
The present invention relates to construction of railways technical field, particularly relate to a kind of high-speed railway concrete bedding end townhouse buckle and reinforce positioner.
Background technology
nullThe present invention relies on roadbed concrete bedding construction under Beijing-Shenyang railway of passengers' private line line to research and develop,When high-speed railway subgrade uses concrete bedding to do line lower stress structure in design,In view of expanding with heat and contract with cold and the impact of anti-hydric factor,Scalable dowel steel and waterstop is being designed along line direction concrete bedding end,Step by step tray construction in work progress,The scalable dowel steel in end and waterstop need unsettled reinforcing to position,Up till now structure design less on high-speed railway,Refer to construction and equipment facility are rare,When the scalable dowel steel in reinforced concrete bedding end and waterstop,Many employing wood glue plate stopper moulds or bamboo slab rubber stopper mould coordinate iron wire colligation to reinforce location,Operation is loaded down with trivial details,Position error is bigger,Relatively costly,Structure using effect is the best,For ensureing scalable dowel steel and waterstop accurate positioning、Reinforce reliable and construction quality,Farthest ensure not affected by concreting and vibrating,Develop this device.
Summary of the invention
For the above-mentioned technical problem in correlation technique, the present invention proposes a kind of high-speed railway concrete bedding end townhouse buckle and reinforces positioner, whole bracing means design simple in construction, accurate positioning, dismounting is flexible, practicality and high efficiency, makes simple, easy and simple to handle, all transfer efficients are high, low cost of manufacture.
For realizing above-mentioned technical purpose, the technical scheme is that and be achieved in that:
A kind of high-speed railway concrete bedding end townhouse buckle reinforces positioner, positioning splint is reinforced including waterstop, described waterstop is reinforced positioning splint and is included waterstop clamping plate upper steel plate, it is provided with waterstop clamping plate lower steel plate, described waterstop clamping plate upper steel plate and described waterstop clamping plate lower steel plate below described waterstop clamping plate upper steel plate and is equilateral L-shaped planar structure;The planes overlapping of described waterstop clamping plate upper steel plate and described waterstop clamping plate lower steel plate horizontal direction is arranged, and the plane of described waterstop clamping plate upper steel plate and described waterstop clamping plate lower steel plate horizontal direction is uniformly distributed and is provided with waterstop Boards wall bolt hole;It is uniformly distributed in the plane of described waterstop clamping plate lower steel plate vertical direction and is provided with dowel steel installation preformed hole;Described waterstop clamping plate upper steel plate and the horizontal plane of described waterstop clamping plate lower steel plate and vertical direction plane are strengthened support bar by waterstop clamping plate and are connected;Being provided with dowel steel location townhouse buckle force rod below described waterstop clamping plate lower steel plate, described dowel steel location townhouse buckle force rod is uniformly distributed and is provided with dowel steel location townhouse buckle, and described dowel steel location townhouse buckle coordinates with end mould bracing frame.
Further, described waterstop clamping plate upper steel plate and waterstop clamping plate lower steel plate are that 5mm steel plate is welded.
Further, described dowel steel location townhouse buckle force rod is high-strength thick-walled seamless steel pipes.
Further, described dowel steel location townhouse buckle is cruciform fastening for falsework.
Further, described end mould bracing frame includes holding mould bracing frame vertical rod, end mould bracing frame to strengthen cross bar, cross bar swept the floor by end mould bracing frame, end mould bracing frame hound and end mould bracing frame are swept the floor support bar.
Beneficial effects of the present invention:
1, design simple in construction, accurate positioning;
2, dismounting is flexibly, reusable, safe and efficient, practical;
3, without geographical restrictions, make simple, easy to operate;
4, cost of manufacture is relatively low, and use cost is low.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment will be briefly described below, apparently, accompanying drawing in describing below is only some embodiments of the present invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is that positioning splint side view reinforced by waterstop according to embodiments of the present invention.
Fig. 2 is that positioning splint front assembling figure reinforced by waterstop according to embodiments of the present invention.
Fig. 3 is that location townhouse buckle front elevation reinforced by dowel steel according to embodiments of the present invention.
Fig. 4 is that location townhouse buckle front assembling figure reinforced by dowel steel according to embodiments of the present invention.
Fig. 5 is that location townhouse buckle side elevation assembling figure reinforced by dowel steel according to embodiments of the present invention.
In figure: 1, waterstop clamping plate upper steel plate;2, waterstop clamping plate lower steel plate;3, preformed hole installed by dowel steel;4, support bar strengthened by waterstop clamping plate;5, waterstop Boards wall bolt hole;6, dowel steel location townhouse buckle force rod;7, dowel steel location townhouse buckle;8, end mould bracing frame vertical rod;9, cross bar strengthened by end mould bracing frame;10, end mould bracing frame is swept the floor cross bar;11, end mould bracing frame hound;12, end mould bracing frame is swept the floor support bar.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained, broadly fall into the scope of protection of the invention.
As Figure 1-Figure 5, a kind of high-speed railway concrete bedding end townhouse buckle described according to embodiments of the present invention reinforces positioner, positioning splint is reinforced including waterstop, described waterstop is reinforced positioning splint and is included waterstop clamping plate upper steel plate 1, it is provided with waterstop clamping plate lower steel plate 2, described waterstop clamping plate upper steel plate 1 and described waterstop clamping plate lower steel plate 2 below described waterstop clamping plate upper steel plate 1 and is equilateral L-shaped planar structure;The planes overlapping of described waterstop clamping plate upper steel plate 1 and described waterstop clamping plate lower steel plate 2 horizontal direction is arranged, and the plane of described waterstop clamping plate upper steel plate 1 and described waterstop clamping plate lower steel plate 2 horizontal direction is uniformly distributed and is provided with waterstop Boards wall bolt hole 5;It is uniformly distributed in the plane of described waterstop clamping plate lower steel plate 2 vertical direction and is provided with dowel steel installation preformed hole 3;Described waterstop clamping plate upper steel plate 1 and the horizontal plane of described waterstop clamping plate lower steel plate 2 and vertical direction plane are strengthened support bar 4 by waterstop clamping plate and are connected;Being provided with dowel steel location townhouse buckle force rod 6 below described waterstop clamping plate lower steel plate 2, described dowel steel location townhouse buckle force rod 6 is uniformly distributed and is provided with dowel steel location townhouse buckle 7, and described dowel steel location townhouse buckle 7 coordinates with end mould bracing frame.
In one embodiment of the invention, described waterstop clamping plate upper steel plate 1 and waterstop clamping plate lower steel plate 2 are welded for 5mm steel plate.
In one embodiment of the invention, described dowel steel location townhouse buckle force rod 6 is high-strength thick-walled seamless steel pipes.
In one embodiment of the invention, described dowel steel location townhouse buckle 7 is cruciform fastening for falsework.
In one embodiment of the invention, described end mould bracing frame includes holding mould bracing frame vertical rod 8, end mould bracing frame to strengthen cross bar 9, cross bar 10 swept the floor by end mould bracing frame, end mould bracing frame hound 11 and end mould bracing frame are swept the floor support bar 12.
Understand the technique scheme of the present invention for convenience, be described in detail below by way of technique scheme to the present invention in specifically used mode.
When actually used, as Figure 1-5, waterstop clamping plate upper steel plate 1 and waterstop clamping plate lower steel plate 2 are the thick equilateral L-shaped steel plate of 5mm, and described L-shaped steel plate cuts according to waterstop protruded length, welds formation in 90 °.Preformed hole 3 installed by waterstop Boards wall bolt hole 5 and dowel steel, facilitate dowel steel to install, clamp region entirety accurate positioning, self is unlikely to deform, and makes simple and convenient, particularly in concreting process, being vibrated, it is less to affect, non-deformability is relatively strong, can be effectively improved concrete bedding end presentation quality, carries out reinforcing location by positioning splint when waterstop is installed.Described dowel steel is reinforced and is installed general (building scaffold is used) cruciform fastening for falsework (vertical fastener) on the force rod 7 of locating fastener, parallel with rail track direction, it is fixing fastening under the normal service condition of cruciform fastening for falsework on force rod 7, position no longer changes, fixing for concrete bedding dowel steel, overall structure forms dowel steel location townhouse buckle 8;When dowel steel is installed, need to reinforce positioning splint preformed hole 3 by waterstop and pass, townhouse buckle 8 location reinforces.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (5)

1. a high-speed railway concrete bedding end townhouse buckle reinforces positioner, it is characterized in that, positioning splint is reinforced including waterstop, described waterstop is reinforced positioning splint and is included waterstop clamping plate upper steel plate (1), described waterstop clamping plate upper steel plate (1) lower section is provided with waterstop clamping plate lower steel plate (2), described waterstop clamping plate upper steel plate (1) and described waterstop clamping plate lower steel plate (2) and is equilateral L-shaped planar structure;The planes overlapping of described waterstop clamping plate upper steel plate (1) and described waterstop clamping plate lower steel plate (2) horizontal direction is arranged, and the plane of described waterstop clamping plate upper steel plate (1) and described waterstop clamping plate lower steel plate (2) horizontal direction is uniformly distributed and is provided with waterstop Boards wall bolt hole (5);It is uniformly distributed in the plane of described waterstop clamping plate lower steel plate (2) vertical direction and is provided with dowel steel installation preformed hole (3);Described waterstop clamping plate upper steel plate (1) and the horizontal plane of described waterstop clamping plate lower steel plate (2) and vertical direction plane are strengthened support bar (4) by waterstop clamping plate and are connected;Described waterstop clamping plate lower steel plate (2) lower section is provided with dowel steel location townhouse buckle force rod (6), being evenly distributed with dowel steel location townhouse buckle (7) on described dowel steel location townhouse buckle force rod (6), described dowel steel location townhouse buckle (7) coordinates with end mould bracing frame.
High-speed railway concrete bedding end the most according to claim 1 townhouse buckle reinforces positioner, it is characterised in that described waterstop clamping plate upper steel plate (1) and waterstop clamping plate lower steel plate (2) are that 5mm steel plate is welded.
High-speed railway concrete bedding end the most according to claim 1 townhouse buckle reinforces positioner, it is characterised in that described dowel steel location townhouse buckle force rod (6) is high-strength thick-walled seamless steel pipes.
High-speed railway concrete bedding end the most according to claim 1 townhouse buckle reinforces positioner, it is characterised in that described dowel steel location townhouse buckle (7) is cruciform fastening for falsework.
High-speed railway concrete bedding end the most according to claim 1 townhouse buckle reinforces positioner, it is characterized in that, described end mould bracing frame includes holding mould bracing frame vertical rod (8), end mould bracing frame to strengthen cross bar (9), end mould bracing frame sweeps the floor cross bar (10), end mould bracing frame hound (11) and holds mould bracing frame to sweep the floor support bar (12).
CN201610305776.3A 2016-05-09 2016-05-09 A kind of high-speed railway concrete bedding end townhouse buckle reinforces positioner Active CN105926373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610305776.3A CN105926373B (en) 2016-05-09 2016-05-09 A kind of high-speed railway concrete bedding end townhouse buckle reinforces positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610305776.3A CN105926373B (en) 2016-05-09 2016-05-09 A kind of high-speed railway concrete bedding end townhouse buckle reinforces positioner

Publications (2)

Publication Number Publication Date
CN105926373A true CN105926373A (en) 2016-09-07
CN105926373B CN105926373B (en) 2018-02-23

Family

ID=56835589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610305776.3A Active CN105926373B (en) 2016-05-09 2016-05-09 A kind of high-speed railway concrete bedding end townhouse buckle reinforces positioner

Country Status (1)

Country Link
CN (1) CN105926373B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9206140U1 (en) * 1992-05-07 1993-09-09 Peca Verbundtechnik formwork
CN203160206U (en) * 2013-04-10 2013-08-28 中国水利水电第十四工程局有限公司 Water-stopping reinforcing device for concrete
CN103541332A (en) * 2012-07-09 2014-01-29 葛洲坝集团第五工程有限公司 Fixing device for rubber water stopping sheets and rubber slurry stopping sheets
CN204024679U (en) * 2014-07-09 2014-12-17 中铁四局集团第五工程有限公司 Buried water stop fastening devices in a kind of tunnel lining hoop
CN204899938U (en) * 2015-06-30 2015-12-23 中铁隧道股份有限公司 Tunnel secondary lining formworking jumbo bulkhead
CN204982970U (en) * 2015-05-25 2016-01-20 济南黄河路桥工程公司 Mould is fixed to bottom plate steel limit rubber waterstop
CN105275482A (en) * 2015-11-26 2016-01-27 中交隧道工程局有限公司 Lining end module for embedded water stop belt

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9206140U1 (en) * 1992-05-07 1993-09-09 Peca Verbundtechnik formwork
CN103541332A (en) * 2012-07-09 2014-01-29 葛洲坝集团第五工程有限公司 Fixing device for rubber water stopping sheets and rubber slurry stopping sheets
CN203160206U (en) * 2013-04-10 2013-08-28 中国水利水电第十四工程局有限公司 Water-stopping reinforcing device for concrete
CN204024679U (en) * 2014-07-09 2014-12-17 中铁四局集团第五工程有限公司 Buried water stop fastening devices in a kind of tunnel lining hoop
CN204982970U (en) * 2015-05-25 2016-01-20 济南黄河路桥工程公司 Mould is fixed to bottom plate steel limit rubber waterstop
CN204899938U (en) * 2015-06-30 2015-12-23 中铁隧道股份有限公司 Tunnel secondary lining formworking jumbo bulkhead
CN105275482A (en) * 2015-11-26 2016-01-27 中交隧道工程局有限公司 Lining end module for embedded water stop belt

Also Published As

Publication number Publication date
CN105926373B (en) 2018-02-23

Similar Documents

Publication Publication Date Title
KR101630238B1 (en) Constructing structure using pc-wall
CN104018581A (en) Prestress concrete F slab and framework structure system
CN102677569B (en) Positioning support for dowel bars at concrete pavement joints
KR200442545Y1 (en) Height adjusting form
CN202064634U (en) Formwork supporting structure for square concrete cap
CN107965065B (en) Buckling support Combined type pre-embedded member construction method
CN205036070U (en) Device is set up in complete pre -buried installation of cantilever frame roof beam side
CN105926373A (en) Row buckle reinforcement positioning device for high-speed railway concrete foundation bed end
JP2008502822A (en) Architectural elements and construction methods
CN107574727B (en) Conveniently-installed shield trolley combined sleeper and use method thereof
CN202626787U (en) Concrete pavement joint dowel bar positioning bracket
CN202248286U (en) Mounting structure of wall body built-in fitting
CN202359511U (en) Subway tunnel ditch and track bed one-time pouring formwork structure
KR101098878B1 (en) Band clamping type prefab apparatus for reinforcing head of pile
KR100859160B1 (en) A slab form system
CN212866842U (en) Frame structure type building scaffold
CN203411908U (en) Temporary tensioned prestress anchoring device
CN210196646U (en) Concrete pump pipe support
CN201714085U (en) Shear wall door opening side molding plate reinforcing device
KR101872298B1 (en) the rigid connection structure between precast concrete column and precast concrete beam
CN220167506U (en) Supporting structure for reinforcing side beam template
CN213804769U (en) Supporting template for paving roadbed
CN204435400U (en) A kind of novel building Toft foundation structure
CN201738205U (en) CRTS II rail-board curve-section fixing frame
CN203285055U (en) System used for fastening formwork at joint of new concrete and old concrete on structural side wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Shuai

Inventor after: Yang Chao

Inventor after: Zeng Ming

Inventor after: Wang Huiying

Inventor after: Ma Dong

Inventor after: Zhang Chuanan

Inventor after: Li Pengfei

Inventor after: Qiu Zhaosen

Inventor after: Yu Haibin

Inventor after: Deng Yuehua

Inventor before: Wang Shuai

Inventor before: Zeng Ming

Inventor before: Wang Huiying