CN105908706B - The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure - Google Patents

The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure Download PDF

Info

Publication number
CN105908706B
CN105908706B CN201610293672.5A CN201610293672A CN105908706B CN 105908706 B CN105908706 B CN 105908706B CN 201610293672 A CN201610293672 A CN 201610293672A CN 105908706 B CN105908706 B CN 105908706B
Authority
CN
China
Prior art keywords
longitudinal reinforcement
isolated tube
tooth
spike
neck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610293672.5A
Other languages
Chinese (zh)
Other versions
CN105908706A (en
Inventor
罗战友
邹宝平
陶燕丽
莫林飞
李超
祝行
李琪
夏建中
吴李泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lover Health Science and Technology Development Co Ltd
Original Assignee
Zhejiang Lover Health Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Lover Health Science and Technology Development Co Ltd filed Critical Zhejiang Lover Health Science and Technology Development Co Ltd
Priority to CN201610293672.5A priority Critical patent/CN105908706B/en
Publication of CN105908706A publication Critical patent/CN105908706A/en
Application granted granted Critical
Publication of CN105908706B publication Critical patent/CN105908706B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure, comprise the following steps and 1) determine each component specification according to going along with sb. to guard him design drawing;2) connection of longitudinal reinforcement lower end spike-tooth and annulus pile crown;3) isolated tube and longitudinal reinforcement socket;4) isolated tube is connected with annulus pile crown;5) isolated tube top plug is filled out;6) stirrup is connected with isolated tube:7) bore stake holes, lay steel reinforcement cage, casting concrete, maintenance pile body;8) construction and maintenance of capping beam;9) longitudinal reinforcement tensioning and anchor;10) longitudinal reinforcement is reclaimed, process is as follows:After the completion of foundation ditch backfill, nut and levelling backing plate are removed, longitudinal steel reinforcing bar is reused by upward extract, and recovery is completed.The present invention realizes whole Reinforcement recovery in bored concrete pile, reduces cost, be easy to operate.

Description

The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure
Technical field
The present invention relates to the recovery of longitudinal reinforcement in foundation ditch bored concrete pile, the bored concrete pile suitable for building enclosure, category building Technical field of construction.
Background technology
With the proposition of " 13 planning ", the energy consumption for how reducing building industry is already environmentally friendly, slow as social energy conservation Solve the most important thing of energy crisis.In the campshed structural protective system of foundation ditch, bored concrete pile is using most common, because it has , rigidity big, stability good, deformation small the features such as small to surrounding environment influence, and it is widely applied in bracing engineering.But It is in foundation pit system, bored concrete pile is Disposable artifact, local mainly for the protection of the safety during basement construction After the completion of the backfill of lower room, going along with sb. to guard him the bored concrete pile in being not will no longer play a role, and the reinforcing bar retained in bored concrete pile then causes Great waste.Recovery method is that two presstressed reinforcing steels are used in pile body at present, and reinforcing bar base plate portion is connected by screw bolts. The deficiency of existing method has:1) it is only capable of reclaiming presstressed reinforcing steel, whole Reinforcements can not be reclaimed;2) deformed bar is reclaimed When, because reinforcing bar base plate portion is connected by screw bolts, and reinforcing bar is longer, it is difficult to reinforcing bar is screwed out from bolt hole, so as to cause steel Muscle recovery is unsuccessful;3) no and capping beam forms vertical horizontal to coordination work system, it is difficult to plays prestressing force effect;4) elder generation is needed Deformed bar could be reclaimed by abolishing capping beam, and difficulty is big, and cost is high, complex operation.
The content of the invention
In order to overcome bored concrete pile Reinforcement in existing foundation pit system can not reclaim or reclaim difficult, cost The high, deficiency of complex operation, the present invention provide one kind and realize whole Reinforcement recovery in bored concrete pile, reduce cost, behaviour Make the recovery method of bored concrete pile longitudinal reinforcement in convenient foundation pit enclosure structure.
The technical solution adopted for the present invention to solve the technical problems is:
The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure, realize the retracting device bag of the recovery method Include levelling backing plate, nut, isolated tube and annulus pile crown, the top of the longitudinal reinforcement is in threaded rod, the bottom of the longitudinal reinforcement End is in tooth-like structure, and the levelling backing plate is located on capping beam, and the levelling circle of backing plate one is provided with the longitudinal reinforcement The through hole that portion passes through, the nut, which is fixed on, to be stretched out on the threaded rod of levelling backing plate upper end;The annulus pile crown is located at fender post Lower section, the first circle of circular annular pile are provided with the internal bore groove for longitudinal reinforcement bottom grafting, and the tooth-like structure is plugged on In the internal bore groove;The longitudinal reinforcement is enclosed in isolated tube, and the isolated tube upper end connects with the levelling backing plate, it is described every Lower end from pipe connects with the annulus pile crown, and the recovery method comprises the following steps:
1) before fender post of constructing, according to the specification for going along with sb. to guard him design drawing and determining levelling backing plate and annulus pile crown, and The top of longitudinal reinforcement and the specification of bottom;
2) connection of longitudinal reinforcement lower end spike-tooth and annulus pile crown;
3) isolated tube and longitudinal reinforcement socket, longitudinal reinforcement freely can be rotated and moved up and down in isolated tube;
4) isolated tube is connected with annulus pile crown;
5) isolated tube top plug is filled out;
6) stirrup is connected with isolated tube:Connected between stirrup and isolated tube using colligation, stirrup and lengthways main steel bar form steel Muscle cage overall skeleton;
7) bore stake holes, lay steel reinforcement cage, casting concrete, maintenance pile body;
8) construction and maintenance of capping beam, longitudinal reinforcement and isolated tube pass through capping beam, and conserve capping beam;
9) longitudinal reinforcement tensioning and anchor:After capping beam reaches design strength, longitudinal reinforcement passes through wearing on levelling backing plate Hole, tensioning and anchoring are carried out to longitudinal reinforcement with nut further according to design requirement so that fender post and capping beam can form vertical horizontal To coordination work system;
10) longitudinal reinforcement is reclaimed, process is as follows:After the completion of foundation ditch backfill, nut and levelling backing plate, longitudinal reinforcement are removed Reused by upward extract, recovery is completed.
Further, the tooth-like structure includes spike-tooth, and the internal bore groove includes slot and guide and limit groove, the slot Positioned at the top of guide and limit groove, the internal diameter of the slot is bigger than the internal diameter of guide and limit groove, and the guide and limit groove inwall is opened There are the guide groove inserted from top to bottom for the spike-tooth and the neck for spike-tooth positioning, the guide groove is arranged up and down in axial direction, The neck is in horizontal arc, and the entrance of the neck communicates with guide groove.
In the step 2), longitudinal reinforcement is adjusted, makes spike-tooth face guide groove, then spike-tooth is inserted into the bottom of internal bore groove along guide groove Portion, longitudinal reinforcement is turned clockwise into neck;
In the step 10), by longitudinal reinforcement rotate counterclockwise, reinforcing bar bottom spike-tooth completely disengages neck, not constrained Longitudinal reinforcement reused by upward extract.
Further, the top of the joint of the neck and guide groove is provided with spacing for preventing that spike-tooth from skidding off from neck Block;
In the step 2), longitudinal reinforcement enter neck after, then by longitudinal reinforcement pull up until spike-tooth just with card Groove upper wall is bonded and fettered by limited block;
In the step 10), after removing nut and levelling backing plate, longitudinal reinforcement will fall automatically so that spike-tooth is from card Groove upper wall drops to neck lower wall, then by longitudinal reinforcement rotate counterclockwise.
Further, in the step 4), isolated tube is inserted in the slot of annulus pile crown, inserted using epoxy resin sealing Space between groove and isolated tube.
In the step 5), the upper end requirement of isolated tube is higher than capping beam 100mm, and in longitudinal reinforcement and isolated tube Between gap filled out with soft filler plug.
The present invention technical concept be:Fender post and capping beam pass through annulus pile crown, longitudinal reinforcement, levelling backing plate and nut It is linked to be a vertically and horizontally stress entirety.The upper top certain length scope of longitudinal reinforcement is processed into threaded rod, bottom certain length Scope is processed into tooth-like structure.Annulus pile crown is hollow cylinder, is wherein set on the upside of cylindrical wall according to the number of steel bars of design If there is individual corresponding interior slotted eye.Interior slotted eye is made up of slot, guide groove, neck, and guide groove mainly rises to the spike-tooth on longitudinal reinforcement The effect of directional guide, neck is used to constrain spike-tooth, so that longitudinal reinforcement lower end links together with annulus pile crown.Isolated tube Longitudinal reinforcement is passed through from top to bottom, it is cementing one using adhesives such as epoxy resin between its underpart and the slot of annulus pile crown Rise.Longitudinal reinforcement is coupled by stirrup, increases lateral restriction, forms overall skeleton.
Not only meet the functional requirements such as intensity and deformation of the cast-in-situ bored pile in foundation ditch system, and with operation letter Single, easy for construction, the advantages that cost is low, speed is fast, safe.
Beneficial effects of the present invention are mainly manifested in:(1) rate of recovery is high.When fender post works, Reinforcement is complete Isolate entirely with concrete, after the completion for the treatment of foundation ditch backfill, whole Reinforcements can be departed from and be reclaimed from pile body. (2) cost is low, and economic and social benefit is good.The device uses common materials, and materials are few, far below reclaimed longitudinal reinforcement valency Value, and reduce consumption, social and economic benefits and good.(3) it is simple and easy, easy to operate.Capping beam need not be abolished in advance with regard to energy Lengthways main steel bar is reclaimed, and reinforcing bar is fixed or reclaimed by rotating unconfined reinforcing bar can.(4) cooperative bearing system, It is safe.By applying prestressing force, pile body and capping beam are formed and are reliably connected, and form vertical horizontal to coordination work system, The degree of safety of retaining design is high.
Brief description of the drawings
Fig. 1 is the schematic diagram of the retracting device of bored concrete pile longitudinal reinforcement in foundation pit enclosure structure.
Fig. 2 is Fig. 1 overall profile.
Fig. 3 is the schematic diagram of annulus pile crown.
Fig. 4 is the top view of internal bore groove.
Fig. 5 is the profile of internal bore groove.
Fig. 6 is the schematic diagram of the tooth-like structure of longitudinal reinforcement bottom.
Fig. 7 is Fig. 6 longitudinal sectional view.
Fig. 8 is Fig. 7 transverse sectional view.
Fig. 9 is the connection diagram of longitudinal reinforcement bottom.
Figure 10 is the schematic diagram of levelling backing plate.
Figure 11 is the connection diagram on longitudinal reinforcement top.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
1~Figure 11 of reference picture, the recovery method of bored concrete pile longitudinal reinforcement, realizes the recovery side in a kind of foundation pit enclosure structure The retracting device of method includes levelling backing plate 6, nut 5, isolated tube 3 and annulus pile crown 1, and the foundation pit enclosure structure includes capping beam 7 and fender post 8, the capping beam 7 be located on fender post 8, the longitudinal reinforcement 2 passes through capping beam 7 and fender post from top to bottom 8, the top of the longitudinal reinforcement 2 is in threaded rod, and the bottom of the longitudinal reinforcement 2 is in tooth-like structure, levelling 6, the backing plate In on the capping beam 7, the levelling backing plate 6 one encloses the through hole for being provided with and being passed through for the longitudinal reinforcement top, and the nut 5 is solid It is scheduled on and stretches out on the threaded rod of the levelling upper end of backing plate 6;The annulus pile crown 1 is located at the lower section of fender post 8, the annulus pile crown 1 one Circle is provided with the internal bore groove 9 for the bottom grafting of longitudinal reinforcement 2, and the tooth-like structure is plugged in the internal bore groove 9;It is described Longitudinal reinforcement 2 is enclosed in isolated tube 3, and the upper end of isolated tube 3 connects with the levelling backing plate 6, the lower end of the isolated tube 3 with The annulus pile crown 1 connects, and the recovery method comprises the following steps:
1) before fender post of constructing, according to the specification for going along with sb. to guard him design drawing and determining levelling backing plate and annulus pile crown, and The top of longitudinal reinforcement and the specification of bottom;
2) connection of longitudinal reinforcement lower end spike-tooth and annulus pile crown;
3) isolated tube and longitudinal reinforcement socket, longitudinal reinforcement freely can be rotated and moved up and down in isolated tube;
4) isolated tube is connected with annulus pile crown;
5) isolated tube top plug is filled out;
6) stirrup is connected with isolated tube:Connected between stirrup and isolated tube using colligation, stirrup and lengthways main steel bar form steel Muscle cage overall skeleton;
7) bore stake holes, lay steel reinforcement cage, casting concrete, maintenance pile body;
8) construction and maintenance of capping beam, longitudinal reinforcement and isolated tube pass through capping beam, and conserve capping beam;
9) longitudinal reinforcement tensioning and anchor:After capping beam reaches design strength, longitudinal reinforcement passes through wearing on levelling backing plate Hole, tensioning and anchoring are carried out to longitudinal reinforcement with nut further according to design requirement so that fender post and capping beam can form vertical horizontal To coordination work system;
10) longitudinal reinforcement is reclaimed, process is as follows:After the completion of foundation ditch backfill, nut and levelling backing plate, longitudinal reinforcement are removed Reused by upward extract, recovery is completed.
Further, the tooth-like structure includes spike-tooth 14, and the internal bore groove includes slot 10 and guide and limit groove, described Slot 10 is located at the top of guide and limit groove, and the internal diameter of the slot 10 is bigger than the internal diameter of guide and limit groove, the guide and limit Groove inwall is provided with the guide groove 11 inserted from top to bottom for the spike-tooth and the neck 12 for spike-tooth positioning, and the guide groove 11 is in Axially arrange up and down, the neck 12 is in horizontal arc, and the entrance of the neck 12 communicates with guide groove 11;
In the step 2), longitudinal reinforcement is adjusted, makes spike-tooth face guide groove, then spike-tooth is inserted into internal bore groove 9 along guide groove Bottom, longitudinal reinforcement is turned clockwise into neck;
In the step 10), by longitudinal reinforcement rotate counterclockwise, reinforcing bar bottom ailhead completely disengages neck, not constrained Longitudinal reinforcement reused by upward extract.
Further, the top of the neck 12 and the joint of guide groove 11, which is provided with, is used to prevent what spike-tooth from skidding off from neck Limited block;
In the step 2), longitudinal reinforcement enter neck after, then by longitudinal reinforcement pull up until spike-tooth just with card Groove upper wall is bonded and fettered by limited block;
In the step 10), after removing nut and levelling backing plate, longitudinal reinforcement will fall automatically so that spike-tooth is from card Groove upper wall drops to neck lower wall, then by longitudinal reinforcement rotate counterclockwise.
The cutting depth of certain foundation ditch is 6.95m, using the cast-in-situ bored pile of mud off, stake a length of 14m, diameter 700mm, Capping beam thickness 600mm, strength grade of concrete C25, stake number is 556.Cage bar radical is 10 in bored concrete pile, a diameter of 20mm.The diameter of isolated tube is larger than the diameter of reinforcing bar, takes 28mm.The diameter of levelling backing plate is not less than the diameter of fender post. Longitudinal reinforcement passes through pile body, and the upper edge portion of every reinforcing bar is processed into screw thread, and tooth-like, wherein spike-tooth height are processed into bottom For 5mm, the distance between upper and lower spike-tooth is 9mm, and height is all 5mm on the upside of baffle plate, and height is 7mm on the left of baffle plate, on the right side of baffle plate Height is 9mm.By the use of this retracting device and recovery method, it is not only able to reach recovery longitudinal reinforcement, reduces consumption, and And the security of increase foundation ditch, there is good Social benefit and economic benefit.
The embodiment of the recovery method of bored concrete pile longitudinal reinforcement is in the foundation pit enclosure structure of the present embodiment:
1) size of determining device each several part.Before fender post of constructing, each portion is determined previously according to design drawing is gone along with sb. to guard him Component specification used by part.This engineering annulus pile crown 1 takes external diameter 700mm, internal diameter 500mm, height 100mm;With leveling cushion Plate takes external diameter 700mm, internal diameter 500mm, height 10mm, and interior slotted eye 9 is 10, is circumferentially evenly arranged;The lower end of longitudinal reinforcement Spike-tooth haves three layers altogether, 4 every layer, symmetrical.
2) connection of longitudinal reinforcement lower end spike-tooth and annulus pile crown.Longitudinal reinforcement 2 is adjusted, makes the face guide groove 11 of spike-tooth 14, Spike-tooth 14 is inserted into the bottom of interior slotted eye 9 along guide groove 11 again.Longitudinal reinforcement 2 is turned clockwise 45 degree.Again by longitudinal reinforcement 2 to Upper drawing, and by the constraint of limited block 13, prevent from slipping from neck 12 during 2 stress stretch-draw anchor of longitudinal reinforcement.
3) isolated tube and longitudinal reinforcement socket.Isolated tube 3 is put to longitudinal reinforcement 2, makes longitudinal reinforcement 2 in casting concrete During isolate with concrete, and the diameter of isolated tube 3 is more than bar diameter, and reinforcing bar can freely turn in isolated tube 3 Move and move up and down, facilitate the later stage of lengthways main steel bar to reclaim.
4) isolated tube is connected with annulus pile crown.Isolated tube 3 is inserted in the slot 10 of annulus pile crown.For the ease of every It is inserted into from pipe 3 in the slot 10 of annulus pile crown, it is necessary to the diameter of isolated tube 3 is slightly smaller than the diameter of slot 10, in this example, isolated tube 3 a diameter of 28mm, a diameter of 32mm of slot 10.In order to prevent during the casting concrete slime water flow into slotted eye 9 In, using the space between epoxy resin sealing slot 10 and isolated tube 3, in order to avoid avoid influenceing the recovery of reinforcing bar.
5) isolated tube top plug is filled out.The upper end requirement of isolated tube 3 be higher than the 100mm of capping beam 7, and reinforcing bar and every Filled out from the gap between pipe with soft filler plug, such as cotton, Bituminous hemp fiber, prevent that slime water flows into pipe during casting concrete In.
6) stirrup is connected with isolated tube.Connected between stirrup 4 and isolated tube 3 using colligation, stirrup 4 and the shape of lengthways main steel bar 2 Into steel reinforcement cage overall skeleton.
7) bore stake holes, lay steel reinforcement cage, casting concrete, maintenance pile body.Fender post position on corresponding design drawing exists Construction site carries out stake holes bore operation, after the completion of, the steel reinforcement cage overall skeleton combined is hung in drilling, by pile body coagulation The conventional casting method of soil carries out pouring for pile body concrete, and carries out the maintenance of pile concrete.
8) construction and maintenance of capping beam.After pile concrete maintenance reaches design strength, the construction of capping beam 7 is carried out, Cage bar 2 and isolated tube 3 in stake will pass through capping beam 7, and conserve capping beam 7.
9) longitudinal reinforcement tensioning and anchor.After capping beam reaches design strength, fallen with cutter cuts beyond capping beam 7 Isolated tube 3.Longitudinal reinforcement 2 is opened further according to design requirement through the perforation on levelling backing plate 6 with nut 5 to longitudinal reinforcement 2 Draw and anchor so that fender post 8 and capping beam 7 can form vertical horizontal to coordination work system.
10) longitudinal reinforcement 2 is reclaimed.After the completion of foundation ditch backfill, nut 5 and levelling backing plate 6 are removed, such longitudinal reinforcement is just The bottom in inside groove hole 9 is fallen under meeting is automatic, at this moment completely disengages 45 degree of longitudinal reinforcement rotate counterclockwise, reinforcing bar bottom spike-tooth 14 Neck 12.The abandoned can of longitudinal reinforcement 2 is reused by upward extract, and recovery is completed.

Claims (5)

1. the recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure, realizing the retracting device of the recovery method includes Levelling backing plate, nut and annulus pile crown, the top of the longitudinal reinforcement is in threaded rod, and the bottom of the longitudinal reinforcement is in tooth-like Structure, the levelling backing plate are located on capping beam, and the levelling backing plate one encloses to be provided with to be led to for what the longitudinal reinforcement top passed through Hole, the nut, which is fixed on, to be stretched out on the threaded rod of levelling backing plate upper end;The annulus pile crown is located at below fender post, the circle Ring pile crown one encloses the internal bore groove being provided with for longitudinal reinforcement bottom grafting, and the tooth-like structure is plugged on the internal bore groove It is interior;The longitudinal reinforcement is enclosed in isolated tube, and the isolated tube upper end connects with the levelling backing plate, the lower end of the isolated tube Connect with the annulus pile crown, the recovery method comprises the following steps:
1) before fender post of constructing, according to the specification for going along with sb. to guard him design drawing and determining levelling backing plate and annulus pile crown, and longitudinal direction The top of reinforcing bar and the specification of bottom;
2) connection of longitudinal reinforcement lower end spike-tooth and annulus pile crown;
3) isolated tube and longitudinal reinforcement socket, longitudinal reinforcement freely can be rotated and moved up and down in isolated tube;
4) isolated tube is connected with annulus pile crown;
5) isolated tube top plug is filled out;
6) stirrup is connected with isolated tube:Connected between stirrup and isolated tube using colligation, stirrup and lengthways main steel bar form steel reinforcement cage Overall skeleton;
7) bore stake holes, lay steel reinforcement cage, casting concrete, maintenance pile body;
8) construction and maintenance of capping beam, longitudinal reinforcement and isolated tube pass through capping beam, and conserve capping beam;
9) longitudinal reinforcement tensioning and anchor:After capping beam reaches design strength, longitudinal reinforcement passes through the perforation on levelling backing plate, then Tensioning and anchoring are carried out to longitudinal reinforcement with nut according to design requirement so that fender post and capping beam can form perpendicular horizontal coordination Work system;
10) longitudinal reinforcement is reclaimed, process is as follows:After the completion of foundation ditch backfill, remove nut and levelling backing plate, longitudinal reinforcement by Upper to extract recycling, recovery is completed.
2. the recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure as claimed in claim 1, it is characterised in that: The tooth-like structure includes spike-tooth, and the internal bore groove includes slot and guide and limit groove, and the slot is located at guide and limit groove Top, the internal diameter of the slot is bigger than the internal diameter of guide and limit groove, the guide and limit groove inwall be provided with for the spike-tooth from The guide groove and the neck for spike-tooth positioning of top to bottm insertion, the guide groove in axially arranging up and down, and the neck is in level Arc, the entrance of the neck communicate with guide groove;
In the step 2), longitudinal reinforcement is adjusted, makes spike-tooth face guide groove, then spike-tooth is inserted into the bottom of internal bore groove along guide groove, Longitudinal reinforcement is turned clockwise into neck;
In the step 10), by longitudinal reinforcement rotate counterclockwise, reinforcing bar bottom spike-tooth completely disengages neck, abandoned vertical Reused to reinforcing bar by upward extract.
3. the recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure as claimed in claim 2, it is characterised in that: The top of the joint of the neck and guide groove is provided with the limited block for being used for preventing that spike-tooth from skidding off from neck;
In the step 2), longitudinal reinforcement enter neck after, then by longitudinal reinforcement pull up until spike-tooth just with neck Wall is bonded and fettered by limited block;
In the step 10), after removing nut and levelling backing plate, longitudinal reinforcement will fall automatically so that spike-tooth is from neck Wall drops to neck lower wall, then by longitudinal reinforcement rotate counterclockwise.
4. the recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure as described in one of claims 1 to 3, it is special Sign is:In the step 4), isolated tube is inserted in the slot of annulus pile crown, using epoxy resin sealing slot and isolated tube Between space.
5. the recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure as described in one of claims 1 to 3, it is special Sign is:In the step 5), the upper end requirement of isolated tube is higher than capping beam 100mm, and in longitudinal reinforcement and isolated tube Between gap filled out with soft filler plug.
CN201610293672.5A 2016-05-04 2016-05-04 The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure Active CN105908706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610293672.5A CN105908706B (en) 2016-05-04 2016-05-04 The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610293672.5A CN105908706B (en) 2016-05-04 2016-05-04 The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure

Publications (2)

Publication Number Publication Date
CN105908706A CN105908706A (en) 2016-08-31
CN105908706B true CN105908706B (en) 2017-12-22

Family

ID=56753343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610293672.5A Active CN105908706B (en) 2016-05-04 2016-05-04 The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure

Country Status (1)

Country Link
CN (1) CN105908706B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107687267A (en) * 2017-09-28 2018-02-13 开普天(上海)岩土科技有限公司 Reinforcing bar is pulled out with clamping device and reinforcing bar removal method
CN108951613B (en) * 2018-06-26 2021-04-02 北京健安诚岩土工程有限公司 Recoverable steel reinforcement cage
CN113638428B (en) * 2021-10-15 2022-02-08 索泰克(北京)岩土科技有限公司 Detachable rib prestress supporting structure and manufacturing method thereof
CN113638404B (en) * 2021-10-15 2022-02-08 索泰克(北京)岩土科技有限公司 Detachable reinforcement cage and manufacturing method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1030807A (en) * 1987-07-16 1989-02-01 朱传浦 Concrete pipe pile provided with temporary prestressing force
CN2149419Y (en) * 1993-01-19 1993-12-15 卫龙武 Steel bar structure for reinforced convrete pile
GB2436582A (en) * 2006-03-29 2007-10-03 Cementation Found Skanska Ltd Geothermal energy pile / foundation
CN201305955Y (en) * 2008-10-27 2009-09-09 曹新恒 Steel reinforcement cage hanging steel bar used for grouting piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1030807A (en) * 1987-07-16 1989-02-01 朱传浦 Concrete pipe pile provided with temporary prestressing force
CN2149419Y (en) * 1993-01-19 1993-12-15 卫龙武 Steel bar structure for reinforced convrete pile
GB2436582A (en) * 2006-03-29 2007-10-03 Cementation Found Skanska Ltd Geothermal energy pile / foundation
CN201305955Y (en) * 2008-10-27 2009-09-09 曹新恒 Steel reinforcement cage hanging steel bar used for grouting piles

Also Published As

Publication number Publication date
CN105908706A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN105908706B (en) The recovery method of bored concrete pile longitudinal reinforcement in a kind of foundation pit enclosure structure
CN105735251B (en) Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig
CN103628473A (en) Composite type combined piles and construction method thereof
CN204039921U (en) A kind of Construction Support without support bent cap
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN104047542B (en) Embedding rock taper pile impacts drilling pipe hammer system and embedding rock taper pile impacts construction method
CN101294384A (en) Pile, pole interface positioning device and construction method
CN101538857A (en) Pile extraction construction method
CN1963044A (en) Construction method for withdrawal of waste pile
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN111424669A (en) Pile end grouting process and device of quick and recyclable grouting device
CN213358594U (en) Constructional engineering pile
CN204753628U (en) Guider that hangs down is transferred to contrary way of doing things steel -pipe column that can have enough to meet need
CN105951744B (en) The retracting device of bored concrete pile longitudinal reinforcement in foundation pit enclosure structure
CN205742211U (en) The retracting device of bored concrete pile longitudinal reinforcement in foundation pit enclosure structure
CN105064334A (en) Construction method for cast-in-situ bored pile
CN110206481A (en) Dewatering well constructing device
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN104878775A (en) Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof
CN204326089U (en) A kind of structure for foundation ditch Yield rainfall relation
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN201206428Y (en) Stone extrusion drill
CN219280717U (en) Novel pull-press combined type detachable spiral drill pipe diagonal bracing structure
CN202337980U (en) Uplift structural body capable of recovering stiffening pile of reinforced solid
CN211171754U (en) Detachable and reusable anti-collision pier device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant