CN105907988A - Device for lead and zinc ore smelting - Google Patents

Device for lead and zinc ore smelting Download PDF

Info

Publication number
CN105907988A
CN105907988A CN201610439929.3A CN201610439929A CN105907988A CN 105907988 A CN105907988 A CN 105907988A CN 201610439929 A CN201610439929 A CN 201610439929A CN 105907988 A CN105907988 A CN 105907988A
Authority
CN
China
Prior art keywords
zinc
lead
outlet
melt
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610439929.3A
Other languages
Chinese (zh)
Other versions
CN105907988B (en
Inventor
蒋继穆
张廷安
李东波
黎敏
李栋
马明生
裴忠冶
陈学刚
吴卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201610439929.3A priority Critical patent/CN105907988B/en
Publication of CN105907988A publication Critical patent/CN105907988A/en
Application granted granted Critical
Publication of CN105907988B publication Critical patent/CN105907988B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B19/00Obtaining zinc or zinc oxide
    • C22B19/04Obtaining zinc by distilling
    • C22B19/16Distilling vessels
    • C22B19/18Condensers, Receiving vessels
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B13/00Obtaining lead
    • C22B13/02Obtaining lead by dry processes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/004Systems for reclaiming waste heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/008Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases cleaning gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/004Systems for reclaiming waste heat
    • F27D2017/006Systems for reclaiming waste heat using a boiler

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a device for lead and zinc ore smelting. The device for lead and zinc ore smelting comprises an oxidization smelting furnace, a power frequency electric heating reduction furnace and a zinc rain condenser; the oxidization smelting furnace is provided with a lead and zinc ore inlet, a fluxing agent inlet, a smelting flue gas outlet and a melt outlet, and melt contains zinc oxide and lead oxide; the power frequency electric heating reduction furnace is provided with a melt inlet, a reduction agent inlet, a liquid lead outlet, a furnace slag outlet and a zinc-containing flue gas outlet, and the melt inlet is connected with the melt outlet; and the zinc rain condenser is provided with a zinc-containing flue gas inlet, a liquid zinc outlet and a coal gas outlet, and the zinc-containing flue gas inlet is connected with the zinc-containing flue gas outlet. By means of the device, after being subjected to oxidization melting, the lead and zinc ore can be directly supplied to the power frequency electric heating reduction furnace in a high-temperature melt state, in the furnace body, the zinc oxide is reduced into metal zinc steam by high-temperature carbon, and liquid metal zinc is further obtained through condensation. The lead oxide entering the furnace body is reduced into liquid metal lead by high-temperature carbon, and the liquid metal lead and liquid metal lead slag composed of iron oxide, silicon oxide, calcium oxide, aluminum oxide, magnesium oxide and other oxides jointly descend into a settling chamber on the lower portion of a vertical shaft type power frequency electric heating furnace.

Description

The equipment smelted for Pb-Zn deposits
Technical field
The present invention relates to field of metallurgy.Concrete, the present invention relates to the equipment smelted for Pb-Zn deposits.
Background technology
It mostly is mineral intergrowth based on led-zinc-silver deposit, is generally individually sorted at present as lead concentrate and zinc concentrate after exploitation, send lead respectively Smeltery and zinc abstraction factory separately process.Owing to sorting is difficult to thoroughly, the most miscellaneous in lead concentrate have a number of zinc, zinc concentrate In miscellaneous have a number of lead.Smelt Hou Qian factory output Zn dust Xu Song zinc factory and office reason, zinc factory output lead smelting gas Xu Song lead factory and office Reason.
Thus, current Pb-Zn deposits is smelted means and is still had much room for improvement.
Summary of the invention
It is contemplated that solve one of above-mentioned technical problem the most to a certain extent or provide at a kind of useful business choosing Select.To this end, it is an object of the present invention to propose a kind of means having and can effectively Pb-Zn deposits being smelted.
The present invention is following discovery based on inventor and completes:
During by using main frequency furnace that the melt of zinc oxide and lead oxide is carried out reduction treatment, reduzate zinc can become gaseous state, Reduzate lead then can maintain liquid.
In one aspect of the invention, the present invention proposes a kind of equipment smelted for Pb-Zn deposits, according to the enforcement of the present invention Example, this equipment includes: oxidizing semlting stove, and described oxidizing semlting stove has Pb-Zn deposits entrance, flux entrance, melting flue gas to go out Mouth and melt outlet, described melt contains zinc oxide and lead oxide;Power frequency electric thermal reduction furnace, described power frequency electric thermal reduction stove Having the outlet of melt inlet, reducing agent entrance, liquid lead, slag outlet and the exhanst gas outlet on zinc, described melt inlet is with described Melt outlet is connected;And zinc rain condenser, described zinc rain condenser has containing zinc smoke inlet, liquid Zn outlet and coal gas Outlet, described is connected with the described exhanst gas outlet containing zinc containing zinc smoke inlet.
Utilize this equipment, it is possible to effectively Pb-Zn deposits is smelted, as it was previously stated, utilize this technique, it is not necessary to lead zinc Ore deposit sorts, and directly by after oxidized for Pb-Zn deposits fusing, supplies to power frequency electric thermal reduction furnace under high-temperature fusant state, In this body of heater, zinc oxide can be reduced to metallic zinc steam by pyrocarbon, obtains liquid metal zinc by condensation further.Enter Enter the lead oxide in body of heater, be reduced to liquid metal lead by pyrocarbon, with the oxide such as iron, silicon, calcium, aluminium, magnesium composition Liquid lead skim drops to straight well formula power frequency electrothermal furnace bottom expansion chamber together.Slag lead separation is carried out at expansion chamber.By under expansion chamber Portion's discharge port releases metallic lead.According to embodiments of the invention, slag can be released by expansion chamber top discharge port.Slag water Sell outside after quenching.
It addition, the equipment smelted for Pb-Zn deposits according to the above embodiment of the present invention can also have following additional technology spy Levy:
In some embodiments of the invention, described reducing agent porch is provided with double-charging bell feeder.Thus, it is possible to it is notable Raising equipment sealing property.
In some embodiments of the invention, waste heat boiler, the smoke inlet of described waste heat boiler and described melting flue gas are also included Outlet is connected.Thus, it is possible to make system waste heat be fully utilized.
In some embodiments of the invention, the smoke of deduster, the import of described deduster and described waste heat boiler is also included Mouth is connected.
In some embodiments of the invention, described deduster is electric cleaner.
In some embodiments of the invention, described power frequency electric thermal reduction furnace includes vertical reduction section and Horizontal sedimentation section, and It is provided with coil on the outer wall of described vertical reduction section and described Horizontal sedimentation section.Thus, it is possible to effectively maintain furnace temperature.
In some embodiments of the invention, by siphon port, by described melt input to described power frequency electric thermal reduction furnace. Thus, it is possible to improve equipment sealing property further.
In some embodiments of the invention, described reducing agent is coke.
In some embodiments of the invention, described reducing agent farther includes magnetic conductor.
In some embodiments of the invention, described magnetic conductor is graphite.
In some embodiments of the invention, described graphite is the 10~50% of described reducing agent quality.
In some embodiments of the invention, the temperature of described melt is at least 900 degrees Celsius.
In some embodiments of the invention, liquid lead is discharged by siphon port.Seal thus, it is possible to improve equipment further Performance.
The additional aspect of the present invention and advantage will part be given in the following description, and part will become bright from the following description Aobvious, or recognized by the practice of the present invention.
Accompanying drawing explanation
Above-mentioned and/or the additional aspect of the present invention and advantage will be apparent from from combining the accompanying drawings below description to embodiment With easy to understand, wherein:
Fig. 1 shows the cross section structure schematic diagram of the equipment smelted for Pb-Zn deposits of one embodiment of the invention;
Fig. 2 shows the part-structure top view in the equipment that Pb-Zn deposits is smelted of further embodiment of the present invention;
Fig. 3 shows the structural representation of the equipment smelted for Pb-Zn deposits of another embodiment of the present invention;
Fig. 4 shows the structural representation of the equipment smelted for Pb-Zn deposits of another embodiment of the present invention;
Fig. 5 shows the stream of the equipment enforcement Pb-Zn deposits smelting process smelted for Pb-Zn deposits utilizing one embodiment of the invention Journey schematic diagram.
Detailed description of the invention
Embodiments of the invention are described below in detail, and the example of described embodiment is shown in the drawings, the most identical Or similar label represents same or similar element or has the element of same or like function.Retouch below with reference to accompanying drawing The embodiment stated is exemplary, it is intended to is used for explaining the present invention, and is not considered as limiting the invention.
In describing the invention, it is to be understood that term " " center ", " longitudinally ", " laterally ", " length ", " width ", " thickness ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", " outward ", Orientation or the position relationship of the instruction such as " clockwise ", " counterclockwise ", " axially ", " radially ", " circumferential " are based on shown in the drawings Orientation or position relationship, be for only for ease of describe the present invention and simplify describe rather than instruction or hint indication device or Element must have specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.
Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance or Person implies the quantity indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Implicitly include at least one this feature.In describing the invention, " multiple " are meant that at least two, such as two, Three etc., unless otherwise expressly limited specifically.
In the present invention, unless otherwise clearly defined and limited, term " install ", " being connected ", " connection ", the art such as " fixing " Language should be interpreted broadly, and connects for example, it may be fixing, it is also possible to be to removably connect, or integral;Can be machinery Connect, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two units Connection within part or the interaction relationship of two elements, unless otherwise clear and definite restriction.Ordinary skill for this area For personnel, above-mentioned term concrete meaning in the present invention can be understood as the case may be.
In the present invention, unless otherwise clearly defined and limited, fisrt feature second feature " on " or D score can be One directly contacts with second feature, or the first and second features are by intermediary mediate contact.And, fisrt feature is Two features " on ", " top " and " above " but fisrt feature directly over second feature or oblique upper, or be merely representative of first Characteristic level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be fisrt feature Immediately below second feature or obliquely downward, or it is merely representative of fisrt feature level height less than second feature.
Embodiments of the invention are described below in detail, and the embodiment described below with reference to accompanying drawing is exemplary, it is intended to use In explaining the present invention, and it is not considered as limiting the invention.
All bibliography mentioned in this article are all incorporated herein by.
Unless there are indicating on the contrary, all technology used herein and scientific terminology all have and art ordinary skill of the present invention The identical implication that personnel are generally understood.Unless there are indicating on the contrary, technology that is used herein or that mention is that this area is general Standard technique known to logical technical staff.Material, method and example are only used as to illustrate, rather than are any limitation as.
The present invention is following discovery based on inventor and completes:
During by using main frequency furnace that the melt of zinc oxide and lead oxide is carried out reduction treatment, reduzate zinc can become gaseous state, Reduzate lead then can keep liquid.
In one aspect of the invention, the present invention proposes a kind of equipment smelted for Pb-Zn deposits, according to the enforcement of the present invention Example, with reference to Fig. 1, this equipment includes: oxidizing semlting stove 100, power frequency electric thermal reduction furnace 200 and zinc rain condenser 300.
According to embodiments of the invention, oxidizing semlting stove 100 has Pb-Zn deposits entrance 101, flux entrance 102, melting flue gas Outlet 103 and melt outlet 104, and be suitable to the mixture obtained by being mixed with flux by Pb-Zn deposits and carry out oxidizing semlting, from And the melt containing zinc oxide and lead oxide can be obtained.Concrete, Pb-Zn deposits can be lead zinc composite sulfuration ore deposit, and Suitable slag former can be added during oxidizing semlting.It should be noted that those skilled in the art can be according to actual need The condition of the flux used and oxidizing semlting is selected, and Pb-Zn deposits entrance 101 and flux entrance 102 can Think same entrance or independent two entrances
According to one embodiment of present invention, the temperature containing zinc oxide and the melt of lead oxide is at least 900 degrees Celsius.By This, can improve the Environmental Protection Level that in subsequent process, Pb-Zn deposits is smelted further.
According to embodiments of the invention, power frequency electric thermal reduction furnace 200 has melt inlet 201, reducing agent entrance 202, liquid Lead outlet 203, slag outlet 204 and containing zinc exhanst gas outlet 205, melt inlet 201 is connected with melt outlet 104, and fits In utilizing reducing agent, the melt containing zinc oxide and lead oxide obtained by above-mentioned is reduced in power frequency electric thermal reduction furnace Process and slag settlement treatment, it is hereby achieved that containing zinc flue gas, liquid lead and slag.
According to one embodiment of present invention, siphon port can be passed through, oxidizing semlting operation is obtained containing zinc oxide and oxygen The melt changing lead supplies to power frequency electric thermal reduction furnace.Inventor finds by using siphon port to feed, can be effectively close Feed under the conditions of envelope, such that it is able to improve the efficiency that Pb-Zn deposits is smelted further.
According to still a further embodiment, with reference to Fig. 1 and Fig. 2, power frequency electric thermal reduction furnace 200 can include the most also It is provided with coil 23 in former section 21 and Horizontal sedimentation section 22, and the outer wall of vertical reduction section 21 and Horizontal sedimentation section 22. Concrete, as it is shown in figure 1, vertically the lower end passage of reduction section 21 is connected with the Upper passage of Horizontal sedimentation section 22, and And the lower end passage of vertical reduction section 21 tilts upward, such that it is able to avoid the reducing agent adding reduction section to enter into settling section. Thus, by arranging coil on the outer wall of vertical reduction section 21 and Horizontal sedimentation section 22, coil is used to produce alternating magnetic field Maintain reduction section and the furnace temperature of settling section, such that it is able to improve the efficiency that Pb-Zn deposits is smelted further.Concrete according to the present invention Embodiment, can use the induction coil of 200~400 kilowatts.
According to still another embodiment of the invention, reducing agent can be coke.Smelt thus, it is possible to improve Pb-Zn deposits further Efficiency.
According to still another embodiment of the invention, reducing agent may further include magnetic conductor.Thus, produce at external coil Under raw action of alternating magnetic field, magnetic conductor can temperature stabilization in holding furnace effectively, such that it is able to improve Pb-Zn deposits further The efficiency smelted.
According to still another embodiment of the invention, magnetic conductor can be graphite.Inventor find graphite can magnetic conduction effectively, And subsequent reactions will not be introduced impurity, such that it is able to improve the efficiency that Pb-Zn deposits is smelted further.Concrete, coke and Graphite block mixture is added directly in the reduction section in power frequency electric thermal reduction furnace, and coke is used as reducing agent, and graphite block is as leading Magnetic exothermic material (during actual production, the carbon in graphite has certain reproducibility equally), reduction section furnace shell is outer equipped with single-core line circle, During indirect current coil produce change magnetic field, graphite block affected by this variation magnetic field start heating and circumference coke with Melt, maintains reaction zone thermal balance, makes the temperature of whole direct-reduction section meet the requirement of smelting charge of lead and zinc direct-reduction.
According to one embodiment of present invention, graphite can be the 10~50% of reducing agent quality.Thus, it is possible to improve further The efficiency that Pb-Zn deposits is smelted.Inventor finds, if the ratio of graphite is too small, then not enough so that the temperature in reduction space is steady Fixed, if the ratio of graphite is excessive, then can affect the efficiency of reduction treatment.
According to still another embodiment of the invention, liquid lead is discharged by siphon port.Thus, it is possible to improve Pb-Zn deposits further The efficiency smelted.
According to still another embodiment of the invention, it is provided with double-charging bell feeder 24 at reducing agent entrance 202.Concrete, logical Cross Special crane and will fill the charging bell of incandescent coke and graphite block, accurately fall to sitting to double-charging bell feeder, then put down and add Material bell bottom valve, incandescent coke and graphite fall in the bucket of double-charging bell feeder top, then hang away charging bell, then puts down extra quality The top bottom valve of clock feeder, coke and graphite fall in the bottom bucket of double-charging bell feeder, now promote top bottom valve, close Closing gas passage, then open the bottom bottom valve of double-charging bell feeder, incandescent coke and graphite block are by reducing agent entrance the most at last Add in power frequency electric thermal reduction furnace in reduction reaction district, and with this cycle operation, be continuously replenished Jiao of continuous consumption in reaction zone Charcoal and graphite block.
In this step, concrete, in the melt containing zinc oxide and lead oxide falls into the reduction section of power frequency electric thermal reduction furnace, Run into red-hot coke, reduction reaction can be occurred immediately to generate melted metallic lead, slag and contain zinc fume and an oxidation The flue gas of carbon/carbon dioxide.Melted metallic lead and slag flow downward, logical from the upper end of settling section through reduction section hypomere passage Road (being inclined upwardly, in order to avoid coke and graphite block fall into precipitating phase) flows into precipitating phase.It is also provided with coil outside precipitating phase furnace shell, Melted metallic lead can generate heat maintenance furnace temperature under the effect of variation magnetic field, thus keeps certain mobility.Finally, melted Metallic lead bottom precipitating phase siphon lead tap release, a small amount of slag after running up to a certain degree, slag pass through top slagging Mouth is released.
According to embodiments of the invention, zinc rain condenser 300 has containing zinc smoke inlet 301, liquid Zn outlet 302 and coal Gas outlet 303, is connected with containing zinc exhanst gas outlet 205 containing zinc smoke inlet 301, and is suitable to obtain in power frequency electric thermal reduction furnace To the flue gas containing zinc condense, in order to obtain liquid Zn and coal gas.According to one embodiment of present invention, it is possible to use zinc The condensation to carrying out Pb-Zn deposits smelting containing zinc flue gas of the rain condenser.Thus, employing zinc rain can be by containing the gold carried in zinc flue gas Belong to zinc to condense out, and the carbon monoxide wherein carried is or/and carbon dioxide continues to exist in a gaseous form, and wash further It is recycled with coal gas form after purification.Concrete, that zinc rain condenser is trapped by zinc rain liquid Zn rain lead, uses pump Delivering to zinc liquid cooling bath, after refrigerated separation lead, part zinc liquid is cast into product coarse zinc ingot metal, and part zinc liquid returns zinc rain condenser It is cycled to used in trapping zinc fume.
Thus, the equipment smelted for Pb-Zn deposits according to embodiments of the present invention, it is possible to effectively Pb-Zn deposits is smelted, As it was previously stated, utilize this technique, it is not necessary to Pb-Zn deposits is sorted, directly by after oxidized for Pb-Zn deposits fusing, at high temperature Supplying under melt state to power frequency electric thermal reduction furnace, in this body of heater, zinc oxide can be reduced to metallic zinc steam by pyrocarbon, Liquid metal zinc is obtained further by condensation.Enter the lead oxide in body of heater, be reduced to liquid metal lead by pyrocarbon, with The liquid lead skim of the oxide compositions such as iron, silicon, calcium, aluminium, magnesium drops to straight well formula power frequency electrothermal furnace bottom expansion chamber together. Slag lead separation is carried out at expansion chamber.Metallic lead is released by expansion chamber lower tap hole.According to embodiments of the invention, Ke Yiyou Expansion chamber top discharge port releases slag.Sell outside after furnace slag granulating.
With reference to Fig. 3, the equipment for Pb-Zn deposits smelting according to embodiments of the present invention farther includes: waste heat boiler 400.
According to embodiments of the invention, the smoke inlet of waste heat boiler 400 is connected with melting exhanst gas outlet 103.Thus, it is possible to System waste heat is fully utilized.
With reference to Fig. 4, the equipment for Pb-Zn deposits smelting according to embodiments of the present invention farther includes: deduster 500.
According to embodiments of the invention, the import of deduster 500 is connected with the outlet flue of waste heat boiler 400.According to the present invention An embodiment, deduster can be electric cleaner.Thus, it is possible to improve efficiency of dust collection further.
According to embodiments of the invention, the equipment for Pb-Zn deposits smelting according to embodiments of the present invention can at least have following At least one advantage:
According to embodiments of the invention, simplify the mineral processing circuit of lead and zinc mineral resources, improve recovery rate of valuable metals, Reduce beneficiation cost.
According to embodiments of the invention, lead zinc synchronous smelting together, eliminate association unit between the lead factory of original technique and zinc factory The intermediate material that element produces is had bad luck the most back and forth, transports without intermediate material, reduces main Metal Production cost.
According to embodiments of the invention, use main frequency furnace electrothermal reduction lead zinc, it is to avoid original technique uses air-supply or send oxygen, Fuel burning heat supply is relied on just to maintain reduction process thermal balance.Fuel burning dimension temperature, exhaust gas volumn is big, and it is more that flue gas takes away waste heat, because of This energy consumption is higher.The lead oxide that needs in the high-temperature fusant that electrothermal reduction only adds to be reduced, zinc oxide, di-iron trioxide The oxygen brought into Deng material just consumes reducing agent carbon or hydrogen.Reducing agent consumption is theoretical value, and the exhaust gas volumn of generation is also theoretical value, Energy consumption is minimum in all technique.
According to embodiments of the invention, the zinc of more than 85% is produced by wet method smelting process the most in the world, and its leached mud is Danger waste dump is one the difficult problem of environmental protection, and its harmless treatment, existing process energy consumption is the highest.This technique can economical and effective Solution zinc leaching residue pollute environment a difficult problem.
According to the expansion examination authorizing invention CN200610066648.4 " a kind of lead smelting process and for realizing the device of this lead smelting process " Testing parameter, use vertical shaft type electrothermal reduction, lead, zinc metal recovery rate are the highest.Accompanying element beyond lead zinc, as Au, Ag, Cu, Ni, Bi, Sn, the overwhelming majority is reduced in entrance lead bullion, and the volatile matters such as Cd, Ga, In, Il, Ge are equal Be condensed entrance crude zinc.Along with lead bullion and crude zinc refining process, these associated metals can be reclaimed the most one by one, it is achieved the most comprehensive Close and utilize.As for As, Hg accompanying element contained in lead and zinc industry, big absolutely portion during first step oxidizing semlting Divide entrance flue gas to be removed, do not inquire in the range of this patent.
Using ore deposit thermal resistance stove heat supply in prior art, have multiple electrode-inserting holes, electrode-inserting holes is difficult to positive confinement, many Rare flue gas leaks and affects environment.This patent uses main frequency furnace heat supply, does not has electrode-inserting holes, body of heater all to seal, nothing Flue gas leaks, and has optimal environmental benefit.Employing ore-smelting electric furnace reduces, internal by air or nitrogen to ore-smelting electric furnace Pulverized coal injection can make zinc fume concentration reduce as reducing agent, air or nitrogen, and slag is containing Zn >=3%, and uses main frequency furnace Reduction liquid smelting charge of lead and zinc, zinc fume concentration is high, and slag can reach theoretical value≤0.22% containing zinc, so using ore deposit thermoelectricity Stove carries out reducing and smelting smelting charge of lead and zinc to be needed to be followed by fuming furnace and is further processed slag, uses main frequency furnace then without again Slag is carried out advanced treating.
Understand for convenience, below with reference to the Fig. 5 equipment enforcement lead zinc smelted for Pb-Zn deposits to using the embodiment of the present invention Mining and metallurgy smelting method is described in detail.According to embodiments of the invention, the method includes:
S100: Pb-Zn deposits is mixed with flux, and obtained mixture is carried out oxidizing semlting
In this step Pb-Zn deposits is mixed with flux, and obtained mixture is carried out oxidizing semlting, in order to obtain and contain Zinc oxide and the melt of lead oxide.Concrete, herein Pb-Zn deposits can refer to include lead content > 40wt% high-grade raw ore, Or general lead zine ores lead and zinc total amount after ore dressing > lead and zinc concentrate of 50wt%, and can add during oxidizing semlting Suitable slag former.It should be noted that those skilled in the art can be according to actual needs to the flux used and oxygen The condition changing melting selects.
According to one embodiment of present invention, the temperature containing zinc oxide and the melt of lead oxide is at least 900 degrees Celsius.By This, can improve the efficiency that in subsequent process, Pb-Zn deposits is smelted further.
S200: utilize reducing agent, carries out reduction treatment to the melt containing zinc oxide and lead oxide in power frequency electric thermal reduction furnace With slag settlement treatment
In this step, utilize reducing agent, to the above-mentioned obtained melt containing zinc oxide and lead oxide at power frequency electric heating also Former stove carries out reduction treatment and slag settlement treatment, in order to obtain containing zinc flue gas, liquid lead and slag.
According to one embodiment of present invention, siphon port can be passed through, oxidizing semlting operation is obtained containing zinc oxide and oxygen The melt changing lead supplies to power frequency electric thermal reduction furnace.Inventor finds by using siphon port to feed, can be effectively close Feed under the conditions of envelope, such that it is able to improve the Environmental Protection Level that Pb-Zn deposits is smelted further.
According to still a further embodiment, power frequency electric thermal reduction furnace can have multiple coil, and multiple coil is arranged On the outer wall of power frequency electric thermal reduction furnace.Thus, by using coil to produce alternating magnetic field maintenance furnace temperature, such that it is able to enter one Step improves the efficiency that Pb-Zn deposits is smelted.According to a particular embodiment of the invention, the induction coil of 200~400 kilowatts can be used.
According to still another embodiment of the invention, reducing agent can be coke.Smelt thus, it is possible to improve Pb-Zn deposits further Efficiency.
According to still another embodiment of the invention, reducing agent may further include magnetic conductor.Thus, produce at external coil Under raw action of alternating magnetic field, magnetic conductor can keep stablizing of in-furnace temperature effectively, such that it is able to improve lead zinc further The efficiency of mining and metallurgy refining.
According to still another embodiment of the invention, magnetic conductor can be graphite.Inventor find graphite can magnetic conduction effectively, And subsequent reactions will not be introduced impurity, such that it is able to improve the efficiency that Pb-Zn deposits is smelted further.
According to one embodiment of present invention, graphite can be the 10~50% of reducing agent quality.Thus, it is possible to improve further The efficiency that Pb-Zn deposits is smelted.Inventor finds, if the ratio of graphite is too small, then not enough so that the temperature in reduction space is steady Fixed, if the ratio of graphite is excessive, then can affect the efficiency of reduction treatment.
According to still another embodiment of the invention, liquid lead is discharged by siphon port.Thus, it is possible to improve Pb-Zn deposits further The efficiency smelted.
S300: zinc flue gas will be contained and condense
In this step, the flue gas containing zinc obtained in power frequency electric thermal reduction furnace is condensed, in order to obtain liquid Zn and coal gas. According to one embodiment of present invention, it is possible to use the condensation to carrying out Pb-Zn deposits smelting containing zinc flue gas of the zinc rain condenser.Thus, Use zinc rain will condense out containing the metallic zinc carried in zinc flue gas, and the carbon monoxide wherein carried is or/and carbon dioxide Continue to exist in a gaseous form, and be recycled with coal gas form after further washing, purifying.
Thus, the equipment enforcement Pb-Zn deposits smelting process smelted for Pb-Zn deposits of the embodiment of the present invention is utilized, it is not necessary to lead Zinc ore sorts, and directly by after oxidized for Pb-Zn deposits fusing, supplies to power frequency electric thermal reduction furnace under high-temperature fusant state, In this body of heater, zinc oxide can be reduced to metallic zinc steam by pyrocarbon, obtains liquid metal zinc by condensation further. Enter the lead oxide in body of heater, be reduced to liquid metal lead by pyrocarbon, with the oxide composition such as iron, silicon, calcium, aluminium, magnesium Liquid lead skim drop to straight well formula power frequency electrothermal furnace bottom expansion chamber together.Slag lead separation is carried out at expansion chamber.By expansion chamber Lower tap hole releases metallic lead.According to embodiments of the invention, slag, slag can be released by expansion chamber top discharge port Sell outside after shrend.
In the description of this specification, reference term " embodiment ", " some embodiments ", " example ", " concrete example ", Or specific features, structure, material or the feature bag that the description of " some examples " etc. means to combine this embodiment or example describes It is contained at least one embodiment or the example of the present invention.In this manual, to the schematic representation of above-mentioned term not necessarily Refer to identical embodiment or example.And, the specific features of description, structure, material or feature can be any One or more embodiments or example combine in an appropriate manner.
Although above it has been shown and described that embodiments of the invention, it is to be understood that above-described embodiment is exemplary, Being not considered as limiting the invention, those of ordinary skill in the art is without departing from the principle of the present invention and the situation of objective Under above-described embodiment can be changed within the scope of the invention, revise, replace and modification.

Claims (13)

1. the equipment smelted for Pb-Zn deposits, it is characterised in that including:
Oxidizing semlting stove, described oxidizing semlting stove has Pb-Zn deposits entrance, flux entrance, melting exhanst gas outlet and melt outlet, Described melt contains zinc oxide and lead oxide;
Power frequency electric thermal reduction furnace, described power frequency electric thermal reduction furnace has melt inlet, reducing agent entrance, liquid lead outlet, stove Slag outlet and the exhanst gas outlet on zinc, described melt inlet is connected with described melt outlet;And
Zinc rain condenser, described zinc rain condenser has containing zinc smoke inlet, liquid Zn outlet and gas exit, described containing zinc Smoke inlet is connected with the described exhanst gas outlet containing zinc.
Equipment the most according to claim 1, it is characterised in that described reducing agent porch is provided with double-charging bell feeder.
Equipment the most according to claim 1 and 2, it is characterised in that also include waste heat boiler, described waste heat boiler Smoke inlet is connected with described melting exhanst gas outlet.
Equipment the most according to claim 3, it is characterised in that also include deduster, the import of described deduster and institute The outlet flue stating waste heat boiler is connected.
Equipment the most according to claim 4, it is characterised in that described deduster is electric cleaner.
Equipment the most according to claim 1, it is characterised in that described power frequency electric thermal reduction furnace include vertical reduction section and It is provided with coil in Horizontal sedimentation section, and the outer wall of described vertical reduction section and described Horizontal sedimentation section.
Equipment the most according to claim 6, it is characterised in that by siphon port, by the input of described melt to described work Frequently in electric reduction furnace.
Equipment the most according to claim 1, it is characterised in that described reducing agent is coke.
Equipment the most according to claim 8, it is characterised in that described reducing agent farther includes magnetic conductor.
Equipment the most according to claim 9, it is characterised in that described magnetic conductor is graphite.
11. equipment according to claim 10, it is characterised in that described graphite is the 10~50% of described reducing agent quality.
12. equipment according to claim 1, it is characterised in that the temperature of described melt is at least 900 degrees Celsius.
13. equipment according to claim 1, it is characterised in that discharge liquid lead by siphon port.
CN201610439929.3A 2016-06-17 2016-06-17 The equipment smelted for Pb-Zn deposits Active CN105907988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610439929.3A CN105907988B (en) 2016-06-17 2016-06-17 The equipment smelted for Pb-Zn deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610439929.3A CN105907988B (en) 2016-06-17 2016-06-17 The equipment smelted for Pb-Zn deposits

Publications (2)

Publication Number Publication Date
CN105907988A true CN105907988A (en) 2016-08-31
CN105907988B CN105907988B (en) 2019-05-07

Family

ID=56750417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610439929.3A Active CN105907988B (en) 2016-06-17 2016-06-17 The equipment smelted for Pb-Zn deposits

Country Status (1)

Country Link
CN (1) CN105907988B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048625A (en) * 2020-07-16 2020-12-08 云南驰宏锌锗股份有限公司 Lead-zinc oxide ore recycling harmless treatment system and method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0324238A (en) * 1989-06-20 1991-02-01 Dowa Mining Co Ltd Lead smelting method
CN101899580A (en) * 2010-07-20 2010-12-01 中国恩菲工程技术有限公司 Zinc concentrate smelting equipment
CN201793692U (en) * 2010-07-20 2011-04-13 中国恩菲工程技术有限公司 Zinc concentrate smelting device
CN103205582A (en) * 2013-03-11 2013-07-17 中国恩菲工程技术有限公司 Bottom blowing smelting electrothermal reduction lead and zinc smelting process
CN103205581A (en) * 2013-03-11 2013-07-17 中国恩菲工程技术有限公司 Bottom blowing smelting electrothermal reduction lead and zinc smelting device
CN203187731U (en) * 2013-03-11 2013-09-11 中国恩菲工程技术有限公司 Equipment for smelting lead and zinc by bottom blowing smelting and electrothermal reduction
CN103451446A (en) * 2013-09-10 2013-12-18 中国恩菲工程技术有限公司 Smelting side-blowing reduction lead-zinc smelting device
CN203498450U (en) * 2013-09-10 2014-03-26 中国恩菲工程技术有限公司 Side-blown reducing lead-zinc smelting equipment
CN105671314A (en) * 2016-04-20 2016-06-15 长沙有色冶金设计研究院有限公司 Direct smelting method and system for producing metallic lead and zinc at the same time
CN205687989U (en) * 2016-06-17 2016-11-16 中国恩菲工程技术有限公司 The equipment smelted for Pb-Zn deposits

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0324238A (en) * 1989-06-20 1991-02-01 Dowa Mining Co Ltd Lead smelting method
CN101899580A (en) * 2010-07-20 2010-12-01 中国恩菲工程技术有限公司 Zinc concentrate smelting equipment
CN201793692U (en) * 2010-07-20 2011-04-13 中国恩菲工程技术有限公司 Zinc concentrate smelting device
CN103205582A (en) * 2013-03-11 2013-07-17 中国恩菲工程技术有限公司 Bottom blowing smelting electrothermal reduction lead and zinc smelting process
CN103205581A (en) * 2013-03-11 2013-07-17 中国恩菲工程技术有限公司 Bottom blowing smelting electrothermal reduction lead and zinc smelting device
CN203187731U (en) * 2013-03-11 2013-09-11 中国恩菲工程技术有限公司 Equipment for smelting lead and zinc by bottom blowing smelting and electrothermal reduction
CN103451446A (en) * 2013-09-10 2013-12-18 中国恩菲工程技术有限公司 Smelting side-blowing reduction lead-zinc smelting device
CN203498450U (en) * 2013-09-10 2014-03-26 中国恩菲工程技术有限公司 Side-blown reducing lead-zinc smelting equipment
CN105671314A (en) * 2016-04-20 2016-06-15 长沙有色冶金设计研究院有限公司 Direct smelting method and system for producing metallic lead and zinc at the same time
CN205687989U (en) * 2016-06-17 2016-11-16 中国恩菲工程技术有限公司 The equipment smelted for Pb-Zn deposits

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《现代电气工程师实用手册》编写组编: "《现代电气工程师实用手册 下》", 30 June 2014, 北京:中国水利水电出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048625A (en) * 2020-07-16 2020-12-08 云南驰宏锌锗股份有限公司 Lead-zinc oxide ore recycling harmless treatment system and method

Also Published As

Publication number Publication date
CN105907988B (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN105925805B (en) Pb-Zn deposits smelting process
CN100469907C (en) Method for processing dust with zinc of electric furnace
CN101871050B (en) Method for eliminating magnetic iron oxide furnace accretion produced in copper sulfide concentrate pyrometallurgical process
CN106048254A (en) Continuous smelting device and method of nickel-containing material
CN104105802A (en) Base metal recovery
CN101240379A (en) Method for directly smelting lead zinc sulfide ore by hydrogen
CN111411234A (en) Jet smelting electrothermal reduction furnace and method for smelting zinc-containing material
CN102162037A (en) Method for depleting refining slag of copper
CN107488791A (en) Copper smelting apparatus
US5431710A (en) Method for continuously producing iron, steel or semi-steel and energy
CN111457735A (en) Integrated pyrometallurgical furnace and method for treating zinc leaching residues
CN111440957A (en) System and method for treating zinc concentrate and zinc slag
CN205687989U (en) The equipment smelted for Pb-Zn deposits
CN105907988A (en) Device for lead and zinc ore smelting
CN206089768U (en) Lead zinc ore 's melting equipment
CN206089776U (en) Lead zinc ore 's melting equipment
CN206089775U (en) Lead zinc ore 's melting equipment
CN106086464B (en) The smelting equipment of Pb-Zn deposits
CN106086463B (en) The smelting equipment of Pb-Zn deposits
KR101494256B1 (en) System for Recovering Valuable Metal
CN212247151U (en) Jet smelting electric heating reduction furnace
US4514221A (en) Method of smelting zinc by injection smelting
CN106086456B (en) The smelting equipment of Pb-Zn deposits
AU594370B2 (en) Recovery of volatile metal values from metallurgical slags
JP3969522B2 (en) Operation method of copper smelting furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant