CN105903649A - Solid propellant rocket engine rear mouth grouting tool - Google Patents
Solid propellant rocket engine rear mouth grouting tool Download PDFInfo
- Publication number
- CN105903649A CN105903649A CN201510970727.7A CN201510970727A CN105903649A CN 105903649 A CN105903649 A CN 105903649A CN 201510970727 A CN201510970727 A CN 201510970727A CN 105903649 A CN105903649 A CN 105903649A
- Authority
- CN
- China
- Prior art keywords
- solid propellant
- propellant rocket
- machine mouth
- grouting
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C21/00—Accessories or implements for use in connection with applying liquids or other fluent materials to surfaces, not provided for in groups B05C1/00 - B05C19/00
Abstract
The invention relates to a solid propellant rocket engine manufacture technology and concretely relates to a solid propellant rocket engine rear mouth grouting tool. The tool comprises an inner baffle plate, an outer baffle plate, a top plate, an upper connection rod, a lower connection rod I and a lower connection rod II. The top plate and the outer baffle plate are designed according to the molded surface size of a solid propellant rocket engine rear mouth nonmetal steps. The inner baffle plate is designed according to the size of a solid propellant rocket engine rear mouth shaping structure. The upper connection rod and the lower connection rod I are combined through adjustment nuts and are connected to the inner baffle plate and the top plate. Through the adjustment nuts, a pressure force is applied for the inner baffle plate. The upper connection rod and the lower connection rod II are combined through adjustment nuts and through the adjustment nuts, a pressure force is applied for the outer baffle plate.
Description
Technical field
The present invention relates to a kind of solid propellant rocket manufacturing technology, be specifically related to machine mouth grouting work after a kind of solid propellant rocket
Dress.
Background technology
Solid-rocket starts just (model XX-68A) forward and backward artificial unsticking seam domestic demand to pour into grouting material, plays thermal insulation and release
Stress etc. act on, it is desirable to artificial unsticking gap is full of, fills real by grouting material.
At present, behind XX-68A combustion chamber, the grouting of machine mouth uses horizontal grouting.Existing grouting process requires " should first use F410-1 before grouting
Artificial unsticking gap is blocked by joint filling material, and closure scope should be greater than the 1/3 of machine mouth arc length, joint filling material solidification 2h with
After on, the two ends plasticine at joint filling material respectively does a funnel-form chute.During grouting, grouting material is filled by a chute from which
Enter in artificial unsticking seam, after seeing liquid level from another chute, stop grouting ".Because grouting material has poor fluidity, foaming etc.
Physical attribute, therefore during practical operation, there are the following problems: 1. because artificial unsticking seam gap is narrow, grouting material mobility
Difference, the material once poured into are few, cause every product to be both needed to repeatedly batch mixing grouting and just can complete this operation, inefficiency;②
Because of the grouting material foaming in pouring into artificial unsticking seam, bubble is difficult to discharge, and after grouting material solidifies, operating personnel cannot
Filling reality degree in stitching artificial unsticking judges, it is possible to exists and fills unreal or leakage filling phenomenon, affects product quality reliability.
Therefore, the existing grouting process grouting cycle is long, easily occurs filling unreal problem, and personnel also cannot be to the filling in artificial unsticking seam
Slurry situation carries out checking confirmation, replaces plugging grouting method by plasticine barrier dam technology, although shorten the grouting cycle and fill unreal
Quality problems, but barrier dam process is relatively complicated, takes time and effort, inefficiency.
Summary of the invention
In view of the problem in the presence of above-mentioned prior art, the present invention provides machine mouth grouting frock after a kind of solid propellant rocket,
Solve the grouting cycle longer and fill unreal problem, and improve operating efficiency.
The concrete technical scheme of the present invention is as follows:
A kind of solid propellant rocket tail machine mouth grouting frock, including Internal baffle, outer baffle, top board, upper connecting rod, lower link I
With lower link II, the molding surface size that wherein top board and outer baffle require according to the nonmetal step of machine mouth after solid propellant rocket is carried out
Design;Internal baffle is according to machine mouth reshaping structure size design after solid propellant rocket;Upper connecting rod passes through adjusting nut and lower link
I is assembled integrally, and is connected with Internal baffle, top board, applies pressure by adjusting nut to Internal baffle;Upper connecting rod is by regulation spiral shell
Mother is assembled integrally with lower link II, applies pressure by adjusting nut to outer baffle.
The uniform multiple screws of outer baffle, for being connected with machine mouth lower end after solid propellant rocket;Six screws are had respectively on top board,
Wherein 3 is screw hole I, and 2 is screw hole II, and 1 is screw hole II I, and after screw hole I and solid propellant rocket, machine mouth upper end is fixed,
Screw hole II is for the fixing upper connecting rod being connected with Internal baffle, and screw hole II I in the middle part of top board is for the fixing upper connecting rod being connected with outer baffle.
For making this grouting frock fit tightly with nonmetal step surface and powder column shaping surface, inside and outside baffle plate and upper connecting rod, lower link
I and lower connecting rod II junction are respectively equipped with sealing gasket and O RunddichtringO.
The invention have the benefit that the use of this frock can shorten grouting time, solve unreal problem of being in the milk, save
Cost, shortens the grouting cycle, and batch product for subsequent models lays the foundation.
Accompanying drawing explanation
Fig. 1 shows this frock integrated connection method with engine and the primary structure composition of this frock;
Fig. 2 shows the parts composition of each structure, the connected mode between each parts, the encapsulating method of frock and concrete installation method;
Mark as follows shown in figure: 1, top board;2, bolt;3, backing plate (silicon rubber backing plate);4, bolt M6 × 25;5、
Nut M6;6, upper connecting rod;7, adjusting nut;8, lower link I;9, lower link II;10, Internal baffle;11, outer baffle;
12, O RunddichtringO;13, sealing gasket I;14, sealing gasket II.
Detailed description of the invention
Describe the present invention with instantiation below in conjunction with the accompanying drawings.
The molding surface size required according to the nonmetal step of machine mouth after XX-68A solid propellant rocket, design top board 1 and outer baffle
11.The key dimension of top board 1 and outer baffle 11 includes the degree of depth of diameter and step, and to design outer baffle radian be 120 °.
According to machine mouth reshaping structure size after the multiple XX-68A Solid Rocket Motor combustion chamber of statistics, designing Internal baffle 10, radian is
120°.Uniform 5 screws of outer baffle 11, for being connected with rear machine mouth lower end, with fixing outer baffle 11.On Internal baffle 10
Reserved 4 screw hole II of end, for fixing with lower link I 8.Have respectively on top board 1 six screws (3 screw hole I, 2
Screw hole II, 1 screw hole II I), wherein screw hole I is fixed with rear machine mouth upper end, and screw hole II is connected with Internal baffle 10 for fixing
Upper connecting rod 6, screw hole II I in the middle part of top board 1 is for the fixing upper connecting rod 6 being connected with outer baffle 11.Internal baffle 10, outer baffle 11
Upper connecting rod 6, lower link I 8, lower link II 9 connected by adjusting nut, simultaneously for making this grouting frock and nonmetal step
Face and powder column shaping surface fit tightly, and are respectively equipped with sealing gasket I, II and silicon rubber O RunddichtringO, material during to ensure to be in the milk
Excessive.
Concrete grouting tool structure and schematic diagram are as it is shown in figure 1, it will be seen from figure 1 that this grouting frock mainly includes Internal baffle
10, outer baffle 11, top board 1, adjusting nut, upper connecting rod 6 and lower link I 8, lower link II 9, wherein Internal baffle 10, outer
The effect of baffle plate 11 is that when making grouting, liquid level reach a certain height, to ensure machine mouth grouting after completing three times.Outer baffle 11 also rises
To with housing after effect fixing bottom machine mouth.Top board 1 play with housing after the fixing effect in machine mouth top.Upper connecting rod 6, tune
Joint nut is assembled integrally with lower link I 8, is connected with Internal baffle 10, top board 1, is applied to Internal baffle 10 by adjusting nut
Pressure, to ensure that Internal baffle 10 closes with the laminating of shaping powder, when preventing from being in the milk, material flows out.Equally, upper connecting rod 6, regulation
Nut is assembled integrally with lower link II 9, applies pressure by adjusting nut to outer baffle 11, with ensure outer baffle 11 with after
The laminating of machine mouth non-metal surfaces is closed, and when preventing from being in the milk, material flows out.Internal baffle 10, outer baffle 11 use metallic article, with medicine
When face shaping surface and the laminating of rear machine mouth non-metal surfaces, there is gap, need sealing ring, sealing gasket to play sealing function.
When being embodied as, first upper connecting rod 6 is connected with lower link I 8, lower link II 9 respectively by regulation bolt, named company
Fitting I and connector II.Connector I nut is attached with Internal baffle 10 and top board 1 respectively, after having connected, logical
Cross screw hole I top board 1 is fixed with rear machine mouth and tightened, adjust adjusting nut and make Internal baffle 10 fit tightly with shaping medicine surface.
After installing Internal baffle 10, outer baffle 11 is connected, by the lower company on connector II by screw hole I V is fixing with bottom rear machine mouth
Bar II inserts outer baffle 11.After adjustment adjusting nut makes connecting rod 6 be connected with top board 1 screw hole II I, continue adjusting nut and make outer gear
Plate fits tightly with the rear nonmetal step surface of machine mouth.
The present invention formally uses on XX-68A combustion chamber, and using effect is good, installs, dismantles convenient, promotes work effect
Rate, solves unreal problem of being in the milk, and because filling process does not use plasticine, it is simple to cleaning work after solidification.
Claims (4)
1. a solid propellant rocket tail machine mouth grouting frock, it is characterised in that: include Internal baffle, outer baffle, top board, upper company
Bar, lower link I and lower link II, wherein top board and outer baffle are according to machine mouth nonmetal step requirement after solid propellant rocket
Molding surface size be designed;Internal baffle is according to machine mouth reshaping structure size design after solid propellant rocket;Upper connecting rod passes through
Adjusting nut is assembled integrally with lower link I, is connected with Internal baffle, top board, applies pressure by adjusting nut to Internal baffle;
Upper connecting rod is assembled integrally with lower link II by adjusting nut, applies pressure by adjusting nut to outer baffle.
Machine mouth grouting frock after solid propellant rocket the most according to claim 1, it is characterised in that: outer baffle is uniform multiple
Screw, for being connected with machine mouth lower end after solid propellant rocket;Having six screws on top board respectively, wherein 3 is screw
I, 2 is screw hole II, and 1 is screw hole II I, and after screw hole I and solid propellant rocket, machine mouth upper end is fixed, and screw hole II is used
In the fixing upper connecting rod being connected with Internal baffle, screw hole II I in the middle part of top board is for the fixing upper connecting rod being connected with outer baffle.
Machine mouth grouting frock after solid propellant rocket the most according to claim 1, it is characterised in that: for making this grouting frock
Fitting tightly with nonmetal step surface and powder column shaping surface, inside and outside baffle plate is with upper connecting rod, lower link I and lower connecting rod II even
The place of connecing is respectively equipped with sealing gasket and O RunddichtringO.
Machine mouth grouting frock after solid propellant rocket the most according to claim 1, it is characterised in that: inside and outside baffle plate radian
It it is 120 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510970727.7A CN105903649B (en) | 2015-12-15 | 2015-12-15 | Machine mouth is in the milk tooling after a kind of solid propellant rocket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510970727.7A CN105903649B (en) | 2015-12-15 | 2015-12-15 | Machine mouth is in the milk tooling after a kind of solid propellant rocket |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105903649A true CN105903649A (en) | 2016-08-31 |
CN105903649B CN105903649B (en) | 2018-12-14 |
Family
ID=56744242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510970727.7A Active CN105903649B (en) | 2015-12-15 | 2015-12-15 | Machine mouth is in the milk tooling after a kind of solid propellant rocket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105903649B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107420223A (en) * | 2017-07-24 | 2017-12-01 | 湖北三江航天江河化工科技有限公司 | A kind of solid propellant rocket prosthetic device and its restorative procedure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101947831A (en) * | 2010-08-05 | 2011-01-19 | 熊昉 | Polyurethane molding closing perfusion vertical foaming automatic mould base |
CN102896728A (en) * | 2011-07-27 | 2013-01-30 | 昆山隆昌车业有限公司 | Semi-automatic foaming mould device |
CN202922851U (en) * | 2012-07-30 | 2013-05-08 | 西安科技大学 | Foaming mould with variable foaming ratio |
CN103776670A (en) * | 2013-10-21 | 2014-05-07 | 中国建材检验认证集团西安有限公司 | Sample preparing mold for testing wall building standard brick strength |
CN104476707A (en) * | 2014-12-08 | 2015-04-01 | 广西玉柴机器股份有限公司 | Manufacturing process for core box mould plastic sample core |
-
2015
- 2015-12-15 CN CN201510970727.7A patent/CN105903649B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101947831A (en) * | 2010-08-05 | 2011-01-19 | 熊昉 | Polyurethane molding closing perfusion vertical foaming automatic mould base |
CN102896728A (en) * | 2011-07-27 | 2013-01-30 | 昆山隆昌车业有限公司 | Semi-automatic foaming mould device |
CN202922851U (en) * | 2012-07-30 | 2013-05-08 | 西安科技大学 | Foaming mould with variable foaming ratio |
CN103776670A (en) * | 2013-10-21 | 2014-05-07 | 中国建材检验认证集团西安有限公司 | Sample preparing mold for testing wall building standard brick strength |
CN104476707A (en) * | 2014-12-08 | 2015-04-01 | 广西玉柴机器股份有限公司 | Manufacturing process for core box mould plastic sample core |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107420223A (en) * | 2017-07-24 | 2017-12-01 | 湖北三江航天江河化工科技有限公司 | A kind of solid propellant rocket prosthetic device and its restorative procedure |
CN107420223B (en) * | 2017-07-24 | 2019-03-29 | 湖北三江航天江河化工科技有限公司 | A kind of solid propellant rocket prosthetic device and its restorative procedure |
Also Published As
Publication number | Publication date |
---|---|
CN105903649B (en) | 2018-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106735092B (en) | One-armed pipe castingin forming method | |
CN105965738B (en) | A kind of method for filling to special-shaped coils skeleton form | |
CN105170911B (en) | A kind of complicated abnormal shape is combined the manufacture method of core | |
CN206763883U (en) | A kind of die casting for being used to test bar-shaped casting thermal fragmentation tendency and mechanical property | |
CN108515146A (en) | The running gate system of whole essence casting guider | |
CN102935488A (en) | Shell filler assisting shell manufacture in investment casting and method filling shells by adopting filler | |
CN201702319U (en) | Sand mould of cylinder cover of engine | |
CN105903649A (en) | Solid propellant rocket engine rear mouth grouting tool | |
CN109500375B (en) | Faucet casting process | |
CN203198125U (en) | Circuit board mold | |
CN107443674A (en) | A kind of automobile die with temperature control function | |
CN108162302A (en) | A kind of moulding and its injection molding forming method, water proof equipment | |
CN106984769A (en) | A kind of hot investment casting pressure wax apparatus | |
CN207057591U (en) | A kind of pick housing of pneumatic pick mold | |
CN206492923U (en) | A kind of mould of motor case | |
CN108160974A (en) | Emission forming machine | |
CN106363863A (en) | Toy injection molding machine | |
CN209424497U (en) | A kind of sand mold being used to prepare arc casting | |
CN103878327B (en) | Heavy castings loam core fixed structure | |
CN209255765U (en) | Casting and pouring gap-bridging device | |
CN207787667U (en) | Low-pressure casting device for burner of casting | |
CN206568489U (en) | A kind of injection mold with exhaust structure | |
CN110497579A (en) | A kind of investment casting method of pneumatic software mechanical claw | |
CN206047029U (en) | A kind of hole base part casting mould | |
CN206824611U (en) | A kind of hot investment casting pressure wax apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200910 Address after: 010076 Inner Mongolia Autonomous Region Hohhot Inner Mongolia 1053 Mailbox Co-patentee after: Inner Mongolia Aerospace Jinxia Chemical Co., Ltd Patentee after: INNER MONGOLIA AEROSPACE HONGXIA CHEMICAL Co.,Ltd. Address before: 1053 mailbox 010076, Hohhot, the Inner Mongolia Autonomous Region Patentee before: INNER MONGOLIA AEROSPACE HONGXIA CHEMICAL Co.,Ltd. |