CN105887927A - 预制沉箱式跨海隧道 - Google Patents
预制沉箱式跨海隧道 Download PDFInfo
- Publication number
- CN105887927A CN105887927A CN201510012206.0A CN201510012206A CN105887927A CN 105887927 A CN105887927 A CN 105887927A CN 201510012206 A CN201510012206 A CN 201510012206A CN 105887927 A CN105887927 A CN 105887927A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- caisson
- ocean
- cage
- caissons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
预制沉箱式跨海隧道,属公路、铁路、海洋工程领域;跨海道路:架桥影响水面船舶航行,水过深也不宜架桥;开凿隧道,投资大、耗时长、有透水风险。预制沉箱式跨海隧道的方法是:首先,预制金属沉箱并防锈;其次,将沉箱连接成龙状并做防水处理;再次,在金属沉箱龙内压配重,使沉箱龙俯卧在海床上;第四,在沉箱龙内浇筑混凝土内衬壁,并减相应配重,此时,沉箱龙已是跨海隧道了,并处于半悬浮状态;第五,铺设公路或铁路等交通使用设施,并减相应配重;第六,在隧道外,用锚链进行水平加固,用串通将碎石堆放于隧道悬空底侧部,做承载力加固;第六,在隧道浅海处,放置水漂警示,提示航行船只。
Description
技术领域:属公路工程、铁路工程、海洋工程领域。
背景技术:在公路和铁路建设领域,跨过海峡、水域,大都采用架设跨海桥梁或开凿隧道。架设跨海桥梁的缺点是:影响水面航行船舶的高度,水深影响架桥的可行性,大风时,影响桥面车辆行驶安全;开凿跨海隧道的缺点是:耗资大、工期长,施工时透水影响施工安全。预制沉箱大都使用在水下基础工程施工,预制沉箱,现场竖向连接,放置施工部位水中,排除沉箱中的水体,清除水床表面软土,使沉箱下降到设计位置,沉箱的下降,也提高了地基对基础的摩擦承载力,沉箱下降到设计持力层,实现地基对基础的设计承载力,并保持基础的水平稳定。
发明内容:首先,预制公路或铁路断面形状的金属沉箱,并做防锈处理;其次,将预制的金属沉箱运至设计隧道位置两岸的组装平台,进行横向连接组装,并做防水处理,将连接的沉箱在水一端封闭,并牵引该端向对岸,相向沉箱龙相遇时,利用对接平台对接;再次,在连接后的沉箱龙两端岸边,向沉箱龙内均匀放置配重,如钢砂混凝土块或沙袋等,将沉箱龙压至设计的海床面卧放;第四,在沉箱内分段浇筑混凝土内衬壁,并减相应配重,将沉箱龙变成沉附在海床上的隧道,配重使隧道即沉浮在海床面,又处于半悬浮状态;按设计在隧道内铺设公路或铁路及设施,安装相应的照明、通风、通讯设施等,并减相应的配重,使使用状态的隧道始终处于半悬浮状态,海床对隧道的承载力箱体、内衬、道路设施等的重量综合,稍大与水体对隧道的浮力,加运营动荷载组合,单位面积承载力不会很大;第五,隧道加固,水平方向,设置锚链水平加固,以防止洋流和潮汐对隧道水平作用,竖向,利用串通将悬空或软基处,放值碎石堆,形成持力堆桩,以保证隧道设计的承载力;第六,在浅水的隧道处,设置水漂警示,提示水面航行的舰船,水下有跨海隧道。
隧道在水下悬空处,处于整体受拉状态,形成悬链线受拉杆,可较大跨度的跨越海底海沟。
附图说明:附图1是预制沉箱式跨海隧道侧视图,示意隧道在水下状态,与海岸、海床、海沟的相关位置,水漂警示的示意位置等;附图2是预制沉箱式隧道剖面图,示意隧道内沉箱、内衬、道路设施,示意隧道外隧道与海床的关系,隧道外水平、竖向加固等。
具体实施方式:将上述发明原理,介绍给公路、铁路规划、设计部门,方案论证、实验、使用。也可以介绍给需要铺设跨海管道的部门,用上述发明原理,采用到供水、输油等管线工程中。
Claims (2)
1.将预制沉箱水平连接,用配重将沉箱压入海底,浇筑混凝土内衬壁,形成海底隧道,小的可铺设油管、水管等的管线,大的可做铁路、公路等,这种方法是专利发明人的权利要求。
2.在浇筑混凝土内衬壁和铺设公路和铁路设施的同时,减相应的配重,始终保持沉箱重、内衬重加道路设施重,稍大于水对它的浮力,海床对隧道的承载力只比隧道内的动荷载大一些,隧道的抗拉能力又较强,固隧道可有较大的跨度,跨越海底海沟和断崖,这也是专利发明人的权利要求。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510012206.0A CN105887927A (zh) | 2015-01-12 | 2015-01-12 | 预制沉箱式跨海隧道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510012206.0A CN105887927A (zh) | 2015-01-12 | 2015-01-12 | 预制沉箱式跨海隧道 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105887927A true CN105887927A (zh) | 2016-08-24 |
Family
ID=56998936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510012206.0A Pending CN105887927A (zh) | 2015-01-12 | 2015-01-12 | 预制沉箱式跨海隧道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105887927A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691447A (zh) * | 2020-05-27 | 2020-09-22 | 武汉建策工程咨询有限公司 | 用于沉管隧道管顶减载的缓沉式沉箱施工方法 |
CN113622366A (zh) * | 2021-08-20 | 2021-11-09 | 中交四航局第二工程有限公司 | 一种沉箱码头及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6450734B1 (en) * | 1997-05-09 | 2002-09-17 | Michael W. Kuja | Transportation underwater tunnel system |
CN1854397A (zh) * | 2005-04-27 | 2006-11-01 | 黎达明 | 悬浮法海底隧道 |
CN1920186A (zh) * | 2006-09-14 | 2007-02-28 | 董兰田 | 跨海水下吊浮隧道桥 |
CN101985837A (zh) * | 2010-09-17 | 2011-03-16 | 李瑞静 | 陆地制作一体式海底隧道的过程与施工方法 |
CN203905053U (zh) * | 2014-06-26 | 2014-10-29 | 万雷 | 海下隧道桥 |
-
2015
- 2015-01-12 CN CN201510012206.0A patent/CN105887927A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6450734B1 (en) * | 1997-05-09 | 2002-09-17 | Michael W. Kuja | Transportation underwater tunnel system |
CN1854397A (zh) * | 2005-04-27 | 2006-11-01 | 黎达明 | 悬浮法海底隧道 |
CN1920186A (zh) * | 2006-09-14 | 2007-02-28 | 董兰田 | 跨海水下吊浮隧道桥 |
CN101985837A (zh) * | 2010-09-17 | 2011-03-16 | 李瑞静 | 陆地制作一体式海底隧道的过程与施工方法 |
CN203905053U (zh) * | 2014-06-26 | 2014-10-29 | 万雷 | 海下隧道桥 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691447A (zh) * | 2020-05-27 | 2020-09-22 | 武汉建策工程咨询有限公司 | 用于沉管隧道管顶减载的缓沉式沉箱施工方法 |
CN113622366A (zh) * | 2021-08-20 | 2021-11-09 | 中交四航局第二工程有限公司 | 一种沉箱码头及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109506044A (zh) | 一种海底输油管道施工工艺 | |
CN109780325A (zh) | 一种水厂取水隧道水下管道安装方法 | |
JP5787172B2 (ja) | 防波堤の嵩上げ工法 | |
KR101211811B1 (ko) | 조립케이슨을 이용한 현장타설말뚝 | |
CN104196026A (zh) | 水中桥梁临时工程用钢管桩拔除方法 | |
CN111424716B (zh) | 一种人工岛接力延伸的斜拉锚碇式悬浮隧道结构 | |
CN103498420B (zh) | 大型钢箱梁上岸施工方法 | |
CN107338760B (zh) | 一种低潮差港区岸壁沉箱码头结构及其建造方法 | |
CN105887927A (zh) | 预制沉箱式跨海隧道 | |
US11787514B2 (en) | Marine construction and a method for constructing the same | |
WO1990015223A1 (en) | Submerged bridge tunnel | |
CN207749530U (zh) | 自安装组合锚桩及加固地基的沉垫式基础平台 | |
JP2000265450A (ja) | 通水可能な函体からなる人工地盤とその施工方法 | |
CN116812079B (zh) | 一种浮动标志固定装置 | |
RU2587730C1 (ru) | Способ закрепления подводного трубопровода в проектном положении | |
KR20100120326A (ko) | 선형의 변곡점 또는 환기구가 있는 물속다리(水中橋梁) | |
Douairi et al. | Upgrading techniques for quay walls | |
Buring | Flexible Quay Wall Structures for Container Vessels | |
KR20100119909A (ko) | 교각을 가진 물속다리(水中橋梁) | |
Ruiz de Temiño Alonso | Gravity base foundations for offshore wind farms: marine operations and installation processes | |
KR200240421Y1 (ko) | 프리케스트 콘크리트 부재를 사용하는 중력식 안벽의저항력 증대용 맞물림 접합의 시공구조 | |
CN112878357A (zh) | 超百米深水跨海大桥沉箱基础结构及施工方法 | |
Byrne et al. | Townsville-Magnetic Island Submarine Pipeline | |
Yao et al. | Paper 8-In-the-Wet Construction | |
Gursoy | Immersed tube tunnels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160824 |
|
WD01 | Invention patent application deemed withdrawn after publication |