CN105887651A - Arch hexagonal steel box beam manufacturing method - Google Patents
Arch hexagonal steel box beam manufacturing method Download PDFInfo
- Publication number
- CN105887651A CN105887651A CN201410677313.0A CN201410677313A CN105887651A CN 105887651 A CN105887651 A CN 105887651A CN 201410677313 A CN201410677313 A CN 201410677313A CN 105887651 A CN105887651 A CN 105887651A
- Authority
- CN
- China
- Prior art keywords
- arch
- steel box
- girder
- plate
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention relates to an arch hexagonal steel box beam manufacturing method. The method comprises the steps that a mold for an arch hexagonal steel box beam is manufactured, wherein the mold comprises a base and a mold plate and is characterized in that the base comprises a bottom beam, a supporting beam, a connecting plate and a supporting rod, the bottom beam is formed by machining two number-56 I-beams, the supporting beam is formed by machining two number-32 I-beams, and the supporting beam is connected to the middle of an upper plane of the bottom beam; one side face of the mold plate is machined into an arch shape, the radian of the mold plate is the same as the radian of a lower flange plate of the arch hexagonal steel box beam, during construction, the machined lower flange plate of the arch hexagonal steel box beam is fixed to the mold plate, the lower flange plate and the arch side face of the mold plate are attached tightly and kept perpendicular, the center line of the lower flange plate is aligned to the upper plane of the mold plate, then, a transverse partition plate, a web plate and the upper flange plate are installed in place, and assembling of the arch hexagonal steel box beam is completed. According to the method, construction is convenient and rapid, and the assembling precision and quality of the arch hexagonal steel box beam are effectively ensured.
Description
One, technical field:
The present invention relates to a kind of arch hexagon steel box-girder preparation method, belong to structural steelwork construction field.
Two, background technology:
Little Miao Zi township, Qingshuihe County, Huhehaote City bridge, bridge steel structure view is shaped to butterfly, and bridge is complete
Long 100m, width 28m, bridge floor both sides monolithic arch rib signifies the double-vane of rapid development, by main arch and two side arches
It is formed by connecting by I-shaped strut.The arch of main arch rib is parabola, and its cross section uses hexagon steel case
Cross section, a width of 1.4m, high 1.2m, thickness of slab 16mm, main arch sagitta 16.63m, main arch span 60m.Side is encircleed
For square-section, high 0.4m, wide 0.3m, thickness of slab 12mm, side arch has a hyperboloid spatial modelling, main arch with
Angle 9.9 ° between the arch of side, main arch is linked into an integrated entity by strut with side arch.When the main arch of butterfly arch bridge makes,
Because main arch is the parabolic shape that hexagon steel box-girder is made, in the prior art, steel box-girder mostly is quadrangle
Steel box-girder, does not the most make arch hexagon steel box-girder mature technology.
Three, summary of the invention:
The present invention is directed to prior art not enough, propose a kind of a kind of arch six limit simple to operate, easy to use
Shape steel box-girder preparation method.
The technical problem to be solved in the present invention is to put forward a kind of arch hexagon steel box-girder preparation method of arch, first
Carrying out making the mold used by arch hexagon steel box-girder, described mold includes base and template, and its feature exists
In: described base includes bottom girder, joist, connecting plate, strut, and described bottom girder is added by 2 No. 56 I-steel
Work forms, and level interval 300mm between 2 No. 56 I-steel, along bottom girder length side, every 500mm is 2
Being connected with connecting plate in the middle of individual No. 56 I-steel, described joist uses 2 No. 32 I-steel to add
Work forms, and joist is placed on the centre position of plane on bottom girder and links into an integrated entity with bottom girder.Described template is adopted
Processing with 16mm steel plate, arc is processed in a side of template, its radian and arch hexagon steel
The radian of the bottom wing listrium of box beam is identical, and template is placed on joist plane and links into an integrated entity with joist, edge
Joist length direction, template is reinforced by every 500mm at 2 No. 32 I-steel both sides struts.Because of arch
Shape hexagon steel box-girder span is 60m, during described internal model making, first releases arch hexagon steel case on platform
The arc curve of the bottom wing listrium of beam, is fabricated to some sections by described base, puts inside arc curve,
And with connecting plate, each section of base is linked into an integrated entity, the template processed is fixed on base completes tire subsequently
Tool makes.During construction, first the bottom wing listrium of the arch hexagon steel box-girder processed is fixed in template,
Bottom wing listrium is adjacent to the arcuate flanks of template and keeps vertical, and ensures in bottom wing listrium center line and template
Planar registration, releases the rigging position line of diaphragm plate subsequently on bottom wing listrium and diaphragm plate installation is put in place,
The most following two blocks of webs are installed and put in place, and along its length, every 500mm bearing is fixed,
Last above two blocks of webs and top flange plate installations again puts in place, completes the assembler of arch hexagon steel box-girder
Make.
The useful good effect of the present invention: the present invention is easy to operate, can effectively ensure that arch hexagon steel box-girder
Assembly precision and quality, and improve work efficiency, in construction, mold material used should be in other engineering project
In be continuing with, meet green construction technology, reduce construction cost, the effect of environmental protection.
Four, accompanying drawing explanation
Fig. 1: the present invention makes the positioner structure schematic diagram of arch hexagon steel box-girder
Fig. 2: the present invention makes the mold horizontal layout schematic diagram of arch hexagon steel box-girder
Fig. 3: the present invention assembles schematic diagram
Five, detailed description of the invention
Embodiment one: see Fig. 1, Fig. 2, Fig. 3, the present invention relates to a kind of arch hexagon steel box-girder and makes
Method, first carries out making the mold used by arch hexagon steel box-girder, and described mold includes base 1 and mould
Plate 5, it is characterised in that: described base 1 includes bottom girder 2, joist 4, connecting plate 3, strut 6, the described end
Beam 2 is processed by 2 No. 56 I-steel, and level interval 300mm between 2 No. 56 I-steel, the end of along
Beam 2 length side, every 500mm is connected with connecting plate 3 in the middle of 2 No. 56 I-steel, described
Joist 4 uses 2 No. 32 I-steel to process, and joist 4 is placed on the centre position of plane on bottom girder 2
And link into an integrated entity with bottom girder 2.Described template 5 uses 16mm steel plate to process, of template 5
Arc is processed in side, and its radian is identical with the radian of the bottom wing listrium 7 of arch hexagon steel box-girder, template 5
Being placed on joist 4 plane and link into an integrated entity with joist 4, along joist 4 length direction, every 500mm is 2
Template 5 is reinforced by individual No. 32 I-steel both sides struts 6.Because arch hexagon steel box-girder span is 60m,
During described internal model making, on platform, first release the arc curve of the bottom wing listrium 7 of arch hexagon steel box-girder
15, described base 1 is fabricated to some sections, puts inside arc curve 15, and will be each with connecting plate 3
Section base 1 links into an integrated entity, and the template 5 processed is fixed on base 1 subsequently and completes internal model making.
During construction, first the bottom wing listrium 7 of the arch hexagon steel box-girder processed is fixed in template 5, bottom wing
Listrium 7 is adjacent to the arcuate flanks of template 5 and keeps vertical, and ensures bottom wing listrium 7 center line and template 5
Upper planar registration, releases the rigging position line of diaphragm plate 8 subsequently on bottom wing listrium 7 and is pacified by diaphragm plate 8
Install to position, following two blocks of webs 9 and web 10 are installed put in place afterwards, and along its length, every 500mm
It is fixed with bearing 11, the most again by two blocks of webs 12 and web 13 and top flange plate 14 are installed above
Put in place, complete the assembly work of arch hexagon steel box-girder, according to said method construct, convenient and swift, and can have
Effect ensures assembly precision and the quality of arch hexagon steel box-girder.
Claims (1)
1. an arch hexagon steel box-girder preparation method, first carries out making used by arch hexagon steel box-girder
Mold, described mold includes base and template, it is characterised in that: described base include bottom girder, joist,
Connecting plate, strut, described bottom girder and being processed by 2 No. 56 I-steel, described joist uses 2 32
Number I-steel processes, and joist is connected to the centre position of plane on bottom girder;One side of described template
Being processed into arc, its radian is identical with the radian of the bottom wing listrium of arch hexagon steel box-girder, during construction, first
The bottom wing listrium of the arch hexagon steel box-girder processed is fixed in template, bottom wing listrium and the arc of template
Shape side is adjacent to and keeps vertical, planar registration in its center line and template, subsequently by diaphragm plate, web and
Top flange plate is installed and is put in place, completes the assembly work of arch hexagon steel box-girder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410677313.0A CN105887651B (en) | 2014-11-24 | 2014-11-24 | A kind of arch hexagon steel box-girder preparation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410677313.0A CN105887651B (en) | 2014-11-24 | 2014-11-24 | A kind of arch hexagon steel box-girder preparation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105887651A true CN105887651A (en) | 2016-08-24 |
CN105887651B CN105887651B (en) | 2017-12-05 |
Family
ID=56698620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410677313.0A Active CN105887651B (en) | 2014-11-24 | 2014-11-24 | A kind of arch hexagon steel box-girder preparation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105887651B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113215998A (en) * | 2021-05-20 | 2021-08-06 | 中国十七冶集团有限公司 | Cast-in-place box girder wing plate position template precision control structure and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11323822A (en) * | 1998-05-07 | 1999-11-26 | Shigeru Taniguchi | Snow removal method for top chord member (arch portion) and beam of bridge by snowplow |
CN101839063A (en) * | 2010-05-25 | 2010-09-22 | 中铁十七局集团第三工程有限公司 | Movable steel base for constructing prefabricated beam and standard joint thereof |
CN102733312A (en) * | 2012-07-03 | 2012-10-17 | 宁波二十冶建设有限公司 | Arch rib manufacturing process |
CN103406733A (en) * | 2013-08-21 | 2013-11-27 | 安徽鸿路钢结构(集团)股份有限公司 | Method for fabricating great bridge arch rib |
CN104120658A (en) * | 2014-08-01 | 2014-10-29 | 武船重型工程股份有限公司 | Machining method of space warping bridge and space warping bridge |
-
2014
- 2014-11-24 CN CN201410677313.0A patent/CN105887651B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11323822A (en) * | 1998-05-07 | 1999-11-26 | Shigeru Taniguchi | Snow removal method for top chord member (arch portion) and beam of bridge by snowplow |
CN101839063A (en) * | 2010-05-25 | 2010-09-22 | 中铁十七局集团第三工程有限公司 | Movable steel base for constructing prefabricated beam and standard joint thereof |
CN102733312A (en) * | 2012-07-03 | 2012-10-17 | 宁波二十冶建设有限公司 | Arch rib manufacturing process |
CN103406733A (en) * | 2013-08-21 | 2013-11-27 | 安徽鸿路钢结构(集团)股份有限公司 | Method for fabricating great bridge arch rib |
CN104120658A (en) * | 2014-08-01 | 2014-10-29 | 武船重型工程股份有限公司 | Machining method of space warping bridge and space warping bridge |
Non-Patent Citations (1)
Title |
---|
张春雷: "九堡大桥主航道桥副拱设计与制造特点", 《城市道桥与防洪》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113215998A (en) * | 2021-05-20 | 2021-08-06 | 中国十七冶集团有限公司 | Cast-in-place box girder wing plate position template precision control structure and construction method thereof |
CN113215998B (en) * | 2021-05-20 | 2023-04-07 | 中国十七冶集团有限公司 | Cast-in-place box girder wing plate position template precision control structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN105887651B (en) | 2017-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498509A (en) | Steel structure combined column system and connecting method thereof | |
CN106284838B (en) | A kind of lattice honeycomb girder segment and large span lattice girder steel and its fabrication and installation method | |
CN103806593B (en) | A kind of precast concrete | |
CN102251631A (en) | Hanging integrated type stair with steel structure and manufacturing method thereof | |
CN105887651A (en) | Arch hexagonal steel box beam manufacturing method | |
CN104196245B (en) | The sectional making assembling method of large-scale steel pipe truss variable cross-section curved beam | |
CN103806538A (en) | Precast reinforced concrete member | |
CN204235035U (en) | A kind of arch hexagon steel box-girder makes mold | |
CN108412109B (en) | Double-circle-center vector-type cross arch suspended ceiling structure and construction method thereof | |
CN102777703A (en) | Assembly type light pipeline hanger | |
CN103669710A (en) | Hollow precast concrete slab and manufacturing method thereof | |
CN203834687U (en) | Drum joint steel structure framework | |
CN105887650A (en) | Method for making double-curved-surface steel box girder | |
CN205712637U (en) | High-rise oversize stone material molding unit body and grid system thereof | |
CN103711254A (en) | Precast concrete unit | |
CN216551864U (en) | Eight-leg wellhead platform block with guide cylinder | |
CN215857599U (en) | Eight-leg wellhead platform block suitable for sea area | |
CN203626132U (en) | Prefabricated reinforced concrete member with connecting ring | |
CN102888989A (en) | Technology for processing complex irregularly-shaped honeycomb steel frame joints and steel frame joints | |
CN204435408U (en) | Tower machine lower margin fixed frame | |
CN203393727U (en) | Opposite-support transferrable part for support system in foundation pit support | |
CN204418529U (en) | A kind of prestressing force superimposed sheet support | |
CN203429558U (en) | Large-scale river-crossing step type underwater steel platform | |
CN215060121U (en) | Large-diameter reserved casing for pipe well | |
CN203393723U (en) | Connection end for whole prestressed fabricated support system in foundation pit support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |