CN105887605B - A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse - Google Patents

A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse Download PDF

Info

Publication number
CN105887605B
CN105887605B CN201610293321.4A CN201610293321A CN105887605B CN 105887605 B CN105887605 B CN 105887605B CN 201610293321 A CN201610293321 A CN 201610293321A CN 105887605 B CN105887605 B CN 105887605B
Authority
CN
China
Prior art keywords
roadbed
armored concrete
portable plate
frost
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610293321.4A
Other languages
Chinese (zh)
Other versions
CN105887605A (en
Inventor
马学宁
吴培元
王旭
张延杰
蒋代军
王博林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
Original Assignee
Lanzhou Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University filed Critical Lanzhou Jiaotong University
Priority to CN201610293321.4A priority Critical patent/CN105887605B/en
Publication of CN105887605A publication Critical patent/CN105887605A/en
Application granted granted Critical
Publication of CN105887605B publication Critical patent/CN105887605B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration

Abstract

The present invention relates to the device of existing railway roadbed anti-freeze expansion thaw collapse, the device of more particularly to a kind of existing railway anti-freeze expansion thaw collapse for northern China Frozen Area.The device is made up of armored concrete casing, self-feeding anchor pile, armored concrete portable plate and groups of springs device, and wherein self-feeding anchor pile prevents that device swells together with frozen soil during body frost heaving, and miscellaneous part function is to prevent roadbed frost damage thaw collapse.When freezing soil, frost-heave force is produced, promotes portable plate to move inward, while groups of springs accumulation of energy, discharge frost-heave force, you can roadbed frost damage amount is reduced or eliminated;When the soil body melts, volume-diminished, rigidity weakens, and the spring of accumulation of energy will promote portable plate to be displaced outwardly, extrusion soil, increases subgrade stiffness, reduces roadbed expansion amount.The present apparatus have the characteristics that it is cheap, can on-site consolidation, construction is simple, good endurance, can be recycled, safeguard and change convenient, had broad application prospects in terms of existing roadbed freeze-harm is prevented and treated.

Description

A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse
Technical field
It is more particularly to a kind of to be directed to northern China seasonal frozen ground the present invention relates to railway bed anti-freeze expansion and the device of thaw collapse The existing railway anti-freeze expansion in area and the device of thaw collapse.
Background technology
The frozen soil in China can be divided into frost zone and ever-frozen ground, and wherein frost zone accounts for the one of China territory area More than half, ever-frozen ground accounts for the 1/5 of national territory area.In seasonal frozen soil region, permafrost hazards can cause road bed when occurring Differential frost heave and melt it is sunken, when serious, entail dangers to traffic safety.
At present, the major measure of existing railway roadbed prevention frost damage has:Cushion, physical-chemical process, draining water proof method and Frost heave board is along slope method etc..Cushion is to replace existing roadbed frost damage soil with the soil of the non-frost heaves such as coarse sand, gravelly sand, sandy gravel, Roadbed not frost heave can be ensured by changing after filling out, but this method working face is big, and time length, process is more, to cut off traffic, in actual freeze injury Seldom used in training works.Physical-chemical process is that Cucumber (such as Nacl) is added in the soil body, changes grogs and water Between interaction, the water translocation in the soil body and its freezing point is changed, so as to slacken soil frost heave, this method construction Simplicity, but need annual autumn operation, expense is larger, and the retention time is not grown, and environment, rail and fastener is polluted and rotten Erosion.Draining water proof method be lowering of watertable, reduce season active layer in the range of water content of soil, separate water nourishment source With the method for excluding surface water, this method is difficult that the moisture in roadbed is discharged in actual applications, and for cutting location Freeze injury can not realize corresponding function, therefore be unable to reach promising result.Frost heave board is in roadbed frost damage, in steel along slope method Bamboo clappers is encased inside between rail and sleeper or rubber mat plate is carried out along slope, and must be adhered to the operation risen with pad during freeze injury goes up Principle, frozen soil withdraw from backing plate along slope again when melting, and must adhere to during freeze injury falls after rise with falling with the operation principle removed, this method Operation is repeated, in place, is once removed on earth it is difficult to once pad, workload is very big, wastes time and energy.
Preferably to solve the problems, such as the existing roadbed freeze-harm in Frozen Area, this of this proposition is based on stress relief method The device of roadbed anti-freeze expansion thaw collapse is by armored concrete casing, armored concrete portable plate, groups of springs device and self-advancing type anchor Bar forms.The device intensity is high, rigidity is big, and requirement of the roadbed to bearing capacity can be met by being embedded in roadbed.During frost heave, road Base, which bankets, produces frost-heave force, frost-heave force promotion portable plate occurred level displacement, the frost-heave force in removal roadbed, road is reduced or eliminated Base frost heaving amount, while groups of springs device accumulation of energy;During thawing, portable plate surrounding soil rigidity reduces, the energy that groups of springs device stores Promote portable plate in turn again, portable plate extruding subgrade soil, reduce roadbed expansion amount.So repeatedly, in several freezing and thawing cycles It is interior, the frozen swell and melt settlement harm of frozen soil can be reduced or eliminated well., should compared with other processing subgrade soil frozen swell and melt settlement methods Device can substantially reduce roadbed maintenance load, reduce investment outlay, and have critically important engineering application value and social benefit, solving Certainly had broad application prospects in terms of the roadbed freeze-harm of Frozen Area.
The content of the invention
The problem of for Frozen Area railway bed freeze injury, this proposes that one kind is based on stress relief method roadbed anti-freeze expansion Device.
The present invention with lower part by being formed:Self-feeding anchor pile, armored concrete casing, armored concrete portable plate, spring Group device and tetrafluoro plate.
The function of the device critical piece is:Two self-feeding anchor piles are devised with armored concrete casing by bolt to connect Connect, can prevent from driving the present apparatus to swell together during subgrade soil frost heave, there is resistance to plucking;Groups of springs device uses sleeve die Formula, it can prevent spring from tilting, sliding or block, the stiffness coefficient and arrangement form of spring can be according to the subgrade soils of locality actual measurement Maximum frost-heave force and distribution characteristics determine, and make each spring stress equal, ensure that translation displacements only occur in device for portable plate; Armored concrete portable plate bears frost-heave force and the active force of groups of springs, should there is certain strength and stiffness, when prefabricated according to Hole position is reserved in the position of groups of springs device, is easy to in-site installation, fixed spring group device, should make spring during fixed spring group device There is certain pre compressed magnitude, to offset active earth pressure caused by Roadbed Soil.One of effect of tetrafluoro plate is to prevent activity Freeze between plate and box bottom, side plate, and reduce frictional force when portable plate moves, another effect is to prevent portable plate forward When mobile, soil particle enters casing, causes portable plate to be unable to Self-resetting, reduces its operating efficiency.
The solution have the advantages that:When body frost heaving, native reclaimed water freezing and expansion, frozen soil volume accordingly increases, and produces Frost-heave force, armored concrete portable plate will be promoted to move inward, discharge frost-heave force, while groups of springs accumulation of energy, be reduced or eliminated The frost heaving amount of roadbed;When the soil body melts, ice-out Cheng Shui in soil, soil body volume-diminished, rigidity decrease, the spring assembling of accumulation of energy Putting will promote armored concrete portable plate to be displaced outwardly, extrusion soil, increase subgrade soil rigidity, reduce melting for roadbed soil layer Heavy deformation.
It is an advantage of the invention that:
(1) can on-site consolidation, convenient construction.The present apparatus is bolted on-site consolidation and formed, and transports and easy for construction; Utilize permanent way maintenance skylight, you can construction;
(2) good endurance, investment reduction.The present apparatus is recycled work once burying in place, time saving and energy saving;And reduce road Base freeze injury maintenance workload, substantially reduces maintenance cost;
(3) safeguard and change conveniently.If after failure of apparatus, can change in time can recover effect;Practicality is good, operation side Just it is, cheap, application easy to spread.
(4) can be embedded using manually digging pit, it is not required to big machinery and the activity duration is short.
Brief description of the drawings
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 is layout drawing of the apparatus of the present invention along roadbed longitudinal direction;
Fig. 2 is layout drawing of the apparatus of the present invention on subgrade cross section;
Fig. 3 is apparatus of the present invention primary structure top plan view;
Fig. 4 is apparatus of the present invention primary structure main view profile;
Fig. 5 is apparatus of the present invention primary structure side cutaway view;
Fig. 6 is apparatus of the present invention spring group parts front view and top view;
Fig. 7 is apparatus of the present invention primary structure arrangement of reinforcement.
In figure:1. self-feeding anchor pile, 2. armored concrete casings, 3. box bottoms, 4. prepared screw-bolt holes, 5. case-sides Plate, 6. roof box, 7. pre-embedded bolts, 8. tetrafluoro plates, 9. tetrafluoro plate risers, 10. armored concrete portable plates, 11. groups of springs Device, 12. threaded guide rods, 13. springs, 14. steel bushings.
Embodiment
The invention will be further described with reference to the accompanying drawings and detailed description.
Step 1:Preparation of construction.Subgrade soils parameter (including the frost-heave force size in freeze injury location is determined by field test And distribution), position and the spring rate for determining groups of springs device 11 are calculated according to parameters obtained;The prefabricated each structure of the present apparatus Part, prefabricated component include roof box 6, the internal box side 5 for pasting tetrafluoro plate 8 and box bottom 3, side and paste tetrafluoro Armored concrete portable plate 10, the steel bushing 14 being embedded in box side 5 of tetrafluoro plate 8, casing are pasted in plate riser 9 and bottom Bottom plate 3 is prefabricated integral with box side 5;Between the present apparatus is disposed longitudinally on two sleepers along roadbed, optimal spacing should basis The frost heaving amount of local subgrade soil, thaw collapse amount are determined;The other engineering time should be chosen in the fall (before the soil body does not freeze).
Step 2:Excavate pit.According to the time of skylight point, construct, pushed aside between sleeper on existing railway roadbed Railway ballast, excavated out between two sleepers and present apparatus size identical pit.
Step 3:Self-feeding anchor pile 1 is set.By the corresponding place in the position of box bottom prepared screw-bolt hole 4, by two from Feeding anchor pile 1 is squeezed into ground, and driving depth should freeze below line 300cm in locality.
Step 4:On-site consolidation.Spring 13 is enclosed on steel bushing 14, armored concrete portable plate 10 is then put into steel In reinforced concrete casing 2, threaded guide rod 12 is penetrated into steel bushing 14 in the preformed hole of armored concrete portable plate 10 In, and threaded guide rod 12 is fixed on armored concrete portable plate 10 with nut.
Step 5:Place armored concrete casing 2.Assembled good armored concrete casing 2 is put into the pit dug, Prepared screw-bolt hole 4 on box bottom 3 will be directed at placement with self-feeding anchor pile 1, and be fixed with nut.
Step 6:Installation casing top plate 6, recover circuit original appearance.Roof box 6 is placed, passes through pre-buried spiral shell on box side 5 Roof box 6 is fixed bolt 7, then backfills pit and is compacted, recover railway ballast, construction finishes.

Claims (1)

1. a kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse, device is by self-feeding anchor pile(1), reinforced concrete box Body(2), armored concrete portable plate(10), groups of springs device(11)And tetrafluoro plate(8), tetrafluoro plate riser(9)Composition, it is special Sign is:Self-feeding anchor pile(1)Driving depth freezes below line 300cm in locality, and passes through bolt and box bottom(3)Phase Even, armored concrete portable plate(10)With armored concrete casing(2)Between pass through groups of springs device(11)It is connected, in casing Bottom plate(3), box side(5)And armored concrete portable plate(10)Tetrafluoro plate is pasted on bottom surface(8), armored concrete portable plate (10)Paste two tetrafluoro plate risers in front(9);Box bottom(3)With box side(5)It is prefabricated integral, roof box(6) Pass through box side(5)Upper pre-embedded bolt(7)Connection composition armored concrete casing(2);Box side is fixed on when prefabricated(5) On steel bushing(14), spring(13)And it is fixed on armored concrete portable plate with nut(10)On threaded guide rod (12)Constitute groups of springs device(11).
CN201610293321.4A 2016-05-06 2016-05-06 A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse Expired - Fee Related CN105887605B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610293321.4A CN105887605B (en) 2016-05-06 2016-05-06 A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610293321.4A CN105887605B (en) 2016-05-06 2016-05-06 A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse

Publications (2)

Publication Number Publication Date
CN105887605A CN105887605A (en) 2016-08-24
CN105887605B true CN105887605B (en) 2018-01-05

Family

ID=56703215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610293321.4A Expired - Fee Related CN105887605B (en) 2016-05-06 2016-05-06 A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse

Country Status (1)

Country Link
CN (1) CN105887605B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111458062B (en) * 2020-04-10 2022-03-04 水利部交通运输部国家能源局南京水利科学研究院 Instrument for automatically measuring three-dimensional frost heaving force of channel and measuring and mounting method thereof
CN111395274A (en) * 2020-04-24 2020-07-10 中水北方勘测设计研究有限责任公司 Anti-frost-heaving method and anti-frost-heaving assembly of measurement and control integrated gate
CN112376328B (en) * 2020-05-28 2022-07-22 兰州交通大学 Roadbed freeze injury treatment device with vertical subareas gradually depressurized
CN112301805B (en) * 2020-05-28 2022-07-22 兰州交通大学 Roadbed freezing injury treatment device with horizontal bidirectional layered decompression

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2864078B2 (en) * 1992-09-07 1999-03-03 信越化学工業株式会社 Road laying method
CN100419160C (en) * 2002-11-27 2008-09-17 中国科学院寒区旱区环境与工程研究所 Thermal-insulating cold-conductive device for protecting frozen soil
CN2633953Y (en) * 2003-04-02 2004-08-18 中国科学院寒区旱区环境与工程研究所 Automatic temperature control ventilator for road bed
DE102005057380B4 (en) * 2005-11-30 2009-12-03 Walter Sobolewski Tubular, hollow, solid track carrier
CN201738208U (en) * 2010-06-25 2011-02-09 中交第二公路勘察设计研究院有限公司 Roadbed structure for preventing road damage in seasonally frozen ground area
RU2487210C1 (en) * 2012-01-10 2013-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) Device for preparation of foundations of ice roads on dried swamps

Also Published As

Publication number Publication date
CN105887605A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105887605B (en) A kind of device based on stress relief method roadbed anti-freeze expansion thaw collapse
CN102071607B (en) Railroad bed repair method without affecting existing running conditions
CN105951553B (en) A kind of existing roadbed frost damage prevention device of achievable bidirectional decompression and Self-resetting
CN101476466B (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN103074882A (en) Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles
CN109537604A (en) A method of utilizing screw pile bolt anchorage Cut Slopes of Expansive Soil
CN105926397B (en) A kind of four-way decompression of roadbed anti-freeze expansion thaw collapse and automatic runback device
Badhon et al. Performance of recycled plastic pins for improving the bearing capacity of MSE wall foundation
CN105926391B (en) A kind of curb method for widening of existing railway roadbed
CN108487234B (en) Construction method of cast-in-situ pile plate type platform wall
CN102493288A (en) Prefabricated L-shaped retaining structure
CN103452028B (en) A kind of double layer continuous arrangement of reinforcement repairs the method for joint cement rigid pavement
CN102296591A (en) Rapid drainage solidifying treatment method of soft soil foundation
CN103276645B (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN208981043U (en) Municipal Road Engineering roadbed
Yong et al. Mechanism and control of subgrade mud pumping under the cyclic load of train
CN201502065U (en) Anchor rod joint excavation compound basis
RU2536538C1 (en) Method for reduction of deformations of motor and railway roads on permafrost soils that thaw out in process of operation
CN207829902U (en) The U-shaped wall base with architecture detaches bearing type liner structure with bottom plate sound
CN204899393U (en) Prevent transmission line cement pole up -pull structure
CN214089271U (en) Soft soil roadbed reinforced structure
CN220246586U (en) Water-retaining roadbed structure for high-water-level deep soft soil area
RU2785329C1 (en) Method for protecting the bearing support structure of above-ground main pipeline from the impact of the forces of frosty heaving of soil
CN220318279U (en) Mountain area turning road widens structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ma Xuening

Inventor after: Wang Bolin

Inventor after: Wu Peiyuan

Inventor after: Wang Xu

Inventor after: Zhang Yanjie

Inventor after: Jiang Daijun

Inventor before: Ma Xuening

Inventor before: Wu Peiyuan

Inventor before: Wang Xu

Inventor before: Zhang Yanjie

Inventor before: Jiang Daijun

Inventor before: Wang Bolin

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105

Termination date: 20200506