CN105887600A - National vehicle and pedestrian safety express way - Google Patents

National vehicle and pedestrian safety express way Download PDF

Info

Publication number
CN105887600A
CN105887600A CN201610395055.6A CN201610395055A CN105887600A CN 105887600 A CN105887600 A CN 105887600A CN 201610395055 A CN201610395055 A CN 201610395055A CN 105887600 A CN105887600 A CN 105887600A
Authority
CN
China
Prior art keywords
crossing
bridge
lane
track
footpath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610395055.6A
Other languages
Chinese (zh)
Inventor
杜洪发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610395055.6A priority Critical patent/CN105887600A/en
Publication of CN105887600A publication Critical patent/CN105887600A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels

Abstract

The invention provides a national vehicle and pedestrian safety express way. The express way comprises straight lanes, footbridges above the straight lanes, intersection lanes and bridge face peripheral sidewalks. An intersection safety road comprises four interactions including the first intersection A, the second intersection B, the third intersection C and the fourth intersection D which are sequentially arranged in the anticlockwise direction. U-turn lanes and right-turn lanes of the intersections are arranged on the ground under the footbridges, and the straight lanes are arranged on the surfaces of the footbridges. Left-turn lanes in one direction are arranged on the ground under the footbridges, and left-turn lanes in the other direction turn left from the inner sides of the arc-shaped straight lanes for getting on the footbridges above to the straight lanes for getting off the footbridges in the first direction. The sidewalks are arranged on the peripheries of the arc-shaped lanes on the surfaces of the footbridges. The first intersection A is opposite to the third intersection C. The express way has the advantages that the problems of traffic jam and vehicle collision and conflicts between vehicles and pedestrians are solved, and traffic lights and zebra crossings can be completely omitted.

Description

Whole people's traffic safety high speed road
Technical field:
The invention belongs to traffic pass through space frame, particularly relate to a kind of urban freeway.
Background technology:
Whole world heavy congestion at present.Vehicle and vehicle, the traffic accident between vehicle and pedestrian is sent out Raw rate is frequent.Between vehicle, blocking causes environmental pollution, people's valuable time wave the most in vain Take.
Summary of the invention:
The present invention is directed to the problems referred to above, it is proposed that this overlaps solution, solves between vehicle Blockage problem, stops the vehicle accident between vehicle, and conflicting between vehicle with pedestrian, Make traffic more convenient, unobstructed.
The technical solution adopted for the present invention to solve the technical problems is:
Whole people's traffic safety high speed road, including the people above Through Lane and Through Lane The setting of row bridge, and track, crossroad and periphery, bridge floor track footpath arranges.
Crossroad green route divides four crossings: order is followed successively by the first via counterclockwise Mouth A, the second crossing B, the 3rd crossing C and the tune track at the 4th crossing D: each crossing, Right-turn lane is located at ground under bridge, and Through Lane is arranged at bridge floor;And left turn lane has one Direction is ground under bridge, and the left turn lane in another direction is in upper bridge arc Through Lane Turn left into the lower bridge Through Lane in first direction in side;Footpath is located at outside bridge floor arc track Enclose;First crossing A and the 3rd crossing C is oppositely arranged;The Through Lane in this direction is on road Face hits exactly, the vehicle relatively travelled respectively from the first crossing A, bridge on the 3rd crossing C, then from right Bridge under the 3rd crossing C or the first crossing A in face, bus this shunting turn right under bridge to stopping By point;First crossing A, on the 3rd crossing C, the right side of bridge starting point is ground left turn lane successively A2, left turn lane C2, right-turn lane A3 and right-turn lane C3;Tune track, ground A4 Turn left to reverse end for end to travel into the 4th crossing from ground left turn lane inside track with tune track C4 The right-turn lane B3 at right-turn lane D3 or the second crossing.
The footpath of the first crossing A and the 3rd crossing C starts the arc inverse time from ground footpath Bridge on pin, from the first crossing or the top of the 3rd crossing right-turning vehicles and the 4th crossing or second Under the arc of crossing, bridge through vehicles and its footpath passes over and bridge floor left turn lane Parallel traveling, then from the second crossing or the lower section in the 4th Shang Qiao track, crossing and the second crossing or Passing over of 4th track, ground, crossing, lower bridge walks to ground footpath;
Second crossing B, the 4th crossing D are oppositely arranged;The Through Lane in this direction and left-hand rotation Upper bridge is turned left through its right-turn lane B3 counterclockwise from the outermost arc of highway together in track Or above right-turn lane D3, and the 3rd crossing, the tune track C4 at the first crossing and tune The top of head track A4, and the first crossing and the Through Lane A1 at the 3rd crossing and craspedodrome Top (bridge floor extreme higher position) process of minimum point after bridge under the C1 of track, is further continued for A small distance, Through Lane here starts from the footpath at the first crossing and the 3rd crossing Side slowly descend bridge, bus start outside bridge floor Through Lane from here shunting turn right time bridge from The lower section of the first crossing and the 3rd crossing footpath travels to anchor point;Left turn lane does not descends bridge, And make continuation turn left counterclockwise the lower bridge Through Lane into the first crossing or the 3rd crossing;
Second crossing footpath B6 and the 4th crossing footpath D6 bridge Through Lane from arc The footpath in outside start on arc bridge from the top of the first crossing or the 3rd crossing footpath with And first above crossing or the 3rd crossing Through Lane and the 4th crossing and the second crossing bridge floor The top of left turn lane and the second crossing the 4th crossing right-turn lane, the top warp in tune track Cross the parallel traveling of arc together with upper bridge Through Lane, from the first crossing and the 3rd crossing footpath Lower section, and the top of crossing, opposite left turn lane and right-turn lane slowly descends bridge, and arc is straight The outside in the bus zone Xia Qiao track outside runway, marches to ground footpath.
Described Through Lane includes forward travel track and backward going track, described forward row Sail and between track and backward going track, be provided with fast, described forward travel track and reverse row The outside sailing track is provided with emergent anchor point.
Above Through Lane, the setting of bridge floor footpath is respectively to arrange two load-bearing at both sides of highway Post and two support columns, the center of bridge is provided with a crossbeam, is higher than the position of vehicle at support column Being respectively provided with the crossbeam at the two shelving bridge, four capital ends of homonymy are respectively provided with one and connect homonymy The beam of four posts, the beam of capital end is slightly larger, and tie-beam is used for connecting cross beam and the beam of capital end, The both sides of bridge are respectively symmetrically and arrange ladder.
The method have the benefit that 1. present invention specifically addresses congested with cars, vehicle collision, and Conflicting between vehicle with pedestrian, traffic lights and zebra crossing can be cancelled completely.
Accompanying drawing illustrates:
Fig. 1 is track, crossroad of the present invention and the structural representation of periphery, bridge floor track footpath Figure;
Fig. 2 is bridge floor structure of sidewalk schematic diagram above the Through Lane of the present invention.
Detailed description of the invention:
As shown in Figure 1-2, whole people's traffic safety high speed road, including Through Lane with straight The setting of the foot bridge above runway, and track, crossroad and bridge floor track periphery People's Bank of China Road is arranged.
Crossroad green route divides four crossings: order is followed successively by the first via counterclockwise Mouth A, the second crossing B, the 3rd crossing C and the tune track at the 4th crossing D: each crossing, Right-turn lane is located at ground under bridge, and Through Lane is arranged at bridge floor;And left turn lane has one Direction is ground under bridge, and the left turn lane in another direction is in upper bridge arc Through Lane Turn left into the lower bridge Through Lane in first direction in side;Footpath is located at outside bridge floor arc track Enclose;First crossing A and the 3rd crossing C is oppositely arranged;The Through Lane in this direction is on road Face hits exactly, the vehicle relatively travelled respectively from the first crossing A, bridge on the 3rd crossing C, then from right Bridge under the 3rd crossing C or the first crossing A in face, bus this shunting turn right under bridge to stopping By point;First crossing A, on the 3rd crossing C, the right side of bridge starting point is ground left turn lane successively A2, left turn lane C2, right-turn lane A3 and right-turn lane C3;Tune track, ground A4 Turn left to reverse end for end to travel into the 4th crossing from ground left turn lane inside track with tune track C4 The right-turn lane B3 at right-turn lane D3 or the second crossing.
The footpath of the first crossing A and the 3rd crossing C starts the arc inverse time from ground footpath Bridge on pin, from the first crossing or the top of the 3rd crossing right-turning vehicles and the 4th crossing or second Under the arc of crossing, bridge through vehicles and its footpath passes over and bridge floor left turn lane Parallel traveling, then from the second crossing or the lower section in the 4th Shang Qiao track, crossing and the second crossing or Passing over of 4th track, ground, crossing, lower bridge walks to ground footpath;
Second crossing B, the 4th crossing D are oppositely arranged;The Through Lane in this direction and left-hand rotation Upper bridge is turned left through its right-turn lane B3 counterclockwise from the outermost arc of highway together in track Or above right-turn lane D3, and the 3rd crossing, the tune track C4 at the first crossing and tune The top of head track A4, and the first crossing and the Through Lane A1 at the 3rd crossing and craspedodrome Top (bridge floor extreme higher position) process of minimum point after bridge under the C1 of track, is further continued for A small distance, Through Lane here starts from the footpath at the first crossing and the 3rd crossing Side slowly descend bridge, bus start outside bridge floor Through Lane from here shunting turn right time bridge from The lower section of the first crossing and the 3rd crossing footpath travels to anchor point;Left turn lane does not descends bridge, And make continuation turn left counterclockwise the lower bridge Through Lane into the first crossing or the 3rd crossing;
Second crossing footpath B6 and the 4th crossing footpath D6 bridge Through Lane from arc The footpath in outside start on arc bridge from the top of the first crossing or the 3rd crossing footpath with And first above crossing or the 3rd crossing Through Lane and the 4th crossing and the second crossing bridge floor The top of left turn lane and the second crossing the 4th crossing right-turn lane, the top warp in tune track Cross the parallel traveling of arc together with upper bridge Through Lane, from the first crossing and the 3rd crossing footpath Lower section, and the top of crossing, opposite left turn lane and right-turn lane slowly descends bridge, and arc is straight The outside in the bus zone Xia Qiao track outside runway, marches to ground footpath.
Described Through Lane includes forward travel track and backward going track, described forward row Sail and between track and backward going track, be provided with fast, described forward travel track and reverse row The outside sailing track is provided with Public Transit Bus Stopping point and emergent anchor point.Forward travel track is with reverse It it is bicycle lane outside traveling lane.
Support column 4 quantity is four, each two of the both sides of bridge;Column 1 quantity is 4, bridge Each two of both sides.
Above Through Lane, the setting of bridge floor footpath is respectively to arrange two load-bearing at both sides of highway Post 1 and two support columns 4, the center of bridge 2 is provided with a crossbeam 6, is higher than at support column 4 The position of vehicle is respectively provided with the crossbeam 8 at the two shelving bridge, and four capital ends of homonymy are respectively provided with Article one, connecting the beam 7 of four posts of homonymy, the beam of capital end is slightly larger, and tie-beam is used for connecting horizontal stroke The beam 7 of beam 6 and capital end, the both sides of bridge 2 are respectively symmetrically and arrange ladder 3.
The present invention uses lever Bridge Design, relies on load bearing support bridge floor bottom load-bearing pillar, this The distance inventing two crossbeam distance intermediolateral columns 5 is the 1/2 of load-bearing pillar distance intermediolateral column distance Times, this design makes the weight capacity of bridge better, and bridge is firmer.The present invention is special Door solves congested with cars, conflicting between vehicle collision, and vehicle with pedestrian, the most permissible Cancel traffic lights and zebra crossing.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-mentioned Embodiment is only intended to citing and descriptive purpose, and is not intended to limit the invention to described Scope of embodiments in.In addition it will be appreciated by persons skilled in the art that the present invention not office It is limited to above-described embodiment, more kinds of modification can also be made according to the teachings of the present invention and repair Change, within these variants and modifications all fall within scope of the present invention.

Claims (4)

1. whole people's traffic safety high speed road, it is characterised in that include that Through Lane is with straight The setting of the foot bridge above runway, and track, crossroad and bridge floor track periphery People's Bank of China Road is arranged.
2. whole people's traffic safety high speed road as claimed in claim 1, its feature exists In, crossroad green route divides four crossings: order is followed successively by the first via counterclockwise Mouth A, the second crossing B, the 3rd crossing C and the tune track at the 4th crossing D: each crossing, Right-turn lane is located at ground under bridge, and Through Lane is arranged at bridge floor;And left turn lane has one Direction is ground under bridge, and the left turn lane in another direction is in upper bridge arc Through Lane Turn left into the lower bridge Through Lane in first direction in side;Footpath is located at outside bridge floor arc track Enclose;First crossing A and the 3rd crossing C is oppositely arranged;The Through Lane in this direction is on road surface Center, the vehicle relatively travelled respectively from the first crossing A, bridge on the 3rd crossing C, then from opposite The 3rd crossing C or the first crossing A under bridge, bus this shunting turn right under bridge to anchor point; First crossing A, on the 3rd crossing C, the right side of bridge starting point is ground left turn lane A2 successively, left Change trains or buses C2, right-turn lane A3 and right-turn lane C3;Tune track, ground A4 and tune car Road C4 turns left to reverse end for end to travel the right-turn lane into the 4th crossing from ground left turn lane inside track The right-turn lane B3 at D3 or the second crossing.
It is counterclockwise that the footpath of the first crossing A and the 3rd crossing C starts arc from ground footpath Upper bridge, from the first crossing or the top of the 3rd crossing right-turning vehicles and the 4th crossing or the second tunnel Under mouth arc, bridge through vehicles and passing over of its footpath are put down with bridge floor left turn lane Every trade is entered, then from the second crossing or the lower section in the 4th Shang Qiao track, crossing and the second crossing or Passing over of four tracks, ground, crossing, lower bridge walks to ground footpath;
Second crossing B, the 4th crossing D are oppositely arranged;The Through Lane in this direction and left-hand rotation Upper bridge is turned left through its right-turn lane B3 counterclockwise from the outermost arc of highway together in track Or above right-turn lane D3, and the 3rd crossing, the tune track C4 at the first crossing and tune The top of track A4, and the first crossing and the Through Lane A1 at the 3rd crossing and Through Lane Under C1, top (bridge floor extreme higher position) process of minimum point after bridge, is further continued for one little Segment distance, Through Lane here starts below the footpath at the first crossing and the 3rd crossing slow Laxation bridge, bus starts shunting outside bridge floor Through Lane from here and turns right lower bridge from first The lower section of crossing and the 3rd crossing footpath travels to anchor point;Left turn lane does not descends bridge, and makes Continue to turn left counterclockwise the lower bridge Through Lane into the first crossing or the 3rd crossing;
Second crossing footpath B6 and the 4th crossing footpath D6 are from arc outside bridge Through Lane The footpath of side start on arc bridge from the first crossing or the top of the 3rd crossing footpath and Above first crossing or the 3rd crossing Through Lane and the 4th crossing and the second crossing bridge floor are left The top changed trains or buses and the second crossing the 4th crossing right-turn lane, passing over of tune track The parallel traveling of arc together with upper bridge Through Lane, from the first crossing and the 3rd crossing footpath Lower section, and the top of crossing, opposite left turn lane and right-turn lane slowly descends bridge, arc is kept straight on The outside in the bus zone Xia Qiao track outside track, marches to ground footpath.
3. whole people's traffic safety high speed road as claimed in claim 1, its feature exists In, described Through Lane includes forward travel track and backward going track, described forward row Sail and between track and backward going track, be provided with fast, described forward travel track and reverse row The outside sailing track is provided with emergent anchor point.
4. whole people's traffic safety high speed road as claimed in claim 1, its feature exists In, above Through Lane, the setting of bridge floor footpath is respectively to arrange two load-bearing pillars at both sides of highway With two support columns, the center of bridge is provided with a crossbeam, each higher than the position of vehicle at support column Being provided with the crossbeam at the two shelving bridge, four capital ends of homonymy are respectively provided with one and connect homonymy The beam of four posts, the beam of capital end is slightly larger, and tie-beam is used for connecting cross beam and the beam of capital end, The both sides of bridge are respectively symmetrically and arrange ladder.
CN201610395055.6A 2016-06-03 2016-06-03 National vehicle and pedestrian safety express way Pending CN105887600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610395055.6A CN105887600A (en) 2016-06-03 2016-06-03 National vehicle and pedestrian safety express way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610395055.6A CN105887600A (en) 2016-06-03 2016-06-03 National vehicle and pedestrian safety express way

Publications (1)

Publication Number Publication Date
CN105887600A true CN105887600A (en) 2016-08-24

Family

ID=56711525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610395055.6A Pending CN105887600A (en) 2016-06-03 2016-06-03 National vehicle and pedestrian safety express way

Country Status (1)

Country Link
CN (1) CN105887600A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203188076U (en) * 2012-12-27 2013-09-11 宋茹 Urban all-pass flyover
CN104313966A (en) * 2014-11-12 2015-01-28 冼日声 Crossroad traffic system without traffic lights
CN104727198A (en) * 2015-03-27 2015-06-24 杜洪发 Urban expressway
WO2015108446A2 (en) * 2014-01-17 2015-07-23 Никита Александрович ДАНИЛУШКИН Traffic intersection for light vehicles
CN204626179U (en) * 2013-10-12 2015-09-09 李安举 A kind of without left-turn flyover

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203188076U (en) * 2012-12-27 2013-09-11 宋茹 Urban all-pass flyover
CN204626179U (en) * 2013-10-12 2015-09-09 李安举 A kind of without left-turn flyover
WO2015108446A2 (en) * 2014-01-17 2015-07-23 Никита Александрович ДАНИЛУШКИН Traffic intersection for light vehicles
CN104313966A (en) * 2014-11-12 2015-01-28 冼日声 Crossroad traffic system without traffic lights
CN104727198A (en) * 2015-03-27 2015-06-24 杜洪发 Urban expressway

Similar Documents

Publication Publication Date Title
CN104195907B (en) Crossing that multi-directionally turns left simultaneously and traffic method thereof
CN207073044U (en) Bridge tunnel composite cross crossing road
CN202671992U (en) Downtown flyover
CN204475095U (en) Multilayer passes unimpeded overpass bridge
CN101709561B (en) Unblocked cloverleaf intersection at traffic crossroad
CN205775679U (en) A kind of multi-functional cross overpass
CN105155374A (en) Multifunctional cross-shaped overpass
CN202809421U (en) Checkless overpass
CN105951545A (en) Well field type non-traffic-light non-overpass road traffic system for one-way traffic in whole course
CN102787540B (en) One passes unimpeded overpass bridge
CN209602887U (en) A kind of no red light overpass at crossroads
CN102146649A (en) Public traffic method
CN106223149A (en) Viaduct is vertically changed in a kind of crossroad
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
CN202090253U (en) Two crossroad full unblocked cross composite bridges of right turn bridges
CN102400425B (en) Spiral type overpass
CN105887600A (en) National vehicle and pedestrian safety express way
CN203451962U (en) Intersection fast-slow diverging cross road structure
CN103215867A (en) Assembled type intersected road system of bridge floor supporting band traveling device
CN201006969Y (en) T-shape crossing viaduct
CN103321116A (en) Cross way structure for dispersing traffic flow based on speeds at cross road
CN203200628U (en) Assembled type interchange road system of bridge floor supporting belt walking device
CN202730574U (en) Combined bridge or combined tunnel with two right-hand-running-system lane-changing-type bifurcate units
CN201317903Y (en) Lane tunnel bridge at crossing
CN204875403U (en) Multi -functional cross overpass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824