CN105873228A - Resource distribution method and device - Google Patents

Resource distribution method and device Download PDF

Info

Publication number
CN105873228A
CN105873228A CN201610379372.9A CN201610379372A CN105873228A CN 105873228 A CN105873228 A CN 105873228A CN 201610379372 A CN201610379372 A CN 201610379372A CN 105873228 A CN105873228 A CN 105873228A
Authority
CN
China
Prior art keywords
resource
region
target
terminal
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610379372.9A
Other languages
Chinese (zh)
Other versions
CN105873228B (en
Inventor
张力方
胡泽妍
陈丹
许珺
乌云霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN201610379372.9A priority Critical patent/CN105873228B/en
Publication of CN105873228A publication Critical patent/CN105873228A/en
Application granted granted Critical
Publication of CN105873228B publication Critical patent/CN105873228B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/535Allocation or scheduling criteria for wireless resources based on resource usage policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention discloses a resource distribution method and device and relates to the technical field of communication. The resource distribution method and device can increase the probability that resources are distributed to users at the coverage edge of a cell. The method comprises the step that according to a carrier frequency point of network equipment, a cell corresponding to the network equipment is partitioned into at least two areas; the resource distribution probability of each area is determined, wherein the resource distribution probability is used for expressing the probability that target resources are distributed to each area; a target area to which the target resources are distributed in the areas at the moment is determined according to the resource distribution probability; the target resources are distributed to terminals in the target area. The resource distribution method and device are suitable for the resource distribution process.

Description

A kind of method and device of resource distribution
Technical field
The present invention relates to communication technical field, particularly relate to the method and device of a kind of resource distribution.
Background technology
Along with the development of communication technology, mobile Internet universal so that same intra-cell users quantity is drastically Increase.But, the resource that can be used for distribution in same community is limited, therefore, in order to carry to user For better service, PF (English: Proportional Fairness, Chinese: ratio can be used at present Example is fair) algorithm realizes scheduling of resource.
The channel quality of the channel that PF algorithm currently can communicate according to user, and this user was in the past Handling capacity in the range of certain time, for one priority of user setup each in community.Afterwards, execution is worked as During scheduling of resource process, it is possible to for the user resource allocation that priority in this community is maximum, and complete resource After scheduling process, update the priority of user, thus realize the priority by adjusting user, guarantee money In the scheduling process of source, can not only be preferably the preferable user of channel quality provides resource to distribute, and, to the greatest extent may be used meanwhile Resource distribution can be carried out liberally for all users in community.
But, the user's channel quality under normal circumstances being in cell edge is poor, therefore, calculates using PF During method carries out scheduling of resource, the user being in cell edge needs could obtain higher through the long period Priority.Also imply that being in the user of cell edge typically requires the wait long period and could be allocated Resource.Therefore, use said method to carry out resource distribution, often make to be in the use at MPS process edge Family affects normal course of communications owing to cannot be assigned to resource for a long time.
Summary of the invention
The embodiment of the present invention provides the method and device of a kind of resource distribution, can improve and be in MPS process limit The user of edge is assigned to the probability of resource.
For reaching above-mentioned purpose, the embodiment of the present invention adopts the following technical scheme that
First aspect, the embodiment of the present invention provides the method for a kind of resource distribution, and described method includes:
According to the carrier frequency point of the network equipment, community corresponding for the described network equipment is divided at least two district Territory;
Determine that the resource allocation probability in described each region, described resource allocation probability are used for representing described each Region is allocated the probability of target resource;
According to described resource allocation probability, determine described mesh to be allocated at least two region described in current time The target area of mark resource;
For target resource described in the terminal distribution in described target area.
Second aspect, the embodiment of the present invention provides a kind of resource assigned unit, and described device includes:
Divide module, for the carrier frequency point according to the network equipment, by little zoning corresponding for the described network equipment It is divided at least two region;
Determining module, for determining the resource allocation probability in described each region, described resource allocation probability is used In representing that described each region is allocated the probability of target resource;
Described determine module, be additionally operable to according to described resource allocation probability, determine described in current time at least two The target area of described target resource to be allocated in individual region;
Distribution module, is used for as target resource described in the terminal distribution in described target area.
The method and device of a kind of resource distribution that the embodiment of the present invention provides, with the carrier frequency point of the network equipment For foundation, community is divided, obtain at least two region, and determine that each region may be allocated mesh The probability of mark resource, the resource allocation probability in the most each region, distributes general according to the resource of regional afterwards Rate determines that current time needs the target area of allocated target resource, and divides for the terminal in target area Join target resource.It is compared in prior art the user channel quality because being in cell edge poor, and makes User waits that the long period could obtain higher priority, thus obtaining the network equipment is its Resources allocation Chance, the present invention by carrying out region division to community, and determines the resource allocation probability in each region, makes Terminal in each region is owned by the chance being scheduled within a certain period of time.Also imply that, be in community The user at edge can be according to the resource allocation probability in this region by network equipment Resources allocation.So, Avoid and be in the user at MPS process edge and cannot be assigned to the situation of resource for a long time.Therefore, use The method of above-mentioned Resources allocation can be effectively improved the fairness of scheduling of resource, thus improve and be in MPS process The user at edge is assigned to the probability of resource, also ensures that user normal being in MPS process edge Communication.
Accompanying drawing explanation
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, below will be to required in embodiment The accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only the one of the present invention A little embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawing can be obtained according to these accompanying drawings.
The method flow diagram of a kind of resource distribution that Fig. 1 provides for the embodiment of the present invention;
The method flow diagram of the another kind of resource distribution that Fig. 2 provides for the embodiment of the present invention;
The method flow diagram of the another kind of resource distribution that Fig. 3 provides for the embodiment of the present invention;
The method flow diagram of the another kind of resource distribution that Fig. 4 provides for the embodiment of the present invention;
The method flow diagram of the another kind of resource distribution that Fig. 5 provides for the embodiment of the present invention;
A kind of resource assigned unit structural representation that Fig. 6 provides for the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clearly Chu, be fully described by, it is clear that described embodiment be only a part of embodiment of the present invention rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creation The all other embodiments obtained under property work premise, broadly fall into the scope of protection of the invention.
The embodiment of the present invention provides the method for a kind of resource distribution, as it is shown in figure 1, the method is by such as base station The network equipment perform, the method flow process includes:
101, according to the carrier frequency point of the network equipment, community corresponding for the network equipment is divided at least two district Territory.
In embodiments of the present invention, the network equipment is specifically as follows the base station with carrier aggregation function.The most just It is meant that this base station can corresponding multiple carrier frequency points, and the coverage corresponding to each carrier frequency point is not With, therefore, it can the carrier frequency point according to the network equipment and complete the partition process of community inner region.
102, the resource allocation probability in each region is determined.
Wherein, resource allocation probability is for representing that each region is allocated the probability of target resource.
103, according to resource allocation probability, target resource to be allocated in current time at least two region is determined Target area.
104, for the terminal distribution target resource in target area.
According to above-mentioned steps 101 community carried out region division as a result, it is possible to determine and be in cell edge region Interior terminal causes this terminal may migrate to other communities at any time due to jitter.Therefore, holding During row step 104, for being in the terminal at MPS process edge, if cannot ensure, this terminal has one Fixed stability, is not the most this terminal distribution target resource.
The method of a kind of resource distribution that the embodiment of the present invention provides, with the carrier frequency point of the network equipment as foundation, Community is divided, obtains at least two region, and determine that each region may be allocated target resource Probability, the resource allocation probability in the most each region, determine according to the resource allocation probability of regional afterwards Current time needs the target area of allocated target resource, and is the terminal distribution target money in target area Source.It is compared in prior art the user channel quality because being in cell edge poor, and makes user wait Long period could obtain higher priority, thus obtains the chance that the network equipment is its Resources allocation, this Invention by carrying out region division to community, and determines the resource allocation probability in each region, makes each region Interior terminal is owned by the chance being scheduled within a certain period of time.Also imply that, be in the use of cell edge Family can be according to the resource allocation probability in this region by network equipment Resources allocation.So, it is to avoid place User in MPS process edge cannot be assigned to the situation of resource for a long time.Therefore, above-mentioned distribution is used The method of resource can be effectively improved the fairness of scheduling of resource, thus improves the use being in MPS process edge Family is assigned to the probability of resource, also ensures that the proper communication of the user being in MPS process edge.
In order to ensure in resource allocation process, it is possible to be that the terminal being in diverse location provides the most liberally Source is distributed, and in an implementation of the embodiment of the present invention, according to certain rule, community can be carried out district Territory divides.Therefore, on the basis of implementation as shown in Figure 1, it is also possible to be embodied as shown in Figure 2 Implementation.Wherein, step 101 is according to the carrier frequency point of the network equipment, by little zoning corresponding for the network equipment It is divided at least two region, step 1011 can be implemented as to step 1013:
1011, carrier frequency point is arranged in order according to order from big to small, obtains f1 to fn.
Wherein, f is used for representing carrier frequency point, and n is the positive integer more than 1 and less than or equal to 6.
The carrier frequency point of the network equipment is sorted from high to low, it is thus achieved that carrier frequency point set A, A={f1 > f2 ... fn-1>fn}.Wherein, due at LTE (English: Long Term Evolution, Chinese: Long Term Evolution) In Rel-10 agreement, a network equipment is at best able to be polymerized 6 member carriers, including a main carrier and 1 To 5 auxiliary carrier waves, therefore, n is the positive integer more than 1 and less than or equal to 6.
1012, with the network equipment as the center of circle, the covering radius of each carrier frequency point is determined.
Due to the corresponding coverage of each carrier frequency point, therefore, it is possible to the network equipment as the center of circle, really The covering radius of fixed each carrier frequency point correspondence coverage, the covering radius of the most each carrier frequency point.Wherein, Covering radius can represent with set R, specially R={R1 < R2 ... Rn-1 < Rn}, n is more than 1 and to be less than Or the positive integer equal to 6.
1013, according to covering radius, community is divided into a border circular areas and at least one annular region.
With the network equipment as the center of circle, R is radius, can obtain n concentric circular.According to this n concentric circular by little Zoning is divided into a border circular areas and border circular areas corresponding to n-1 annular region, specially f1, and f1 with The annular region formed between the covering edge of f2 correspondence overlay area, in like manner can obtain, fn-1 with fn is corresponding to be covered The annular region formed between the covering edge in cover region territory.
The method of a kind of resource distribution that the embodiment of the present invention provides, is being divided at least two region by community During, it is possible to the network equipment as the center of circle, according to carrier frequency point order from big to small, determine successively The covering radius of each carrier frequency point, covering radius determined by basis, is divided into a circle by community afterwards Shape region and at least one annular region.It is compared in prior art the subscriber channel because being in cell edge Second-rate, and the long period could obtain higher priority to make user wait, thus obtain the network equipment For the chance of its Resources allocation, the present invention can be effectively improved the fairness of scheduling of resource, and raising is in little The user at covering edge, district is assigned to the probability of resource, it is ensured that be in user normal at MPS process edge In the case of communication, by the basis of carrier frequency point, community is carried out the classifying rationally in region, makes difference Carrier frequency point involved between region is different, thus is guaranteed at the data transmission matter of the terminal of same area Measure similar.Namely by region is divided, it can be ensured that during resource is distributed, it is contemplated that Terminal for unlike signal transmission quality carries out resource distribution, also avoid to transmit second-rate be positioned at little The terminal at covering edge, district cannot get resource for a long time, thus promotes resource distributional equity further.
In order to ensure in resource allocation process, each region can be more fair for other regions Be assigned to resource, in an implementation of the embodiment of the present invention, can be big according to the area in region The little resource allocation probability determining each region.Therefore, on the basis of implementation as shown in Figure 1, It is also implemented as implementation as shown in Figure 3.Wherein, step 102 determines the resource distribution in each region Probability, can be implemented as step 1021 and step 1022:
1021, the area in each region, and the area of community are determined.
The region obtained is divided, it may be determined that the area in each region and the area of community according to step 101. On the basis of region division result obtained by according to step 1011 to 1013, it may be determined that each region Area S.Such as: the area of f1 correspondence border circular areas is S1, S1=π R12;The corresponding overlay area of f1 with f2 The area covering the annular region formed between edge is S2, S2=π (R22-R12);Fn-1 with fn is corresponding to be covered The area covering the annular region formed between edge in region is Sn, Sn=π (Rn2-Rn-12).Wherein, little The gross area in district can be expressed as π Rn2
1022, the ratio of the area in each region Yu the area of community is defined as resource allocation probability.
The allocation probability P of the target resource in each region, is specifically as follows circle intra domain user corresponding for f1 Resource allocation probability is P1, P1=R12/Rn2;Formed between the covering edge of the corresponding overlay area of f1 with f2 The resource allocation probability of annulus intra domain user is P2, P2=(R22-R12)/Rn2;By that analogy, fn-1 and fn The resource allocation probability covering the annulus intra domain user formed between edge of corresponding overlay area is Pn, Pn=(Rn2-Rn-12)/Rn2
The method of a kind of resource distribution that the embodiment of the present invention provides, it is possible to dividing a cell at least two Behind region, determine the resource allocation probability of each community according to the area in each region and the ratio of plot area. It is compared in prior art the user channel quality because being in cell edge poor, and it is longer to make user wait Time could obtain higher priority, thus obtains the chance that the network equipment is its Resources allocation, the present invention Be that each region determines a resource allocation probability according to area ratio so that the size of resource allocation probability with The size of each region occupied area is directly proportional, say, that the user in the region that area is big is assigned to The probability of resource is relatively large, and the probability that the user in the region that area is little is assigned to resource is relatively small, Improve user in regional with this and be allocated the fairness of resource.Therefore, above-mentioned Resources allocation is used Method can be that the user being in MPS process edge determines a resource allocation probability, it is to avoid is in community and covers The user at lid edge cannot obtain resource for a long time, thus the user that raising is in MPS process edge is allocated To the probability of resource, further increase resource distributional equity.
In order to ensure in resource allocation process, target area has preferable fairness and bigger handling capacity simultaneously, In an implementation of the embodiment of the present invention, can be according to the priority of target area internal object terminal It distributes target resource.Therefore, on the basis of implementation as shown in Figure 2, it is also possible to be embodied as such as figure Implementation shown in 4.Wherein, perform step 104 be target area in terminal distribution target resource it Before, it is also possible to first carrying out step 105, step 104 can be implemented as step 1041:
105, the priority of target area internal object terminal is determined.
Divide the region obtained according to step 101, MPS process marginal area and non-MPS process limit can be divided into Edge region.According to region division result, can cover corresponding with fn for the covering edge of fn-1 correspondence overlay area The annular region formed between edge that covers in cover region territory is defined as MPS process marginal area, by other districts Territory is defined as non-MPS process marginal area.
It is in the terminal in MPS process marginal area, owing to jitter may can migrate to other at any time Community.Therefore, during performing step 105, to the terminal being in MPS process marginal area, if Cannot ensure that this terminal has certain stability, then need not determine the priority of this terminal, the most not for being somebody's turn to do Terminal distribution target resource.For being in the terminal in MPS process marginal area, this end can be determined by End RSRP on each carrier frequency point (English: Reference Signal Receiving Power, in Literary composition: Reference Signal Received Power), and by each RSRP of this terminal respectively compared with the handoff threshold of base station, If all RSRP that this terminal is corresponding and the difference of base station handoff threshold, it is satisfied by threshold requirement, i.e. this difference More than or equal to this threshold value, it is determined that this terminal is target terminal;If this terminal exist at least one RSRP with The difference of base station handoff threshold, is unsatisfactory for threshold requirement, it is determined that this terminal is not target terminal, i.e. this end End does not possess can be for the condition of its distribution target resource.For being in the end in non-MPS process marginal area End, is all defined as target terminal.
The process of the distribution priority of target resource is determined for target terminal each in current target region In, priority can be determined according to equation below:
P (t)=ri (n, s)/Ri (s)
Wherein, moment t is used for representing current time, and (n, when being s) slot s, i-th user is at carrier frequency for ri Instantaneous transmission speed on some fn, Ri (s) is the average biography of i-th user in the certain time before slot s Defeated speed.
1041, for the highest terminal of target terminal medium priority or priority more than the terminal distribution target of threshold value Resource.
In embodiments of the present invention, threshold value can be preset according to historical experience value by staff, Not limiting at this, concrete set-up mode is not limited only to above-mentioned setting means.
The method of a kind of resource distribution that the embodiment of the present invention provides, according to the target terminal in target area Priority, meets the target terminal distribution target resource of certain condition for priority.It is compared to prior art The middle user channel quality because being in cell edge is poor, and making user wait, that the long period could obtain is higher Priority, thus obtain the chance that the network equipment is its Resources allocation, in the present invention can be target area Priority is the highest or priority is more than the preferential Resources allocation of target terminal of threshold value, ensures that Target cell is domestic-investment Existing preferable fairness is distributed in source, again can be in view of the demand to time delay of the business performed by different terminals. Therefore, the method for above-mentioned Resources allocation is used to enable to be in user's medium priority at MPS process edge relatively High user priority is assigned to resource, thus is assigned to money improving the user being in MPS process edge On the premise of the probability in source, improve the fairness between the user being in MPS process edge, ensure that simultaneously Business performed by target terminal disclosure satisfy that its demand for time delay.
Priority in order to ensure terminal disclosure satisfy that the demand of self performed practical business, in the present invention In one implementation of embodiment, can be that the terminal in target area provides a kind of next according to transfer rate The method of the priority of terminal in renewal target area.Therefore, on the basis of implementation as shown in Figure 4, It is also implemented as implementation as shown in Figure 5.Wherein, perform step 1041 be in target terminal preferentially After the highest terminal of level or priority are more than the terminal distribution target resource of threshold value, step 106 can be performed:
106, according to target terminal in the transfer rate of current time, and average transmission within a certain period of time Speed, updates the priority of target terminal.
Wherein, the cut-off time of certain time is current time.
Moment t be that priority is the highest or priority more than the target terminal distribution target resource of threshold value after, update The priority of target terminal.Wherein, update principle can be such that
Ri (s+1)=(1-1/Tc) * Ri (s)+(1/Tc) * ri (n, s) * [α (i)+β (i)]/2
Wherein, Tc is a TTI (English: Transport Time Interval, Chinese: transmission time Interval) time window length, α (i) is that service rate ensures the factor, and β (i) is the grade of service factor. In embodiments of the present invention, GBR (English: Guaranteed Bit Rate, Chinese: ensure bit rate) Business correspondence α (i)=0, and Non-GBR (English: Non Guaranteed Bit Rate, Chinese: non-guarantor Card bit rate) business correspondence α (i)=1, business correspondence β (i)=0 higher to delay requirement, pair time Prolong business correspondence β (i)=1 that requirement is relatively low.
In order to further ensure that the fairness of resource allocation process, at moment t+1, can excellent according to after updating First level redefines the terminal of target resource to be allocated, i.e. performs step 1041.
It should be noted that in embodiments of the present invention, introduce the grade of service factor and service rate ensure because of Son carrys out the priority of more new terminal, it is ensured that the terminal performing the higher task of delay requirement can have higher Priority, or ensure perform the higher task of transmission quality requirements terminal can have higher priority. During the priority corresponding to more new terminal, it is not limited only to above-mentioned update mode, it is also possible to according to it He for embody business performed by terminal for time delay and/or transmission quality requirement parameter, carry out priority Renewal, be not especially limited at this.
The method of a kind of resource distribution that the embodiment of the present invention provides, target terminal completes one in the target area After the distribution of secondary resource, according to the transfer rate of target terminal current time and average in the past period Transfer rate updates the priority of each target terminal.It is compared in prior art because being in cell edge User channel quality is poor, and the long period could obtain higher priority to make user wait, thus obtains The network equipment is the chance of its Resources allocation, and the present invention, by updating the priority of target terminal, reduces communication The priority of the measured target terminal of matter, the priority corresponding to terminal enabling communication quality poor obtains Promoting, thus avoid during scheduling of resource, the preferable terminal of communication quality takies target money for a long time Source, thus improve the network equipment is the fairness in each terminal distribution resource process.Implement in the present invention In example, specifically the business demand of target terminal can be made to be guaranteed by introducing operation factor.Therefore, The method using above-mentioned Resources allocation can be assigned to resource improving the user being in MPS process edge On the premise of probability, more preferable fairness between the user at raising MPS process edge further, and preferably Meet business demand.
The embodiment of the present invention provides a kind of resource assigned unit 20, for performing as shown in Fig. 1 to Fig. 5 Any a set of method flow, as shown in Figure 6, this device 20 includes:
Divide module 21, for the carrier frequency point according to the network equipment, by little Division corresponding for the network equipment For at least two region.
Determine module 22, the resource allocation probability in each region after determining the division of divided module 21, Resource allocation probability is for representing that each region is allocated the probability of target resource.
Determine module 22, be additionally operable to according to resource allocation probability, determine in current time at least two region and treat The target area of distribution target resource.
Distribution module 23, for for determining the terminal distribution target resource in target area determined by module 22.
In an implementation of the embodiment of the present invention, divide module 21, specifically for being pressed by carrier frequency point Being arranged in order according to order from big to small, obtain f1 to fn, wherein, f is used for representing carrier frequency point, and n is big In 1 and less than or equal to 6 positive integer;
With the network equipment as the center of circle, determine the covering radius of each carrier frequency point;
According to covering radius, community is divided into a border circular areas and at least one annular region.
In an implementation of the embodiment of the present invention, determine module 22, specifically for determining each region Area, and the area of community;
The ratio of the area in each region Yu the area of community is defined as resource allocation probability.
In an implementation of the embodiment of the present invention, determine module 22, be additionally operable to determine described target area The priority of territory internal object terminal.
Distribution module 23, is more than threshold value specifically for the terminal the highest for target terminal medium priority or priority Terminal distribution target resource.
In an implementation of the embodiment of the present invention, device 20 also includes:
More new module 24, for according to target terminal in the transfer rate of current time, and in certain time Interior average transmission rate, updates the priority of target terminal, and the cut-off time of certain time is current time.
A kind of resource assigned unit that the embodiment of the present invention provides, with the carrier frequency point of the network equipment as foundation, Community is divided, obtains at least two region, and determine that each region may be allocated target resource Probability, the resource allocation probability in the most each region, determine according to the resource allocation probability of regional afterwards Current time needs the target area of allocated target resource, and is the terminal distribution target money in target area Source.It is compared in prior art the user channel quality because being in cell edge poor, and makes user wait Long period could obtain higher priority, thus obtains the chance that the network equipment is its Resources allocation, this Invention by carrying out region division to community, and determines the resource allocation probability in each region, makes each region Interior terminal is owned by the chance being scheduled within a certain period of time.Also imply that, be in the use of cell edge Family can be according to the resource allocation probability in this region by network equipment Resources allocation.So, it is to avoid place User in MPS process edge cannot be assigned to the situation of resource for a long time.Therefore, above-mentioned distribution is used The method of resource can be effectively improved the fairness of scheduling of resource, thus improves the use being in MPS process edge Family is assigned to the probability of resource, also ensures that the proper communication of the user being in MPS process edge.
Each embodiment in this specification all uses the mode gone forward one by one to describe, phase homophase between each embodiment As part see mutually, what each embodiment stressed is different from other embodiments it Place.For device embodiment, owing to it is substantially similar to embodiment of the method, so describing Fairly simple, relevant part sees the part of embodiment of the method and illustrates.
One of ordinary skill in the art will appreciate that all or part of flow process realizing in above-described embodiment method, Can be by computer program and complete to instruct relevant hardware, described program can be stored in computer In read/write memory medium, this program is upon execution, it may include such as the flow process of the embodiment of above-mentioned each method. Wherein, described storage medium can be magnetic disc, CD, read-only store-memory body (English: Read-Only Memory, is called for short: ROM) or random store-memory body (English: Random Access Memory, be called for short: RAM) etc..
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited to This, any those familiar with the art, in the technical scope that the invention discloses, can readily occur in Change or replacement, all should contain within protection scope of the present invention.Therefore, protection scope of the present invention Should be as the criterion with scope of the claims.

Claims (10)

1. the method for a resource distribution, it is characterised in that described method includes:
According to the carrier frequency point of the network equipment, community corresponding for the described network equipment is divided at least two district Territory;
Determine that the resource allocation probability in described each region, described resource allocation probability are used for representing described each Region is allocated the probability of target resource;
According to described resource allocation probability, determine described mesh to be allocated at least two region described in current time The target area of mark resource;
For target resource described in the terminal distribution in described target area.
Method the most according to claim 1, it is characterised in that according to the carrier frequency point of the network equipment, Community corresponding for the described network equipment is divided at least two region, including:
Being arranged in order according to order from big to small by described carrier frequency point, obtain f1 to fn, wherein, f is used for Representing carrier frequency point, n is the positive integer more than 1 and less than or equal to 6;
With the described network equipment as the center of circle, determine the covering radius of each carrier frequency point;
According to described covering radius, described community is divided into a border circular areas and at least one annular region.
Method the most according to claim 1 and 2, it is characterised in that described determine described each region Resource allocation probability, including:
Determine the area in described each region, and the area of described community;
The ratio of the area in described each region Yu the area of described community is defined as the distribution of described resource general Rate.
Method the most according to claim 2, it is characterised in that described in described target area Before target resource described in terminal distribution, including:
Determine the priority of described target area internal object terminal;
Described for target resource described in the terminal distribution in described target area, including:
The terminal the highest for described target terminal medium priority or priority are more than mesh described in the terminal distribution of threshold value Mark resource.
Method the most according to claim 4, it is characterised in that described for described target terminal in excellent After terminal that first level is the highest or priority are more than target resource described in the terminal distribution of threshold value, including:
According to described target terminal in the transfer rate of described current time, and within a certain period of time average Transfer rate, updates the priority of described target terminal, the cut-off time of described certain time be described currently Moment.
6. a resource assigned unit, it is characterised in that described device includes:
Divide module, for the carrier frequency point according to the network equipment, by little zoning corresponding for the described network equipment It is divided at least two region;
Determining module, for determining the resource allocation probability in described each region, described resource allocation probability is used In representing that described each region is allocated the probability of target resource;
Described determine module, be additionally operable to according to described resource allocation probability, determine described in current time at least two The target area of described target resource to be allocated in individual region;
Distribution module, is used for as target resource described in the terminal distribution in described target area.
Device the most according to claim 1, it is characterised in that described division module, specifically for inciting somebody to action Described carrier frequency point is arranged in order according to order from big to small, obtains f1 to fn, and wherein, f is used for representing load Ripple frequency, n is the positive integer more than 1 and less than or equal to 6;
With the described network equipment as the center of circle, determine the covering radius of each carrier frequency point;
According to described covering radius, described community is divided into a border circular areas and at least one annular region.
8. according to the device described in claim 6 or 7, it is characterised in that described determine module, specifically for Determine the area in described each region, and the area of described community;
The ratio of the area in described each region Yu the area of described community is defined as the distribution of described resource general Rate.
Device the most according to claim 7, it is characterised in that described determine module, is additionally operable to determine The priority of described target area internal object terminal;
Described distribution module is big specifically for the terminal the highest for described target terminal medium priority or priority In target resource described in the terminal distribution of threshold value.
Device the most according to claim 9, it is characterised in that described device also includes:
More new module, for according to described target terminal in the transfer rate of described current time, and one Fix time interior average transmission rate, update the priority of described target terminal, the cut-off of described certain time Moment is described current time.
CN201610379372.9A 2016-05-31 2016-05-31 A kind of method and device of resource allocation Active CN105873228B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610379372.9A CN105873228B (en) 2016-05-31 2016-05-31 A kind of method and device of resource allocation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610379372.9A CN105873228B (en) 2016-05-31 2016-05-31 A kind of method and device of resource allocation

Publications (2)

Publication Number Publication Date
CN105873228A true CN105873228A (en) 2016-08-17
CN105873228B CN105873228B (en) 2019-04-16

Family

ID=56642976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610379372.9A Active CN105873228B (en) 2016-05-31 2016-05-31 A kind of method and device of resource allocation

Country Status (1)

Country Link
CN (1) CN105873228B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112492635A (en) * 2020-12-11 2021-03-12 中国联合网络通信集团有限公司 Method and device for determining scheduling priority

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409884A (en) * 2008-11-18 2009-04-15 中国移动通信集团福建有限公司 Method for optimizing network frequency based on measurement report
CN101568125A (en) * 2009-05-15 2009-10-28 重庆大学 Wireless resource allocation method capable of supporting the frequency spectrum resource sharing
CN101730231A (en) * 2008-10-10 2010-06-09 中兴通讯股份有限公司 Resource allocation method with partial frequency multiplexing
US20140293920A1 (en) * 2006-03-29 2014-10-02 Hitachi, Ltd. Broadband Wireless Communication Resource Assigning Method, Base Station Apparatus and Terminal Apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140293920A1 (en) * 2006-03-29 2014-10-02 Hitachi, Ltd. Broadband Wireless Communication Resource Assigning Method, Base Station Apparatus and Terminal Apparatus
CN101730231A (en) * 2008-10-10 2010-06-09 中兴通讯股份有限公司 Resource allocation method with partial frequency multiplexing
CN101409884A (en) * 2008-11-18 2009-04-15 中国移动通信集团福建有限公司 Method for optimizing network frequency based on measurement report
CN101568125A (en) * 2009-05-15 2009-10-28 重庆大学 Wireless resource allocation method capable of supporting the frequency spectrum resource sharing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112492635A (en) * 2020-12-11 2021-03-12 中国联合网络通信集团有限公司 Method and device for determining scheduling priority
CN112492635B (en) * 2020-12-11 2023-06-02 中国联合网络通信集团有限公司 Determination method and device for scheduling priority

Also Published As

Publication number Publication date
CN105873228B (en) 2019-04-16

Similar Documents

Publication Publication Date Title
CN1992962B (en) Inter-cell interference coordination method based on evolution network architecture of 3G system
CN105407486B (en) A kind of method and device of the network capacity extension
CN102204310B (en) Resource allocation method, apparatus and base station
CN102026390B (en) Base station and resource allocation method for realizing interference coordination among cells
WO2015127880A1 (en) Base station frequency resource allocation method and network device
CN101964980B (en) Method and device for coordinating inter-cell interference
CN106162913A (en) Apparatus and method in spectral coordination apparatus and method, wireless communication system
CN103229580B (en) The method and apparatus of scheduling of resource
CN102088723A (en) Method and device for determining high interference indication (HII)
CN104053160A (en) Method and device for adjusting cell work frequency bands
CN103945540A (en) Processing method and device for logical channel priority
EP3986061A1 (en) Method for suppressing cell co-channel interference, and base station and system
CN104902484B (en) LTE inter-cell interference coordination methods and device
CN105517054B (en) A kind of method and apparatus of load control system
EP2533558A1 (en) Bandwidth adjustment method, communications device, and bandwidth adjustment device
JP2016523065A (en) Controller for allocating radio resource blocks to user devices located in cells of a cellular network
CN104918331A (en) Frequency resource allocation method and device
CN105764150A (en) Method and device for allocating resources
CN105636059B (en) A kind of method and apparatus distributing frequency spectrum
CN114641036A (en) Load balancing method and device, base station and computer readable storage medium
CN106162901A (en) The method of a kind of resource distribution and the network equipment
CN105873228A (en) Resource distribution method and device
CN103997738A (en) Anti-interference clustering management method and device
CN104170309B (en) A kind of method for managing resource and device
Wilhelm et al. Geo-spatial resource allocation for heterogeneous vehicular communications: Poster

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant