CN105870968B - 一种计及系统负序电压的三相不平衡无功电压控制方法 - Google Patents

一种计及系统负序电压的三相不平衡无功电压控制方法 Download PDF

Info

Publication number
CN105870968B
CN105870968B CN201610316822.XA CN201610316822A CN105870968B CN 105870968 B CN105870968 B CN 105870968B CN 201610316822 A CN201610316822 A CN 201610316822A CN 105870968 B CN105870968 B CN 105870968B
Authority
CN
China
Prior art keywords
mrow
msubsup
gamma
mtd
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610316822.XA
Other languages
English (en)
Other versions
CN105870968A (zh
Inventor
赵晋泉
刘绪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201610316822.XA priority Critical patent/CN105870968B/zh
Publication of CN105870968A publication Critical patent/CN105870968A/zh
Application granted granted Critical
Publication of CN105870968B publication Critical patent/CN105870968B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/383
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • H02J3/1821Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/26Arrangements for eliminating or reducing asymmetry in polyphase networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks

Abstract

本发明公开了一种计及系统负序电压的三相不平衡配电网无功电压控制方法,属于电力系统运行与控制技术领域。具体实现包括如下步骤,步骤1:建立计及系统负序电压和网络损耗的目标函数;步骤2:建立三相不平衡配电网在直角坐标系下的节点功率方程;步骤3:建立三相不平衡配电网安全运行约束;步骤4:建立三相不平衡配电网控制变量约束;步骤5:利用分支定界结合二次约束二次规划算法进行求解。本发明建立了计及系统负序电压的三相不平衡配电网无功电压控制方法,可以通过多种无功补偿装置与分布式电源之间的协调优化,实现在降低三相不平衡配电网网络损耗的同时减小系统的负序电压,优化配电系统的三相不平衡问题。

Description

一种计及系统负序电压的三相不平衡无功电压控制方法
技术领域
本发明涉及电力系统运行与控制技术领域,特别是一种计及系统负序电压的三相不平衡无功电压控制方法。
背景技术
环境污染的日益加重、传统化石燃料的枯竭驱使能够实现可再生能源并网运行控制的主动配电网迅速发展。而主动配电网中有大量可控资源,用来提高能源利用率、降低网络损耗,使得配电网各控制设备之间的协调优化控制成为一个新的挑战。由于配电网中多含有单相/两相和三相不对称负荷,并且三相线路参数不对称现象普遍存在,随着大量单相分布式电源接入,配电网的三相不平衡特征日益突出。同时系统三相不平衡运行时,电压中存在大量负序分量,使设备的损耗增大并使设备运行于非正常状态。因此,近年来考虑电压不平度的三相不平衡配电网无功电压控制成为研究热点。
目前国内外学者针对三相不平衡配电网无功优化相关领域进行了研究,文献一《Athree-phase optimal power-flow algorithm to mitigate voltage unbalance》(IEEETransactions on Power Delivery,2013年第28卷第4期第2394页)提出了一种直角坐标系下基于电流注入法的三相不平衡优化模型,以分布式电源无功出力及连续可调的无功补偿设备为控制变量,来减小优化三相不平衡问题,但其仅考虑了减小三相电压不平衡问题,没有对网络损耗进行优化。文献二《基于混合整数二阶锥规划的三相有源配电网无功优化》(电力系统自动化,2014年第38卷第15期第58页)提出了包含离散无功补偿装置约束和连续无功补偿装置约束、逆变器并网的分布式电源无功运行约束等的配电网三相无功优化模型,但其构造的模型中仅考虑网络损耗最小,未考虑三相电压不平衡的优化问题。文献三《Multi-Objective optimization for the operation of an electric distributionsystem with a large number of single phase solar generators》(IEEETransactions on Smart Grid,2013年第4卷第2期第1038页)建立了以减小网络损耗和三相电流不平衡为目标的配电网三相不平衡无功优化模型。但仅考虑了并联电容器接入与否(取0或1)、变压器分接头位置及网络重构开关等离散控制变量,未考虑多种无功补偿装置与分布式电源之间的协调优化。
发明内容
本发明所要解决的技术问题是克服现有技术的不足而提供一种计及系统负序电压的三相不平衡无功电压控制方法,可以实现多种无功补偿设备与分布式电源之间的协调优化,进而降低三相不平衡配电网网络损耗的同时减小系统的负序电压,优化配电系统的三相不平衡问题。
本发明为解决上述技术问题采用以下技术方案:
根据本发明提出的一种计及系统负序电压的三相不平衡配电网无功电压控制方法,包括如下步骤:
步骤1:采用线性加权和法建立计及系统负序电压和网络损耗的目标函数;
步骤2:根据节点电压法建立三相不平衡配电网在直角坐标系下的节点功率方程;
步骤3:根据电力系统安全运行要求建立三相不平衡配电网状态变量约束;
步骤4:根据控制设备调节范围建立三相不平衡配电网控制变量约束;
步骤5:采用分支定界结合二次约束二次规划算法,并根据步骤2的三相不平衡配电网在直角坐标系下的节点功率方程和步骤3的三相不平衡配电网状态变量约束、步骤4的三相不平衡配电网控制变量约束,对步骤1的计及系统负序电压和网络损耗的目标函数进行求解,得到逆变器并网分布式电源、连续调节的无功补偿装置、分组投切电容器和根节点变压器变比控制量。
作为本发明所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法进一步优化方案,所述步骤1中采用线性加权和法建立计及系统负序电压和网络损耗的目标函数为:
其中,ω1和ω2分别为系统负序电压和网络损耗的权重,ω12=1;Uneg为系统负序电压,Ploss为计及相间互阻抗的精确网络损耗,为仅优化系统负序电压单一目标函数时取得的目标函数值,为仅优化网络损耗单一目标函数时取得的目标函数值;
系统负序电压Uneg为:
其中,ΩB为系统中所有节点的集合;ei,-、fi,-分别为节点i负序电压的实部和虚部;表示:
分别为节点i的a、b、c各相电压;
计及相间互阻抗的精确网络损耗Ploss为:
其中,Ωl为所有支路的集合;fi γ分别为节点i的γ相电压的实部和虚部;分别为节点导纳矩阵中的节点i的γ相与节点j的β相对应元素的实部和虚部。
作为本发明所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法进一步优化方案,所述步骤2中根据节点电压法建立三相不平衡配电网在直角坐标系下的节点功率方程具体为:
其中:为节点i的γ相的有功和无功负荷;为节点i的γ相接入的分布式电源有功和无功出力;为节点i的γ相接入的分组投切电容器无功补偿量;为节点i的γ相接入的连续调节无功补偿设备无功补偿量。
作为本发明所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法进一步优化方案,所述步骤3中根据电力系统安全运行要求建立三相不平衡配电网状态变量约束为:
根节点s的三相电压相间角度相差120度:
其中,Vmax为节点电压幅值的上限,Vmin为节点电压幅值的下限,fs a为根节点s的a相电压的虚部,fs b为根节点s的b相电压的虚部,fs c为根节点s的c相电压的虚部,为根节点s的a相电压的实部,为根节点s的b相电压的实部,为根节点s的c相电压的实部。
作为本发明所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法进一步优化方案,所述步骤4中根据控制设备调节范围建立三相不平衡配电网控制变量约束为:
其中:为节点i经逆变器并网分布式电源γ相的无功出力上限,为节点i经逆变器并网分布式电源γ相的无功出力下限,为节点i连续调节无功补偿装置γ相的无功补偿量上限,为节点i连续调节无功补偿装置γ相的无功补偿量下限,为节点i分组投切电容器γ相投切的组数,为节点i分组投切电容器γ相投切组数的上限,为节点i分组投切电容器γ相投切组数的下限;Tγ为根节点有载调压变压器的变比,根节点有载调压变压器变比的上限,分别为根节点有载调压变压器变比的下限,ΩD为经逆变器并网分布式电源的节点集合,ΩQ为连续调节的无功补偿装置的节点集合、ΩC为分组投切电容器的节点集合。
本发明采用以上技术方案与现有技术相比,具有以下技术效果:本发明建立了考虑系统负序电压的三相不平衡配电网无功电压控制方法,可以通过多种无功补偿装置与分布式电源之间的协调优化,实现在降低三相不平衡配电网网络损耗的同时减小系统的负序电压,优化配电系统的三相不平衡问题。
附图说明
图1是本发明的计算流程图。
图2是场景1本发明控制方法优化后设备各相控制策略图。
图3是场景2本发明控制方法优化后设备各相控制策略图。
图4是各节点UI优化前后对比图。
具体实施方式
下面结合附图和具体实施例,进一步阐明本发明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落于本申请所附权利要求所限定的范围。
本发明提出的计及系统负序电压的三相不平衡配电网无功电压控制方法,包括以下步骤:
步骤1:建立计及系统负序电压和网络损耗的目标函数;
步骤2:建立三相不平衡配电网在直角坐标系下的节点功率方程;
步骤3:建立三相不平衡配电网状态变量约束;
步骤4:建立三相不平衡配电网控制变量约束;
步骤5:利用分支定界结合二次约束二次规划算法进行求解。
所述步骤1包括:
采用线性加权和法将系统负序电压和网络损耗两个目标函数转化为单目标函数,建立计及系统负序电压和网络损耗的目标函数为:
其中,ω1和ω2分别为系统负序电压和网络损耗的权重,ω12=1;Uneg为系统负序电压,Ploss为计及相间互阻抗的精确网络损耗,为仅优化系统负序电压单一目标函数时取得的目标函数值,为仅优化网络损耗单一目标函数时取得的目标函数值;
系统负序电压Uneg的大小由系统中所有节点负序电压幅值的平方和表示为:
其中,ΩB为系统中所有节点的集合;ei-、fi-分别为节点i负序电压的实部和虚部。表示:
分别为节点i的a、b、c各相电压。
计及相间互阻抗的精确网络损耗Ploss为:
式中:Ωl为所有支路的集合;fi γ分别为节点i的γ相电压的实部和虚部;分别为节点导纳矩阵中的节点i的γ相与节点j的β相对应元素的实部和虚部。
所述步骤2包括:
根据节点电压法建立三相不平衡配电网在直角坐标系下的节点功率方程具体为:
其中:为节点i的γ相的有功和无功负荷;为节点i的γ相接入的分布式电源有功和无功出力;为节点i的γ相接入的分组投切电容器无功补偿量;为节点i的γ相接入的连续调节无功补偿设备无功补偿量。
所述步骤3包括:
根据电力系统安全运行要求建立三相不平衡配电网状态变量约束:
根节点s的三相电压相间角度相差120度:
其中,Vmax为节点电压幅值的上限,Vmin为节点电压幅值的下限,fs a为根节点s的a相电压的虚部,fs b为根节点s的b相电压的虚部,fs c为根节点s的c相电压的虚部,为根节点s的a相电压的实部,为根节点s的b相电压的实部,为根节点s的c相电压的实部。
所述步骤4包括:
根据控制设备调节范围建立三相不平衡配电网控制变量约束:
其中:为节点i经逆变器并网分布式电源γ相的无功出力上限,为节点i经逆变器并网分布式电源γ相的无功出力下限,为节点i连续调节无功补偿装置γ相的无功补偿量上限,为节点i连续调节无功补偿装置γ相的无功补偿量下限,为节点i分组投切电容器投切的组数,为节点i分组投切电容器投切组数的上限,为节点i分组投切电容器投切组数的下限,Tγ为根节点有载调压变压器的变比,为根节点有载调压变压器变比的上限,为根节点有载调压变压器变比的下限,ΩD为经逆变器并网分布式电源的节点集合,ΩQ为连续调节的无功补偿装置的节点集合,ΩC为分组投切电容器的节点集合。
所述步骤5包括:
根据步骤2三相不平衡配电网在直角坐标系下的节点功率方程和步骤3、步骤4的三相不平衡配电网运行约束,和步骤1的计及系统负序电压和网络损耗的目标函数在直角坐标系下构成了计及系统负序电压的三相不平衡配电网无功电压控制模型,该模型目标函数和约束均为二次或线性的,且含有离散控制变量,可以采用分支定界结合二次约束二次规划算法进行求解,从而得到逆变器并网分布式电源、连续调节的无功补偿装置、分组投切电容器和根节点变压器变比控制量,本发明的计算流程图如图1所示。
结果验证:为了测试本发明所提方法的有效性,应用本发明方法对IEEE-33三相不平衡配电系统进行了仿真验证。
节点15和30连接两个三相无功可独立调节的逆变器并网DG(DG15,DG30),每相有功出力为300kW,无功出力在其无功容量限制内进行调节。节点9和26接入两个分组投切电容器组(CB9,CB26),每个电容器组各相有6个档位,每相每一档位补偿功率为50kvar,即每个电容器组每相最大补偿功率为300kvar,三相独立调节。节点22接入无功可连续调节的静止无功补偿装置(SVC22),无功补偿范围为-300~300kvar。根节点ULTC每相变比调节范围为0.90~1.10,分接头分10档进行调节。
为衡量节点和系统的三相不平衡程度,采用国标定义的节点电压不平衡度(unbalance index,UI)来描述每个节点的三相电压不平衡程度:
式中:ei,+、fi,+分别为节点i正序电压的实部和虚部。其中,表示为:
并用系统电压的不平衡度指标来衡量系统三相电压不平衡程度:
设置两组场景,共六种情形来说明。
场景1:无大量单相光伏接入时,配电系统的三相不平衡主要与系统线路参数和负荷的不对称有关。设置两种情形,情形1和情形2分别为系统优化前和采用本发明所述无功电压控制方法优化后的结果。按照算法步骤对无功电压控制后,优化结果如表1所示。
表1场景1各情形结果对比
情形 网损/kW 网损下降百分比/% UIsys/%
1 17.7867 0 2.94×10-4
2 10.6679 40.02 8.30×10-5
结果表明:对比情形1和情形2,当不考虑大量单相光伏接入时,采用本发明模型和算法优化后,UIsys由2.94×10-4变为8.30×10-5,并且网损下降40.02%,优化效果明显。图2为情形2采用本发明控制方法优化后设备各相控制策略,可以看出多种无功补偿装置与分布式电源之间的协调优化。
场景2:模拟大量单相光伏接入极端场景,本发明采用10个100kW单相且无功出力为0的光伏接入系统,接入点和接入相随机选择,接入位置如表2所示。设置四种情形,其中:情形3为中系统优化前;情形4为文献一仅优化负序电压单一目标函数;情形5为文献二中仅优化网损单一目标函数;情形6采用本发明步骤进行优化。优化结果如表3所示。
表2光伏接入位置
接入节点 接入相 接入节点 接入相 接入节点 接入相
4 a 15 b 26 c
5 b 17 c 31 a
8 c 21 c
12 c 25 b
表3场景2结果对比
结果表明:①情形1和情形3比较,UIsys由2.94×10-4增大至1.66×10-2,说明单相光伏的大量接入明显增大了系统负序电压。②对比情形3、4、6,可以看出采用文献一中仅系统负序电压单一目标函数时,UIsys大幅降低且能够间接降低网损,但网损仅降低了8.24%。采用本发明控制方法优化后,UIsys值变为4.99×10-3,且网损降低了30.60%,优化效果明显。③对比情形3、5、6,当采用文献二仅优化网损时,虽然网损优化幅度较大,但UIsys反而增大为9.64×10-2。由此可以看出当单相光伏大量接入配电网,仅优化网络损耗虽然能有效减少配电网的网损,但会间接导致UIsys增加,而本发明能在减小配网有功损耗的同时,明显减小系统负序电压,实现了改善三相电压不平衡问题的目的。
图3为情形6采用本发明控制方法优化后设备各相控制策略图,可以看出多种无功补偿装置与分布式电源之间的协调优化。图4为情形6下各个节点的UI情况,可以看出对所有节点的三相不平衡情况优化效果较好。
综上所述,本发明具有以下有益效果:
(1)本发明建立了考虑系统负序电压的三相不平衡配电网无功电压控制方法,可以实现多种无功补偿装置与分布式电源之间的协调优化。
(2)考虑系统负序电压的三相不平衡配电网无功电压控制方法实现在降低三相不平衡配电网网络损耗的同时减小系统的负序电压,优化配电系统的三相不平衡问题。

Claims (5)

1.一种计及系统负序电压的三相不平衡配电网无功电压控制方法,其特征在于,包括如下步骤:
步骤1:采用线性加权和法建立计及系统负序电压和网络损耗的目标函数;
步骤2:根据节点电压法建立三相不平衡配电网在直角坐标系下的节点功率方程;
步骤3:根据电力系统安全运行要求建立三相不平衡配电网状态变量约束;
步骤4:根据控制设备调节范围建立三相不平衡配电网控制变量约束;
步骤5:采用分支定界结合二次约束二次规划算法,并根据步骤2的三相不平衡配电网在直角坐标系下的节点功率方程和步骤3的三相不平衡配电网状态变量约束、步骤4的三相不平衡配电网控制变量约束,对步骤1的计及系统负序电压和网络损耗的目标函数进行求解,得到逆变器并网分布式电源、连续调节的无功补偿装置、分组投切电容器和根节点变压器变比控制量。
2.根据权利要求1所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法,其特征在于,所述步骤1中采用线性加权和法建立计及系统负序电压和网络损耗的目标函数为:
其中,ω1和ω2分别为系统负序电压和网络损耗的权重,ω12=1;Uneg为系统负序电压,Ploss为计及相间互阻抗的精确网络损耗,为仅优化系统负序电压单一目标函数时取得的目标函数值,为仅优化网络损耗单一目标函数时取得的目标函数值;
系统负序电压Uneg为:
其中,ΩB为系统中所有节点的集合;ei,-、fi,-分别为节点i负序电压的实部和虚部;表示:
分别为节点i的a、b、c各相电压;
计及相间互阻抗的精确网络损耗Ploss为:
<mrow> <mfenced open='' close=''> <mtable> <mtr> <mtd> <msub> <mi>PP</mi> <mi>loss</mi> </msub> <mo>=</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <munder> <mi>&amp;Sigma;</mi> <mrow> <mi>ij</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>l</mi> </msub> </mrow> </munder> <munder> <mi>&amp;Sigma;</mi> <mrow> <mi>&amp;gamma;</mi> <mo>=</mo> <mi>a</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>c</mi> </mrow> </munder> <munder> <mi>&amp;Sigma;</mi> <mrow> <mi>&amp;beta;</mi> <mo>=</mo> <mi>a</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>c</mi> </mrow> </munder> <mo>{</mo> <mo>-</mo> <msubsup> <mi>G</mi> <mi>ij</mi> <mi>&amp;gamma;&amp;beta;</mi> </msubsup> <mo>[</mo> <mrow> <mo>(</mo> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;beta;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>+</mo> <mrow> <mo>(</mo> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;beta;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>]</mo> </mtd> </mtr> <mtr> <mtd> <mo>-</mo> <msubsup> <mi>B</mi> <mi>ij</mi> <mi>&amp;gamma;&amp;beta;</mi> </msubsup> <mo>[</mo> <mrow> <mo>(</mo> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>+</mo> <mrow> <mo>(</mo> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;beta;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>]</mo> <mo>}</mo> </mtd> </mtr> </mtable> </mfenced> <mo>;</mo> </mrow>
其中,Ωl为所有支路的集合;分别为节点i的γ相电压的实部和虚部;分别为节点导纳矩阵中的节点i的γ相与节点j的β相对应元素的实部和虚部。
3.根据权利要求2所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法,其特征在于,所述步骤2中根据节点电压法建立三相不平衡配电网在直角坐标系下的节点功率方程具体为:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>D</mi> <mi>G</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>d</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </munder> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>&amp;beta;</mi> <mo>=</mo> <mi>a</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>c</mi> </mrow> </munder> <mrow> <mo>(</mo> <msubsup> <mi>G</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>-</mo> </mrow> </mtd> </mtr> <mtr> <mtd> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </munder> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>&amp;beta;</mi> <mo>=</mo> <mi>a</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>c</mi> </mrow> </munder> <mrow> <mo>(</mo> <msubsup> <mi>G</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>+</mo> <msubsup> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>=</mo> <mn>0</mn> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mtd> </mtr> </mtable> </mfenced>
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>D</mi> <mi>G</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>+</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>C</mi> <mi>B</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>+</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>c</mi> <mi>o</mi> <mi>m</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>d</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </munder> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>&amp;beta;</mi> <mo>=</mo> <mi>a</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>c</mi> </mrow> </munder> <mrow> <mo>(</mo> <msubsup> <mi>G</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>-</mo> <msubsup> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>+</mo> </mrow> </mtd> </mtr> <mtr> <mtd> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </munder> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>&amp;beta;</mi> <mo>=</mo> <mi>a</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>c</mi> </mrow> </munder> <mrow> <mo>(</mo> <msubsup> <mi>G</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>f</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>+</mo> <msubsup> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>&amp;gamma;</mi> <mi>&amp;beta;</mi> </mrow> </msubsup> <msubsup> <mi>e</mi> <mi>j</mi> <mi>&amp;beta;</mi> </msubsup> <mo>)</mo> </mrow> <mo>=</mo> <mn>0</mn> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mtd> </mtr> </mtable> </mfenced>
其中:为节点i的γ相的有功和无功负荷;为节点i的γ相接入的分布式电源有功和无功出力;为节点i的γ相接入的分组投切电容器无功补偿量;为节点i的γ相接入的连续调节无功补偿设备无功补偿量。
4.根据权利要求3所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法,其特征在于,所述步骤3中根据电力系统安全运行要求建立三相不平衡配电网状态变量约束为:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>V</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> <mn>2</mn> </msubsup> <mo>&amp;le;</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>e</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>f</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;le;</mo> <msubsup> <mi>V</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> <mn>2</mn> </msubsup> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>B</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
根节点s的三相电压相间角度相差120度:
<mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <msubsup> <mi>f</mi> <mi>s</mi> <mi>a</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>s</mi> <mi>a</mi> </msubsup> <mi>t</mi> <mi>a</mi> <mi>n</mi> <mo>(</mo> <mfrac> <mrow> <mn>0</mn> <mi>&amp;pi;</mi> </mrow> <mn>180</mn> </mfrac> <mo>)</mo> <mo>=</mo> <mn>0</mn> </mtd> </mtr> <mtr> <mtd> <msubsup> <mi>f</mi> <mi>s</mi> <mi>b</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>s</mi> <mi>b</mi> </msubsup> <mi>t</mi> <mi>a</mi> <mi>n</mi> <mo>(</mo> <mfrac> <mrow> <mo>-</mo> <mn>120</mn> <mi>&amp;pi;</mi> </mrow> <mn>180</mn> </mfrac> <mo>)</mo> <mo>=</mo> <mn>0</mn> </mtd> </mtr> <mtr> <mtd> <msubsup> <mi>f</mi> <mi>s</mi> <mi>c</mi> </msubsup> <mo>-</mo> <msubsup> <mi>e</mi> <mi>s</mi> <mi>c</mi> </msubsup> <mi>t</mi> <mi>a</mi> <mi>n</mi> <mo>(</mo> <mfrac> <mrow> <mn>120</mn> <mi>&amp;pi;</mi> </mrow> <mn>180</mn> </mfrac> <mo>)</mo> <mo>=</mo> <mn>0</mn> </mtd> </mtr> </mtable> </mfenced>
其中,Vmax为节点电压幅值的上限,Vmin为节点电压幅值的下限,为根节点s的a相电压的虚部,为根节点s的b相电压的虚部,为根节点s的c相电压的虚部,为根节点s的a相电压的实部,为根节点s的b相电压的实部,为根节点s的c相电压的实部。
5.根据权利要求4所述一种计及系统负序电压的三相不平衡配电网无功电压控制方法,其特征在于,所述步骤4中根据控制设备调节范围建立三相不平衡配电网控制变量约束为:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>D</mi> <mi>G</mi> <mo>,</mo> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>D</mi> <mi>G</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>D</mi> <mi>G</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>D</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>c</mi> <mi>o</mi> <mi>m</mi> <mo>,</mo> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>c</mi> <mi>o</mi> <mi>m</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>c</mi> <mi>o</mi> <mi>m</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>Q</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msubsup> <mi>C</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msubsup> <mi>C</mi> <mi>i</mi> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msubsup> <mi>C</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>&amp;Omega;</mi> <mi>C</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
<mrow> <msubsup> <mi>T</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>&amp;le;</mo> <msup> <mi>T</mi> <mi>&amp;gamma;</mi> </msup> <mo>&amp;le;</mo> <msubsup> <mi>T</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> <mi>&amp;gamma;</mi> </msubsup> <mo>;</mo> </mrow>
其中:为节点i经逆变器并网分布式电源γ相的无功出力上限,为节点i经逆变器并网分布式电源γ相的无功出力下限,为节点i连续调节无功补偿装置γ相的无功补偿量上限,为节点i连续调节无功补偿装置γ相的无功补偿量下限,为节点i分组投切电容器γ相投切的组数,为节点i分组投切电容器γ相投切组数的上限,为节点i分组投切电容器γ相投切组数的下限;Tγ为根节点有载调压变压器的变比,根节点有载调压变压器变比的上限,分别为根节点有载调压变压器变比的下限,ΩD为经逆变器并网分布式电源的节点集合,ΩQ为连续调节的无功补偿装置的节点集合、ΩC为分组投切电容器的节点集合。
CN201610316822.XA 2016-05-13 2016-05-13 一种计及系统负序电压的三相不平衡无功电压控制方法 Active CN105870968B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610316822.XA CN105870968B (zh) 2016-05-13 2016-05-13 一种计及系统负序电压的三相不平衡无功电压控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610316822.XA CN105870968B (zh) 2016-05-13 2016-05-13 一种计及系统负序电压的三相不平衡无功电压控制方法

Publications (2)

Publication Number Publication Date
CN105870968A CN105870968A (zh) 2016-08-17
CN105870968B true CN105870968B (zh) 2018-01-05

Family

ID=56631017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610316822.XA Active CN105870968B (zh) 2016-05-13 2016-05-13 一种计及系统负序电压的三相不平衡无功电压控制方法

Country Status (1)

Country Link
CN (1) CN105870968B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107797023B (zh) * 2016-08-24 2020-08-25 新疆金风科技股份有限公司 三相电压不平衡源定位方法、装置和系统
CN109617092A (zh) * 2018-12-19 2019-04-12 中国电力科学研究院有限公司 一种交直流混合电网动态无功优化方法及系统
CN109787256A (zh) * 2019-02-15 2019-05-21 合肥工业大学 基于柔性多状态开关的三相不平衡无功电压控制方法
CN110071503B (zh) * 2019-05-09 2020-10-02 山东大学 分布式输配协同无功优化的二次规划模型构建方法及系统
CN112838622B (zh) * 2021-03-26 2023-07-14 云南电网有限责任公司电力科学研究院 一种10kV供电区域的无功电压优化控制方法及系统
CN113625066B (zh) * 2021-08-03 2023-11-21 国网北京市电力公司 配电变压器相位不平衡检测方法、系统、装置及存储介质
CN114024338B (zh) * 2021-11-25 2024-01-19 华北电力大学 一种大规模风电汇集电网分相潮流优化方法及系统

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2638282B1 (en) * 2010-11-10 2020-09-09 Vestas Wind Systems A/S Method and system for operating a wind turbine
CN104538978B (zh) * 2015-01-21 2016-08-17 合肥工业大学 一种双馈风力发电机组电网电压不平衡骤升的无功功率控制方法

Also Published As

Publication number Publication date
CN105870968A (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
CN105870968B (zh) 一种计及系统负序电压的三相不平衡无功电压控制方法
Sakar et al. Increasing PV hosting capacity in distorted distribution systems using passive harmonic filtering
CN103701140B (zh) 提高交直流电网暂态电压稳定的动态无功备用优化方法
CN105119280B (zh) 基于锥优化的交直流混合结构有源配电网运行优化方法
Kargarian et al. Multiobjective optimal power flow algorithm to enhance multi-microgrids performance incorporating IPFC
CN110896231B (zh) 一种扶贫区配电网接纳分布式光伏能力计算方法及系统
CN104158198A (zh) 配电网优化潮流控制装置和方法
CN104362650B (zh) 一种考虑成本因素的电力系统无功优化方法
CN106779313A (zh) 基于混合整数规划的多目标分布式电源选址定容方法
CN102769292B (zh) 一种增强风电场电压安全裕度的方法
CN109888775B (zh) 一种考虑风电接入的低负荷运行日输电网结构优化方法
CN103730900A (zh) 电力系统多时间尺度的省地县一体化无功优化方法
CN105449707A (zh) 一种分布式光伏发电接入方法
CN105958530A (zh) 一种具有无功自动补偿的微电网系统
Mahendru et al. Reduction in system losses and power demand by combination of optimal power flow and conservation voltage reduction using smart PV inverters
Tadjeddine et al. A contribution to the control of voltage and power of the interconnection between two decentralized electrical grids with an optimal localization of the SVC devices in real-time
CN105071397A (zh) 风电外送的多类型无功补偿设备的协调无功电压控制方法
CN112751371A (zh) 一种基于二阶锥算法的含风电集群近区电网无功优化方法
CN115689187A (zh) 一种配电网分布式光伏可开放容量计算方法及系统
Zhao et al. Optimal Configuration of ESS and SVG for the Coordinated Improvement of Power Quality in Low Voltage Distribution Network with high Penetration PV
Nawaz et al. A novel approach for multiple DG allocation in real distribution system
Ethmane et al. Statcom integration in a power grid to enhance voltage stability
CN109193820A (zh) 用于对光伏发电站进行无功优化的方法、系统及存储介质
Xuefeng et al. A brief analysis of distributed generation connected to distribution network
Xu et al. An approach to the ultimate goal of power grid development—constant voltage operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant