CN105864517A - Tube cable laying method for filling mining - Google Patents
Tube cable laying method for filling mining Download PDFInfo
- Publication number
- CN105864517A CN105864517A CN201610202674.9A CN201610202674A CN105864517A CN 105864517 A CN105864517 A CN 105864517A CN 201610202674 A CN201610202674 A CN 201610202674A CN 105864517 A CN105864517 A CN 105864517A
- Authority
- CN
- China
- Prior art keywords
- suspension ring
- triangle
- triangle suspension
- production flow
- flow line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/12—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
- F16L3/133—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing and hanging from a pendant
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a tube cable laying method for filling mining. The method comprises the following steps that S100, triangular hanging rings are manufactured, and the triangular hanging rings and a filling base plate truss are welded into a whole; S200, the triangular hanging rings are arranged on a roadway base plate and buried with loose broken stones; and S300, after the triangular hanging rings are exposed during tunneling on the lower layer, production pipelines and cables are closely attached to a tunnel roof, and the production pipelines and the cables are fixed through the triangular hanging rings. According to the method, the steel bar triangular hanging rings manufactured in advance are embedded in a tunnel base plate before filling of an upper goaf; when a lower panel region is exposed out through tunneling, steel tubes are additionally and transversely arranged between the two triangular hanging rings to directly serve as a pipeline bracket. Branched pipeline joints are reserved in the panel region every a certain distance. Accordingly, the problems of pipeline disorder and safety are effectively solved.
Description
Technical field:
The invention belongs to lower to gut line erection technique field, method of mining by the way of filling panel, be used for filling particularly to one
Fill out the umbilical distribution method of mining.
Background technology:
Mine down-hole produce used by geomantic omen pipeline, the Reasonable Arrangement of cable etc. directly affect operating efficiency and safety
Produce.Lower to method of mining by the way of filling mine, in panel, various line layout are usually and beat note anchor pole at top, tunnel
Form bracket and carry out pipelining, or fix L at tunnel one lateral wall and be hooked into line pipe line and hang.Top, tunnel is beaten
Note anchor pole bracket is relatively big and relatively costly for the damage of obturation top board;And tunnel lateral wall beat note L hook exist with
Vehicle mutually scratches, pipeline moves the problems such as winding complexity frequent, mutual, causes the effective usable floor area in tunnel to subtract
Little, pipeline maintenance cost increases, and security risk increases.Similar mine typically uses beats note on obturation top board
Two cement-roll anchor poles, the mode of anchor pole lower end transverse weld channel-section steel forms pipeline bracket.Although this kind of bracket
Technique is attractive in appearance, but all required people's station of top Drilling square and the work such as the injection of cement-roll, channel-section steel welding
Servicer platform carries out operation, time and effort consuming of constructing, relatively costly.Thinking of the present invention is: above divide mined out
Before district's filling, welding one group of triangle suspension ring on base plate filling truss, suspension ring are after lower leaf driving exposes, horizontal
To penetrating a waste and old steel pipe i.e. as pipeline bracket.This invented technology is simple, it is simple to operation, it is not necessary to high-altitude is made
Industry, in achieving mining panel with relatively low input in the case of not damaging obturation top board, each pipeline is along top board
Smooth lay, do not affect vehicle and run;At provided pipe line interface at a certain distance, thus it is oblique to occur without pipeline
Drawing and askew hang, mutually harass and disturb and frequently move phenomenon, site environment is clean and tidy, eliminates the in disorder safety caused of pipeline
Hidden danger.
Summary of the invention:
Based on this, the invention discloses a kind of umbilical distribution method for mining with stowing, described method include with
Lower step:
S100, making triangle suspension ring, and described triangle suspension ring and filling base plate truss are processed to form entirety;
S200, described triangle suspension ring are placed on roadway floor, and bury with loose rubble;
S300, lower floor driving expose triangle suspension ring after, production flow line cable is close to top board and lays, and make
With triangle suspension ring, production flow line cable is fixed.
The present invention has an advantages below:
The reinforcing bar triangle suspension ring made in advance, before the goaf filling of upper strata, are embedded in by method of the present invention
Roadway floor, after lower floor's panel driving is exposed, laterally adding steel pipe between two triangle suspension ring just can be direct
As pipeline bracket;Reserved branch pipeline interface at a certain distance in panel, thus effectively solve aforementioned pipe
Line disorder and safety problem.
Accompanying drawing explanation
Fig. 1 is a kind of umbilical distribution method schematic diagram for mining with stowing in one embodiment of the invention;Wherein
1 represents truss, and the first triangle suspension ring 3 that 2 is reserved represent bracket, and 4 represent production flow line, and 5 is reserved
Second triangle suspension ring.
Detailed description of the invention
Below in conjunction with the accompanying drawings 1 and specific embodiment the present invention is further detailed;
In one embodiment, the invention discloses a kind of umbilical distribution method for mining with stowing, described side
Method comprises the following steps:
S100, making triangle suspension ring, and described triangle suspension ring and filling base plate truss are processed to form entirety;
S200, described triangle suspension ring are placed on roadway floor, and bury with loose rubble;
S300, lower floor driving expose triangle suspension ring after, production flow line cable is close to top board and lays, and make
With triangle suspension ring, production flow line cable is fixed.
The present embodiment, before upper point of goaf filling, connects solid by welding or screw on base plate filling truss
Fixed one group of triangle suspension ring, suspension ring, after lower leaf driving exposes, laterally penetrate a waste and old steel pipe i.e. as pipeline
Bracket.This embodiment technique is simple, it is simple to operation, it is not necessary to work high above the ground, in the feelings not damaging obturation top board
In achieving mining panel with relatively low input under condition, each pipeline lays along top board is smooth, does not affect vehicle and runs;
At provided pipe line interface at a certain distance, thus occur without pipeline oblique pull and askew hang, mutually harass and disturb and frequently move
Phenomenon, site environment is clean and tidy, eliminates the in disorder potential safety hazard caused of pipeline.
The triangle suspension ring that the present embodiment is placed on roadway floor use loose rubble to bury, and prevent filling slurry from inciting somebody to action
It enriches triangle suspension ring when causing lower floor's sinking and blasting and cannot be completely exposed.
In one embodiment, the triangle suspension ring described in step S100 use reinforcing bar to make, and described three
Angle suspension ring be shaped as equilateral triangle.
In the present embodiment, the material manufacturing triangle suspension ring could alternatively be steel pipe or other materials, but should
Material self must have certain intensity, it is possible to bears the production flow line of bottom or the tension of cable, and
Can be fixed with filling base plate truss, convenient construction.In the present embodiment, described triangle suspension ring are fabricated to
Equilateral triangle has convenient construction, the feature that stability is high.
In one embodiment, the triangle suspension ring in described S100 include that the first triangle suspension ring and the second triangle hang
Ring, described first triangle suspension ring are used for laying production flow line, and the second triangle suspension ring are used for laying cable.
In the present embodiment, owing to production flow line is different with the size of cable, and weight is the most different, uses not
Same triangle suspension ring carry out laying production flow line and cable, in the present embodiment, the position of different triangle suspension ring
Also different, it is positioned at the right side of filling base plate truss for laying the triangle suspension ring of production flow line, is used for laying cable
Triangle suspension ring be positioned at the left side of filling base plate truss, convenient different production flow lines and cable made a distinction and examine
Look into.
In one embodiment, use the first triangle suspension ring that production flow line is laid specifically, said two
First triangle suspension ring are one group, and centre is connected by bracket, and described production flow line is fixed by bracket.
In the present embodiment, it is one group for laying two, the first triangle suspension ring of production flow line, middle by with the
The bracket of one triangle suspension ring welding is connected, and production flow line is carried out by two the first triangle suspension ring i.e. bracket
Fixing.
In one embodiment, use the second triangle suspension ring that cable is laid particularly as follows: by cable through the
Two triangle suspension ring, and it is solid to use a waste steel bar or steel pipe to carry out through the second triangle suspension ring production flow line
Fixed.
In the present embodiment, triangle suspension ring pre-buried when utilizing filling are as the vertical lifting muscle of lower leaf admission passage filling
Suspension ring, eliminate the work progress of filling suspension ring completely, and layering road filling is possible with existing triangle suspension ring and makees
For hanging muscle fixed mount.Similar mine admission passage filling the most still uses breaks note square insertion doubling reinforcing bar, and notes
The method entering cement-roll anchoring, need to be equipped with servicer coordinating operation specially, and construction labour intensity is big.
In one embodiment, described reinforcing bar be diameter be the reinforcing bar of 10mm.
Why the present embodiment, for limiting the diameter of reinforcing bar, selects the reinforcing bar of 10mm diameter, is to consider three
The size of angle suspension ring and load-bearing, certainly, if the size of triangle suspension ring and load-bearing are varied from, selection herein
The diameter of reinforcing bar also can respective change.
In one embodiment, described first triangle suspension ring be shaped as the equilateral triangle that the length of side is 20cm,
Two triangle suspension ring be shaped as the equilateral triangle that the length of side is 10cm.
In the present embodiment, the size of the first triangle suspension ring and the second triangle suspension ring is different, due to the first triangle suspension ring and
The effect of the second triangle suspension ring is different, and production flow line and the weight of cable and size are different, so making
During corresponding triangle suspension ring, size would also vary from.
In one embodiment, the arrangement of described first triangle suspension ring is: two the first triangle suspension ring are one
Group, two group of first triangle suspension ring are spaced apart, along tunnel direction of advance, the production flow line that ensure that between two brackets
For straight line.
In the present embodiment, according to site operation experience, if two group of first triangle suspension ring is along tunnel direction of advance
Distance excessive, production flow line between two brackets is just difficult to form straight line, can fall down.More excellent, described
The distance of two group of first triangle suspension ring is 2.4m.In the present embodiment, the spacing between the first triangle suspension ring is often organized
For 400mm-500mm.
In one embodiment, disclose a kind of umbilical distribution method for mining with stowing, comprise the following steps:
(1) supporter ring usesRegular reinforcement is fabricated to equilateral triangle suspension ring, and triangle suspension ring are with conventional
Filling base plate truss simultaneously welding processing form entirety, be one group for laying two, the suspension ring of production flow line,
Suspension ring spacing is carriage width 500mm;Often group suspension ring are spaced apart 2.4m along tunnel direction of advance.(2) fill
When filling out pre-buried, the triangle suspension ring being placed on roadway floor use loose rubble to bury, and prevent filling slurry by it
Enrich triangle suspension ring when causing lower floor's sinking and blasting cannot be completely exposed.(3) pipeline is fixed: tunnel in lower floor
After exposing triangle suspension ring, cable is close to top board and is laid, and uses waste steel bar or the steel of a root length degree 500mm
Cable is fixed by pipe through two suspension ring.
Method of the present invention has the advantage that (1) is for managing to geomantic omen, method of mining by the way of filling panel under using
A kind of new erection method of layout design of line and cable, technique is simple, constructs convenient.(2) panel pipeline
General arranging along layering road, after this invention is applied to Mining entrance, triangle suspension ring pre-buried when utilizing filling are made
For the vertical lifting muscle suspension ring of lower leaf admission passage filling, eliminating the work progress of filling suspension ring completely, layering road fills
Fill out and be possible with existing triangle suspension ring as hanging muscle fixed mount.Similar mine admission passage filling the most still uses and beats
Note square inserts doubling reinforcing bar, and the method injecting cement-roll anchoring, need to be equipped with servicer specially and coordinate work
Industry, construction labour intensity is big.(3) solve to beat the damage to obturation of the anchor pole edge, and tunnel at filling top board
Lateral wall L hook bracket takies lane space and L hook and mutually collides, with vehicle, the problem of scratching when laying the line.(4)
During pipelining, snap joint is reserved in segmentation, shortens the scope of operation branch production flow line distance away from main pipe line
And it is easy to use to take into account layering Mining entrance geomantic omen, both sides, road, reduces the production flow line Connection Time and reduce life simultaneously
Produce pipeline frequently to move production flow line attrition.
Here description of the invention and application is illustrative, is not wishing to limit the scope of the invention to above-mentioned reality
Execute in example.The deformation of embodiments disclosed herein and change are possible, for the common skill of those this areas
For art is arbitrary, the various parts with equivalence of replacing of embodiment are known.Art technology arbitrary it should also be apparent that
, in the case of without departing from the spirit or essential characteristics of the present invention, the present invention can in other forms, knot
Structure, layout, ratio, and realize with other assembly, material and parts.Without departing from the scope of the invention and
In the case of spirit, embodiments disclosed herein can be carried out other deformation and change.
Claims (10)
1. the umbilical distribution method for mining with stowing, it is characterised in that said method comprising the steps of:
S100, making triangle suspension ring, and described triangle suspension ring and filling base plate truss are processed to form entirety;
S200, described triangle suspension ring are placed on roadway floor, and bury with loose rubble;
S300, after lower floor's driving exposes triangle suspension ring, production flow line, cable are close to back and lay,
And use triangle suspension ring that production flow line and cable are fixed.
Method the most according to claim 1, it is characterised in that: preferably, the triangle described in step S100
Suspension ring use reinforcing bar to make.
Method the most according to claim 1, it is characterised in that: the shape of triangle suspension ring described in step S100
For equilateral triangle.
Method the most according to claim 2, it is characterised in that: the triangle suspension ring in described S100 include first
Triangle suspension ring and the second triangle suspension ring, described first triangle suspension ring are used for laying production flow line, the second triangle suspension ring
For laying cable.
Method the most according to claim 4, it is characterised in that use the first triangle suspension ring that production flow line is entered
Row is laid particularly as follows: said two the first triangle suspension ring are one group, and centre is connected by bracket, and production flow line leads to
Cross bracket to be fixed.
Method the most according to claim 4, it is characterised in that use the second triangle suspension ring that cable is carried out cloth
If particularly as follows: by cable through the second triangle suspension ring, and using a waste steel bar or steel pipe through the two or three
Angle suspension ring production flow line is fixed.
Method the most according to claim 2, it is characterised in that: described reinforcing bar be diameter be the reinforcing bar of 10mm.
Method the most according to claim 4, it is characterised in that: described first triangle suspension ring be shaped as the length of side
It it is the equilateral triangle of 20cm.
Method the most according to claim 4, it is characterised in that: described second triangle suspension ring be shaped as the length of side
It it is the equilateral triangle of 10cm.
Method the most according to claim 4, it is characterised in that: the arrangement of described first triangle suspension ring is:
Two the first triangle suspension ring are one group, often organize the first triangle suspension ring and ensure that along being spaced apart of tunnel direction of advance
Production flow line between two brackets is straight line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610202674.9A CN105864517B (en) | 2016-04-01 | 2016-04-01 | A kind of umbilical distribution method for mining with stowing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610202674.9A CN105864517B (en) | 2016-04-01 | 2016-04-01 | A kind of umbilical distribution method for mining with stowing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105864517A true CN105864517A (en) | 2016-08-17 |
CN105864517B CN105864517B (en) | 2018-10-23 |
Family
ID=56626775
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610202674.9A Expired - Fee Related CN105864517B (en) | 2016-04-01 | 2016-04-01 | A kind of umbilical distribution method for mining with stowing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105864517B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108167018A (en) * | 2017-12-25 | 2018-06-15 | 中南大学 | For the continuous filling piping system and its method for arranging of big ore deposit section stage open stope mining with stowing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5605419A (en) * | 1994-06-14 | 1997-02-25 | Reinert, Sr.; Gary L. | Underground duct banks |
US6406220B1 (en) * | 1997-10-09 | 2002-06-18 | James Crawford Thomson | Arched support structure |
CN202228794U (en) * | 2011-08-10 | 2012-05-23 | 鞍钢集团矿业公司 | Suspension device of power cable for mining towing carriage |
CN103195209A (en) * | 2013-04-08 | 2013-07-10 | 中建五局工业设备安装有限公司 | Combined bracket for light-weight steel structure ceiling to bear electromechanical pipelines |
CN103628900A (en) * | 2013-12-06 | 2014-03-12 | 山东科技大学 | Triangular cross-section beam and circular ring combined yielding support |
CN204030523U (en) * | 2014-03-14 | 2014-12-17 | 贵州开磷(集团)有限责任公司 | The arrangement of a kind of mine down-hole airduct, water pipe, cable and communications optical cable |
-
2016
- 2016-04-01 CN CN201610202674.9A patent/CN105864517B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5605419A (en) * | 1994-06-14 | 1997-02-25 | Reinert, Sr.; Gary L. | Underground duct banks |
US6406220B1 (en) * | 1997-10-09 | 2002-06-18 | James Crawford Thomson | Arched support structure |
CN202228794U (en) * | 2011-08-10 | 2012-05-23 | 鞍钢集团矿业公司 | Suspension device of power cable for mining towing carriage |
CN103195209A (en) * | 2013-04-08 | 2013-07-10 | 中建五局工业设备安装有限公司 | Combined bracket for light-weight steel structure ceiling to bear electromechanical pipelines |
CN103628900A (en) * | 2013-12-06 | 2014-03-12 | 山东科技大学 | Triangular cross-section beam and circular ring combined yielding support |
CN204030523U (en) * | 2014-03-14 | 2014-12-17 | 贵州开磷(集团)有限责任公司 | The arrangement of a kind of mine down-hole airduct, water pipe, cable and communications optical cable |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108167018A (en) * | 2017-12-25 | 2018-06-15 | 中南大学 | For the continuous filling piping system and its method for arranging of big ore deposit section stage open stope mining with stowing |
Also Published As
Publication number | Publication date |
---|---|
CN105864517B (en) | 2018-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533446B (en) | Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs | |
CN101775988B (en) | Construction method for inclined shaft to main tunnel of weak surrounding rock | |
CN104612713B (en) | Construction method of tunnel in ultra-shallow buried section | |
CN106320346A (en) | Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting | |
CN105443143B (en) | A kind of coal mine gob roadway support device and its construction method | |
CN104533428B (en) | A kind of steep cliffs tunnel outlet engineering method | |
CN104989449B (en) | Filling mining pipeline erecting and filling method | |
CN205663447U (en) | Novel anchor net spouts compound supporting construction | |
CN106246204B (en) | The system that a kind of vehicular prevents tunnel vault surrounding rock collapse | |
CN105908625A (en) | Construction method for adding frame bridge under existing railway line based on dragging method | |
US8727319B2 (en) | System and method for installing fiber optic cable | |
CN207177932U (en) | A kind of single arch is without post greatly across the advanced support structure of Station | |
CN107119569A (en) | A kind of construction method of the oblique rock geology construction make-shift bridge of deep water shallow overburden | |
CN111379573A (en) | Connecting system for connecting shield tunnel in middle of oil and gas pipeline | |
CN107023310A (en) | The separate zone production quick lapping technique of large area | |
CN205189888U (en) | Tunnel supporting construction's grounding construction structure | |
CN105864517A (en) | Tube cable laying method for filling mining | |
CN108951642A (en) | The ruggedized construction and construction method of anti-pit accident on a kind of across existing tunnel | |
CN111677530B (en) | Safe construction method for three-step temporary inverted arch at tunnel through section | |
CN111425247B (en) | Downward access filling body false roof with built-in prefabricated metal mesh reinforcing structure and construction method thereof | |
CN205560001U (en) | A device is laid to pipe cable for cut -and -fill mining | |
CN105201529B (en) | Double tow ties up Flexible formwork assembly and its placement methods to a kind of gob side entry retaining crosswise | |
CN206360720U (en) | A kind of novel flexible filling isolation barricade | |
CN209066508U (en) | Cross the existing electric power piping lane protection structure of tunnel foundation pit | |
CN208235578U (en) | A kind of reserved bridge zone assembled barricade for reinforcing hole slot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181023 Termination date: 20190401 |