CN105863079B CN201610343377.6A CN201610343377A CN105863079B CN 105863079 B CN105863079 B CN 105863079B CN 201610343377 A CN201610343377 A CN 201610343377A CN 105863079 B CN105863079 B CN 105863079B
Authority
CN
China
Prior art keywords
partition board
sleeper
concrete filled
steel tube
tube coupled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610343377.6A
Other languages
Chinese (zh)
Other versions
CN105863079A (en
Inventor
黄育琪
郝际平
樊春雷
薛强
孙晓岭
刘斌
陈永昌
王磊
刘瀚超
何梦楠
尹伟康
赵子健
张峻铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Jianda Assembly Steel Structure Research Institute Co., Ltd.
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201610343377.6A priority Critical patent/CN105863079B/en
Publication of CN105863079A publication Critical patent/CN105863079A/en
Application granted granted Critical
Publication of CN105863079B publication Critical patent/CN105863079B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions

Abstract

Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method, including multi-chamber concrete filled steel tube coupled column and steel I-beam, the multi-chamber concrete filled steel tube coupled column includes the sleeper positioned at both ends, it is provided with parallel web between two sleeper, partition board is provided between web;It is provided with first on each sleeper and runs through partition board and second through partition board, first runs through partition board and the second and stretching sleeper horizontally disposed through partition board, and first runs through the top flange connection of partition board and steel I-beam, and second connects through the lower flange of partition board and steel I-beam.Due to running through partition board completely through sleeper, sleeper is stretched out through partition board, so through partition board lateral dimension compared with deck-siding, beam web is connected by doubly-linked fishplate bar with multi-chamber concrete filled steel tube coupled column, and the design criteria of " strong column and weak beam, the strong weak rod piece of node " is realized.Only run through sleeper through partition board, it is less to the weakening of column section, it is effectively guaranteed the vertical power transmission of multi-chamber steel core concrete column.

Description

Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method
Technical field
The present invention relates to through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method.
Background technology
Steel construction is a kind of building system of industrialization, meets standardized designs, batch production making, prefabricated construction, letter The building industrialization standard requirement of breathization management.Assembled in situization construction saving is a large amount of artificial, and waste material of constructing is few, energy-saving ring It protects.Steel column in steel structure system, girder steel, the components such as support, manually manufacturing still has sizable ratio, and steel column is mostly square rectangle Column, in residential application, there is steel column salient angle in interior, makes troubles to building arrangements.
Traditional concrete structure needs scene a large amount of artificial, and timber applies more, the dirts such as waste water, airborne dust in construction Dye is serious, does not meet the policy requirements of national energy-saving environmental protection.But shear wall structure system in concrete structure, it is preferably anti-providing While the rigidity of side, architectural composition is flexible.Especially in residential structure, shear wall is relatively thin, can have with building segmenting wall body Benefit combines, and provides the comfortable interior space.
Existing research is combined the shear wall structure in concrete structure with steel construction, proposes multi-chamber steel tube concrete local soil type This novel anti-lateral displacement component of zygostyle, give full play to concrete shear force wall architectural composition it is flexible while, have steel construction concurrently Manufacture the feature that industrialization degree is high, speed of application is fast.But node domain construction is complicated, manufactures of high cost.
Invention content
It is complicated in order to solve existing multi-chamber concrete filled steel tube coupled column bean column node construction, problem of high cost is manufactured, The purpose of the present invention is to provide through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method, construction letter Single, convenient and quick construction is convenient for industrialized production, and stock utilization is high, is conducive to save material, reduces cost.
To achieve the above object, the technical solution adopted by the present invention is:
One kind running through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, including multi-chamber concrete filled steel tube Coupled column and steel I-beam, the multi-chamber concrete filled steel tube coupled column include the sleeper positioned at both ends, are set between two sleeper It is equipped with parallel web, partition board is provided between web;Be provided on each sleeper first through partition board and second through every Plate, first is horizontally disposed through partition board through partition board and second and stretch out sleeper, and first through the upper of partition board and steel I-beam The edge of a wing connects, and second connects through the lower flange of partition board and steel I-beam.
The web of the steel I-beam is connected by connecting plate with multi-chamber concrete filled steel tube coupled column.
The connecting plate is arranged using fillet weld on multi-chamber concrete filled steel tube coupled column.
The web of the steel I-beam is connected with connecting plate by bolt.
The sleeper includes first segment sleeper, second segment sleeper and the third section sleeper being connected from bottom to top.
Described first is arranged through partition board between first segment sleeper and second segment sleeper, and second is arranged through partition board the Between two sections of sleeper and third section sleeper.
First stretches out the length of sleeper for 15mm through partition board and second through partition board.
Described first is connected through the top flange of partition board and steel I-beam by groove welding, and second runs through partition board and I-steel The lower flange of beam is connected by groove welding.
Described first offers through-hole through partition board and second on partition board.
A kind of assembly method through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, including following step Suddenly:
(1) run through positioning of the partition board on multi-chamber concrete filled steel tube coupled column through partition board and second according to first, first The first segment sleeper of each sleeper of multi-chamber concrete filled steel tube coupled column is welded, then by first through partition board to be welded on first segment dark Second segment sleeper is welded through the top of partition board first, then second is arranged through partition board in second segment sleeper in the top of column Top, finally second through partition board top be arranged third section sleeper;
(2) parallel web, the short side width of the distance between two webs and sleeper are set between two sleeper It is identical, and partition board is set between two webs, partition board is identical at a distance from the sleeper of both ends, completes multi-chamber steel tube concrete local soil type The assembly of zygostyle;
(3) connecting plate is welded to multi-chamber steel by the positioning according to connecting plate on multi-chamber concrete filled steel tube coupled column On each sleeper of pipe concrete coupled column;
(4) steel I-beam web is connected by screw bolts with connecting plate, and the top flange of steel I-beam and first is made to run through Partition board is concordant, and lower flange is concordant through partition board with second;
(5) sleeper part is stretched out in steel I-beam top flange with first through partition board by groove welding to be connected, by lower flange Sleeper part is stretched out with second through partition board by groove welding to be connected.
The present invention includes multi-chamber concrete filled steel tube coupled column, i-shape steel beam, penetration type partition board.It is passed through with general square steel tube It wears unlike iris type node, partition board runs through multi-chamber concrete filled steel tube coupled column both ends sleeper, and not through shaft, it saves Material, while reducing difficulty of construction, moreover it is possible to reduce the weakening to column section.Beam web and multi-chamber concrete filled steel tube coupled column It is bolted by vertical connecting plate.
Multi-chamber concrete filled steel tube coupled column both ends sleeper, through the position of partition board disconnect, spacing distance with pass through Wear that block board thickness size is identical, as through the junction of partition board and sleeper.
It is described to be connected with multi-chamber concrete filled steel tube coupled column sleeper using twin fillet wolt through partition board.
It is described to use groove welding and I-steel through sponson of the partition board outside multi-chamber concrete filled steel tube coupled column Lower flange is connected on beam.
The steel I-beam web is combined by doubly-linked fishplate bar using high-strength friction-type bolt and multi-chamber concrete filled steel tube Column is connected, and doubly-linked fishplate bar is connect with multi-chamber concrete filled steel tube coupled column by vertical fillet weld.
Compared with prior art, the beneficial effects of the invention are as follows:
1, due to running through partition board completely through sleeper, sleeper is stretched out through partition board, so through partition board lateral dimension compared with beam Width, beam web are connected by doubly-linked fishplate bar with multi-chamber concrete filled steel tube coupled column, and " strong column and weak beam, the strong weak bar of node are realized The design criteria of part ".
2, sleeper has only been run through due to running through partition board, without completely through multi-chamber concrete filled steel tube coupled column, to column The weakening in section is less, is effectively guaranteed the vertical power transmission of multi-chamber steel core concrete column.
3, the node with generally completely through iris type multi-chamber steel core concrete column bean column node compared with, reduce processing When welding job amount, joint structure is simpler, stock utilization higher, be conducive to save material, reduce environmental pollution, more Add environmentally protective.
4, the node is compared with general external partition formula node, and welding job amount is less and easy for construction when construction, can be effective Guarantee construction quality and speed of application.
Description of the drawings
Fig. 1 is through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node facade structural map;
Fig. 2 is that steel I-beam connect detail drawing with multi-chamber concrete filled steel tube coupled column;
Fig. 3 is through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node area's internal structure detail drawing;
Fig. 4 is through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node graphics;
Fig. 5 is through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node three-dimensional explosive view.
Fig. 6 is that schematic diagram is surrendered in lower flange on beam.
Fig. 7 is that beam-ends plastic hinge schematic diagram occurs.
Fig. 8 is that cover board destroys schematic diagram.
Fig. 9 is final destruction schematic diagram.
Figure 10 is hysteresis loop figure.
In figure, 1 is steel I-beam, and 2 be multi-chamber concrete filled steel tube coupled column, and 3 be multi-chamber steel core concrete column sleeper Part, 4 run through partition board for first, and 5 be connecting plate, and 6 run through partition board for second.
Specific implementation mode
Referring to figs. 1 to Fig. 5, the present invention includes multi-chamber concrete filled steel tube coupled column, multi-chamber concrete filled steel tube coupled column Setting runs through partition board 6 there are two spaced first through partition board 4 and second on each sleeper at both ends, and described first runs through Partition board 4 and second offers through-hole on partition board 6.First through partition board 4 and second through partition board 6 be horizontally disposed with and Sleeper is stretched out, first connect through partition board 4 with the top flange of steel I-beam 1, and second runs through the bottom wing of partition board 6 and steel I-beam 1 Edge connects.The web of steel I-beam 1 is connected by connecting plate 5 with multi-chamber concrete filled steel tube coupled column 2.Sleeper wraps from bottom to top Include the first segment sleeper being connected, second segment sleeper and third section sleeper.
As shown in Figure 1 to Figure 3, it is horizontal positioned through partition board 4, and concordant with the edge of a wing of steel I-beam 1, it is complete through partition board Entirely on the outside of sleeper and stretching sleeper, the length through partition board stretched out on the outside of sleeper is 15mm.
Stretch out sleeper part through partition board 4 takes groove welding to be connected with the top flange of steel I-beam 1, lower flange.
As shown in Figure 1 to Figure 3, the web of steel I-beam 1 passes through connecting plate 5 and 2 phase of multi-chamber concrete filled steel tube coupled column Even, it is bolted using high strength friction type between the web and connecting plate 5 of steel I-beam 1, connecting plate 5 is using fillet weld and more Chamber concrete filled steel tube coupled column 2 is connected.
The above-mentioned assembly method through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, including walk as follows Suddenly:
(1) fixed on the sleeper of multi-chamber concrete filled steel tube coupled column 2 through partition board 6 through partition board 4 and second by first Position.
(2) run through positioning of the partition board 6 on multi-chamber concrete filled steel tube coupled column 2 through partition board 4 and second according to first, The first segment sleeper of multi-chamber concrete filled steel tube coupled column sleeper is first welded, then by first through partition board 4 to be welded on first segment dark Second segment sleeper is welded in the top of column first through the top of partition board 4, then dark in second segment through the setting of partition board 6 by second The top of column is finally arranged third section sleeper through the top of partition board 6 second, completes the assembly of sleeper.
(3) parallel web, the short side width of the distance between two webs and sleeper are set between two sleeper It is identical, and partition board is set between two webs, partition board is identical at a distance from the sleeper of both ends, completes multi-chamber steel tube concrete local soil type The assembly of zygostyle.
(4) connecting plate 5 is positioned on multi-chamber concrete filled steel tube coupled column 2.
(5) connecting plate 5 is welded to multi-chamber by the positioning according to connecting plate 5 on multi-chamber concrete filled steel tube coupled column 2 On each sleeper of concrete filled steel tube coupled column 2.
(6) 1 web of steel I-beam is bolted with connecting plate 5 using high strength friction type, and makes the upper of steel I-beam 1 The edge of a wing is concordant through partition board 4 with first, and lower flange is concordant through partition board 6 with second.
(7) the stretching sleeper part that plate 6 is run through into 1 top flange of steel I-beam through partition board 4, lower flange with first with second It is connected by groove welding.
A kind of construction of present invention offer is more simple and practical, manufactures the lower bean column node of cost, is possessing steel construction assembly While the features such as change construction, speed of application is fast, moreover it is possible to ensure that bean column node possesses enough intensity, meet " strong column and weak beam, by force The requirement of the weak rod piece of node ", the popularization to current multi-chamber concrete filled steel tube coupled column, will play great impetus.
The anti-seismic performance of the failure mode to the present invention and node illustrates below.
It is now to arrange the mechanical property for illustrating novel joint with multi-cavity steel tube concrete coupled column-girder steel U-shaped rigid joint. Finite element analysis is carried out to node using ABAQUS softwares, node column is the multi-cavity steel tube concrete coupled column of 200x600, Liang Cai With the welding H-bar of H350x150x6x10, dual-sided board and cover sheet thickness are with flange of beam the same as thick at node.Finite element analysis As a result as follows.
1. failure mode
Multi-cavity steel tube concrete coupled column-girder steel rigid connection node of the present invention, due to using multi-cavity steel tube concrete Coupled column, steel pipe have stronger effect of contraction to concrete, and the bearing capacity and ductility of shaft entirety are relatively good, realize strong The weak beam of column, the design requirement of the strong weak component of node.The destruction sequence of the connecting node of the present invention is as Figure 6-9.(1) work as level When outer force effect, lower flange initially enters plasticity on node region beam-ends, and cover board and side plate are in addition to small part area of stress concentration Domain surrender is outer, remaining most of region steel is still in elastic stage (as shown in Figure 6).(2) as external force increases, beam-ends prior to There is plastic hinge (as shown in Figure 7) first in other parts, and deck portion region steel, which are surrendered, at this time enters the plastic stage, and side plate Except small part area of stress concentration is overseas, most of region steel are still in elastic stage.(3) since the reinforcing of steel material is made With when external force load persistently increases, cover board both sides are surrendered with side plate join domain steel plate shearing, and steel enter plasticity rank Section, node side plate major part region is still in elastic stage at this time, and only small part stress raiser steel plate surrender is (such as Fig. 8 institutes Show).(4) as shown in figure 9, being continuously increased with load, structure is finally destroyed, lower flange buckling on beam-ends at this time, and side plate Still only part enters the plastic stage, and the side plate of node region is most of still in elastic stage.
2. the anti-seismic performance of node
According to conceptual Design of Earthquake Resistance principle, structure should have multiple tracks and provide fortification against earthquakes line, avoid leading because partial component is destroyed It causes integral system to destroy, while also requiring structure that should have necessary intensity, good deformability and energy dissipation capacity.The present invention Rigid connection node pass through the node connector that full-height side plate and cover board are constituted in such a way that column is isolated with beam-ends To transmit beam-ends moment of flexure and shearing.
Due to above-mentioned destruction sequence, when geological process, there is plastic hinge first in beam-ends, consumes certain seismic energy Amount, back shroud shear yielding, further dissipate seismic energy, final when destroying, node region side plate only partly surrender into Enter plasticity, it is most of still in elastic stage.Overall structure meets the design principle of " strong column and weak beam, the strong weak component of node ".
Before ductility refers to structure or destroys, bearing capacity without being subjected to inelastic deformation ability under conditions of significant decrease, In the Aseismic Design of structure, Ductility Index is a key property.Multi-cavity steel tube concrete coupled column-girder steel U-shaped has just connect section The story drift of point is 7% -10%, meets China's code requirement.
When structure is in geological process, there are one the time-continuing processes of energy absorption and dissipation for structure.When structure enters bullet When mecystasis, anti-seismic performance depends primarily on component energy dissipation capacity.The face that load phase curve is surrounded in hysteresis loop Product can reflect that structure absorbs the size of energy;And the area that curve is surrounded when curve when unloading and load is Dissipated energy Amount.These energy be by the interior frictional resistance or local damage of material will quantitative change be heat energy dissipation to space in.Lost Energy is more, and the possibility that structure is destroyed is smaller.Due to above-mentioned destruction of a node sequence, beam-ends and cover board successively dissipate largely Seismic energy, final guarantee node have preferable energy dissipation capacity.As shown in Figure 10, the hysteresis loop of node is full, does not have Apparent Draw shrinkage, dissipate a large amount of seismic energies, and the energy dissipation capacity of node is good, has stronger anti-seismic performance.

Claims (7)

1. one kind running through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, which is characterized in that including multi-chamber Concrete filled steel tube coupled column and steel I-beam (1), the multi-chamber concrete filled steel tube coupled column include the sleeper positioned at both ends, and two It is provided with parallel web between a sleeper, partition board is provided between web;It is provided with first on each sleeper and runs through partition board (4) and second runs through partition board (6), and first is horizontally disposed with through partition board (6) through partition board (4) and second and stretches out sleeper, the One connect through partition board (4) with the top flange of steel I-beam (1), and second connects through partition board (6) and the lower flange of steel I-beam (1) It connects;
The sleeper includes first segment sleeper, second segment sleeper and the third section sleeper being connected from bottom to top;
Described first is arranged through partition board (4) between first segment sleeper and second segment sleeper, and second is arranged through partition board (6) Between second segment sleeper and third section sleeper;
The web of the steel I-beam (1) is connected by connecting plate (5) with multi-chamber concrete filled steel tube coupled column (2).
2. one kind according to claim 1 runs through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, It is characterized in that, the connecting plate (5) is arranged using fillet weld on multi-chamber concrete filled steel tube coupled column (2).
3. one kind according to claim 1 runs through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, It is characterized in that, the web of the steel I-beam (1) is connected with connecting plate (5) by bolt.
4. one kind according to claim 1 runs through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, It is characterized in that, first stretches out the length of sleeper for 15mm through partition board (4) and second through partition board (6).
5. one kind according to claim 1 runs through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, It is characterized in that, described first is connect with the top flange of steel I-beam (1) by groove welding through partition board (4), and second runs through partition board (6) it is connect by groove welding with the lower flange of steel I-beam (1).
6. one kind according to claim 1 runs through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, It is characterized in that, described first offers through-hole through partition board (4) and second on partition board (6).
7. a kind of assembly method through iris type multi-chamber concrete filled steel tube coupled column axle i-beam node, which is characterized in that Include the following steps:
(1) determine on multi-chamber concrete filled steel tube coupled column (2) through partition board (6) through partition board (4) and second according to first Position, first welds the first segment sleeper of each sleeper of multi-chamber concrete filled steel tube coupled column, then first is welded on through partition board (4) Second segment sleeper is welded through the top of partition board (4) first, then second is set through partition board (6) in the top of first segment sleeper It sets at the top of second segment sleeper, third section sleeper finally is set through the top of partition board (6) second;
(2) parallel web is set between two sleeper, the distance between two webs and the short side of sleeper are of same size, And partition board is set between two webs, partition board is identical at a distance from the sleeper of both ends, completes multi-chamber concrete filled steel tube coupled column Assembly;
(3) connecting plate (5) is welded to multi-cavity by the positioning according to connecting plate (5) on multi-chamber concrete filled steel tube coupled column (2) On each sleeper of room concrete filled steel tube coupled column (2);
(4) steel I-beam (1) web and connecting plate (5) are connected by screw bolts, and make the top flange and first of steel I-beam (1) Concordantly through partition board (4), lower flange is concordant through partition board (6) with second;
(5) sleeper part is stretched out in steel I-beam (1) top flange with first through partition board (4) by groove welding to be connected, by bottom wing Edge stretches out sleeper part through partition board (6) with second and is connected by groove welding.
CN201610343377.6A 2016-05-20 2016-05-20 Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method Active CN105863079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610343377.6A CN105863079B (en) 2016-05-20 2016-05-20 Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610343377.6A CN105863079B (en) 2016-05-20 2016-05-20 Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method

Publications (2)

Publication Number Publication Date
CN105863079A CN105863079A (en) 2016-08-17
CN105863079B true CN105863079B (en) 2018-08-31

Family

ID=56634607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610343377.6A Active CN105863079B (en) 2016-05-20 2016-05-20 Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method

Country Status (1)

Country Link
CN (1) CN105863079B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049256A (en) * 2020-09-21 2020-12-08 河南工业大学 Anchoring type steel reinforced concrete beam and steel pipe concrete column connecting node

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205712508U (en) * 2016-05-20 2016-11-23 西安建筑科技大学 Run through iris type multi-chamber concrete filled steel tube coupled column steel beam joint

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2824023B2 (en) * 1994-11-29 1998-11-11 淳 中川 Shaped steel joining method
CN2693848Y (en) * 2004-05-20 2005-04-20 上海拜特钢结构设计有限公司 Perforated diaphragm plate type quadrate column beam connection node structure
CN202767252U (en) * 2012-09-04 2013-03-06 山东科技大学 Inner separating board type concrete filled square steel tube column and H type girder semi-rigid node
CN102936924A (en) * 2012-11-08 2013-02-20 沈阳建筑大学 Girder embedding ribbed through partition square concrete filled steel tube column-H-shaped girder combination nodes
CN103161224A (en) * 2013-03-07 2013-06-19 天津大学 Rectangular concrete filled steel tubular column - steel beam connection node and construction methods thereof
CN104047364A (en) * 2014-05-05 2014-09-17 浙江杭萧钢构股份有限公司 Novel steel beam and steel tube bundle combined structure shear wall connection node

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205712508U (en) * 2016-05-20 2016-11-23 西安建筑科技大学 Run through iris type multi-chamber concrete filled steel tube coupled column steel beam joint

Also Published As

Publication number Publication date
CN105863079A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN105839793B (en) Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method
CN109667354B (en) Vertical energy dissipation seam connecting device of assembled shear force wall
CN105926810A (en) Fabricated energy dissipation frame shear wall
CN105863082B (en) T shapes run through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method
CN206625402U (en) A kind of side intersection of cracking is put more energy into profiled sheet shear wall
CN205712508U (en) Run through iris type multi-chamber concrete filled steel tube coupled column steel beam joint
CN105863056B (en) A kind of dual-sided board bolt joint and assembly method for beam column
CN205975968U (en) A take curb plate bolt node for eccentric beam column
CN105821968B (en) Multi-cavity steel tube concrete coupled column and girder steel U-shaped connecting node and assembly method
CN105863081B (en) Multi-cavity steel tube concrete coupled column and girder steel bolt connection node and assembly method
CN205637169U (en) Two curb plates support node of apron is stretched to outband of beam -ends concatenation
CN110924566A (en) Steel frame infilled CLT plate constraint steel plate shear wall combined structure
CN105863079B (en) Through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method
CN105863080B (en) A kind of bilateral plate node and assembly method by lower flange connection
CN106013466B (en) A kind of bolted bilateral plate node and assembly method
CN209339326U (en) A kind of steel-concrete combined joint
CN205712509U (en) T-shaped runs through iris type multi-chamber concrete filled steel tube coupled column steel beam joint
CN205677091U (en) A kind of bolted dual-sided board node
CN105821976A (en) Supporting inserted type beam column supporting two-sided plate joint
CN205637170U (en) Multicavity steel pipe -concrete composite post and girder steel rigid connection node
CN205637172U (en) Multicavity steel pipe -concrete composite post and girder steel bolted connection node
CN205776787U (en) A kind of support plug-in type beam column supporting bilateral plate node
CN106032683B (en) A kind of bolt connection node and assembly method for eccentric beam column
CN212317231U (en) Assembled steel-bamboo combined shear wall with damper
CN205637143U (en) A bolted connection node for eccentric beam column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 710055 Shaanxi province Xi'an Beilin District Yanta Road No. 13

Patentee after: Xi'an construction division big Assets Management Co., Ltd.

Address before: 710055 Shaanxi province Xi'an Beilin District Yanta Road No. 13

Patentee before: Xi'an Architectural Sci & Tech. Univ.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190813

Address after: 710055 Campus of Xi'an University of Architectural Science and Technology, No. 13 Yanta Road, Beilin District, Xi'an City, Shaanxi Province

Patentee after: Xi'an Jianda Assembly Steel Structure Research Institute Co., Ltd.

Address before: 710055 Shaanxi province Xi'an Beilin District Yanta Road No. 13

Patentee before: Xi'an construction division big Assets Management Co., Ltd.