CN1058541C - Construction process of herringbone retaining wall - Google Patents

Construction process of herringbone retaining wall Download PDF

Info

Publication number
CN1058541C
CN1058541C CN 94110940 CN94110940A CN1058541C CN 1058541 C CN1058541 C CN 1058541C CN 94110940 CN94110940 CN 94110940 CN 94110940 A CN94110940 A CN 94110940A CN 1058541 C CN1058541 C CN 1058541C
Authority
CN
China
Prior art keywords
retaining wall
herringbone
layer
wall
construction process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94110940
Other languages
Chinese (zh)
Other versions
CN1115820A (en
Inventor
吴莺荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 94110940 priority Critical patent/CN1058541C/en
Publication of CN1115820A publication Critical patent/CN1115820A/en
Application granted granted Critical
Publication of CN1058541C publication Critical patent/CN1058541C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Retaining Walls (AREA)

Abstract

The present invention relates to a construction method for a herringbone retaining wall. Prefabricated parts of the herringbone retaining wall are arranged in design positions according to design requirements. Firstly, foundations are smoothed, drainage pipes are arranged, the foundations are tamped with pebbles to form a pebble basal layer, a cement sand layer or a concrete layer is arranged on the pebble basal layer, a patter setting datum line (a straight line or an arc line) is arranged on the cement sand layer or the concrete layer, the retaining wall is hoisted and arranged, and the wall back is filled with pebbles and a soil layer. The present invention has the advantages of reasonable design and convenient construction. The construction method is suitable for hillsides, roads, water channels, etc. and has a stable structure with larger soil pressure resistance and water pressure resistance.

Description

Construction process of herringbone retaining wall
The present invention relates to slope protection works, further is the retaining wall engineering.
Present China rapid economic development; various civil engineerings emerge in an endless stream like rain the back spring bamboo; therefore for the safety of protecting major project and the natural, ecological of protecting surrounding environment; particularly for railway, highway engineering; mine development; the stable slope protection works with natural environment in necessary maintenance hillside has more appearred in the industry of rivers and creeks bank protection and knob and civilian construction.Existing slope protection works roughly has following several processing method:
1, adopt the nature bank protection, this kind mode not only ground works is big, and takies a large amount of soils, does not obviously conform with modern requirement.
2, grout cobble or pitched work, this method is applicable to the preferably little engineering of geological condition, and is relatively poor for large-engineering or geological condition, because of building stones collection and transportation difficulty, and inapplicable.
3, gravity concrete retaining wall, normal palpus in-site pouring concrete, and relatively poor to the strain capacity of soil pressure and water pressure on mechanics.
4, font of falling T or L font retaining wall are present widely used methods, but consider that from the mechanics angle soil pressure that its upstanding wall can bear is still undesirable.
The present invention is directed to above-mentioned situation and propose a kind of job practices of herringbone retaining wall, its purpose is to provide a kind of easy construction, the retaining wall job practices that is applicable to various landform that cost is low; Another object of the present invention provides a kind of relative T font and L font retaining wall, has the retaining wall job practices of better mechanical property.
Technical scheme of the present invention (can concentrate on prefabrication and transport to the job location for using a kind of herringbone retaining wall prefabricated component, also can be prefabricated at the scene the back for construction with) install by engine request, and before construction, fix a drainpipe and carry out Foundation Design.
Details are as follows in conjunction with the accompanying drawings in the present invention, wherein:
Fig. 1 is a herringbone retaining wall engineering schematic perspective view;
Fig. 2 is herringbone retaining wall construction schematic cross-section;
Fig. 3 is herringbone retaining wall stress distribution and physical dimension schematic diagram;
Fig. 4 is the herringbone retaining wall schematic diagram that is used for road;
Fig. 5 is the herringbone retaining wall schematic diagram that is used for stablizing the hillside;
Fig. 6 is the herringbone retaining wall schematic diagram that is used for the water route.
As shown in Figure 2, ground is at first put at the place in order at the installation retaining wall, if then must on the layer eliminating phreatic gutter (2) be set forever thoroughly when underground water is arranged, ram with cobble then and fill out basic boulder bed (3), (5), the surface configuration of this basis boulder bed should match with the bottom shape of herringbone retaining wall (8), establishes the thick cement sand bed of 3-4cm or base concrete layer (4) and (6) again on basic boulder bed.The rule directrix (straight line or camber line) that the retaining wall sole is drawn in designing requirement is pressed on its surface again after cement mortar or concrete setting, again prefabricated retaining wall is sling, make on its rule directrix that fitly is arranged in setting in placely, and fix with cement mortar at the joint of two barricades.After cobble (7) was filled up at herringbone retaining wall (8) back, banket (1) made it to become a complete slight slope again at last.
The architectural feature of herringbone retaining wall of the present invention is made up of a stalk and former and later two soles as shown in Figure 3, and sole (being the right crus of diaphragm plate among Fig. 3) is greater than forefoot plate thereafter, if having set the height of retaining wall is h, then sole length is 0.40725h thereafter, forefoot plate is 0.375h, and stalk end thickness is 2 * 0.025h (the strong wall dotted line on one's body of retaining soil is represented spilled water hole among Fig. 3).
Herringbone retaining wall of the present invention is applicable to various landform and different purposes, and following embodiment is illustrated respectively.
Embodiment 1, and to be applied to geological conditions relatively poor when retaining wall, during domatic higher location, can vertically arrange three gear cob walls as shown in Figure 1 continuously, also can be more when needing.
Embodiment 2, when retaining wall is applied to domatic quite high location, can every a segment distance one gear cob wall be set in vertical direction as shown in Figure 5 according to geological conditions.
Embodiment 3, and Fig. 4 represents to utilize the invention process on highway construction, establish line-up's font retaining wall at the end, road slope, and settle number gear cob wall (being three rows among Fig. 4) on the side slope of excavating out.
Embodiment 4, and Fig. 6 represents that herringbone retaining wall of the present invention is applied to water channel, and the construction section of water channel etc. is arranged.
Embodiment 5, Fig. 3 represents the appearance and size of retaining wall of the present invention and the situation of drag, and h represents the wall height among the figure, and 0.40725h is a back sole length, 0.375h be forefoot plate length, Wc is the deadweight of wall body, and Ww conducts oneself with dignity for the above soil body in basis within the walls, E be within the walls the side group plinth with pressure that upper part was born, P is making a concerted effort of Ww and E, δ=Φ=30 ° are angle of internal friction, ° the elevation angle, ψ=60 for the P that makes a concerted effort, and 0.241b is the arm of force of Ww.

Claims (2)

1, a kind of construction process of herringbone retaining wall, it comprises the steps:
A, arrangement ground, the cleaning basis;
B, at the default gutter of impervious layer;
C, rammer are filled out basic cobble, and the bottom of aspect and herringbone retaining wall is coincide;
D, on basic boulder bed, establish cement sand bed or layer of concrete;
E, after the rule directrix of the engineering of drawing by design on cement sand bed or the layer of concrete lifting retaining wall prefabricated component;
Fill boulder bed and soil layer behind f, the wall.
By the described construction process of herringbone retaining wall of claim 1, it is characterized in that 2, the overall dimensions of herringbone retaining wall are such, forefoot plate length is 0.375h, and back sole length is 0.40725h, and the wall tip thickness is 2 * 0.25h, and above-mentioned h is the wall height.
CN 94110940 1994-04-22 1994-04-22 Construction process of herringbone retaining wall Expired - Fee Related CN1058541C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94110940 CN1058541C (en) 1994-04-22 1994-04-22 Construction process of herringbone retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94110940 CN1058541C (en) 1994-04-22 1994-04-22 Construction process of herringbone retaining wall

Publications (2)

Publication Number Publication Date
CN1115820A CN1115820A (en) 1996-01-31
CN1058541C true CN1058541C (en) 2000-11-15

Family

ID=5034856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94110940 Expired - Fee Related CN1058541C (en) 1994-04-22 1994-04-22 Construction process of herringbone retaining wall

Country Status (1)

Country Link
CN (1) CN1058541C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418575B (en) * 2007-10-23 2010-10-06 中铁第一勘察设计院集团有限公司 L-shaped retaining wall, construction method and detection method thereof
CN102031759A (en) * 2009-09-28 2011-04-27 王全祥 Novel method for stabilizing and controlling sand by multifunctional windbreak wall
CN103210861B (en) * 2013-04-11 2018-09-25 杨成胜 Lake purse net reinforcement setting method
CN111851539A (en) * 2020-08-27 2020-10-30 北交智汇千路(北京)科技有限公司 Groove type anti-slide pile for slope structure safety and construction method thereof

Also Published As

Publication number Publication date
CN1115820A (en) 1996-01-31

Similar Documents

Publication Publication Date Title
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN109610435B (en) Loess high fill valley foundation drainage structure and laying method thereof
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN107100180A (en) Superelevation light supporting structure and improvement high roadbed, the method for high slope engineering
CN107794946B (en) Underground comprehensive pipe rack structure deeply buried in soft soil and construction method thereof
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN1563671A (en) Dormant digging and separating construction method for underground two layers and multilayer composite lining structure
CN106049196A (en) Construction method of ballastless track subgrade with combined flexible piles and pile rafts at same fracture surfaces
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN100513705C (en) Underground Beam-Pile Frame Structure for Slope Reinforcement
CN111648383A (en) Internal drainage method for loess high-fill side slope
CN205348221U (en) Merogenesis formula prefabricated barricade building block and retaining wall structure on an empty stomach
CN206844132U (en) Superelevation light supporting structure
CN1058541C (en) Construction process of herringbone retaining wall
CN204252164U (en) A kind of Submersed type active well
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN105821902B (en) The light-duty armored concrete Ecological Retaining Wall construction method of vertical lattice
CN1348037A (en) Continuous wall foundation pit supporting method with short brad
CN217681768U (en) Ultra-long communication channel frozen wall melting and sinking grouting system
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof
CN205874851U (en) Ballastless track roadbed structure is made up with stake raft with section to flexible stake
CN210151776U (en) Structure of balance weight type retaining wall
CN212000674U (en) Novel reverse construction method assembly type non-pressure culvert

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee