CN105839527B - A kind of cladding system for bridge expanssion joint - Google Patents

A kind of cladding system for bridge expanssion joint Download PDF

Info

Publication number
CN105839527B
CN105839527B CN201610233473.5A CN201610233473A CN105839527B CN 105839527 B CN105839527 B CN 105839527B CN 201610233473 A CN201610233473 A CN 201610233473A CN 105839527 B CN105839527 B CN 105839527B
Authority
CN
China
Prior art keywords
extension
dop
disengagable
bridge
shear pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610233473.5A
Other languages
Chinese (zh)
Other versions
CN105839527A (en
Inventor
杜传锟
宋丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianyungang Ganyu District comprehensive inspection and Testing Center
Original Assignee
Ganyu District Productivity Promotion Center Lianyungang
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ganyu District Productivity Promotion Center Lianyungang filed Critical Ganyu District Productivity Promotion Center Lianyungang
Priority to CN201610233473.5A priority Critical patent/CN105839527B/en
Publication of CN105839527A publication Critical patent/CN105839527A/en
Application granted granted Critical
Publication of CN105839527B publication Critical patent/CN105839527B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/062Joints having intermediate beams
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of cladding system for bridge expanssion joint, for being covered at the road surface to bridge expanssion joint, including the rubber body flushed with the level height of bridge pavement(9), positioned at the rubber body(9)Internal supporter(8)And can be in the supporter(8)In towards and away from two symmetrical extension support members of mobile and structure(7), wherein, described two extension support members(7)In each include can be in the supporter(8)Chute(81)The horizontal extension head that reclaimed water is smoothly moved(721)And the horizontal extension head(721)The vertical extension of connection(72)And with the vertical extension(72)Lower end connection and the support arm extended towards adjacent bridge structure body(71), wherein, described two extension support members(7)End be provided with support plate to be abutted with the adjacent bridge structure body(73).

Description

A kind of cladding system for bridge expanssion joint
Technical field
The present invention relates to bridge field, specially a kind of cladding system for bridge expanssion joint.
Background technology
The road surface of bridge is often provided with expansion joint, to provide the allowance expanded with heat and contract with cold.For traffic safety and dimension The performance of bridge pavement is protected, generally requires to carry out elastomeric objects filling or covering to this expansion joint.Known mode is Covered or clogged using materials such as elastic caoutchoucs.But the installation of this elastic rubber material needs the matrix of road pavement The reprocessing such as surface cutting is carried out, it is in place to install the elastomeric material.And this is easily caused when driving to these Working position, which produces, damages and then damages road surface matrix.And the installation and removal for this elastomeric material are also required to expend greatly Measure manpower and time cost.
The content of the invention
It is an object of the invention to provide a kind of cladding system for bridge expanssion joint, and it can overcome of the prior art Defect.
According to the cladding system for bridge expanssion joint of the present invention, for being covered at the road surface to bridge expanssion joint Lid, including flushed with the level height of bridge pavement rubber body, the supporter inside the rubber body, Yi Jineng Enough two extension support members in the supporter towards and away from mobile and structure symmetrically, wherein, it is described two to prolong Stretch in support member it is each include can the horizontal extension head that the chute reclaimed water of the supporter is smoothly moved, with the water The vertical extension of flat extension head connection and it is connected with the lower end of the vertical extension and towards adjacent bridge structure Body extension support arm, wherein, it is described two extension support members ends be provided with to the adjacent bridge structure The support plate that body abuts, is provided with to be inserted on the end face of the support plate and is arranged on the adjacent bridge structure body Shearing hole in shear pin, and the shear pin is the metal material being magnetized;Wherein, one in two extension support members Vertical extension be fixedly installed disengagable lock hook, another vertical extension is fixedly installed corresponding disengagable lock Determine dop, operation of the cross section for ellipse is provided between the disengagable lock hook and the disengagable locking dop Bar, the action bars are rotatably supported in the support rod being fixedly connected with the bridge structure body;Wherein, it is described disengagable Lock hook includes upper flexible extension that is connected with adjacent bridge structure body and tilting down, consolidated with the upper flexible extension Vertical extension even and the gib head protuberance positioned at the lower end of extension vertically;The disengagable locking dop Including connected with adjacent bridge structure body and acclivitous lower flexible extension, positioned at the lower flexible extension end Dop portion, when the disengagable lock hook with it is described it is disengagable locking dop be in mutually locking state when, the gib head is convex Go out portion and engaged with the adjacent surface in the dop portion and link locking so as to realize, now, the ellipse of the cross section of the action bars Major axis be horizontal direction;When the oval major axis that the action bars is rotated to cross section is vertical direction, the gib head The adjacent surface in protuberance and the dop portion departs from so as to realize unblock, now, described two extension support members can located at Therebetween cause the support plate to be pressed on adjacent bridge structure body in the presence of top pressure spring and cause institute Shear pin is stated to be inserted into corresponding shearing hole;The magnet of the adsorbable shear pin is installed on the inwall in the shearing hole, When the shear pin is by the magnet adsorption, it can make the rubber body is firm to be arranged in bridge expanssion joint;The chute Left end is provided with elastic contact switch, and LED light is provided with the groove of the rubber body, when the shear pin is inserted into When in corresponding shearing hole, the horizontal extension head in left side contacts in leftward position, and with the elastic contact switch, now institute State LED light to light, to prompt the shear pin to have been inserted into corresponding shearing hole.
By the present invention, due to there is provided can elastic top open and two support arm parts away from each other, by with base Supported hole on the side of body coordinates and can be by the elastomeric material at road surface by the friction of end card and matrix side Supporting is in place and is flushed with road surface.And this device is easily installed, reason is, it is before the mounting by being arranged on two Hook part and dop part between support arm it is sealed, enable to two support arms to be in contraction state close to each other, Therefore it is easy in the gap that is successfully inserted between matrix, when needing to be secured in place the cladding system, passes through and operate tool There is the elliptic cross-section action bars of long shape shaft, enable to hook part and the dop part to disengage, so as to by elastic top The elastic top opening force of splenium part and by the end top pressure of two support arms to matrix side to realize fixation.More importantly, when When the action bars with elliptic cross-section is in the contraction state vertical with the disengaged condition, by extruding opposite to each other or Described two support arms are pushed, described two support arms can be close to each other and cause hook part and the dop component elasticity Deform and be changed into locked state from disengaged condition so as to which the cladding system is converted into contraction state.This can manufactured Finish and the conversion operation of this contraction state is carried out when transporting the cladding system, can also need cladding system from flexible Taken when being removed in gap.This by pushing is by with from respective arm automatically into the performance of locked state And the setting of flexible rod portion inclined toward each other and hook part and dop part when close to each other with being engaged with each other Respective guiding surface sets to realize.And by setting the action bars when in the plumbness, it is permitted Perhaps described hook part moves enough amounts to allow chain close of the hook to disengage towards the action bars, and described two pushing Support arm is close to each other so that the action bars can be servo-actuated when entering locked state or slave mode is followed and freely rotated to keep away Exempt to interfere the sealed action.Whole device is simple in construction, and operation is ingenious, can easily operate to realize that installation and removal are made With so as to save the time of installation and removal and cost of labor, and use is reliable, stabilized structure.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the cladding system of the present invention, there is shown with described two extension support members each other Sealed state;
Fig. 2 shows cladding system in Fig. 1 in released state, i.e., state when two extension support members are disconnected from each other; Now the cladding system is installed in place in bridge expanssion joint.
Fig. 3 is the specific enlarged diagram of the disengagable lock hook in Fig. 1 and disengagable dop.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
According to a kind of cladding system for bridge expanssion joint of embodiment, for being carried out at the road surface to bridge expanssion joint Covering, including flushed with the level height of bridge pavement rubber body 9, the supporter 8 inside the rubber body 9, And can in the supporter 8 towards and away from two extension support members 7 that mobile and structure is symmetrical, wherein, institute State each horizontal extension for including smoothly moving in the reclaimed water of chute 81 of the supporter 8 in two extension support members 7 Head 721, the vertical extension 72 being connected with the horizontal extension head 721 and the lower end company with the vertical extension 72 The support arm 71 for connecing and extending towards adjacent bridge structure body, wherein, the end of described two extension support members 7 is provided with To the support plate 73 abutted with the adjacent bridge structure body, it is provided with to insert on the end face of the support plate 73 To the shear pin 731 being arranged in the shearing hole 31 of the adjacent bridge structure body, and the shear pin 731 is magnetized Metal material;Wherein, the vertical extension 72 of one in two extension support members 7 is fixedly installed disengagable lock hook 79, Another vertical extension 72 is fixedly installed corresponding disengagable locking dop 78, in the disengagable lock hook 79 and institute State and be provided with action bars 6 of the cross section for ellipse between disengagable locking dop 78, the action bars 6 is rotatably supported in In the support rod 61 being fixedly connected with the bridge structure body;Wherein, the disengagable lock hook 79 includes and adjacent bridge The vertical extension that the upper flexible extension 791 and the upper flexible extension 791 that structure is connected and tilted down are connected 792 and the gib head protuberance 793 of the lower end positioned at the vertical extension 792;The disengagable locking dop 78 wraps Include connected with adjacent bridge structure body and acclivitous lower flexible extension 781, positioned at the lower end of flexible extension 781 Dop portion 782 at end, when the disengagable lock hook 79 is in mutually locking state with the disengagable locking dop 78, The gib head protuberance 793 engages with the adjacent surface in the dop portion 782 and links locking so as to realize, now, the action bars 6 The oval major axis of cross section be horizontal direction;When the oval major axis that the action bars 6 is rotated to cross section is perpendicular Nogata to when, the adjacent surface in the gib head protuberance 793 and the dop portion 782 departs from so as to realize unblock, now, described two Individual extension support member 7 can cause the support plate 73 to be pressed on phase in the presence of top pressure spring 75 therebetween On adjacent bridge structure body and the shear pin 731 is sheared in hole 31 corresponding to being inserted into;It is described to shear the interior of hole 31 The magnet 32 of the adsorbable shear pin 731 is installed on wall, when the shear pin 731 is adsorbed by the magnet 32, can be made The rubber body 9 is firm to be arranged in bridge expanssion joint;The left end of chute 81 is provided with elastic contact switch 51, the rubber LED light 52 is installed in the groove of glue body 9, when in shearing hole corresponding to the shear pin 731 is inserted into, left side Horizontal extension head 721 contacts in leftward position, and with the elastic contact switch 51, and now the LED light 52 lights, To prompt the shear pin 731 to have been inserted into corresponding shearing hole.
Valuably, wherein, it is described to be provided with sliding bevel portion between extension 792 and the gib head protuberance 793 vertically 790, be provided with the outer upper in the dop portion 782 corresponding to dop sliding bevel 780, when described two extension supports When part 7 is recovered to lock-out state by its thrust close to each other is made by released state, the sliding bevel portion 790 can be with Dop sliding bevel 780 is engaged so that the upper flexible extension 791 and the lower flexible extension 781 corresponding to described Generation elastic deformation, and then the gib head protuberance 793 and the adjacent surface in the dop portion 782 are re-engaged with so as to again Into lock-out state.
Due to there is provided can elastic top open and two support arm parts away from each other, by the side with matrix Supported hole coordinate and by the friction of end card and matrix side the elastomeric material at road surface can be supported it is in place and Flushed with road surface.And this device is easily installed, reason is, it is before the mounting by being arranged between two support arms Hook part and dop part it is sealed, enable to two support arms to be in contraction state close to each other, therefore be easy to smoothly It is inserted into the gap between matrix, when needing to be secured in place the cladding system, by operating with long shape shaft Elliptic cross-section action bars, hook part and the dop part is enabled to disengage, so as to by the elasticity of elastic top splenium part Top opening force and by the end top pressure of two support arms to matrix side to realize fixation.More importantly, there is ellipse when described It is described two by extruding or pushing opposite to each other when the action bars of tee section is in the contraction state vertical with the disengaged condition Support arm, described two support arms can it is close to each other and cause hook part and dop component elasticity deformation and from disengagement State is changed into locked state so as to which the cladding system is converted into contraction state.This can finish in manufacture and transport described The conversion operation of this contraction state is carried out during cladding system, can also be when needing to remove cladding system from flexible gap And take.This by pushing is by with inclining toward each other from respective arm automatically into the performance of locked state The setting of oblique flexible rod portion and hook part and dop part are oblique with the respective guiding being engaged with each other when close to each other Face sets to realize.And by setting the action bars when in the plumbness, it allows the hook part Enough amounts are moved towards the action bars to allow chain close of the hook to disengage, and are leaned on each other pushing described two support arms Closely so that the action bars can be servo-actuated when entering locked state or slave mode is followed and freely rotated to avoid interference with the lock Conjunction acts.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art Change.

Claims (2)

1. a kind of cladding system for bridge expanssion joint, for being covered at the road surface to bridge expanssion joint, including with bridge The rubber body that the level height on beam road surface flushes(9), positioned at the rubber body(9)Internal supporter(8)And can In the supporter(8)In towards and away from two symmetrical extension support members of mobile and structure(7), it is characterised in that: Described two extension support members(7)In each include can be in the supporter(8)Chute(81)What reclaimed water was smoothly moved Horizontal extension head(721)And the horizontal extension head(721)The vertical extension of connection(72)And prolong vertically with described Extending portion(72)Lower end connection and the support arm extended towards adjacent bridge structure body(71), wherein, described two extension branch Support member(7)End be provided with support plate to be abutted with the adjacent bridge structure body(73), in the support plate (73)End face on be provided with to be inserted into the shearing hole for being arranged on the adjacent bridge structure body(31)In shear pin (731), and the shear pin(731)For the metal material being magnetized;Wherein, two extension support members(7)In one perpendicular Straight extension(72)It is fixedly installed disengagable lock hook(79), another vertical extension(72)Corresponding to being fixedly installed Disengagable locking dop(78), in the disengagable lock hook(79)With the disengagable locking dop(78)Between be provided with horizontal stroke Section is oval action bars(6), the action bars(6)It is rotatably supported in what is be fixedly connected with the bridge structure body Support rod(61)On;Wherein, the disengagable lock hook(79)Including with adjacent vertical extension(72)It is connected and dips down Oblique upper flexible extension(791)And the upper flexible extension(791)Connected vertical extension(792)And positioned at institute State vertical extension(792)Lower end gib head protuberance(793);The disengagable locking dop(78)Including with it is adjacent Vertical extension(72)Connected and acclivitous lower flexible extension(781), positioned at the lower flexible extension(781)End Dop portion at end(782), when the disengagable lock hook(79)With the disengagable locking dop(78)In mutually locking During state, the gib head protuberance(793)With the dop portion(782)Adjacent surface engage and so as to realize link locking, now, The action bars(6)The oval major axis of cross section be horizontal direction;When the action bars(6)Rotation is ellipse to cross section When circular major axis is vertical direction, the gib head protuberance(793)With the dop portion(782)Adjacent surface depart from so as to real Now unlock, now, described two extension support members(7)Can be located at top pressure spring therebetween(75)In the presence of and make Obtain the support plate(73)It is pressed on adjacent bridge structure body and causes the shear pin(731)Cut corresponding to being inserted into Power hole(31)In;The shearing hole(31)Inwall on the adsorbable shear pin is installed(731)Magnet(32), described Shear pin(731)By the magnet(32)During absorption, the rubber body can be made(9)It is firm to be arranged in bridge expanssion joint;Institute State chute(81)Left end is provided with elastic contact switch(51), the rubber body(9)Groove in LED light is installed (52), when the shear pin(731)When in shearing hole corresponding to being inserted into, the horizontal extension head in left side(721)In left lateral position Put, and with the elastic contact switch(51)Contact, now the LED light(52)Light, to prompt the shear pin (731)In shearing hole corresponding to having been inserted into.
A kind of 2. cladding system for bridge expanssion joint as claimed in claim 1, it is characterised in that:The vertical extension (792)With the gib head protuberance(793)Between be provided with sliding bevel portion(790), the dop portion(782)Outside top Dop sliding bevel corresponding to being provided with edge(780), when described two extension support members(7)Close to each other pushed away by its is made Power and when being recovered by released state to lock-out state, the sliding bevel portion(790)It can be slided with the corresponding dop oblique Face(780)It is engaged so that the upper flexible extension(791)With the lower flexible extension(781)Generation elastic deformation, And then cause the gib head protuberance(793)With the dop portion(782)Adjacent surface re-engage with so as to reenter locking State.
CN201610233473.5A 2016-04-15 2016-04-15 A kind of cladding system for bridge expanssion joint Active CN105839527B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610233473.5A CN105839527B (en) 2016-04-15 2016-04-15 A kind of cladding system for bridge expanssion joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610233473.5A CN105839527B (en) 2016-04-15 2016-04-15 A kind of cladding system for bridge expanssion joint

Publications (2)

Publication Number Publication Date
CN105839527A CN105839527A (en) 2016-08-10
CN105839527B true CN105839527B (en) 2017-12-26

Family

ID=56597588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610233473.5A Active CN105839527B (en) 2016-04-15 2016-04-15 A kind of cladding system for bridge expanssion joint

Country Status (1)

Country Link
CN (1) CN105839527B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138467A (en) * 2005-11-16 2007-06-07 Juichi Yamauchi Load bearing type expansion device of elevated road and its construction method
CN201901844U (en) * 2010-12-08 2011-07-20 衡水橡胶股份有限公司 Expansion device for railway bridges
CN204298726U (en) * 2014-12-02 2015-04-29 王祥国 A kind of Expansion Units for Highway Bridges
CN204780576U (en) * 2015-06-19 2015-11-18 河海大学 Bridge expansion joint apparatus
CN204919321U (en) * 2015-09-11 2015-12-30 张庆建 Telescoping device on public road bridge roof beam pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138467A (en) * 2005-11-16 2007-06-07 Juichi Yamauchi Load bearing type expansion device of elevated road and its construction method
CN201901844U (en) * 2010-12-08 2011-07-20 衡水橡胶股份有限公司 Expansion device for railway bridges
CN204298726U (en) * 2014-12-02 2015-04-29 王祥国 A kind of Expansion Units for Highway Bridges
CN204780576U (en) * 2015-06-19 2015-11-18 河海大学 Bridge expansion joint apparatus
CN204919321U (en) * 2015-09-11 2015-12-30 张庆建 Telescoping device on public road bridge roof beam pavement

Also Published As

Publication number Publication date
CN105839527A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105735119B (en) A kind of high bridge expanssion joint covering component of stability
CN105839531B (en) A kind of covering device for expansion joint for municipal bridge
CN105839527B (en) A kind of cladding system for bridge expanssion joint
CN105735122B (en) A kind of covering device for expansion joint of municipal bridge
CN105735124B (en) It is a kind of can stable operation bridge expanssion joint cladding system
CN105839523B (en) A kind of safe cladding system of bridge expanssion joint
CN105735121B (en) A kind of covering mechanism for bridge expanssion joint
CN105735123B (en) A kind of bridge expanssion joint covered structure of convenient installation
CN105887671B (en) A kind of covering component for being used to cover bridge expanssion joint
CN105839524B (en) A kind of easy bridge expanssion joint covering mechanism
CN105648903B (en) A kind of bridge expanssion joint overlay device for improving bridge performance
CN105887669B (en) A kind of cladding system of bridge expanssion joint
CN105839525B (en) One kind uses flexible bridge expanssion joint cladding system
CN105735125B (en) A kind of denotable bridge expanssion joint covered structure
CN105839526B (en) A kind of covered structure of bridge expanssion joint
CN105648905B (en) A kind of bridge expanssion joint covering component with LED light
CN105648907B (en) A kind of municipal bridge expanssion joint cladding system easy for installation
CN105887670B (en) A kind of covering device for expansion joint of bridge pavement
CN105648906B (en) A kind of bridge expanssion joint cladding system
CN105862582B (en) A kind of denotable municipal bridge expanssion joint cladding system
CN105648904B (en) A kind of bridge expanssion joint cladding system with pooling feature
CN105862580B (en) A kind of bridge expanssion joint overlay device easy for installation
CN105839528B (en) A kind of bridge expanssion joint cladding system with vibration-damping function
CN105862581B (en) A kind of bridge expanssion joint overlay device for improving service life
CN105735120B (en) A kind of elastic adjustable bridge expanssion joint covering mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Du Chuangun

Inventor after: Song Li

Inventor before: Fang Jian

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171106

Address after: 222100 west of administrative center, Ganyu District, Jiangsu, Lianyungang, 14

Applicant after: Ganyu District Productivity Promotion Center, Lianyungang

Address before: 323900 Zhejiang city of Lishui province Qingtian County Ou Guo Village No. 166 South Street stone

Applicant before: Fang Jian

TA01 Transfer of patent application right
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211108

Address after: 222100 intersection of Xufu road and Shengshi Road, Qingkou Town, Ganyu District, Lianyungang City, Jiangsu Province

Patentee after: Lianyungang Ganyu District comprehensive inspection and Testing Center

Address before: 222100 West, 14th floor, administrative center, Ganyu District, Lianyungang City, Jiangsu Province

Patentee before: Ganyu District Productivity Promotion Center, Lianyungang

TR01 Transfer of patent right