CN105648905B - A kind of bridge expanssion joint covering component with LED light - Google Patents

A kind of bridge expanssion joint covering component with LED light Download PDF

Info

Publication number
CN105648905B
CN105648905B CN201610233331.9A CN201610233331A CN105648905B CN 105648905 B CN105648905 B CN 105648905B CN 201610233331 A CN201610233331 A CN 201610233331A CN 105648905 B CN105648905 B CN 105648905B
Authority
CN
China
Prior art keywords
extension
dop
bridge
led light
disengagable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610233331.9A
Other languages
Chinese (zh)
Other versions
CN105648905A (en
Inventor
孙可欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Tongfei Technology Co ltd
Anhui Safe Electronics Co Ltd
Original Assignee
Shaoxing Joy Planting Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Joy Planting Trading Co Ltd filed Critical Shaoxing Joy Planting Trading Co Ltd
Priority to CN201610233331.9A priority Critical patent/CN105648905B/en
Publication of CN105648905A publication Critical patent/CN105648905A/en
Application granted granted Critical
Publication of CN105648905B publication Critical patent/CN105648905B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

A kind of bridge expanssion joint covering component with LED light, for being covered at the road surface to bridge expanssion joint, including the rubber body flushed with the level height of bridge pavement(9), positioned at the rubber body(9)Internal supporter(8)And can be in the supporter(8)In towards and away from two symmetrical extension support members of mobile and structure(7), wherein, described two extension support members(7)In each include can be in the supporter(8)Chute(81)The horizontal extension head that reclaimed water is smoothly moved(721)And the horizontal extension head(721)The vertical extension of connection(72)And with the vertical extension(72)Lower end connection and the support arm extended towards adjacent bridge structure body(71), wherein, described two extension support members(7)End be provided with support plate to be abutted with the adjacent bridge structure body(73).

Description

A kind of bridge expanssion joint covering component with LED light
Technical field
The present invention relates to bridge field, specially a kind of bridge expanssion joint covering component with LED light.
Background technology
The road surface of bridge is often provided with expansion joint, to provide the allowance expanded with heat and contract with cold.For traffic safety and dimension The performance of bridge pavement is protected, generally requires to carry out elastomeric objects filling or covering to this expansion joint.Known mode is Covered or clogged using materials such as elastic caoutchoucs.But the installation of this elastic rubber material needs the matrix of road pavement The reprocessing such as surface cutting is carried out, it is in place to install the elastomeric material.And this is easily caused when driving to these Working position, which produces, damages and then damages road surface matrix.And the installation and removal for this elastomeric material are also required to expend greatly Measure manpower and time cost.
The content of the invention
It is an object of the invention to provide a kind of bridge expanssion joint with LED light to cover component, and it can overcome existing There is the defects of technology.
Component is covered according to the bridge expanssion joint with LED light of the present invention, for the road surface to bridge expanssion joint Place is covered, including flushed with the level height of bridge pavement rubber body, the support inside the rubber body Body and two extension support members that can be in the supporter towards and away from mobile and structure symmetrically, wherein, institute State in two extension support members it is each include can the horizontal extension head that the chute reclaimed water of the supporter is smoothly moved, The vertical extension that is connected with the horizontal extension head and it is connected with the lower end of the vertical extension and towards adjacent Bridge structure body extension support arm, wherein, it is described two extension support members ends be provided with to it is described adjacent The support plate that bridge structure body abuts, is provided with to be inserted on the end face of the support plate and is arranged on the adjacent bridge Shear pin in the shearing hole of girder construction body;Wherein, the vertical extension of one in two extension support members is fixedly installed Disengagable lock hook, another vertical extension is fixedly installed corresponding disengagable locking dop, in the disengagable lock Determine to be provided with action bars of the cross section for ellipse, the rotatable twelve Earthly Branches of action bars between hook and the disengagable locking dop Hold in the support rod being fixedly connected with the bridge structure body;Wherein, the disengagable lock hook includes and adjacent bridge Upper flexible extension that structure is connected and tilted down, the vertical extension connected with the upper flexible extension and it is located at The gib head protuberance of the lower end of the vertical extension;The disengagable locking dop includes and adjacent bridge structure body Be connected and acclivitous lower flexible extension, positioned at the dop portion of the lower flexible extension end, when described disengagable When lock hook is in mutually locking state with the disengagable locking dop, the gib head protuberance is adjacent with the dop portion Face engagement links locking so as to realize, now, the oval major axis of the cross section of the action bars is horizontal direction;When described When the oval major axis that action bars is rotated to cross section is vertical direction, the gib head protuberance is adjacent with the dop portion Emaciated face is from so as to realize unblock, and now, described two extension support members can be in the effect located at top pressure spring therebetween Make it that the support plate is pressed on adjacent bridge structure body and so that the shear pin is inserted into corresponding shearing down Kong Zhong, the support plate between the shear pin are provided with sensor, and the sensor is touch sensor, the rubber Bodies top middle position is provided with LED light, the LED light and the sensor Electricity Federation, at that time the sensor Signal is sent when touching bridge structure body and controls the LED light to work.
By the present invention, due to there is provided can elastic top open and two support arm parts away from each other, by with base Supported hole on the side of body coordinates and can be by the elastomeric material at road surface by the friction of end card and matrix side Supporting is in place and is flushed with road surface.And this device is easily installed, reason is, it is before the mounting by being arranged on two Hook part and dop part between support arm it is sealed, enable to two support arms to be in contraction state close to each other, Therefore it is easy in the gap that is successfully inserted between matrix, when needing to be secured in place the cladding system, passes through and operate tool There is the elliptic cross-section action bars of long shape shaft, enable to hook part and the dop part to disengage, so as to by elastic top The elastic top opening force of splenium part and by the end top pressure of two support arms to matrix side to realize fixation.More importantly, when When the action bars with elliptic cross-section is in the contraction state vertical with the disengaged condition, by extruding opposite to each other or Described two support arms are pushed, described two support arms can be close to each other and cause hook part and the dop component elasticity Deform and be changed into locked state from disengaged condition so as to which the cladding system is converted into contraction state.This can manufactured Finish and the conversion operation of this contraction state is carried out when transporting the cladding system, can also need cladding system from flexible Taken when being removed in gap.This by pushing is by with from respective arm automatically into the performance of locked state And the setting of flexible rod portion inclined toward each other and hook part and dop part when close to each other with being engaged with each other Respective guiding surface sets to realize.And by setting the action bars when in the plumbness, it is permitted Perhaps described hook part moves enough amounts to allow chain close of the hook to disengage towards the action bars, and described two pushing Support arm is close to each other so that the action bars can be servo-actuated when entering locked state or slave mode is followed and freely rotated to keep away Exempt to interfere the sealed action.Whole device is simple in construction, and operation is ingenious, can easily operate to realize that installation and removal are made With so as to save the time of installation and removal and cost of labor, and use is reliable, stabilized structure.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the cladding system of the present invention, there is shown with described two extension support members each other Sealed state;
Fig. 2 shows cladding system in Fig. 1 in released state, i.e., state when two extension support members are disconnected from each other; Now the cladding system is installed in place in bridge expanssion joint.
Fig. 3 is the specific enlarged diagram of the disengagable lock hook in Fig. 1 and disengagable dop.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
Component is covered according to a kind of bridge expanssion joint with LED light of embodiment, for bridge expanssion joint Covered at road surface, including flushed with the level height of bridge pavement rubber body 9, inside the rubber body 9 Supporter 8 and can be in the supporter 8 towards and away from two extension support members that mobile and structure is symmetrical 7, wherein, each include what can smoothly be moved in the reclaimed water of chute 81 of the supporter 8 in described two extension support members 7 Horizontal extension head 721, the vertical extension 72 being connected with the horizontal extension head 721 and with the vertical extension 72 Lower end connection and the support arm 71 extended towards adjacent bridge structure body, wherein, the ends of described two extension support members 7 The support plate 73 to be abutted with the adjacent bridge structure body is provided with, is provided with the end face of the support plate 73 To the shear pin 731 being inserted into the shearing hole for being arranged on the adjacent bridge structure body;Wherein, two extension support members The vertical extension 72 of one in 7 is fixedly installed disengagable lock hook 79, and another vertical extension 72 is fixedly installed Disengagable locking dop 78 corresponding to having, it is provided between the disengagable lock hook 79 and the disengagable locking dop 78 Cross section is oval action bars 6, and the action bars 6 is rotatably supported in the branch being fixedly connected with the bridge structure body Hold on bar 61;Wherein, the disengagable lock hook 79 includes the upper elasticity for being connected and tilting down with adjacent bridge structure body Extension 791, the vertical extension 792 being connected with the upper flexible extension 791 and positioned at the vertical extension 792 The gib head protuberance 793 of lower end;The disengagable locking dop 78 includes connected and upward with adjacent bridge structure body Inclined lower flexible extension 781, positioned at the dop portion 782 of the lower end of flexible extension 781, when the disengagable lock When determining hook 79 and be in mutually locking state with the disengagable locking dop 78, the gib head protuberance 793 and the dop portion 782 adjacent surface engages links locking so as to realize, now, the oval major axis of the cross section of the action bars 6 is level Direction;When the oval major axis that the action bars 6 is rotated to cross section is vertical direction, the gib head protuberance 793 with The adjacent surface in the dop portion 782 departs from so as to realize unblock, and now, described two extension support members 7 can be located at the two Between top pressure spring 75 in the presence of and cause the support plate 73 be pressed on adjacent bridge structure body and cause institute State shear pin 731 to be inserted into corresponding shearing hole, the support plate 73 between the shear pin 731 is provided with sensor 732, the sensor 732 is touch sensor, and the crown center opening position of rubber body 9 is provided with LED light 910, The LED light 910 and the Electricity Federation of sensor 732, letter is sent when the sensor 732 touches bridge structure body at that time Number and control the LED light 910 to work.
Valuably, wherein, it is described to be provided with sliding bevel portion between extension 792 and the gib head protuberance 793 vertically 790, be provided with the outer upper in the dop portion 782 corresponding to dop sliding bevel 780, when described two extension supports When part 7 is recovered to lock-out state by its thrust close to each other is made by released state, the sliding bevel portion 790 can be with Dop sliding bevel 780 is engaged so that the upper flexible extension 791 and the lower flexible extension 781 corresponding to described Generation elastic deformation, and then the gib head protuberance 793 and the adjacent surface in the dop portion 782 are re-engaged with so as to again Into lock-out state.
Due to there is provided can elastic top open and two support arm parts away from each other, by the side with matrix Supported hole coordinate and by the friction of end card and matrix side the elastomeric material at road surface can be supported it is in place and Flushed with road surface.And this device is easily installed, reason is, it is before the mounting by being arranged between two support arms Hook part and dop part it is sealed, enable to two support arms to be in contraction state close to each other, therefore be easy to smoothly It is inserted into the gap between matrix, when needing to be secured in place the cladding system, by operating with long shape shaft Elliptic cross-section action bars, hook part and the dop part is enabled to disengage, so as to by the elasticity of elastic top splenium part Top opening force and by the end top pressure of two support arms to matrix side to realize fixation.More importantly, there is ellipse when described It is described two by extruding or pushing opposite to each other when the action bars of tee section is in the contraction state vertical with the disengaged condition Support arm, described two support arms can it is close to each other and cause hook part and dop component elasticity deformation and from disengagement State is changed into locked state so as to which the cladding system is converted into contraction state.This can finish in manufacture and transport described The conversion operation of this contraction state is carried out during cladding system, can also be when needing to remove cladding system from flexible gap And take.This by pushing is by with inclining toward each other from respective arm automatically into the performance of locked state The setting of oblique flexible rod portion and hook part and dop part are oblique with the respective guiding being engaged with each other when close to each other Face sets to realize.And by setting the action bars when in the plumbness, it allows the hook part Enough amounts are moved towards the action bars to allow chain close of the hook to disengage, and are leaned on each other pushing described two support arms Closely so that the action bars can be servo-actuated when entering locked state or slave mode is followed and freely rotated to avoid interference with the lock Conjunction acts.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art Change.

Claims (2)

1. a kind of bridge expanssion joint covering component with LED light, for being covered at the road surface to bridge expanssion joint, The rubber body flushed including the level height with bridge pavement(9), positioned at the rubber body(9)Internal supporter(8)、 And can be in the supporter(8)In towards and away from two symmetrical extension support members of mobile and structure(7), its In, described two extension support members(7)In each include can be in the supporter(8)Chute(81)Reclaimed water is smoothly moved Horizontal extension head(721)And the horizontal extension head(721)The vertical extension of connection(72)And with it is described vertical Extension(72)Lower end connection and the support arm extended towards adjacent bridge structure body(71), wherein, described two extensions Support member(7)End be provided with support plate to be abutted with the adjacent bridge structure body(73), in the support Disk(73)End face on be provided with to be inserted into the shear pin being arranged in the shearing hole of the adjacent bridge structure body (731);Wherein, two extension support members(7)In the vertical extension of one(72)It is fixedly installed disengagable lock hook (79), another vertical extension(72)Disengagable locking dop corresponding to being fixedly installed(78), in the disengagable lock Determine hook(79)With the disengagable locking dop(78)Between be provided with cross section for ellipse action bars(6), the operation Bar(6)It is rotatably supported in the support rod being fixedly connected with the bridge structure body(61)On;Wherein, the disengagable locking Hook(79)Including with adjacent vertical extension(72)The upper flexible extension for being connected and tilting down(791)And the upper bullet Property extension(791)Connected vertical extension(792)And positioned at the vertical extension(792)Lower end gib head Protuberance(793);The disengagable locking dop(78)Including with adjacent vertical extension(72)It is connected and acclivitous Lower flexible extension(781), positioned at the lower flexible extension(781)The dop portion of end(782), when the disengagable lock Determine hook(79)With the disengagable locking dop(78)During in mutually locking state, the gib head protuberance(793)With it is described Dop portion(782)Adjacent surface engage and so as to realize link locking, now, the action bars(6)Cross section it is oval Major axis is horizontal direction;When the action bars(6)When the oval major axis rotated to cross section is vertical direction, the gib head Protuberance(793)With the dop portion(782)Adjacent surface depart from so as to realize unblock, now, described two extension support members (7)Can be located at top pressure spring therebetween(75)In the presence of and cause the support plate(73)It is pressed on adjacent bridge On girder construction body and cause the shear pin(731)In shearing hole corresponding to being inserted into, the shear pin(731)Between institute State support plate(73)It is provided with sensor(732), the sensor(732)For touch sensor, the rubber body(9)Top Portion's middle position is provided with LED light(910), the LED light(910)With the sensor(732)Electricity Federation, at that time institute State sensor(732)Signal is sent when touching bridge structure body and controls the LED light(910)Work.
2. a kind of bridge expanssion joint covering component with LED light as claimed in claim 1, wherein, it is described to prolong vertically Extending portion(792)With the gib head protuberance(793)Between be provided with sliding bevel portion(790), the dop portion(782)Outside Upper edge is provided with corresponding dop sliding bevel(780), when described two extension support members(7)Made its close to each other Thrust and when being recovered by released state to lock-out state, the sliding bevel portion(790)It can be slided with the corresponding dop Dynamic inclined-plane(780)It is engaged so that the upper flexible extension(791)With the lower flexible extension(781)Generation elasticity becomes Shape, and then cause the gib head protuberance(793)With the dop portion(782)Adjacent surface re-engage with so as to reenter lock Determine state.
CN201610233331.9A 2016-04-15 2016-04-15 A kind of bridge expanssion joint covering component with LED light Active CN105648905B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610233331.9A CN105648905B (en) 2016-04-15 2016-04-15 A kind of bridge expanssion joint covering component with LED light

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610233331.9A CN105648905B (en) 2016-04-15 2016-04-15 A kind of bridge expanssion joint covering component with LED light

Publications (2)

Publication Number Publication Date
CN105648905A CN105648905A (en) 2016-06-08
CN105648905B true CN105648905B (en) 2017-12-08

Family

ID=56497480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610233331.9A Active CN105648905B (en) 2016-04-15 2016-04-15 A kind of bridge expanssion joint covering component with LED light

Country Status (1)

Country Link
CN (1) CN105648905B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522085B (en) * 2016-11-24 2018-03-13 张德存 A kind of Highway Bridge Expansion Joint sealing protective device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2088120U (en) * 1991-01-25 1991-11-06 陕西省公路局 Arrangement of expansion joints for bridges
JP2007138467A (en) * 2005-11-16 2007-06-07 Juichi Yamauchi Load bearing type expansion device of elevated road and its construction method
CN204298726U (en) * 2014-12-02 2015-04-29 王祥国 A kind of Expansion Units for Highway Bridges
CN204780576U (en) * 2015-06-19 2015-11-18 河海大学 Bridge expansion joint apparatus
CN204919321U (en) * 2015-09-11 2015-12-30 张庆建 Telescoping device on public road bridge roof beam pavement

Also Published As

Publication number Publication date
CN105648905A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105648905B (en) A kind of bridge expanssion joint covering component with LED light
CN105839531B (en) A kind of covering device for expansion joint for municipal bridge
CN105735119B (en) A kind of high bridge expanssion joint covering component of stability
CN105735124B (en) It is a kind of can stable operation bridge expanssion joint cladding system
CN105648904B (en) A kind of bridge expanssion joint cladding system with pooling feature
CN105648907B (en) A kind of municipal bridge expanssion joint cladding system easy for installation
CN105735121B (en) A kind of covering mechanism for bridge expanssion joint
CN105839525B (en) One kind uses flexible bridge expanssion joint cladding system
CN105839528B (en) A kind of bridge expanssion joint cladding system with vibration-damping function
CN105862582B (en) A kind of denotable municipal bridge expanssion joint cladding system
CN105887671B (en) A kind of covering component for being used to cover bridge expanssion joint
CN105648903B (en) A kind of bridge expanssion joint overlay device for improving bridge performance
CN105735122B (en) A kind of covering device for expansion joint of municipal bridge
CN105648906B (en) A kind of bridge expanssion joint cladding system
CN105862580B (en) A kind of bridge expanssion joint overlay device easy for installation
CN105839524B (en) A kind of easy bridge expanssion joint covering mechanism
CN105735125B (en) A kind of denotable bridge expanssion joint covered structure
CN105887670B (en) A kind of covering device for expansion joint of bridge pavement
CN105735123B (en) A kind of bridge expanssion joint covered structure of convenient installation
CN105839526B (en) A kind of covered structure of bridge expanssion joint
CN105887669B (en) A kind of cladding system of bridge expanssion joint
CN105862581B (en) A kind of bridge expanssion joint overlay device for improving service life
CN105839523B (en) A kind of safe cladding system of bridge expanssion joint
CN105839527B (en) A kind of cladding system for bridge expanssion joint
CN105735120B (en) A kind of elastic adjustable bridge expanssion joint covering mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170809

Address after: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: 317599 Taizhou City, Wenling Province Taiping Street, a village of Samsung bridge, building No. 62, No. 2

Applicant before: Wang Jinrong

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sun Kexin

Inventor before: Wang Jinrong

TA01 Transfer of patent application right

Effective date of registration: 20171114

Address after: 312000 Zhejiang province Shaoxing city Keqiao District Qi Street Village 1 rooms

Applicant after: SHAOXING YUEZHI TRADE CO.,LTD.

Address before: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 312000 Zhejiang province Shaoxing city Keqiao District Qi Street Village 1 rooms

Patentee after: Shaoxing Yuet Plant Technology Co.,Ltd.

Address before: 312000 Zhejiang province Shaoxing city Keqiao District Qi Street Village 1 rooms

Patentee before: SHAOXING YUEZHI TRADE CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180921

Address after: 244002 695 north section of Taishan Avenue, Tongling, Anhui.

Patentee after: TONGLING TONGFEI TECHNOLOGY CO.,LTD.

Address before: 312000 Room 101, 1 hilltop village, Qixian street, Keqiao District, Shaoxing, Zhejiang

Patentee before: Shaoxing Yuet Plant Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231227

Address after: 244000 NO.1771 Qifeng Road, Tongling City, Anhui Province

Patentee after: TONGLING TONGFEI TECHNOLOGY CO.,LTD.

Patentee after: ANHUI SAFE ELECTRONICS Co.,Ltd.

Address before: 244002 695 north section of Taishan Avenue, Tongling, Anhui.

Patentee before: TONGLING TONGFEI TECHNOLOGY CO.,LTD.