CN105836364A - Engineering road repairing device and repairing method through engineering road repairing device - Google Patents

Engineering road repairing device and repairing method through engineering road repairing device Download PDF

Info

Publication number
CN105836364A
CN105836364A CN201610297639.XA CN201610297639A CN105836364A CN 105836364 A CN105836364 A CN 105836364A CN 201610297639 A CN201610297639 A CN 201610297639A CN 105836364 A CN105836364 A CN 105836364A
Authority
CN
China
Prior art keywords
cramping body
road
dental calculus
engineering
engineering road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610297639.XA
Other languages
Chinese (zh)
Other versions
CN105836364B (en
Inventor
李健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huazhong Robot Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610297639.XA priority Critical patent/CN105836364B/en
Publication of CN105836364A publication Critical patent/CN105836364A/en
Application granted granted Critical
Publication of CN105836364B publication Critical patent/CN105836364B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G7/00Devices for assisting manual moving or tilting heavy loads
    • B65G7/12Load carriers, e.g. hooks, slings, harness, gloves, modified for load carrying
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Dental Tools And Instruments Or Auxiliary Dental Instruments (AREA)

Abstract

The invention discloses an engineering road repairing device. The engineering road repairing device comprises a device body and clamping bodies. The device body comprises two operating bodies which are symmetrically arranged and rotationally connected. Each operating body comprises a holding end and a working end. The clamping bodies are rotationally connected to the ends of the working ends. A lifting device is inserted in the position, located at one end of the corresponding working end, of one operating body in a suspended mode. The invention further discloses a repairing method through the engineering road repairing device. The engineering road repairing device is quick and convenient to use, safe and efficient. By means of the repairing method through the engineering road repairing device, the laying speed is higher, the efficiency is higher, and the safety is good.

Description

A kind of engineering road maintenance device and the method utilizing this device to carry out keeping in repair
Technical field
The present invention relates to build road engineering technical field, especially relate to a kind of engineering road maintenance device and profit The method carrying out keeping in repair with this device.
Background technology
At present, when at engineering road pavement road dental calculus or keeping in repair laying at the secondary of road, the instrument used, General still uses conventional tool, and pickax, by original road dental calculus, is removed after lifting with artificial hand after tilting, or Road dental calculus is jointly firmly lifted by 2 people by person when laying, and is transported to maintenace point, easily slips and has one's foot squashed, with The block road dental calculus is increasing, and total amount is on 200 jin, and a dead lift lifts, the most unable to do what one wishes, Can use without big machinery again.The particularly circular spheroid of roadside landscape belt, is less susceptible to move or lift.
The problems such as the present invention is to lift carrying complexity for solving existing road dental calculus, easy slippage and design a kind of simple, Convenient, use safe a kind of engineering road maintenance device and the method utilizing this device to carry out keeping in repair.The present invention Can also be used for the carrying of trees felling, move, of many uses.Summary of the invention
First goal of the invention of the present invention is to lift to solve existing road dental calculus, and carrying easily slips and has one's foot squashed, The particularly stone material circle spheroid of roadside landscape belt, the one being difficult to move or lift and design is simple, convenient, It is capable of the engineering road maintenance device of safe and efficient operation.
Second goal of the invention of the present invention is to provide and a kind of utilizes this engineering road maintenance device to carry out keeping in repair Method.
The present invention realizes its goal of the invention and be the technical scheme is that a kind of engineering road maintenance device, including Device body and cramping body, described device body includes two operating bodies being symmetrical arranged and being rotationally connected, often Individual operating body includes holding end and working end, and described cramping body is rotatably connected on the end of working end, described Insert on the operating body of one end, working end and hang with boom hoisting.This engineering road maintenance device, by a pair rotation even The operating body connect, and it is rotatably connected to cramping body in the working end of operating body, and also set up on operating body There is boom hoisting, when the engineering objects such as original road dental calculus are removed by needs, by the lifting on this device Device is inserted into below the engineering objects such as road dental calculus, and the engineering object shovels such as road dental calculus are risen certain position, by behaviour Making body operation element end makes its folding to suitable openings of sizes, and rotates the works such as cramping body Shi Qiyu road dental calculus Width or the thickness of journey object match, and clamp holding end and then by engineering things such as cramping body clamping road dental calculus Body, moves it to specify position, operates the most successively, when needing to carry out laying new road tooth to be laid During the engineering objects such as stone, also with this maintenance unit, the engineering objects such as road dental calculus are lifted successively to paving location, Lay one by one.This maintenance unit is convenient to operation, and safe and efficient.
As preferably, two described operating bodies are rotationally connected by bearing pin and arrange in forceps type structure, wherein The holding end of one operating body is provided with two fixing connections and the connection handle of Y-shaped structure setting, another behaviour Make the holding end of body to be provided with on a connection handle and this connection handle and be provided with termination set.Two operating bodies are done in pincers Structure arrange, so when operate two holding ends time, the openings of sizes of two working ends of this maintenance unit along with The change of holding end and change, to adapt to dismounting or the laying of different size of road dental calculus.And wherein one hold Holding end and arrange two connection handles, in two connection handles is to play auxiliary use, is used for controlling road dental calculus Balance after lifting etc. engineering object and moving left and right after landing, and termination set is set on another connection handle is Control clamping dynamics, it is ensured that clamping body satisfies the need the clamping of the engineering objects such as dental calculus, ensures the security of operation simultaneously.
As preferably, the end of each connection handle is the most threaded with handles, and the outside of described handle is provided with Anti-slip cover.It is threaded connection with handles on connection handle, handle arranges Anti-slip cover, be for easy to operate peace Entirely, it is to avoid the skidding in force process.
As preferably, described cramping body is rotationally connected with working end by rotating shaft, described cramping body and rotating shaft Axis be arranged in parallel and rotate in the range of 60 degree along rotating shaft.Cramping body is rotated even with working end by rotating shaft Connect, be able to adapt to the safety of difform road dental calculus etc. and rise and embrace, 60 degree of scopes are set simultaneously Rotational angle, it is possible to achieve at same position to different angles, the operation of the engineering object such as road dental calculus of shape, Position is moved back and forth without operating personnel.
As preferably, described cramping body is provided with cramping body engaging lug, described working end is provided with solid Determine plate, described fixed plate be provided with fixed plate engaging lug, rotating shaft respectively with cramping body engaging lug and fixed plate Engaging lug is rotationally connected.Cramping body engaging lug is set on cramping body, and fixed plate and fixed plate are set in working end Engaging lug, is to realize being rotationally connected, to realize the adjustment of position angle of cramping body and working end.
As preferably, the operating body of described one end, working end being provided with multiple card hanging hole, described plays lifting Put movable inserting to hang in card hanging hole.Multiple card hanging hole is set on the operating body of working end, such structure be in order to Boom hoisting is facilitated to select diverse location to carry out inserting extension, to meet the operation of the engineering objects such as dental calculus of not going the same way.
As preferably, cramping body is ladder splint structure, and the trapezoidal clamping face of described clamping body is provided with square Connected in star, described rectangular recess internal whorl connects has rectangle to clamp slipmat, and described rectangle clamping is anti-skidding Pad protrudes from trapezoidal clamping face.Cramping body can be arranged as required to as ladder splint structure, the most trapezoidal at it Rectangle clamping slipmat, the clamping of the engineering objects such as dental calculus that satisfy the need with realization are set on clamping face, prevent from coming off.
As preferably, cramping body is curved splint structure, and the arc clamping face of described cramping body is provided with arc Connected in star, described arc groove internal whorl connects has arc to clamp slipmat, and described arc clamping is anti-skidding Pad protrudes from arc clamping face.Certainly cramping body is it can also be provided that curved splint structure, with applicable cylinder etc. The operation of the engineering objects such as irregular road dental calculus.
As preferably, boom hoisting includes hook, bowden cable, chain structure, L-shaped coupler body and flat angle steel head, institute The hook stated mounts with cramping body.Boom hoisting is set to the convenient connection of said structure, lifts by crane, and the side of operation The most quick.
The present invention realizes its second the technical scheme is that one of goal of the invention and utilizes claim 1 Described engineering road maintenance device carries out the method keeped in repair, and this method for maintaining comprises the following steps: 1) remove Maintenance original road, section dental calculus, removes after being tilted by first piece of road dental calculus to be removed;2) operation engineering road Device body on the maintenance unit of road, and clamped by cramping body, insert road dental calculus block to be removed with boom hoisting One end of body, lifts road dental calculus, removes one by one;3) first the groove at original place to be repaired is cleared up, deepens, Bracing wire;4) filler: make the first compound: by stone, yellow sand, cement, lemon yellow according to 4: 3: The ratio of 2.8: 0.2 adds water and stirs;5) the first compound is divided into two heaps, is stacked in road to be laid In the bottom groove of dental calculus, and along length direction one end stacking a pile of road dental calculus, shakeout, arrange between two heaps There is distance;6) operation device body, is lifted road dental calculus to be laid by cramping body, moves and is placed into paving If on the stockpile of the first good compound, mobile road dental calculus stone, righting, lay by line;7) all by line After laying completes, make two compounds: stone, yellow sand, cement, accelerator, swelling agent, hydrophober according to The ratio of 5: 3: 1.7: 0.1: 0.1: 0.1 adds water and stirs;8) along the road tooth after having laid Ground mass, progressively by the second compound, be stacked in dental calculus ground mass limit, road uniformly, then compacting is tight;9) Finally, film covers, observation, maintenance.
As preferably, step 2) and step 6) in engineering road maintenance device, two described operating bodies Being rotationally connected by bearing pin and arrange in forceps type structure, the holding end of one of them operating body is provided with two admittedly The connection handle that fixed connection and Y-shaped structure are arranged, the holding end of another operating body is provided with a connection handle And on this connection handle, it is provided with termination set.The handle that the end of each connection handle is the most threaded with handles, described Outside be provided with Anti-slip cover.Be threaded connection with handles on connection handle, handle arrange Anti-slip cover, be for Easy and safe to operate, it is to avoid skidding in force process.Described cramping body is rotated with working end by rotating shaft Connecting, described cramping body be arranged in parallel with the axis of rotating shaft and rotates in the range of 60 degree along rotating shaft.Described Cramping body on be provided with cramping body engaging lug, described working end is provided with fixed plate, described fixed plate On be provided with fixed plate engaging lug, rotating shaft is rotationally connected with cramping body engaging lug and fixed plate engaging lug respectively.Institute Being provided with multiple card hanging hole on the operating body of the one end, working end stated, described boom hoisting activity is inserted and is hung over card extension In hole.Arranging multiple card hanging hole on the operating body of working end, such structure is that boom hoisting selects for convenience Diverse location carries out inserting extension, to meet the operation of the engineering objects such as dental calculus of not going the same way.
As preferably, step 2) and step 6) in cramping body be ladder splint structure, described clamping body Trapezoidal clamping face on be provided with rectangular recess, described rectangular recess internal whorl connects has rectangle clamping anti-skidding Pad, described rectangle clamping slipmat protrudes from trapezoidal clamping face.Cramping body can be arranged as required to as trapezoidal Clamp region, arranges rectangle clamping slipmat on its trapezoidal clamping face simultaneously, to realize satisfying the need the engineerings such as dental calculus The clamping of object, prevents from coming off.
, step 2 preferred as another kind) in cramping body be curved splint structure, the arc of described cramping body Being provided with arc groove on the tight face of clevis, described arc groove internal whorl connects has arc to clamp slipmat, Described arc clamping slipmat protrudes from arc clamping face.Certainly cramping body is it can also be provided that curved splint is tied Structure, with the operation of the engineering objects such as irregular road dental calculus such as applicable cylinder.
As preferably, boom hoisting includes hook, bowden cable, chain structure, L-shaped coupler body and flat angle steel head, institute The hook stated mounts with cramping body.Boom hoisting is set to the convenient connection of said structure, lifts by crane, and the side of operation The most quick.
The invention has the beneficial effects as follows: this engineering road maintenance device uses efficient and convenient, safe and efficient, and makes The method carrying out keeping in repair with this device so that laying speed is faster, and in hgher efficiency, security is good.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of engineering road maintenance device of the present invention;
Fig. 2 is a kind of structural representation of cramping body in the present invention;
Fig. 3 is the second structural representation of engineering road maintenance device of the present invention;
Fig. 4 is the second structural representation of cramping body in the present invention;
Fig. 5 is a kind of structural representation of boom hoisting in the present invention;
Fig. 6 is working end and a kind of attachment structure schematic diagram of fixed plate in the present invention;
Fig. 7 is the third structural representation of engineering road maintenance device of the present invention;
In figure: 1, device body, 2, cramping body, 3, operating body, 4, holding end, 5, working end, 6, Boom hoisting, 7, bearing pin, 8, connection handle, 9, terminate set, 10, handle, 11, Anti-slip cover, 12, Rotating shaft, 13, cramping body engaging lug, 14, fixed plate, 15, fixed plate engaging lug, 16, card hanging hole, 17, rectangular recess, 18, rectangle clamping slipmat, 19, arc groove, 20, arc clamping slipmat, 21, hook, 22, bowden cable, 23, chain structure, 24, L-shaped coupler body, 25, flat angle steel head, 26, Anti-skid stud.
Detailed description of the invention
Below by specific embodiment and combine accompanying drawing technical scheme is described in further detail.
Embodiment 1:
In the embodiment shown in Fig. 1, Fig. 2, a kind of engineering road maintenance device, including device body 1 He Cramping body 2, device body 1 includes two operating bodies 3 being symmetrical arranged and being rotationally connected, each operating body 3 Including holding end 4 and working end 5, cramping body 2 is rotatably connected on the end of working end 5, one end, working end 5 Operating body 3 on insert hang with boom hoisting 6.Boom hoisting 6 includes linking up with 21, bowden cable 22, chain structure 23, L-shaped coupler body 24 and flat angle steel head 25, hook 21 and cramping body 2 mount (see Fig. 5).Hook 21, Bowden cable 22, chain structure 23, L-shaped coupler body 24 and flat angle steel head 25, be sequentially connected with, L-shaped coupler body bottom Flat angle steel head 25, before lifting, insert one end of road dental calculus, hook activity is articulated in card hanging hole.
Two operating bodies 3 are rotationally connected by bearing pin 7 and arrange in forceps type structure, one of them operating body 3 Holding end 4 be provided with two and fixing connect and connection handles 8 that Y-shaped structure is arranged, (be called first Connection handle 81 and the second connection handle 82), the first connection handle 81 is fixing with the second connection handle 82 to be welded, the Two connection handle 82 auxiliary use, after being used for controlling the balance after the engineering objects such as road dental calculus lift and landing Moving left and right, the holding end 4 of another operating body 3 is provided with a connection handle 8 (the referred to as the 3rd connection handle 83) and it is provided with termination set 9 on this connection handle 8, termination set 9 is set handle 10 can be made to screw fastening.
The end the most threaded with handles 10 of each connection handle 8, the outside of handle 10 is provided with Anti-slip cover 11.The most threaded on first connection handle the 81, second connection handle the 82, the 3rd connection handle 83 have the first Hand 101, the second in command 102 and the 3rd handle 103.
Cramping body 2 is rotationally connected with working end 5 by rotating shaft 12, and cramping body 2 is flat with the axis of rotating shaft 12 Row arranges and rotates in the range of 60 degree along rotating shaft 12.
It is provided with cramping body engaging lug 13 on cramping body 2, working end 5 is provided with fixed plate 14, fixing The a length of 4cm-18cm of plate, height is 2cm-10cm, and thickness is 1.5cm, is fixedly welded on work The bottom of end, the angle between fixed plate and the working end of cramping body is 5-45 degree, general 30 degree;One As for road dental calculus width be 12cm, after clamping, two clamping faces are opposing parallel, fixed plate and clamping It is the angle (see Fig. 6) of 30 degree during welding between body.Fixed plate engaging lug 15 it is provided with in fixed plate 14, Rotating shaft 12 is rotationally connected with cramping body engaging lug 13 and fixed plate engaging lug 15 respectively.One end, working end 5 Operating body 3 on be provided with multiple card hanging hole 16, movable the inserting of boom hoisting 6 hangs in card hanging hole 16.
Cramping body 2 is ladder splint structure, and the trapezoidal clamping face of clamping body 2 is provided with rectangular recess 17, Rectangular recess 17 internal whorl connects has rectangle to clamp slipmat 18, and rectangle clamping slipmat 18 protrudes from ladder The tight face of clevis.The cramping body 2 of ladder splint structure is a prismatoid, its upper end a size of 6cm-20cm, Bottom a size of 4cm-18cm, height is 2cm-10cm, and thickness is 1.5cm, upper end in the present embodiment Taking 13cm, bottom takes 10cm, highly takes 6cm, and thickness takes 1.5cm.Rectangle it is provided with in the middle of prismatoid Groove, rectangular recess is arranged with installing hole, and the rectangular recess degree of depth is 0.6cm, rectangle clamping slipmat The thickness of 18 is 0.8cm.Rectangle clamps in slipmat 18 is arranged on cubold groove and rectangle clamping is anti- The clamping face 0.2cm of ladder splint structure is protruded in skidding 18, and is connected by bolt and rectangular recess are fixing.
Embodiment 2:
In the embodiment shown in Fig. 3, Fig. 4, its technical scheme is substantially the same manner as Example 1, difference Place is: cramping body 2 is curved splint structure, and the arc clamping face of cramping body 2 is provided with arc groove 19, arc groove 19 internal whorl connects has arc to clamp slipmat 20, and arc clamping slipmat 20 is convex Face is clamped for arc.The cramping body of curved splint structure, length 2cm-10cm, highly 2cm-10cm, Thickness 1.5cm, general length 8cm, highly 5cm, thickness 1.5cm.Centre is provided with arc groove, Being arranged with plywood hole on arc groove, arc clamping slipmat 20 can be leather packing, is arranged on curved splint The arc groove of structure is interior and arc clamping slipmat 20 protrudes arc clamping face 0.2cm, passes through bolt Fixing connection.
Embodiment 3:
In the embodiment shown in fig. 7, its technical scheme is substantially the same manner as Example 1, and difference is: Be provided with some anti-skid studs 26 in the fixed plate of cramping body 2, by this fixed plate can directly clamp trees, The engineering objects such as wooden unit.
Utilize the device of engineering road maintenance shown in above-described embodiment to carry out the method keeped in repair, this method for maintaining include with Lower step: 1) remove maintenance original road, section dental calculus, remove after first piece of road dental calculus to be removed is tilted; 2) operate this device, and clamped by cramping body, insert the one of road dental calculus block to be removed with boom hoisting End, lifts road dental calculus, removes one by one;3) first the groove at original place to be repaired is cleared up, deepen, bracing wire; 4) filler: make the first compound: by stone, yellow sand, cement, lemon yellow according to 4: 3: 2.8: 0.2 Ratio add water and stir;5) the first compound is divided into two heaps, is stacked in the end of road dental calculus to be laid In portion's groove, and along road dental calculus length direction one end stack a pile, shakeout, be provided with between two heaps distance (see Fig. 7);6) operation device body, is lifted road dental calculus to be laid by cramping body, moves and is placed into laying On the stockpile of the first good compound, mobile road dental calculus stone, righting, lay by line;7) all spread by line If after completing, make two compounds: stone, yellow sand, cement, accelerator, swelling agent, hydrophober are according to 5: The ratio of 3: 1.7: 0.1: 0.1: 0.1 adds water and stirs;8) along the road dental calculus base after having laid, Progressively by the second compound, be stacked in dental calculus ground mass limit, road uniformly, then compacting is tight;It is 9) last, Film covers, observation, maintenance.
Step 2) and step 6) in engineering road maintenance device, including device body 1 and cramping body 2, Device body 1 includes two operating bodies 3 being symmetrical arranged and being rotationally connected, and each operating body 3 includes gripping End 4 and working end 5, cramping body 2 is rotatably connected on the end of working end 5, the operation of one end, working end 5 Insert on body 3 and hang with boom hoisting 6.Boom hoisting 6 includes linking up with 21, bowden cable 22, chain structure 23, L-shaped coupler body 24 and flat angle steel head 25, hook 21 mounts with cramping body 2.Hook 21, bowden cable 22, Chain structure 23, L-shaped coupler body 24 and flat angle steel head 25, be sequentially connected with, the flat angle steel head of L-shaped coupler body bottom 25, before lifting, insert one end of road dental calculus, hook activity is articulated in card hanging hole.Two operating bodies 3 lead to Crossing bearing pin 7 to be rotationally connected and arrange in forceps type structure, the holding end 4 of one of them operating body 3 is provided with The connection handle 8 that two fixing connections and Y-shaped structure are arranged, (is called the first connection handle 81 and second Connection handle 82), the first connection handle 81 is fixing with the second connection handle 82 to be welded, and the second connection handle 82 is auxiliary Help use, be used for moving left and right after controlling the balance after the engineering objects such as road dental calculus lift and landing, another The holding end 4 of operating body 3 is provided with a connection handle 8 (the referred to as the 3rd connection handle 83) and this connection handle 8 On be provided with termination set 9.
The end the most threaded with handles 10 of each connection handle 8, the outside of handle 10 is provided with Anti-slip cover 11.The most threaded on first connection handle the 81, second connection handle the 82, the 3rd connection handle 83 have the first Hand 101, the second in command 102 and the 3rd handle 103.
Cramping body 2 is rotationally connected with working end 5 by rotating shaft 12, and cramping body 2 is flat with the axis of rotating shaft 12 Row arranges and rotates in the range of 60 degree along rotating shaft 12.
It is provided with cramping body engaging lug 13 on cramping body 2, working end 5 is provided with fixed plate 14, fixing The a length of 4cm-18cm of plate, height is 2cm-10cm, and thickness is 1.5cm, is fixedly welded on work The bottom of end, the angle between fixed plate and the working end of cramping body is 5-45 degree, general 30 degree;One As for road dental calculus width be 12cm, after clamping, two clamping faces are opposing parallel, fixed plate and clamping It is the angle (see Fig. 5) of 30 degree during welding between body.Fixed plate engaging lug 15 it is provided with in fixed plate 14, Rotating shaft 12 is rotationally connected with cramping body engaging lug 13 and fixed plate engaging lug 15 respectively.One end, working end 5 Operating body 3 on be provided with multiple card hanging hole 16, movable the inserting of boom hoisting 6 hangs in card hanging hole 16.
Cramping body 2 is ladder splint structure, and the trapezoidal clamping face of clamping body 2 is provided with rectangular recess 17, Rectangular recess 17 internal whorl connects has rectangle to clamp slipmat 18, and rectangle clamping slipmat 18 protrudes from ladder The tight face of clevis.The cramping body 2 of ladder splint structure is a prismatoid, its upper end a size of 6cm-20cm, Bottom a size of 4cm-18cm, height is 2cm-10cm, and thickness is 1.5cm, upper end in the present embodiment Taking 13cm, bottom takes 10cm, highly takes 6cm, and thickness takes 1.5cm.Rectangle it is provided with in the middle of prismatoid Groove, rectangular recess is arranged with installing hole, and the rectangular recess degree of depth is 0.6cm, rectangle clamping slipmat The thickness of 18 is 0.8cm.Rectangle clamps in slipmat 18 is arranged on cubold groove and rectangle clamping is anti-skidding The clamping face 0.2cm of pad 18 protrusion ladder splint structure, and be connected by bolt and rectangular recess are fixing.Or Person's cramping body 2 is curved splint structure, and the arc clamping face of cramping body 2 is provided with arc groove 19, arc Connected in star 19 internal whorl connects has arc to clamp slipmat 20, and arc clamping slipmat 20 protrudes from arc Clamping face.The cramping body of curved splint structure, length 2cm-10cm, highly 2cm-10cm, thickness 1.5cm, General length 8cm, highly 5cm, thickness 1.5cm.Centre is provided with arc groove, symmetrical on arc groove Being provided with plywood hole, arc clamping slipmat 20 can be leather packing, is arranged on the arc groove of curved splint structure Interior and arc clamping slipmat 20 protrudes arc clamping face 0.2cm, is bolted to connection.
This engineering road maintenance device, by the device body of a kind of forceps type structure with arrange one on device body The cramping body of special shape, cramping body is symmetrically connected to working end by bolt and pin-and-hole, the working end of operating body On be welded with fixed plate, fixed plate is provided with the fixed plate engaging lug no less than, and cramping body is provided with clamping Body engaging lug, cramping body can be clip rectangle plate structure, it is also possible to be curved splint structure, and at cramping body Clamping face is provided with symmetrical slipmat, and slipmat is connected by screw fixing.The working end of cramping body also sets It is equipped with boom hoisting 6.
Fixed plate engaging lug is connected by bearing pin with cramping body engaging lug, the cramping body of ladder splint structure and bearing pin Axis parallel and activity point of view scope between 1-60 degree.So can make cramping body operationally, energy Be suitable for the operation of the engineering objects such as the different road dental calculus block of width, whole of the clamping face of the cramping body made with Slabstone is affixed.Handle is threadeded with holding end, facilitates transportation and packing.The cramping body of curved splint structure and pin Axle main core line is parallel and activity point of view scope is between 1-60 degree.The cramping body of curved splint structure is permissible It is movably connected in fixing upper plate, it is ensured that when embracing circular spheroid, it is possible to safety takes in one's arms.
Carry out maintenance by this device to lay so that laying speed soon, efficiency is high, safer.

Claims (10)

1. an engineering road maintenance device, including device body (1) and cramping body (2), it is characterised in that: Described device body (1) includes two operating bodies (3) being symmetrical arranged and being rotationally connected, each operating body (3) include that holding end (4) and working end (5), described cramping body (2) are rotatably connected on working end (5) End, upper the inserting of the operating body (3) of described working end (5) one end hangs with boom hoisting (6).
A kind of engineering road maintenance device the most according to claim 1, it is characterised in that: two described behaviour Make body (3) be rotationally connected by bearing pin (7) and arrange in forceps type structure, one of them operating body (3) Holding end (4) be provided with two and fixing connect and connection handles (8) that Y-shaped structure is arranged, another behaviour Make the holding end (4) of body (3) to be provided with on a connection handle (8) and this connection handle (8) and be provided with end Only set (9).
A kind of engineering road maintenance device the most according to claim 2, it is characterised in that: each connection handle (8) End the most threaded (10) with handles, the outside of described handle (10) is provided with Anti-slip cover (11).
A kind of engineering road maintenance device the most according to claim 1, it is characterised in that: described cramping body (2) it is rotationally connected with working end (5) by rotating shaft (12), described cramping body (2) and rotating shaft (12) Axis be arranged in parallel and rotate in the range of 60 degree along rotating shaft (12).
A kind of engineering road maintenance device the most according to claim 4, it is characterised in that: described cramping body (2) it is provided with cramping body engaging lug (13) on, described working end (5) is provided with fixed plate (14), Be provided with fixed plate engaging lug (15) in described fixed plate (14), rotating shaft (12) respectively with cramping body Engaging lug (13) and fixed plate engaging lug (15) are rotationally connected.
A kind of engineering road maintenance device the most according to claim 1, it is characterised in that: described working end (5) being provided with multiple card hanging hole (16) on the operating body (3) of one end, described boom hoisting (6) is lived Dynamic inserting hangs in card hanging hole (16).
7. according to a kind of engineering road maintenance device described in claim 1 or 2 or 3 or 4 or 5 or 6, its It is characterised by: cramping body (2) is ladder splint structure, on the trapezoidal clamping face of described clamping body (2) Being provided with rectangular recess (17), described rectangular recess (17) internal whorl connects has rectangle to clamp slipmat (18), described rectangle clamping slipmat (18) protrudes from trapezoidal clamping face.
8. according to a kind of engineering road maintenance device described in claim 1 or 2 or 3 or 4 or 5 or 6, its It is characterised by: cramping body (2) is curved splint structure, on the arc clamping face of described cramping body (2) Being provided with arc groove (19), described arc groove (19) internal whorl connects has arc to clamp slipmat (20), described arc clamping slipmat (20) protrudes from arc clamping face.
9. according to a kind of engineering road maintenance device described in claim 1 or 2 or 3 or 4 or 5 or 6, its It is characterised by: boom hoisting (6) includes linking up with (21), bowden cable (22), chain structure (23), L-shaped Coupler body (24) and flat angle steel head (25), described hook (21) mounts with cramping body (2).
10. the method that the engineering road maintenance device that a kind utilizes described in claim 1 carries out keeping in repair, it is characterised in that: This method for maintaining comprises the following steps: 1) remove maintenance original road, section dental calculus, by be removed first piece Road dental calculus removes after tilting;2) operation device body (1), and clamped by cramping body (2), with lifting Device (6) inserts one end of road dental calculus block to be removed, lifts road dental calculus, removes one by one;3) first will The groove cleaning at original place to be repaired, deepens, bracing wire;4) filler: make the first compound: by stone, Yellow sand, cement, lemon yellow add water according to the ratio of 4: 3: 2.8: 0.2 and stir;5) mix first Close material and be divided into two heaps, be stacked in the bottom groove of road dental calculus to be laid, and along the length direction one of road dental calculus End stacks a pile, shakeouts, is provided with distance between two heaps;6) operation device body (1), passes through cramping body (2) road dental calculus to be laid is lifted, move and be placed on the stockpile of the first compound laid, mobile Road dental calculus stone, righting, lay by line;7), after all having laid by line, two compounds are made: stone, Yellow sand, cement, accelerator, swelling agent, hydrophober are according to 5: 3: 1.7: the ratio of 0.1: 0.1: 0.1 Add water and stir;8) along the road dental calculus base after having laid, progressively by the second compound, uniformly Being stacked in dental calculus ground mass limit, road, then compacting is tight;9) last, film covers, observation, maintenance.
CN201610297639.XA 2016-04-27 2016-04-27 A kind of method that utilizing works road maintenance device carries out road maintenance Active CN105836364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610297639.XA CN105836364B (en) 2016-04-27 2016-04-27 A kind of method that utilizing works road maintenance device carries out road maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610297639.XA CN105836364B (en) 2016-04-27 2016-04-27 A kind of method that utilizing works road maintenance device carries out road maintenance

Publications (2)

Publication Number Publication Date
CN105836364A true CN105836364A (en) 2016-08-10
CN105836364B CN105836364B (en) 2018-02-02

Family

ID=56592119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610297639.XA Active CN105836364B (en) 2016-04-27 2016-04-27 A kind of method that utilizing works road maintenance device carries out road maintenance

Country Status (1)

Country Link
CN (1) CN105836364B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702865A (en) * 2016-12-29 2017-05-24 秦皇岛润昌科技开发有限公司 Full-automatic road traffic stone laying machine for park and garden constructions of municipal roads

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4215889A (en) * 1979-03-02 1980-08-05 Rayburn Lloyd M Lifting tool
DE4017287A1 (en) * 1990-04-27 1991-10-31 Michael Breu GRipper unit for paving stones etc. - has swivel connected arms with grip elements at lower operating ends and gripping rod with end holders
CN202089513U (en) * 2011-05-20 2011-12-28 杭州钱江弹簧有限公司 Portable clamp holder
CN102951402A (en) * 2012-12-10 2013-03-06 常熟建工建设集团有限公司苏州分公司 Constructional fixture
CN202804982U (en) * 2012-08-03 2013-03-20 莱琏钢铁有限公司 Clamping tool
CN103967286A (en) * 2014-04-14 2014-08-06 苏州金螳螂建筑装饰股份有限公司 Large-sized stone installing and transferring clamp
CN204727029U (en) * 2015-06-15 2015-10-28 中国葛洲坝集团国际工程有限公司 Building block mobile device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4215889A (en) * 1979-03-02 1980-08-05 Rayburn Lloyd M Lifting tool
DE4017287A1 (en) * 1990-04-27 1991-10-31 Michael Breu GRipper unit for paving stones etc. - has swivel connected arms with grip elements at lower operating ends and gripping rod with end holders
CN202089513U (en) * 2011-05-20 2011-12-28 杭州钱江弹簧有限公司 Portable clamp holder
CN202804982U (en) * 2012-08-03 2013-03-20 莱琏钢铁有限公司 Clamping tool
CN102951402A (en) * 2012-12-10 2013-03-06 常熟建工建设集团有限公司苏州分公司 Constructional fixture
CN103967286A (en) * 2014-04-14 2014-08-06 苏州金螳螂建筑装饰股份有限公司 Large-sized stone installing and transferring clamp
CN204727029U (en) * 2015-06-15 2015-10-28 中国葛洲坝集团国际工程有限公司 Building block mobile device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702865A (en) * 2016-12-29 2017-05-24 秦皇岛润昌科技开发有限公司 Full-automatic road traffic stone laying machine for park and garden constructions of municipal roads

Also Published As

Publication number Publication date
CN105836364B (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN203319514U (en) Box girder lifting device
MX2013014205A (en) Method for producing a tower segment of a concrete tower of an wind energy installation.
CN208055826U (en) A kind of kerbstone mounting auxiliary
CN104233959A (en) Device and method for assembling, fixing, detaching and moving overhead road and bridge concrete guardrail templates
CN105836364A (en) Engineering road repairing device and repairing method through engineering road repairing device
US6382594B1 (en) Post puller
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
EP2396473B1 (en) Lifting device for lifting a curb stone
CN208166414U (en) A kind of architectural engineering multi-functional carrying machine
WO2018026320A1 (en) System and method for securing, moving and placing a pile or heavy elongated object
KR100992574B1 (en) Clamping device for lug cutting to out panel of ship
CN108643036A (en) A kind of wet seam construction of prefabricated case beam
CN205661953U (en) Engineering road repair device
CN207276039U (en) Aluminium ingot clamp
CN210418915U (en) Special hoisting device for large precast block
CN202346582U (en) Large diameter steel bar hoisting clamp
CN104746541B (en) Crawler type flat bed transport vehicle
CN204898528U (en) T roof beam prestressing jack stretch -draw safety device
CN104860212B (en) A kind of micro lifter
CN204551442U (en) A kind of reinforcing bar cage hoisting movable hook
CN103669219B (en) Many limbs height pier is with sliding construction equipment
JP5801738B2 (en) Structure demolition machine
CN206857962U (en) The boom hoisting of excavator
CN112079148A (en) Brick clamping tool
CN109183550A (en) One kind can fast have enough to meet the need interim road laying method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180717

Address after: 234000 Anhui province Suzhou City Qiao Qiao District West Textile Road Human Resources Industrial Park, Huizi Huizhong creates 7-8 spaces.

Patentee after: Suzhou Earth Network Technology Co., Ltd.

Address before: 234000 No. 20, Xiao Wang Group, Hou Fu Village, Suzhou Economic Development Zone, Anhui

Patentee before: Li Jian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220301

Address after: 234000 room 1-1, incubator, innovation and entrepreneurship center, building B1, Suzhou technician college, Suzhou City, Anhui Province

Patentee after: Anhui Huazhong Robot Technology Development Co.,Ltd.

Address before: 234000 Anhui province Suzhou City Qiao Qiao District West Textile Road Human Resources Industrial Park, Huizi Huizhong creates 7-8 spaces.