CN105834814A - Large part processing and leveling method - Google Patents
Large part processing and leveling method Download PDFInfo
- Publication number
- CN105834814A CN105834814A CN201610451299.1A CN201610451299A CN105834814A CN 105834814 A CN105834814 A CN 105834814A CN 201610451299 A CN201610451299 A CN 201610451299A CN 105834814 A CN105834814 A CN 105834814A
- Authority
- CN
- China
- Prior art keywords
- levelling
- water
- equal
- leveling
- contour
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/18—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for positioning only
- B23Q3/186—Aligning devices
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
The invention provides a large part processing and leveling method. The method comprises the following steps: (1) roughly leveling and (2) finely leveling, wherein the step (1) of roughly leveling comprises the sub-steps: 1) firstly arranging three equal-height leveling blocks in a range of 180 degrees on a working table, then lifting and putting parts on the equal-height leveling blocks, and finally arranging a hydraulic jack in each equal-height leveling block position; and 2) roughly leveling the parts via rising and falling of the hydraulic jack by using a height caliper and simultaneously padding gaskets on the equal-height leveling blocks. The step (2) of finely leveling is characterized by communicating water with an alignment instrument. The method is simple and is convenient to operate; the measurement accuracy can be controlled within 0.02mm; the accuracy of the method is obviously higher than that of the conventional leveling method.
Description
Technical field
The present invention relates to part processing centering field, especially relate to a kind of heavy parts (nuclear power low pressure level Four dividing plate)
Processing leveling method.
Background technology
Nuclear power low pressure level Four dividing plate diameter is big, up to 5.6m;The big 885mm of inner and outer ring span;Amount of deflection is big;It is the highest,
Up to 846mm.During boring machine milling split, in order to ensure outer shroud omoplate face and split perpendicularity 0.08mm after milling,
Within must be by the outer shroud levelling 0.05mm of omoplate sealing surface when dividing plate is put levelling.But, boring spindle length and
Work table rotation limited diameter, therefore cannot be levelling by outer shroud omoplate sealing surface, and boring machine can be vented between narrow, it is impossible to profit
Carry out levelling by conventional level indicator, and conventional levels instrument precision is also unsatisfactory for requirement, be there is a need to find one levelling
Method carries out levelling.
Summary of the invention
It is an object of the invention to: the problem existed for prior art, it is provided that a kind of heavy parts processing leveling method,
When solving existing processing heavy parts, the problem that levelling precision is the highest.
The goal of the invention of the present invention is achieved through the following technical solutions:
A kind of heavy parts processing leveling method, it is characterised in that the method comprises the following steps:
(1) the most levelling:
1) on work top, first in the range of 180 degree, arrange three equal-height padding irons, then part handling is positioned over
On high parallels, finally in one hydraulic jack of each equal-height padding iron location arrangements;
2) utilize height gauge, and by the lifting of hydraulic jack, part is carried out the most levelling, simultaneously at equal-height padding iron
Upper pad pad;
(2) essence is levelling: utilize water connection alignment instrument to carry out essence levelling.
As further technical scheme, thick levelling time, first levelling part left and right directions, more levelling fore-and-aft direction.
As further technical scheme, described water connection alignment instrument includes three identical water tumblers, two sections of flexible pipes and three
Individual contour survey mass, each water tumbler fixes a contour survey mass in same position transverse horizontal, at the bottom of one of them water tumbler
Portion arranges two waterpipe jointings, respectively arranges a waterpipe jointing bottom two other water tumbler, and described two sections of flexible pipes pass through water
Interface tube three water tumblers of connection.
As further technical scheme, utilize water connection alignment instrument carry out smart levelling time: 1) water is connected alignment instrument
Three water tumblers are arranged on the horizontal plane of part, and make the lower surface of contour survey mass and the horizontal plane laminating of part;
2) add water in water tumbler, and after the water surface is steady, at the same position of each contour survey mass, use micrometric depth gauge respectively
The contour survey mass of measurement, to the distance of the water surface, regulates hydraulic jack, so that each contour survey mass is to the water surface simultaneously
Distance equal, then pad pad on equal-height padding iron.
As further technical scheme, smart levelling time, first levelling part left and right directions, more levelling fore-and-aft direction.
As further technical scheme, the method further comprises the steps of: (3) and uses pressure plate mode, fills Clamp blocks,
Compress point with the strong point in a straight line.
As further technical scheme, after clamping parts, again measure contour survey mass extremely with micrometric depth gauge
The distance of the water surface, if change is not less than 0.05mm, then takes off water connection alignment instrument, and centering terminates, and otherwise unclamps part,
And change point is carried out pad, until levelling.
Compared with prior art, the inventive method is simple, easy to operate, and certainty of measurement can be controlled in 0.02mm with
In, more much higher than traditional leveling method precision.
Accompanying drawing explanation
Fig. 1 is equal-height padding iron and hydraulic jack putting position figure;
Water is connected the view that the level of alignment instrument is pressed on the horizontal plane of part by Fig. 2;
Fig. 3 is water tumbler structural representation;
Fig. 4 is the A direction view of Fig. 3;
Fig. 5 is the structural representation of contour survey mass;
Fig. 6 is the installation diagram of contour survey mass and water tumbler;
Fig. 7 is the overall structure schematic diagram of water connection alignment instrument;
Fig. 8 is the measuring principle figure of water connection alignment instrument.
Detailed description of the invention
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment
The inventive method in use, needs to use water connection alignment instrument, and the present invention provides a kind of water connection alignment instrument,
Its structure is as shown in Fig. 3~Fig. 7, and this alignment instrument is mainly contour by three identical 1, two sections of flexible pipes 2 of water tumbler and three
Survey mass 3 forms.The most each water tumbler fixes a contour survey mass 2 in same position transverse horizontal.Three water tumblers
In a water tumbler bottom two waterpipe jointings 4 are set, a waterpipe jointing is respectively set bottom two other water tumbler.Two
Section flexible pipe connects three water tumblers by waterpipe jointing.Water pipe head for be fixed on bottom water tumbler and with water tumbler inner space phase
Logical steel pipe.Contour survey mass 3 is rectangle survey mass, when it is fixed on water tumbler, and upper surface and water cup mouth plane
Equal.
In order to measure conveniently, water tumbler 1 is designed as including diapire and at least two sidewall, and one of them sidewall is planar side
Wall, contour survey mass is fixed in water tumbler flat sidewall be fixed in flat sidewall by packing ring and screw 5.This enforcement
Example provides a kind of concrete water tumbler structure, as shown in Figure 3, Figure 4, including diapire 11 and two sidewalls, one of them side
Wall is flat sidewall 12, and another sidewall is semicircular arc sidewall 13, also referred to as semi-circular cylindrical water tumbler.
The inventive method specifically includes step:
The most levelling:
1. first operative employee all lays three equal-height padding irons 6 on work top in the range of 180 degree, secondly by part 7
(as a example by nuclear power low pressure level Four dividing plate) handling is positioned on equal-height padding iron 6, finally in each equal-height padding iron 6 position
Arrange a hydraulic jack 8, see Fig. 1;
2. look for about straight part split.
3. use the special height gauge of scribing by bench worker, by the lifting of hydraulic jack 8, use and prop up on equal-height padding iron 6
Pad copper sheet or pad, make machined omoplate sealing surface the most levelling, and first levelling left and right directions in leveling procedures, before levelling
Rear to.
Essence is levelling:
1. water connect alignment instrument is uniform to be placed in part plane, and water tumbler (semi-circular cylindrical) spacing between any two is as far as possible
Greatly, in the case of ensureing that water tumbler 1 (semi-circular cylindrical) the planar side wall periphery 9 with part is close to, use and compress
Device 10 (this enforcement uses by the device holding out against screw and nut forms) makes baseplane and the nuclear power of contour survey mass 3
Dividing plate omoplate sealing surface fits tightly, and sees Fig. 2.
2. pouring in water connection alignment instrument, treats that the water surface is steady.
The most as shown in Figure 8, from the same position of the contour survey mass 3 of three water tumblers, use micrometric depth gauge inspection respectively
Survey the distance of contour survey mass 3 to the water surface, if A, B, C size measured is unequal, and hydraulic jack need to be passed through
Lifting, on equal-height padding iron, pad copper coin, copper sheet or pad adjust placement E, F, G tri-actual base of water tumbler respectively
The relative relief in 3, quasi-face, is gradually reduced the angle α in reference face and theoretical principle face so that it is the A of measurement, B,
C size relative size gradually reaches unanimity, until relative error is less than 0.03mm under free state.In leveling procedures first
Levelling left and right, in direction, the levelling world.
4. using pressure plate mode, fill Clamp blocks, compressing point otherwise to need to use auxiliary with the strong point in a straight line
Help supporting way.
5. it is again with micrometric depth gauge and detects the distance of contour survey mass 3 to the water surface, see if there is and changed, if becoming
Changing not less than 0.05mm, it is qualified to be considered as, and otherwise needs to unclamp workpiece pressuring clamping device, and change point is carried out pad, until full
Foot requirement.
6. from workpiece, take off water connection alignment instrument.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, it is noted that
All any amendment, equivalent and improvement etc. made within the spirit and principles in the present invention, should be included in this
Within bright protection domain.
Claims (7)
1. a heavy parts processing leveling method, it is characterised in that the method comprises the following steps:
(1) the most levelling:
1) on work top, first in the range of 180 degree, arrange three equal-height padding irons, then part handling is placed
On equal-height padding iron, finally in one hydraulic jack of each equal-height padding iron location arrangements;
2) utilize height gauge, and by the lifting of hydraulic jack, part is carried out the most levelling, simultaneously contour
Pad pad on parallels;
(2) essence is levelling:
Water connection alignment instrument is utilized to carry out essence levelling.
A kind of heavy parts processing leveling method the most according to claim 1, it is characterised in that the most levelling
Time, first levelling part left and right directions, more levelling fore-and-aft direction.
A kind of heavy parts processing leveling method the most according to claim 1, it is characterised in that described water
Connection alignment instrument includes three identical water tumblers, two sections of flexible pipes and three contour survey mass, and each water tumbler is in same position
Put transverse horizontal and fix a contour survey mass, two waterpipe jointings are set bottom one of them water tumbler, two other
Respectively arranging a waterpipe jointing bottom water tumbler, described two sections of flexible pipes connect three water tumblers by waterpipe jointing.
A kind of heavy parts processing leveling method the most according to claim 3, it is characterised in that utilize water
Connection alignment instrument carry out smart levelling time:
1) three water tumblers that water connects alignment instrument are arranged on the horizontal plane of part, and make contour survey mass
The horizontal plane laminating of lower surface and part;
2) add water in water tumbler, and after the water surface is steady, at the same position of each contour survey mass, respectively with deep
The degree miking contour survey mass of measurement, to the distance of the water surface, regulates hydraulic jack simultaneously, so that each contour survey
Gauge block is equal to the distance of the water surface, then pad pad on equal-height padding iron.
A kind of heavy parts processing leveling method the most according to claim 4, it is characterised in that essence is levelling
Time, first levelling part left and right directions, more levelling fore-and-aft direction.
A kind of heavy parts processing leveling method the most according to claim 1, it is characterised in that the method
Further comprise the steps of: (3) and use pressure plate mode, fill Clamp blocks, compress point with the strong point in a straight line.
A kind of heavy parts processing leveling method the most according to claim 6, it is characterised in that clamping zero
After part, again measure contour survey mass to the distance of the water surface with micrometric depth gauge, if change not less than
0.05mm, then take off water connection alignment instrument, and centering terminates, and otherwise unclamps part, and change point is carried out pad,
Until it is levelling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610451299.1A CN105834814B (en) | 2016-06-21 | 2016-06-21 | Heavy parts process leveling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610451299.1A CN105834814B (en) | 2016-06-21 | 2016-06-21 | Heavy parts process leveling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105834814A true CN105834814A (en) | 2016-08-10 |
CN105834814B CN105834814B (en) | 2018-07-20 |
Family
ID=56576828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610451299.1A Active CN105834814B (en) | 2016-06-21 | 2016-06-21 | Heavy parts process leveling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105834814B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106624679A (en) * | 2016-12-20 | 2017-05-10 | 柳州通为机械有限公司 | Method for increasing processing precision of automobile mold parts |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040211945A1 (en) * | 2003-04-23 | 2004-10-28 | Roberto Maggiori | Leveling instrument, an electromechanical lifter and a self leveling integrated lifting system using both of them |
CN101852096A (en) * | 2010-05-22 | 2010-10-06 | 东方电气集团东方汽轮机有限公司 | Assembly method of draw bar type rotor disk of gas turbine |
CN204209390U (en) * | 2014-04-29 | 2015-03-18 | 兰州西固热电有限责任公司 | A kind of leveling unit for power station favourable turn machine-team |
CN204661242U (en) * | 2015-04-29 | 2015-09-23 | 中国十七冶集团有限公司 | Equipment installs the jacking apparatus of leveling centering |
CN205014977U (en) * | 2015-08-17 | 2016-02-03 | 中国能源建设集团山西电力建设有限公司 | Steam turbine installation platen leveling device |
CN105291082A (en) * | 2015-11-10 | 2016-02-03 | 齐齐哈尔雷昂重工机械制造有限责任公司 | Large-diameter workpiece scribing process |
CN105570622A (en) * | 2016-01-19 | 2016-05-11 | 莱芜钢铁集团有限公司 | Equipment leveling assembly and method |
-
2016
- 2016-06-21 CN CN201610451299.1A patent/CN105834814B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040211945A1 (en) * | 2003-04-23 | 2004-10-28 | Roberto Maggiori | Leveling instrument, an electromechanical lifter and a self leveling integrated lifting system using both of them |
CN101852096A (en) * | 2010-05-22 | 2010-10-06 | 东方电气集团东方汽轮机有限公司 | Assembly method of draw bar type rotor disk of gas turbine |
CN204209390U (en) * | 2014-04-29 | 2015-03-18 | 兰州西固热电有限责任公司 | A kind of leveling unit for power station favourable turn machine-team |
CN204661242U (en) * | 2015-04-29 | 2015-09-23 | 中国十七冶集团有限公司 | Equipment installs the jacking apparatus of leveling centering |
CN205014977U (en) * | 2015-08-17 | 2016-02-03 | 中国能源建设集团山西电力建设有限公司 | Steam turbine installation platen leveling device |
CN105291082A (en) * | 2015-11-10 | 2016-02-03 | 齐齐哈尔雷昂重工机械制造有限责任公司 | Large-diameter workpiece scribing process |
CN105570622A (en) * | 2016-01-19 | 2016-05-11 | 莱芜钢铁集团有限公司 | Equipment leveling assembly and method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106624679A (en) * | 2016-12-20 | 2017-05-10 | 柳州通为机械有限公司 | Method for increasing processing precision of automobile mold parts |
Also Published As
Publication number | Publication date |
---|---|
CN105834814B (en) | 2018-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106482690B (en) | A kind of gear wheel involute model | |
CN102506666B (en) | Comprehensive test method for geometric accuracy of numerically controlled milling machine | |
CN207763666U (en) | A kind of three coordinate setting toolings of high-pressure oil pipe measurement | |
CN105290880A (en) | Device and method for detecting perpendicularity of axis of spindle and reference axis in movement | |
CN105921777B (en) | A kind of eccentric hole forming method | |
CN106017285A (en) | Verticality and symmetry degree testing tool for piston pin hole | |
CN105834814A (en) | Large part processing and leveling method | |
CN108036696B (en) | Device and method for measuring position size of dovetail groove in inner hole of part | |
CN207432050U (en) | A kind of pre-determined bit boss positioner | |
CN203792101U (en) | Alignment assembly of guiding formwork | |
CN211317140U (en) | Deep hole step height measuring device | |
CN102818507A (en) | Angle size accurate measuring method of sine protractor | |
CN201104211Y (en) | Universal angle alignment measuring gauge | |
CN106247899B (en) | The device for fast detecting and its application method of leaf spring knee level alternate position spike | |
CN112857302B (en) | Angle measuring method and method for drawing angle line | |
CN207358865U (en) | Workpiece slope dimension measuring device | |
CN107378021A (en) | A kind of processing method of endoporus | |
CN103196759B (en) | Detection apparatus and detection method of displacement of force application point used for testing rock fracture toughness | |
CN213105583U (en) | Clamp for manufacturing and detecting size of dihedral angle intersection point of workpiece | |
CN204346344U (en) | Machine Design tool ruler | |
CN107782220A (en) | A kind of fast precise sealing cone axial dimension measurement apparatus | |
CN109794734B (en) | Machining method of ring beam | |
CN204438992U (en) | A kind of precision measurement apparatus of high precision verticality | |
CN203605885U (en) | Crankcase comprehensive test tool | |
CN203611148U (en) | Support test tooling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |