CN105821748A - Reinforcing apparatus and method used after core-boring sampling of cast-in-situ floor of road or building - Google Patents

Reinforcing apparatus and method used after core-boring sampling of cast-in-situ floor of road or building Download PDF

Info

Publication number
CN105821748A
CN105821748A CN201510977167.8A CN201510977167A CN105821748A CN 105821748 A CN105821748 A CN 105821748A CN 201510977167 A CN201510977167 A CN 201510977167A CN 105821748 A CN105821748 A CN 105821748A
Authority
CN
China
Prior art keywords
road
cast
coring
diameter
sampling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510977167.8A
Other languages
Chinese (zh)
Other versions
CN105821748B (en
CN105821748B8 (en
Inventor
慕鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yuanchen Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510977167.8A priority Critical patent/CN105821748B8/en
Publication of CN105821748A publication Critical patent/CN105821748A/en
Publication of CN105821748B publication Critical patent/CN105821748B/en
Application granted granted Critical
Publication of CN105821748B8 publication Critical patent/CN105821748B8/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0288Repairing or restoring floor slabs

Abstract

The invention discloses a reinforcing apparatus used after core-boring sampling of a cast-in-situ floor of a road or building. The reinforcing apparatus is cooperatively used with a drilling machine and is characterized in that the reinforcing apparatus comprises an apparatus body and a bore broadening device, wherein the apparatus body comprises an installation body and a core fetching body, the bore broadening device comprises an installation body and a reamer bit which are coaxially arranged, and a bore perforated by the reamer bit is a cylindrical bore with a small bottom end and a large upper end. The reinforcing apparatus and method used after core-boring sampling of the cast-in-situ floor of the road or building carry out bore broadening on a smooth bore in the surface of a floor having undergone core boring sampling, which facilitates subsequent reinforcing and enables a repaired floor to be firmer; and operation is simple and convenient.

Description

The reinforcing device used after a kind of road construction cast-in-place walls core boring sampling and method
Technical field
The present invention relates to construction engineering technical field, the reinforcing device used after especially relating to a kind of road construction cast-in-place walls core boring sampling and method.
Background technology
At present, to detect after building cast-in-situ flooring or road rehabilitation completion, core boring sampling is a kind of the most frequently used method, and it is to utilize special drilling machine and diamond hollow thin-wall drill bit, drills through the core sample of a column type for detecting test on structural concrete.The purpose of test is the detection thickness of road, comprcssive strength, integrity, density, and the intensity of concrete, structural concrete are endured cold, the degree of depth of Fire-damaged, concrete joint, quality condition, the degree of depth of distress in concrete, isolation, hole and the grating of qualification rubble at layering.Core drilling method is directly perceived, accurately, reliable, be a kind of effective ways of not replacing of other Non-Destructive Testings.But after core boring sampling, next vertical with the road surface from top to bottom and cylindrical cavity of inner wall smooth can be stayed in road surface, and existing method is to be directly injected in hole by concrete, levelling rear completion.
Chinese patent literature (day for announcing: on JIUYUE 9th, 2015, notification number: CN204626216U) discloses this utility model and relates to the perforating device that building decoration construction is special.Vehicular road surface drill core repair apparatus includes car body and the core drilling machine being sequentially located on the carriage bottom plate of car body rear, water tank, blender, cement mortar agitator tank;Described core drilling machine controls drill bit by drill bit lifting handle and moves up and down;Described water tank is provided with pipeline and is connected with drill bit;Described cement mortar agitator tank is connected with blender, is provided with Grouting Pipe below;Described Grouting Pipe be arranged over laser sensor.
What technique scheme solved is that road surface drill core repair operation is easy, and coring efficiency is high, and boring can also be repaired after completing by coring, reduces the impact caused attractive in appearance of coring road pavement, the problem that coring unites two into one with repairing two procedures.
Summary of the invention
First goal of the invention of the present invention be for solving road boring and coring after, particularly after the boring and coring of concrete road surface, vertical with road surface from top to bottom and inner wall smooth the cylindrical cavity that road surface stays is repaired, the problem increasing intensity, and a kind of simple in construction is provided, the reinforcing device of easy to operate road construction cast-in-place walls core boring sampling.
Second goal of the invention of the present invention be in order to solve building cast-in-situ flooring boring and coring after, particularly after building cast-in-situ floor end face boring and coring, stay one of cast-in-situ floor is vertical with floor face from top to bottom and the repairing of the cylindrical cavity of inner wall smooth, increase its intensity and the problem leaked, and a kind of simple in construction is provided, the reinforcing device of easy to operate building cast-in-situ flooring core boring sampling.
3rd goal of the invention of the present invention is to provide the reinforcement that a kind of road construction cast-in-place walls core boring sampling uses.
The present invention realizes its first goal of the invention and be the technical scheme is that a kind of reinforcing device building road core boring sampling, this reinforcing device and boring machine with the use of, including device body and Counterboring apparatus, described device body includes fixing body and coring body, described fixing body is coaxially set with coring body, being uniformly arranged coring tooth on described coring body, described Counterboring apparatus includes that fixing body and reaming bit, described fixing body are coaxially set with reaming bit.The reinforcing device that this road core boring sampling uses, the fixing body being provided with by a device body and coring body, fixing body is connected with boring machine, drive coring body that the road position needing detection is carried out coring by boring machine, road hole after coring is due to inwall smoother and be the hole that diameter is identical from top to bottom, unfavorable for the road repair after coring, so carrying out reaming by Counterboring apparatus on the former pertusate coaxial line of road, the hole that Counterboring apparatus is left is that a bottom diameter is identical with foramen primum hole dia, upper end diameter is a cylindrical cavity of bottom diameter 2 times.
As preferably, described reaming bit, a diameter of 105mm of opening, upper end is directly 200mm.The little upper end, structure bottom of reaming bit is greatly the needs in order to meet reinforcement.Under the effect of vehicle or external force, the cylinder after reinforcement does not sinks.
As preferably, described reaming bit, a diameter of 155mm of opening, upper end is directly 300mm.The little upper end, structure bottom of reaming bit is greatly the needs in order to meet reinforcement.
As preferably, the size of coring sample body needs according to detection and sets, but general diameter takes 100mm or 150mm.Reaming bit opening diameter the most also has 105mm or 155mm bis-kinds.
As preferably, described reaming bit opening diameter is gradually incremented by along axial line less than diameter and the bit diameter of reaming bit upper end, described reaming bit hollow, and the hole that described reaming bit is left is the cylindrical hole that little upper end, a bottom is big.
As preferably, described fixing body is cylindrical structure, and described coring body is tube structure, and described fixing body is integrally disposed upon the upper end of coring body, and described coring tooth is uniformly arranged on the opening of coring body cylinder.Such structure is for overall coring, it is ensured that Detection results.
The present invention realizes second goal of the invention and be the technical scheme is that a kind of building cast-in-situ floor face core boring sampling reinforcing device, this reinforcing device and boring machine with the use of, including device body and Counterboring apparatus, described device body includes fixing body and coring body, described fixing body is coaxially set with coring body, described Counterboring apparatus includes that fixing body and reaming bit, described fixing body are coaxially set with reaming bit.So carrying out reaming by Counterboring apparatus on the original hole of road, the hole that Counterboring apparatus is left is that a bottom diameter is identical with foramen primum hole dia, and upper end diameter is a cylindrical cavity of bottom diameter 2 times.Described cylindrical shape hole is in floor face perforate, and sky is presented herein below after perforate.After solving cast-in-situ floor end face boring and coring, stay one of cast-in-situ floor is vertical with floor face from top to bottom, and the reinforced work of the cylindrical cavity that the big bottom of inner wall smooth and upper end is little is provided with pallet arrangement.The problem leaked for cylinder periphery new and old faying face crack after solving reinforcement, the pre-buried slip casting syringe needle when reinforcement.
Realizing the technology used in the present invention method is: the reinforcement used after a kind of road construction cast-in-place walls core boring sampling, it is characterised in that: described reinforcement comprises the following steps:
(1) first the road or cast-in-place walls needing sampling is carried out drill hole sampling;Device body is connected with puncher, add water cooling and carry out punching sampling by the coring tooth on coring body, sample body on the road taken out or cast-in-place walls is cylindrical structure, a diameter of 100mm or 150mm of sample body, and the opening diameter on road or cast-in-place walls is 105mm or 155mm simultaneously;
(2) reaming: be connected with puncher by Counterboring apparatus body, adds water cooling by reaming bit reaming so that the hole bottom diameter on road or cast-in-place walls is 105mm, and upper end diameter is a cylindrical cavity of 200mm;Or by reaming bit reaming so that the hole bottom diameter on road is 155mm, and upper end diameter is a cylindrical cavity of 300mm;
(3) stirring compound: by stone, yellow sand, cement, extender, bonding agent, according to weight ratio: 3: 2: 1: 0.2: 1 mixing match becomes mixed fillers, add water stirring;
(4) mixed fillers that will be stirred, injects in perforate, vibrates with small vibrating device simultaneously, plays slurry, stands;The purpose stood is in order to the extender in compound can fully expand so that it is more closely knit;
(5) need when processing cast-in-place walls hole pallet arrangement is first placed on the hole bottom surface outputed, firmly install, seal, described pallet arrangement is a circular flat board, flat board is provided with hook, and plate diameter is slightly larger than hole bottom diameter, generally 110mm or 160mm;Again the mixed fillers being stirred is injected in perforate, it is ensured that after mixed fillers is inserted, consolidating of pallet arrangement;The purpose arranging supporting plate is to not fall off when mixed fillers injects after vibration, not water clock;During pre-buried slip casting syringe needle, insert in hole upper end surrounding correspondence, pre-buried slip casting syringe needle purpose be condense molding completely for mixed fillers after, its periphery has a gap with the junction of floor face, the mode injecting waterproof material with high-pressure grout injector makes up this gap, guaranteeing roof of storied building, rainy season is water-tight;
(6), after standing 2 hours, observe mixed fillers height and the degree of flushing on road surface, go to add less more, flatten with instrument;
(7) maintenance, carries out maintenance with covered rearing with plastic film;
(8) arrange maintenance to indicate, until being completely solidified as one both completed the reinforced work after sampling with road;
(9) after reinforced work terminates 3 months, by high-pressure grout injector, reserved slip casting syringe needle is carried out slip casting, to reach airtight effect, it is ensured that rainwater not water clock;
(10) finally with electric tool, unnecessary slip casting syringe needle is ground off, remove pallet arrangement, tint on reinforcing body surface, indicate, for future reference;
Beneficial effects of the present invention one is: the reinforcing device used after this road core boring sampling, smooth hole after coring is carried out expanding treatment, expand big bottom, hole upper end little, so facilitate follow-up reinforcement, make the road after repairing firmer, can strengthen being integrated with original path, increase the firmness of road.
Beneficial effects of the present invention two is: the reinforcing device used after this building cast-in-situ flooring core boring sampling, the smooth hole of floor face after coring is carried out expanding treatment, expand big bottom, hole upper end little, so facilitate follow-up reinforcement, make the floor face after repairing firmer, make compound concrement not landing under external force, it is possible to strengthen being integrated with former floor face, increase the firmness of floor face;The gap between floor face and reinforcing body can be filled up by slip casting, thus reach airtight effect.
And utilize the reinforcement of this road construction cast-in-place walls core boring sampling, it is possible to achieve and to the reinforcement body after road construction cast-in-place walls coring, and simple to operate, convenient.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of road construction core boring sampling reinforcing device of the present invention;
Fig. 2 is the Counterboring apparatus structural representation after road construction cast-in-place walls drill core of the present invention;
Fig. 3 is the reaming generalized section of road construction cast-in-place walls core boring sampling of the present invention;
Fig. 4 is the scheme of installation of building cast-in-situ flooring core boring sampling rear supporting plate device of the present invention;
Fig. 5 is the pallet arrangement schematic diagram that building cast-in-situ flooring reinforcement of the present invention uses;
Fig. 6 is road construction cast-in-place walls reinforcement grouting behind shaft or drift lining schematic diagram of the present invention;
In figure: 1, device body, 2, sample body, the 3, second fixing body, 4, reaming bit, 5, reaming section, 6, steel hook, 7, floor, 8, pallet arrangement, 9, slip casting syringe needle, 10, coring body, 11, coring tooth, 12, Counterboring apparatus, 13, perforate, the 14, first fixing body, 15, supporting plate.
Detailed description of the invention
Below by specific embodiment and combine accompanying drawing technical scheme is described in further detail.
Embodiment 1: in the embodiment shown in fig. 1, a kind of reinforcing device of road construction cast-in-place walls core boring sampling, this reinforcing device and boring machine with the use of, including device body 1 and sample body 2, device body 1 includes the first fixing body 14 and coring body 10 and coring tooth 11, first fixing body 14 and coring body 10 are coaxially set, and coring 10 is uniformly arranged coring tooth 11.
Counterboring apparatus 12 includes that the second fixing body 3 and reaming bit 4, the second fixing body 3 and reaming bit 4 are integrated setting in fig. 2.
Fig. 3 is the profile after Counterboring apparatus reaming.
Having perforate 13, perforate 13 on floor 7 shown in Fig. 4 is the hole that big bottom, upper end is little, and steel hook 6 is arranged on floor 7 through hole.
Pallet arrangement 8 shown in Fig. 5, including steel hook 6 and supporting plate 15, steel hook is symmetrical arranged, and no less than 2, steel hook is connected on floor upper surface;Steel hook 6 connects through supporting plate 15 nut, and nut connects can make supporting plate rise or fall, it is ensured that this device is firm.
Slip casting syringe needle shown in Fig. 69 is pre-buried is arranged on filler reinforcement body upper periphery, selection slip casting of selecting a good opportunity, slip casting syringe needle be set to 2, carry out pre-buried as required.
A kind of reinforcement used after road construction cast-in-place walls core boring sampling, described reinforcement comprises the following steps:
(1) first the road or cast-in-place walls needing sampling is carried out drill hole sampling;The first fixing body 14 on device body 1 is connected with puncher, add water cooling and carry out punching sampling by the coring tooth 11 on coring body, sample body 2 on the road taken out or cast-in-place walls is cylindrical structure, a diameter of 100mm or 150mm of sample body 2, the opening diameter on road or cast-in-place walls is 105mm or 155mm simultaneously;The wall thickness 5mm of coring body 10;
(2) reaming: reaming on the basis of foramen primum;The second fixing body 3 on Counterboring apparatus 12 is connected with puncher, adds water cooling by reaming bit 4 reaming so that the hole bottom diameter on road or cast-in-place walls is 105mm, and upper end diameter is a cylindrical cavity of 200mm;Or by reaming bit 4 reaming so that the hole bottom diameter on road is 155mm, and upper end diameter is a cylindrical cavity of 300mm;Section after reaming is as shown in Figure 5;
(3) stirring compound: by stone, yellow sand, cement, extender, bonding agent, according to weight ratio: 3: 2: 1: 0.2: 1 mixing match becomes mixed fillers, add water stirring;
(4) mixed fillers that will be stirred, injects in perforate 13, vibrates with small vibrating device simultaneously, plays slurry, stands;
(5) need first the supporting plate 15 on pallet arrangement 8 to be placed on the hole bottom surface outputed when processing cast-in-place walls hole, steel hook 6 is articulated in through hole the upper surface of floor 7, firmly installs, seal;The mixed fillers being stirred again, injects in perforate 13, it is ensured that not water clock when mixed fillers inserts after vibration;Slip casting syringe needle 9 is arranged on hole upper end surrounding correspondence again insert;
(6), after standing 2 hours, observe mixed fillers height and the degree of flushing on road surface, go to add less more, flatten with instrument;
(7) maintenance, carries out maintenance with covered rearing with plastic film;
(8) arrange maintenance to indicate, until being completely solidified as one both completed the reinforced work after sampling with road;
(9) after reinforced work terminates 3 months, by high-pressure grout injector, reserved slip casting syringe needle is carried out slip casting, to reach airtight effect, it is ensured that rainwater not water clock;
(10) finally with electric tool, unnecessary slip casting syringe needle is ground off, remove pallet arrangement.

Claims (6)

1.The reinforcing device used after a kind of road construction cast-in-place walls core boring sampling and methodThis reinforcing device and boring machine with the use of, it is characterized in that: include device body and Counterboring apparatus, described device body includes fixing body and coring body, described fixing body is coaxially set with coring body, being uniformly arranged coring tooth on described coring body, described Counterboring apparatus includes that fixing body and reaming bit, described fixing body are coaxially set with reaming bit.
2.According to claimThe reinforcing device used after a kind of road construction cast-in-place walls core boring sampling described in 1, it is characterized in that: described fixing body is cylindrical structure, described coring body is tube structure, described fixing body is integrally disposed upon the upper end of coring body, and described coring tooth is uniformly arranged on the opening of coring body cylinder.
3. according to the reinforcing device used after a kind of road construction cast-in-place walls core boring sampling described in claim 1, it is characterised in that: the reaming bit of described Counterboring apparatus, a diameter of 105mm of opening, upper end diameter is 200mm.
4.According to claimThe reinforcing device used after a kind of road construction cast-in-place walls core boring sampling described in 1, it is characterised in that: the reaming bit of described Counterboring apparatus, a diameter of 155mm of opening, upper end diameter is 300mm.
5. according to the reinforcing device used after a kind of road construction cast-in-place walls core boring sampling described in claim 1, it is characterised in that: the reaming bit opening diameter of described Counterboring apparatus is gradually incremented by along axial line less than diameter and the bit diameter of reaming bit upper end.
6.According to claimThe reinforcement used after road construction cast-in-place walls core boring sampling described in 1, it is characterised in that: described reinforcement comprises the following steps:
(1) first the road or cast-in-place walls needing sampling is carried out drill hole sampling;Device body is connected with puncher, add water cooling and carry out punching sampling by the coring tooth on coring body, sample body on the road taken out or cast-in-place walls is cylindrical structure, a diameter of 100mm or 150mm of sample body, and the opening diameter on road or cast-in-place walls is 105mm or 155mm simultaneously;
(2) reaming: be connected with puncher by Counterboring apparatus body, adds water cooling by reaming bit reaming so that the hole bottom diameter on road or cast-in-place walls is 105mm, and upper end diameter is a cylindrical cavity of 200mm;Or by reaming bit reaming so that the hole bottom diameter on road or cast-in-place walls is 155mm, and upper end diameter is a cylindrical cavity of 300mm;
(3) stirring compound: by stone, yellow sand, cement, extender, bonding agent, according to weight ratio: 3: 2: 1: 0.2: 1 mixing match becomes mixed fillers, add water stirring;
(4) mixed fillers being stirred during reinforcement on road, injects in perforate, vibrates with small vibrating device simultaneously, plays slurry, stands;
(5) when processing the hole of cast-in-place walls, need pallet arrangement is first placed on the hole bottom surface outputed, firmly install, seal;The mixed fillers being stirred again, injects in perforate, it is ensured that mixed fillers not water clock during machine vibration;The most pre-buried slip casting syringe needle, slip casting syringe needle is arranged at reinforcing body upper end even circumferential;
(6), after standing 2 hours, observe mixed fillers height and the degree of flushing on road surface, go to add less more, flatten with instrument;
(7) maintenance, carries out maintenance with covered rearing with plastic film;
(8) arrange maintenance to indicate, until being completely solidified as one both completed the reinforced work after sampling with road;
(9) after reinforced work terminates 3 months, by high-pressure grout injector, reserved slip casting syringe needle is carried out slip casting, to reach airtight effect, it is ensured that rainwater not water clock;
(10) finally with electric tool, unnecessary slip casting syringe needle is ground off, remove pallet arrangement.
CN201510977167.8A 2015-12-15 2015-12-15 The reinforcing device and method used after a kind of road construction cast-in-place walls core boring sampling Expired - Fee Related CN105821748B8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510977167.8A CN105821748B8 (en) 2015-12-15 2015-12-15 The reinforcing device and method used after a kind of road construction cast-in-place walls core boring sampling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510977167.8A CN105821748B8 (en) 2015-12-15 2015-12-15 The reinforcing device and method used after a kind of road construction cast-in-place walls core boring sampling

Publications (3)

Publication Number Publication Date
CN105821748A true CN105821748A (en) 2016-08-03
CN105821748B CN105821748B (en) 2018-02-16
CN105821748B8 CN105821748B8 (en) 2018-05-29

Family

ID=56514663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510977167.8A Expired - Fee Related CN105821748B8 (en) 2015-12-15 2015-12-15 The reinforcing device and method used after a kind of road construction cast-in-place walls core boring sampling

Country Status (1)

Country Link
CN (1) CN105821748B8 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086086A (en) * 2017-12-22 2018-05-29 河海大学 A kind of method repaired structure and exploration coring bituminous paving is repaired using it that drills
CN109580279A (en) * 2018-12-21 2019-04-05 遵义师范学院 Road quality detection device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726509A (en) * 1993-07-15 1995-01-27 Kyowa Exeo Corp Road surface cutting machine
CN101308062A (en) * 2008-02-19 2008-11-19 华北科技学院 Self sealed self decompressed coal seam sampling method and apparatus
CN202255999U (en) * 2011-07-30 2012-05-30 池州利锋金刚石工具有限公司 Core sample filler
CN202305261U (en) * 2011-09-16 2012-07-04 长安大学 Concrete easily obtained core sample drilling and taking machine
CN203140835U (en) * 2013-02-19 2013-08-21 临夏回族自治州气象局 Soil sampling drill
CN203360989U (en) * 2013-06-20 2013-12-25 长安大学 Filling and compaction device for bituminous pavement subjected to core drilling and sampling
CN103527187A (en) * 2013-11-01 2014-01-22 白银有色集团股份有限公司 Frozen ore sampling drilling tool
CN203654149U (en) * 2014-01-10 2014-06-18 长安大学 Bituminous pavement core pit filling equipment
CN204626216U (en) * 2015-05-19 2015-09-09 山西省交通科学研究院 Core repair apparatus is bored on a kind of vehicular road surface

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726509A (en) * 1993-07-15 1995-01-27 Kyowa Exeo Corp Road surface cutting machine
CN101308062A (en) * 2008-02-19 2008-11-19 华北科技学院 Self sealed self decompressed coal seam sampling method and apparatus
CN202255999U (en) * 2011-07-30 2012-05-30 池州利锋金刚石工具有限公司 Core sample filler
CN202305261U (en) * 2011-09-16 2012-07-04 长安大学 Concrete easily obtained core sample drilling and taking machine
CN203140835U (en) * 2013-02-19 2013-08-21 临夏回族自治州气象局 Soil sampling drill
CN203360989U (en) * 2013-06-20 2013-12-25 长安大学 Filling and compaction device for bituminous pavement subjected to core drilling and sampling
CN103527187A (en) * 2013-11-01 2014-01-22 白银有色集团股份有限公司 Frozen ore sampling drilling tool
CN203654149U (en) * 2014-01-10 2014-06-18 长安大学 Bituminous pavement core pit filling equipment
CN204626216U (en) * 2015-05-19 2015-09-09 山西省交通科学研究院 Core repair apparatus is bored on a kind of vehicular road surface

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086086A (en) * 2017-12-22 2018-05-29 河海大学 A kind of method repaired structure and exploration coring bituminous paving is repaired using it that drills
CN108086086B (en) * 2017-12-22 2019-11-12 河海大学 A method of drilling repairs structure and repairs exploration coring bituminous pavement using it
CN109580279A (en) * 2018-12-21 2019-04-05 遵义师范学院 Road quality detection device
CN109580279B (en) * 2018-12-21 2021-05-14 遵义师范学院 Road quality detection device

Also Published As

Publication number Publication date
CN105821748B (en) 2018-02-16
CN105821748B8 (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN104846810A (en) Self-circulating posterior grouting bored pile construction method
CN110409433B (en) Construction system and method for performing foundation treatment by using cast-in-place pile with steel sleeve
CN105821748A (en) Reinforcing apparatus and method used after core-boring sampling of cast-in-situ floor of road or building
CN203530988U (en) One-time forming major-diameter anchor rod foundation pit supporting structure
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN101503878B (en) Construction method for building foundation pit enclosure structure with thin-walled cylinder pile as fender post
CN105821747B (en) The device and its reinforcement of reinforcement after a kind of building road coring
CN102094421A (en) Prestressed anchor bar and construction method using same
JP5015558B2 (en) Fiber reinforced cement ground improvement method
CN110644492B (en) Comprehensive grouting construction method for steep dip angle wide-crack stratum
CN103603345B (en) Cement mixing grouting pile foundations and forming method
KR101620789B1 (en) Small bore drain pipe burial method of soft ground condition
CN111395314A (en) CFG pile composite foundation construction method
CN113309128B (en) Construction method of dumbbell-shaped cement soil curtain pile in peat soil stratum
CN103603363B (en) Cement mixing-filling convex joint pile foundation and manufacturing process
CN104032738A (en) Pre-stressed anchor rod and construction method using same
JP2000355949A (en) Reinforcing method for masonry retaining wall
CN102477737A (en) Construction method of cement fly-ash gravel (CFG) pile on collapsible loess foundation of highway
CN105221150B (en) A kind of method of horizontal jet grouting stake reinforced stone door punching coal
CN103774645A (en) Cemented soil and concrete composite pile and construction method thereof
CN110485413B (en) Combined type protection rapid hole forming method for pile foundation of viaduct adjacent to subway
CN109083165B (en) Use method of foaming self-breaking cement mortar in anchoring section of anchor rod or anchor cable
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
CN104500108A (en) Tunnel foundation water return point processing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Lin Yuezhong

Inventor before: Mu Pengfei

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171120

Address after: 515549 Long Bin nine Lane No. six, Xi Dong village, Jiedong District, Jieyang City, Guangdong

Applicant after: Lin Yuezhong

Address before: 233200, Anhui province Dingyuan County Xiang Zhu Mu Cun Cheng ZHONGZU 15

Applicant before: Mu Pengfei

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Jiawei

Inventor before: Lin Yuezhong

TA01 Transfer of patent application right

Effective date of registration: 20180118

Address after: 314204 Pinghu City, Jiaxing City, Zhejiang Province, the whole Tang Town

Applicant after: ZHEJIANG YUANCHEN CONSTRUCTION CO.,LTD.

Address before: 515549 Long Bin nine Lane No. six, Xi Dong village, Jiedong District, Jieyang City, Guangdong

Applicant before: Lin Yuezhong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CI03 Correction of invention patent
CI03 Correction of invention patent

Correction item: Inventor

Correct: Zhang Jiawei|Liu Yalei|Pan Tianwei|Gu Wenchao|Wu Minghao|Wang Haiping

False: Zhang Jiawei

Number: 07-02

Volume: 34

Correction item: Inventor

Correct: Zhang Jiawei|Liu Yalei|Pan Tianwei|Gu Wenchao|Wu Minghao|Wang Haiping

False: Zhang Jiawei

False: Zhang Jiawei

Number: 07-02

Page: The title page

Volume: 34

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20211215