CN105821283A - High-speed steel moldboard plow structure and production process thereof - Google Patents
High-speed steel moldboard plow structure and production process thereof Download PDFInfo
- Publication number
- CN105821283A CN105821283A CN201610192395.9A CN201610192395A CN105821283A CN 105821283 A CN105821283 A CN 105821283A CN 201610192395 A CN201610192395 A CN 201610192395A CN 105821283 A CN105821283 A CN 105821283A
- Authority
- CN
- China
- Prior art keywords
- speed steel
- mouldboard
- plow
- casting
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C33/00—Making ferrous alloys
- C22C33/04—Making ferrous alloys by melting
- C22C33/06—Making ferrous alloys by melting using master alloys
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B15/00—Elements, tools, or details of ploughs
- A01B15/02—Plough blades; Fixing the blades
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
- B22C9/22—Moulds for peculiarly-shaped castings
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/26—Methods of annealing
- C21D1/30—Stress-relieving
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Life Sciences & Earth Sciences (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Soil Sciences (AREA)
- Environmental Sciences (AREA)
- Health & Medical Sciences (AREA)
- Child & Adolescent Psychology (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The invention discloses a production process of a high-speed steel moldboard plow structure. The production process comprises the following steps: smelting and pouring: waste ends of high-speed steel, waste cutters and water chips are remelted in a circuit; a certain quantity of alloy elements is added in the circuit in the smelting process; the pouring for casting the high-speed steel adopts a method of high-temperature furnace discharge and low-temperature pouring; the furnace discharge temperature of W18Cr4V steel is 1570-1550 DEG C; and the pouring temperature is 1480-1460 DEG C; mold casting: the sand mold casting and the fired mold precise casting are adopted, or the ceramic and metal casting is adopted; and heat treatment: before a cast moldboard plow is machined, the annealing firstly performed to eliminate internal stress of the cutters; and the annealing temperature is 950-980 DEG C, and is higher than the annealing temperature of rolled or forged steel. The production process is simplified, saves labors, and largely reduces the tool cost.
Description
Technical field
The invention belongs to agricultural mechanical field, be specifically related to high-speed steel mouldboard plow structure and production technology thereof.
Background technology
Mouldboard plow is the farm implements in a kind of arable land, generally ties up to, on one group of its motor vehicles of traction, be used for crushing soil block upturned soil
Overturn and plough out groove thus prepare for sowing.Plough body is the main working parts of plough, typically by ploughshare, mouldboard, landside
And the composition such as plow standard, plowshoe, U-shaped fastened on plow frame girder with threaded by plow standard top planes.Ploughshare and mouldboard
Collectively constitute the working curved surface of plough, play and cut soil and turn over the effect of upturned soil, from work for be an entirety.Due to ploughshare during work
Bearing bigger load, abrasion is relatively big, affects work, needs to improve this and perfect.
Summary of the invention
It is contemplated that overcome the defect of prior art, it is provided that a kind of high-speed steel mouldboard plow structure and production technology thereof, letter
Metaplasia production. art, saves the amount of labour, significantly lowers the cost of instrument.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
The production technology of a kind of high-speed steel mouldboard plow structure, comprises the steps, melting and cast, by high-speed steel waste material head, gives up
The remelting in circuit of cutter and scrap obtains;In circuit, a certain amount of alloying element is added in fusion process;Casting is at a high speed
The cast of steel uses high temperature to come out of the stove, the method for cast cold, and the tapping temperature of W18Cr4V steel is 1570-1550 DEG C, pouring temperature
For 1480-1460 DEG C;
Casting mold, uses sand casting and precision-investment casting, or uses ceramic mould, permanent mold casting;
Heat treatment, casting high speed steel mouldboard plow before processing, first carries out annealing and eliminates the internal stress of cutter, and annealing temperature is 95
0-980 DEG C, higher than rolling or the annealing temperature of forged steel.
Further, wherein in heat treatment process, mouldboard plow is incubated under higher than normal quenching temperature strip, passes through carbide
Reunion make ledeburite reach granulation.
Further, high-speed steel mouldboard plow structure, fix including ploughshare, mouldboard, landside, plowshoe, plow standard, ploughshare and mouldboard
On plowshoe, ploughshare and mouldboard constitute the fixing connection of working curved surface, plow standard and plowshoe, and plowshoe is a connecting piece, ploughshare, plough
Wall, landside, plow standard composition plough body assembly.
Further, plowshoe high-speed steel plate is stamped to form, or welding or casting form.
Further, plowshoe and plow standard are made integral.
Further, plow standard is the Force transmission parts of plough, and plow standard is open circles or oval directly plow standard or the solid curved plough of flat high-speed steel
Post.
Compared with prior art, the present invention has a following beneficial effect:
The present invention uses casting method to produce the remelting recycling that can realize high-speed steel waste material, to improve stock utilization, simplifies
Production technology, saves the amount of labour, significantly lowers the cost of instrument.When using sand casting and hot investment casting, the utilization rate of material
Can reach 65% and more than 85%.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of high-speed steel mouldboard plow structure of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred reality described herein
Execute example be merely to illustrate and explain the present invention, be not intended to limit the present invention.
As it is shown in figure 1, the production technology of a kind of high-speed steel mouldboard plow structure, comprising the steps, melting and cast, by height
Speed steel waste material head, useless cutter and scrap remelting in circuit obtain;In circuit, a certain amount of alloy is added in fusion process
Element;The cast of casting high speed steel uses high temperature to come out of the stove, the method for cast cold, and the tapping temperature of W18Cr4V steel is 1570-15
50 DEG C, pouring temperature is 1480-1460 DEG C;
Casting mold, uses sand casting and precision-investment casting, or uses ceramic mould, permanent mold casting;
Heat treatment, casting mouldboard plow before processing, first carries out annealing and eliminates the internal stress of cutter, and annealing temperature is 950-980
DEG C, higher than rolling or the annealing temperature of forged steel.Wherein in heat treatment process, eliminate netted Lay formula body, mouldboard plow is being higher than
It is incubated under normal quenching temperature strip, makes ledeburite reach granulation by the reunion of carbide.
Above-mentioned mouldboard plow structure, is fixed on including ploughshare 1, mouldboard 2, landside 3, plowshoe 4, plow standard 5, ploughshare 1 and mouldboard 2
On plowshoe 4, ploughshare 1 and mouldboard 2 constitute working curved surface, plow standard 5 and plowshoe 4 is fixing connects, and plowshoe is a connecting piece, ploughshare,
Mouldboard, landside, plow standard composition plough body assembly.
The foregoing is only explanation embodiments of the present invention, be not limited to the present invention, for the technology of this area
For personnel, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in
Within protection scope of the present invention.
Claims (6)
1. a production technology for high-speed steel mouldboard plow structure, comprises the steps, it is characterised in that: melting and cast, by height
Speed steel waste material head, useless cutter and scrap remelting in circuit obtain;In circuit, a certain amount of alloy is added in fusion process
Element;The cast of casting high speed steel uses high temperature to come out of the stove, the method for cast cold, and the tapping temperature of W18Cr4V steel is 1570-15
50 DEG C, pouring temperature is 1480-1460 DEG C;
Casting mold, uses sand casting and precision-investment casting, or uses ceramic mould, permanent mold casting;
Heat treatment, casting high speed steel mouldboard plow before processing, first carries out annealing and eliminates the internal stress of cutter, and annealing temperature is 95
0-980 DEG C, higher than rolling or the annealing temperature of forged steel.
The production technology of high-speed steel mouldboard plow structure the most according to claim 1, it is characterised in that wherein heat treatment process
In, mouldboard plow is incubated under higher than normal quenching temperature strip, makes ledeburite reach granulation by the reunion of carbide.
High-speed steel mouldboard plow structure the most according to claim 1, it is characterised in that high-speed steel mouldboard plow structure, including ploughshare,
Mouldboard, landside, plowshoe, plow standard, ploughshare and mouldboard are fixed on plowshoe, and ploughshare and mouldboard constitute working curved surface, plow standard and plough
Torr is fixing to be connected, and plowshoe is a connecting piece, ploughshare, mouldboard, landside, plow standard composition plough body assembly.
High-speed steel mouldboard plow structure the most according to claim 3, it is characterised in that plowshoe high-speed steel plate is stamped to form, or
Welding or casting form.
High-speed steel mouldboard plow structure the most according to claim 3, it is characterised in that plowshoe and plow standard are made integral.
High-speed steel mouldboard plow structure the most according to claim 3, it is characterised in that plow standard is the Force transmission parts of plough, and plow standard is
Open circles or oval directly plow standard or solid flat high-speed steel bent plow standar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610192395.9A CN105821283A (en) | 2016-03-30 | 2016-03-30 | High-speed steel moldboard plow structure and production process thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610192395.9A CN105821283A (en) | 2016-03-30 | 2016-03-30 | High-speed steel moldboard plow structure and production process thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105821283A true CN105821283A (en) | 2016-08-03 |
Family
ID=56523665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610192395.9A Pending CN105821283A (en) | 2016-03-30 | 2016-03-30 | High-speed steel moldboard plow structure and production process thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105821283A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113330829A (en) * | 2021-05-20 | 2021-09-03 | 江苏大学 | Low-soil-viscosity high-speed plough |
RU221239U1 (en) * | 2023-05-18 | 2023-10-26 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" | Plow body |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2078071U (en) * | 1990-04-28 | 1991-06-05 | 吴鸿举 | Amphibious plough with adjustable plough face angle |
CN2358664Y (en) * | 1998-10-16 | 2000-01-19 | 郭福才 | Dry farming deep pulveritor share-shovel assembly |
CN1424423A (en) * | 2002-12-24 | 2003-06-18 | 西安交通大学 | High-speed steel roll ring and its production |
WO2005085487A1 (en) * | 2004-03-08 | 2005-09-15 | Dalian Rongchuang Technology Development Co.,Ltd | A process of ledeburite steels |
CN104221508A (en) * | 2014-09-18 | 2014-12-24 | 河南科技大学 | Furrow plow with variable camber |
-
2016
- 2016-03-30 CN CN201610192395.9A patent/CN105821283A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2078071U (en) * | 1990-04-28 | 1991-06-05 | 吴鸿举 | Amphibious plough with adjustable plough face angle |
CN2358664Y (en) * | 1998-10-16 | 2000-01-19 | 郭福才 | Dry farming deep pulveritor share-shovel assembly |
CN1424423A (en) * | 2002-12-24 | 2003-06-18 | 西安交通大学 | High-speed steel roll ring and its production |
WO2005085487A1 (en) * | 2004-03-08 | 2005-09-15 | Dalian Rongchuang Technology Development Co.,Ltd | A process of ledeburite steels |
CN104221508A (en) * | 2014-09-18 | 2014-12-24 | 河南科技大学 | Furrow plow with variable camber |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113330829A (en) * | 2021-05-20 | 2021-09-03 | 江苏大学 | Low-soil-viscosity high-speed plough |
RU221239U1 (en) * | 2023-05-18 | 2023-10-26 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" | Plow body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101302599A (en) | Niobium microalloyed high strength hot work die steel and preparation thereof | |
CN105039865B (en) | A kind of high-strength high-toughness steel plate and its manufacture method | |
CN106756582B (en) | A kind of enhanced low-expansion alloy of intermetallic compound and preparation method | |
CN110172641A (en) | A kind of fine grain high-toughness hot working die steel and preparation method thereof | |
CN102260818A (en) | High-silicon anticorrosion cast iron and manufacturing method thereof | |
CN110129678A (en) | A kind of economical fine grain high-toughness hot working die steel and preparation method thereof | |
CN104087874B (en) | A kind of high-speed steel roll and preparation method thereof | |
CN101660100B (en) | Super-thick quenched and tempered steel plate with good obdurability matching, and manufacturing method thereof | |
CN104745969A (en) | HRB400E high-strength corrosion-resistant steel bar and production process thereof | |
CN101985727A (en) | Heat treatment method suitable for high-strength aluminum alloy thick plates | |
CN102953000A (en) | Ultrahigh-strength steel plate and its manufacturing method | |
CN105821283A (en) | High-speed steel moldboard plow structure and production process thereof | |
CN105755351A (en) | High-speed steel rotary tillage bent tool structure and production process thereof | |
CN107974632B (en) | Austenite hot-work die steel and preparation method thereof | |
CN105349861A (en) | Magnesium metal plate capable of being quickly rolled and formed and rolling method of magnesium metal plate | |
CN105234356A (en) | Preparation method for aluminum alloy semi-solid slurry induced and impregnated by modificator | |
CN102876996A (en) | Austenitic hot-work die steel and preparation method thereof | |
CN102936690A (en) | Novel 9SiCrAlBN alloy tool steel | |
CN105349896B (en) | Preparation method for low-alloy excavator bucket tooththereof | |
CN103602885A (en) | Low-alloy and high-strength steel plate and production method thereof | |
CN104178612B (en) | A kind of tissue miniaturization pretreating process of middle carbon Cr-Mo-V series hot die steel | |
CN102489870A (en) | Method for preparing thixomolding plate blank | |
CN105369081A (en) | Novel aluminum alloy | |
CN105401006A (en) | Novel aluminum alloy preparing method | |
CN105441809A (en) | Super-hard high-speed steel and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 545000 new willow Avenue, Liuzhou, Liuzhou, the Guangxi Zhuang Autonomous Region, No. 2, 20 floors 9, city E District Applicant after: LIUZHOU YIHE SCIENCE & TECHNOLOGY CO., LTD. Address before: 545000 the Guangxi Zhuang Autonomous Region road Liunan District Liuzhou City Lake No. 16 Applicant before: LIUZHOU YIHE SCIENCE & TECHNOLOGY CO., LTD. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160803 |