CN105804754A - 一种煤层为主含水层矿井井筒揭煤方法 - Google Patents

一种煤层为主含水层矿井井筒揭煤方法 Download PDF

Info

Publication number
CN105804754A
CN105804754A CN201610322505.9A CN201610322505A CN105804754A CN 105804754 A CN105804754 A CN 105804754A CN 201610322505 A CN201610322505 A CN 201610322505A CN 105804754 A CN105804754 A CN 105804754A
Authority
CN
China
Prior art keywords
coal seam
coal
water
inclined shaft
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610322505.9A
Other languages
English (en)
Other versions
CN105804754B (zh
Inventor
巨峰
郭帅
李百宜
裴玉龙
肖猛
付志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201610322505.9A priority Critical patent/CN105804754B/zh
Publication of CN105804754A publication Critical patent/CN105804754A/zh
Priority to PCT/CN2017/084071 priority patent/WO2017198109A1/zh
Priority to CA3054206A priority patent/CA3054206C/en
Application granted granted Critical
Publication of CN105804754B publication Critical patent/CN105804754B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

一种煤层为主含水层矿井井筒揭煤方法,从地面垂直向下施工立井至煤层上方上覆岩层内隔水层或弱含水层处;施工排水孔至煤层内进行卸压排水,待煤层卸压排水完毕后,对立井进行注浆封堵,使其避开含水层并掘进斜井,在掘进斜井的过程中施工排水孔、超前钻孔和直排钻孔以控制高压煤层水并建立临时排水系统,将煤层水通过临时排水系统排至地面,待含水煤层排水卸压后,继续掘进斜井直至安全揭煤。本发明能有效地解决煤层为主含水层的突水和揭煤问题,通过注浆封堵解决直接打井筒揭煤时突水淹井问题,运用多学科交叉解决了煤层为主含水层的揭煤问题,能够快速有效地投资建井,填补了煤层为主含水层这一特殊地质条件下安全揭煤方法的空白。

Description

一种煤层为主含水层矿井井筒揭煤方法
技术领域
本发明是一种井筒揭煤方法,尤其是一种解决突水问题的以煤层为主含水层矿井井筒揭煤方法。
背景技术
我国矿山突水问题一直是制约矿山安全生产的重大技术难题。针对这一问题,国内外已形成了防水煤岩柱留设、疏干降压、岩层注浆改造等突水防治方法。煤层为主含水层的水文地质特征在煤矿中为首次发现,此类矿井水害防治及揭煤技术国内外未见明确报道。
发明内容
本发明目的是针对煤层为主含水层这一特殊水文地质所引起的安全揭煤与防治突水问题,提供一种煤层为主含水层矿井井筒揭煤方法。
为实现上述目的,本发明的煤层为主含水层矿井井筒揭煤方法,包括以下步骤:
a.从地面垂直向下施工立井至煤层上方上覆岩层内隔水层或弱含水层处;
b.从立井内垂直向下施工排水孔至煤层内,按常规进行煤层排水卸压;
c.煤层排水卸压完毕后,在立井内施工的排水孔上方进行注浆封堵,注浆封堵的高度为5~10m;
d.待注浆封堵完毕后,由立井底部倾斜向煤层方向掘进斜井,同时在斜井中建立临时排水系统;
e.在斜井掘进过程中,从斜井向煤层垂直方向间隔距离施工多个排水孔;
f.当斜井掘进至煤层时,在斜井掘进头向煤层内施工超前钻孔;
g.在位于超前钻孔的前方从地面垂直向煤层施工一直排钻孔,对超前钻孔前方的煤层进行卸压排水,斜井中的煤层水通过临时排水系统排至地面。超前钻孔前方的煤层水通过直排钻孔排至地面;
h.待煤层水卸压后,沿超前钻孔继续掘进斜井至煤层内,从而实现含水层矿井井筒内的安全揭煤。
所述排水钻孔和超前钻孔排水卸压的量为涌出水量降至100m3/h以下,煤层水卸压降为0.1MPa以下。
所述由立井底部倾斜向煤层方向掘进的角度为6~12°。
所述从立井内垂直向下施工至煤层内的排水孔为3~5个。
所述从斜井向煤层垂直方向施工多个排水孔的水平间隔距离为2.5~3.5m。
有益效果:本发明通过注浆封堵解决直接打井筒揭煤时突水淹井问题,运用多学科交叉解决了煤层为主含水层的揭煤问题,能够快速有效地投资建井,填补了煤层为主含水层这一特殊地质条件下安全揭煤方法的空白。通过直排钻孔和掘进斜井中的排水孔、超前钻孔对煤层进行排水卸压,为安全揭煤提供了保障,有效地防治煤层为主含水层这一特殊水文地质引起的突水问题,从而实现安全揭煤。使得涌水量降至100m3/h以下,煤层水卸压降至0.1MPa以下。本发明是解决煤层为主含水层井筒揭煤问题的有效手段,方案设计合理,实际操作性强。其方法简单,使用效果好,在本技术领域内具有广泛的实用性。
附图说明
图1是本发明的煤层为主含水层矿井井筒揭煤地质剖面图。
图中:1-地面,2-立井,3-上覆岩层,4-2#煤层,5-排水孔,6-脲醛树脂,7-立井底部,8-斜井,9-临时排水系统,10-超前钻孔,11-直排钻孔,12-揭煤。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的描述:
以某矿含水煤层井筒开拓为例,该矿地质剖面如图1所示,其中2#煤层为主含水层,埋深350m。原设计普通凿井法揭煤时巷道涌水量达到320m3/h,最大为540m3/h,水压最大为2.7MPa,流砂现象严重无法施工。针对这种情况,通过直排钻孔和掘进斜井中的排水孔、超前钻孔对煤层进行排水卸压,具体实施如下:
a.从地面1通过上覆岩层3垂直向下打立井2至2#煤层4上方上覆岩层3内隔水层或弱含水层处,该矿隔水层位于上覆岩层3内15m处;所述从立井2内垂直向下施工至煤层4内的排水孔5为3~5个;
b.在立井2中垂直向下打3个排水孔5至2#煤层4内,按常规进行煤层排水卸压;
c.利用排水孔5进行煤层卸压排水完毕后,对立井2施工排水孔5上方使用脲醛树脂6进行注浆封堵,注浆封堵的高度10m;
d.待注浆封堵完毕后,由立井底部7倾斜向煤层4方向掘进斜井8,其中倾斜角度为6°,同时在斜井8中建立临时排水系统9,在斜井中采取德国巴斯夫公司最新的湿喷工艺及MG325注浆堵水材料进行喷浆支护及注浆堵水;所述由立井底部7倾斜向煤层4方向掘进的角度为6~12°;
e.在斜井8掘进过程中,从斜井向2#煤层4垂直方向间隔距离施工多个排水孔5,从斜井8向煤层4垂直方向施工多个排水孔5的水平间隔距离为2.5~3.5m;
f.当斜井8掘进至2#煤层4时,在斜井8掘进头向2#煤层4内打超前钻孔10,同时从地面1垂直向2#煤层4打直排钻孔11,对2#煤层4进行排水卸压。斜井8中的煤层水通过临时排水系统9将其排至地面1,直排钻孔11将煤层水直接排至地面1;
g.待煤层水卸压后,继续掘进斜井8至2#煤层内,实现安全揭煤12。
1.井下实施的排水孔共48个,单孔最大出水量6.4m3/h。
2.通过排水钻孔5和超前钻孔10排水卸压的量使涌水量降至100m3/h以下,煤层水卸压降至0.1MPa以下为止。

Claims (5)

1.一种煤层为主含水层矿井井筒揭煤方法,其特征在于,包括如下步骤:
a.从地面(1)垂直向下施工立井(2)至煤层(4)上方上覆岩层(3)内隔水层或弱含水层处;
b.从立井(2)内垂直向下施工排水孔(5)至煤层(4)内,按常规进行煤层排水卸压;
c.煤层排水卸压完毕后,在立井(2)内施工的排水孔(5)上方进行注浆封堵(6),注浆封堵的高度为5~10m;
d.待注浆封堵完毕后,由立井底部(7)倾斜向煤层(4)方向掘进斜井(8),同时在斜井(8)中建立临时排水系统(9);
e.在斜井(8)掘进过程中,从斜井(8)向煤层(4)垂直方向间隔距离施工多个排水孔(5);
f.当斜井(8)掘进至煤层(3)时,在斜井(8)掘进头向煤层(3)内施工超前钻孔(10);
g.在位于超前钻孔(10)的前方从地面(1)垂直向煤层(4)施工一直排钻孔(11),对超前钻孔(10)前方的煤层(4)进行卸压排水。斜井(8)中的煤层水通过临时排水系统(9)排至地面(1),超前钻孔(10)前方的煤层水通过直排钻孔(11)排至地面(1);
h.待煤层水卸压后,沿超前钻孔(10)继续掘进斜井(8)至煤层(4)内,从而实现含水层矿井井筒内的安全揭煤(12)。
2.根据权利要求1所述的一种煤层为主含水层矿井井筒揭煤方法,其特征在于:所述排水钻孔(5)和超前钻孔(10)排水卸压的量为涌出水量降至100m3/h以下,煤层水卸压降为0.1MPa以下。
3.根据权利要求1所述的一种煤层为主含水层矿井井筒揭煤方法,其特征在于:所述由立井底部(7)倾斜向煤层(4)方向掘进的角度为6~12°。
4.根据权利要求1所述的一种煤层为主含水层矿井井筒揭煤方法,其特征在于:所述从立井(2)内垂直向下施工至煤层(4)内的排水孔(5)为3~5个。
5.根据权利要求1所述的一种煤层为主含水层矿井井筒揭煤方法,其特征在于:所述从斜井(8)向煤层(4)垂直方向施工多个排水孔(5)的水平间隔距离为2.5~3.5m。
CN201610322505.9A 2016-05-16 2016-05-16 一种煤层为主含水层矿井井筒揭煤方法 Active CN105804754B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201610322505.9A CN105804754B (zh) 2016-05-16 2016-05-16 一种煤层为主含水层矿井井筒揭煤方法
PCT/CN2017/084071 WO2017198109A1 (zh) 2016-05-16 2017-05-12 一种煤层为主含水层矿井井筒揭煤方法
CA3054206A CA3054206C (en) 2016-05-16 2017-05-12 Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610322505.9A CN105804754B (zh) 2016-05-16 2016-05-16 一种煤层为主含水层矿井井筒揭煤方法

Publications (2)

Publication Number Publication Date
CN105804754A true CN105804754A (zh) 2016-07-27
CN105804754B CN105804754B (zh) 2017-10-27

Family

ID=56451190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610322505.9A Active CN105804754B (zh) 2016-05-16 2016-05-16 一种煤层为主含水层矿井井筒揭煤方法

Country Status (3)

Country Link
CN (1) CN105804754B (zh)
CA (1) CA3054206C (zh)
WO (1) WO2017198109A1 (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152309A (zh) * 2017-07-19 2017-09-12 中国矿业大学 一种煤层为主含水层的高水高排水害防治方法
WO2017198109A1 (zh) * 2016-05-16 2017-11-23 中国矿业大学 一种煤层为主含水层矿井井筒揭煤方法
CN109139011A (zh) * 2018-08-02 2019-01-04 缪协兴 一种煤层为主含水层的防水采煤方法
CN112855260A (zh) * 2021-02-03 2021-05-28 中煤科工集团西安研究院有限公司 一种地下帷幕截流后全区域快速疏降方法
CN113719284A (zh) * 2021-09-08 2021-11-30 中国矿业大学 一种基于断层破碎带或陷落柱的井筒揭煤水害防治方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344880A (zh) * 2019-08-20 2019-10-18 中国电建集团成都勘测设计研究院有限公司 一种富水隧洞施工超前排水结构及施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1744274A1 (ru) * 1989-03-27 1992-06-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Способ осушени затопленных выработок
CN103306683A (zh) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 一种开挖深埋隧道时洞内综合降水的施工方法
CN104389634A (zh) * 2014-09-16 2015-03-04 中国矿业大学 一种矿山立井筛井井壁结构及其可控疏水方法
CN104612753A (zh) * 2015-01-29 2015-05-13 湖南科技大学 茅口灰岩井下注浆截流的关—堵—疏相结合的防治水方法
CN104863629A (zh) * 2015-06-11 2015-08-26 中国矿业大学 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法
CN104963721A (zh) * 2015-05-26 2015-10-07 安徽建筑大学 一种采用顺层孔与穿层孔结合的井下立体快速疏放水方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1469137A1 (ru) * 1986-12-25 1989-03-30 Ленинградский горный институт им.Г.В.Плеханова Способ управлени кровлей
CN1737337A (zh) * 2004-08-19 2006-02-22 神华集团有限责任公司 薄基岩厚松散含水层矿井防治水方法
CN100560944C (zh) * 2007-12-27 2009-11-18 淮北矿业(集团)有限责任公司 采煤工作面顶板离层水体防治方法
CN102061920B (zh) * 2010-12-24 2013-04-17 西安科技大学 富含水矿区水解放工作面开采方法
CN102505963B (zh) * 2011-11-11 2017-02-01 山西晋城无烟煤矿业集团有限责任公司 回采工作面顶板水预疏放施工方法
CN103742145B (zh) * 2013-12-24 2016-01-20 山东新阳能源有限公司 煤矿富水异常区域防治水方法
CN105804754B (zh) * 2016-05-16 2017-10-27 中国矿业大学 一种煤层为主含水层矿井井筒揭煤方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1744274A1 (ru) * 1989-03-27 1992-06-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Способ осушени затопленных выработок
CN103306683A (zh) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 一种开挖深埋隧道时洞内综合降水的施工方法
CN104389634A (zh) * 2014-09-16 2015-03-04 中国矿业大学 一种矿山立井筛井井壁结构及其可控疏水方法
CN104612753A (zh) * 2015-01-29 2015-05-13 湖南科技大学 茅口灰岩井下注浆截流的关—堵—疏相结合的防治水方法
CN104963721A (zh) * 2015-05-26 2015-10-07 安徽建筑大学 一种采用顺层孔与穿层孔结合的井下立体快速疏放水方法
CN104863629A (zh) * 2015-06-11 2015-08-26 中国矿业大学 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱南京等: "煤层为主含水层矿井水害防治技术研究", 《中国矿业》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017198109A1 (zh) * 2016-05-16 2017-11-23 中国矿业大学 一种煤层为主含水层矿井井筒揭煤方法
CN107152309A (zh) * 2017-07-19 2017-09-12 中国矿业大学 一种煤层为主含水层的高水高排水害防治方法
CN109139011A (zh) * 2018-08-02 2019-01-04 缪协兴 一种煤层为主含水层的防水采煤方法
CN112855260A (zh) * 2021-02-03 2021-05-28 中煤科工集团西安研究院有限公司 一种地下帷幕截流后全区域快速疏降方法
CN113719284A (zh) * 2021-09-08 2021-11-30 中国矿业大学 一种基于断层破碎带或陷落柱的井筒揭煤水害防治方法

Also Published As

Publication number Publication date
CN105804754B (zh) 2017-10-27
CA3054206C (en) 2021-11-30
WO2017198109A1 (zh) 2017-11-23
CA3054206A1 (en) 2017-11-23

Similar Documents

Publication Publication Date Title
CN110242301B (zh) 一种顶板含水层两步骤注浆改性保水采煤方法
CN105804754B (zh) 一种煤层为主含水层矿井井筒揭煤方法
CN104863629A (zh) 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法
CN104314610A (zh) 一种煤巷条带区域消突方法
CN111042791A (zh) 低透气煤层群井上下联合煤与煤层气共采方法
CN108412453A (zh) 一种煤炭开采水与瓦斯共治系统及施工方法
CN103953386A (zh) 一种上堵下渗抽采采动区瓦斯的方法
CN107387082A (zh) 一种弱化煤层坚硬顶板的方法
CN104975868A (zh) 基于定向钻进的顶板高位走向大直径长钻孔瓦斯抽采方法
CN111878079B (zh) 一种煤矿井下大采长工作面松软突出煤层瓦斯治理方法
CN109611146B (zh) 一种离层水疏放注浆方法
CN107152309B (zh) 一种煤层为主含水层的高水高排水害防治方法
CN104265357B (zh) 一种强突煤层预抽防突方法
CN110778317A (zh) 一种采动过程中垮落带内地面注浆充填钻孔结构施工方法
CN114294046A (zh) 一种煤矿区全覆盖井上下立体抽采方法
CN114278372B (zh) 一种巨厚富含水层井下定向钻孔区域导流布置方法
CN113107589B (zh) 一种煤层顶板含水层地面超前预疏放水方法
CN112302715B (zh) 一种松软砂岩含水层疏降方法
CN112855260B (zh) 一种地下帷幕截流后全区域快速疏降方法
CN208220720U (zh) 一种煤炭开采水与瓦斯共治系统
CN113006111A (zh) 一种封堵帷幕顶底界断层带绕流的方法
CN115450693B (zh) 一种急倾斜含水层的大降深疏放方法及疏放系统
JP6552278B2 (ja) トンネル施工方法
CN114575791B (zh) 高位高抽巷及下向钻孔抽采下保护层瓦斯结构及工艺
CN218454763U (zh) 近煤层竖井建设群揭石门防突结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu

Applicant after: China University of Mining & Technology

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China University of Mining & Technology

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant