CN105804388A - Scaffold for building construction - Google Patents
Scaffold for building construction Download PDFInfo
- Publication number
- CN105804388A CN105804388A CN201610170798.3A CN201610170798A CN105804388A CN 105804388 A CN105804388 A CN 105804388A CN 201610170798 A CN201610170798 A CN 201610170798A CN 105804388 A CN105804388 A CN 105804388A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pop
- board
- groove
- collar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/20—Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/22—Stiff scaffolding clamps for connecting scaffold members of common shape for scaffold members in end-to-side relation
Abstract
Description
Claims (8)
- null1. a construction scaffold,Including solid vertical first steel pipe (1) and horizontal second steel pipe (2),It is characterized in that,First steel pipe (1) is provided with multiple annular groove (3),The annular lug (4) being connected with being connected as a single entity with the first steel pipe (1) of annular groove (3),The size of annular lug (4) is sequentially reduced from centre to two ends,The bottom surface of annular groove (3) is provided with multiple circumferentially uniform fixing hole (5),The outer wall of the first steel pipe (1) is provided with the vertical U-lag (6) being placed in annular groove (3) both sides,One end of first steel pipe (1) is provided with stretches out post (30),Stretch out post (30) and be provided with fixture block (31),The other end of the first steel pipe (1) is provided with and stretches out the recessed post groove (32) that post (30) mates,The concave block groove (33) mated with fixture block (31) it is provided with in recessed post groove (32);nullThe two ends of the second steel pipe (2) are provided with the collar (7) being connected as a single entity with it,The collar (7) is provided with the U-shaped block (8) matched with U-lag (6),U-shaped block (8) is provided with the pin-and-hole (9) corresponding with fixing hole (5),Alignment pin (10) it is inserted with in pin-and-hole (9),Constitute the collar (7) can be enclosed within the first steel pipe (1),U-shaped block (8) mates with U-lag (6),The second steel pipe (2) is made to be moved downward to the structure at annular groove (3) place along U-lag (6),And constitute the collar (7) and be stuck in the structure that the annular located pin in lug (4) place (10) location is fixing,The diameter of the collar (7) is provided with the collar (7) of different size size according to different size of annular lug (4),Constitute the collar (7) and the structure at different rings connected in star (3) place can be respectively provided at;Multiple ejection groove (11) being placed on the first steel pipe (1) outer wall it is provided with between each two annular lug (4), eject in groove (11) and be provided with pop-up board (12), pop-up board (12) is connected with the rotating shaft (14) being placed in the first steel pipe (1) through the first spring (13), constituting pop-up board (12) under free state can from ejecting the structure routed up in groove (11), alignment pin (10) pressing above it of the top of ejection groove (11), when composition alignment pin (10) loses efficacy, the structure that pop-up board (12) ejects at once;Pop-up board (12) be connected with safety net (15), the safety net (15) the second spring (16) through being completely stretched is stuck on four the first steel pipes (1) of surrounding, pop-up board (12) be placed in ejection groove (11) interior time, same fixing plate (17) it is connected to below with rotating shaft (14), when constituting pop-up board (12) ejection, the structure that rotating shaft (14) rotates followed by fixing plate (17), fixing plate (17) is connected plate (18) and connects L-shaped connecting rod (19), connecting plate (18) is connected through moving fastening (20) with connecting rod (19), no matter constituting how connecting plate (18) rotates, connecting rod (19) is in the immovable structure in direction all the time;The termination of the second steel pipe (2) is provided with built-in multiple first flat thin magnet (25), and the upper surface of pop-up board (12) is provided with multiple built-in the second flat thin magnet (26), ejects groove (11) inwall and is provided with exhausted magnetosphere (27);Two ends on second steel pipe (2) are provided with steel wire trough (21), both sides the second steel pipe (2) be fixedly arranged above fixed pulley (22), fixed pulley (22) both sides are connected in steel wire trough (21) through steel wire rope (23), it is provided with the little spring (24) being connected with steel wire rope (23) near the second steel pipe (2) place, when being used for constituting normal condition, the second steel pipe (2) is not had the structure of pulling force by steel wire rope (23).
- 2. a kind of construction scaffold according to claim 1, it is characterised in that between two second steel pipes (2) of described fixed pulley (22) side fixed thereon.
- 3. a kind of construction scaffold according to claim 1, it is characterized in that, the rear of described ejection groove (11) is provided with and is horizontally through the second steel pipe (2) and is detachably fixed support bar (28), the two ends of support bar (28) are fixed with dismountable baffle plate (29), and baffle plate (29) is placed in the both sides above when pop-up board (12) ejects.
- 4. a kind of construction scaffold according to claim 1, it is characterised in that the vertical U-lag of described each two (6) is not on the same line.
- 5. a kind of construction scaffold according to claim 1, it is characterised in that the outer wall of described pop-up board (12) and the first steel pipe (1) is in same cambered surface.
- 6. a kind of construction scaffold according to claim 1, it is characterised in that described the second spring (16) is stuck on L-shaped connecting rod (19) through snap ring (34).
- 7. a kind of construction scaffold according to claim 1, it is characterised in that described alignment pin (10) is connected rope (35) and is connected with the second steel pipe (2).
- 8. a kind of construction scaffold according to claim 1, it is characterised in that described pop-up board (12) is groove type pop-up board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610170798.3A CN105804388B (en) | 2016-03-24 | 2016-03-24 | scaffold for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610170798.3A CN105804388B (en) | 2016-03-24 | 2016-03-24 | scaffold for building construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105804388A true CN105804388A (en) | 2016-07-27 |
CN105804388B CN105804388B (en) | 2017-04-19 |
Family
ID=56454818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610170798.3A Expired - Fee Related CN105804388B (en) | 2016-03-24 | 2016-03-24 | scaffold for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804388B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386658A (en) * | 2017-03-20 | 2017-11-24 | 广州珠江工程建设监理有限公司 | A kind of construction method of large steel net frame integral hoisting platform |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001220902A (en) * | 2000-02-08 | 2001-08-17 | Kazuhiko Kishida | Bracing device for concrete form |
CN101824904A (en) * | 2009-03-05 | 2010-09-08 | 卢兴明 | Integral-scaffold supporting elevation method and double-track double-anti-dropping hydraulic lifting integral scaffold thereof |
CN202990393U (en) * | 2012-10-15 | 2013-06-12 | 门晓红 | Tool type steel mesh attached elevating scaffold |
-
2016
- 2016-03-24 CN CN201610170798.3A patent/CN105804388B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001220902A (en) * | 2000-02-08 | 2001-08-17 | Kazuhiko Kishida | Bracing device for concrete form |
CN101824904A (en) * | 2009-03-05 | 2010-09-08 | 卢兴明 | Integral-scaffold supporting elevation method and double-track double-anti-dropping hydraulic lifting integral scaffold thereof |
CN202990393U (en) * | 2012-10-15 | 2013-06-12 | 门晓红 | Tool type steel mesh attached elevating scaffold |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386658A (en) * | 2017-03-20 | 2017-11-24 | 广州珠江工程建设监理有限公司 | A kind of construction method of large steel net frame integral hoisting platform |
Also Published As
Publication number | Publication date |
---|---|
CN105804388B (en) | 2017-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN110094049B (en) | Quick early-dismantling support for constructional engineering | |
CN105803944B (en) | scaffold for road and bridge construction | |
CN209780183U (en) | Scaffold for building engineering | |
CN105804388A (en) | Scaffold for building construction | |
CN211548713U (en) | A suspension type scaffold frame for square chimney | |
CN201221365Y (en) | Front cantilever temporary support | |
CN213626572U (en) | Tool type external cantilever operation platform | |
CN211114737U (en) | A construction operation platform in elevator well for tower crane promotes | |
CN211473327U (en) | Building external climbing type building construction operation platform | |
CN208310302U (en) | A kind of new reinforcing steel bar processing protection canopy | |
CN215829972U (en) | Scaffold frame for engineering construction convenient to equipment | |
CN210947630U (en) | Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble | |
CN209891750U (en) | Elevator shaft protective screening mechanism convenient to disassemble and assemble | |
CN210195457U (en) | Safety protective guard is used in civil engineering | |
CN210598063U (en) | Cross rod structure for column edge connection | |
CN201730306U (en) | Light-weight scaffold | |
CN110344748A (en) | A kind of Domestic staircase that durability is high | |
CN214739838U (en) | Dish knot formula scaffold frame based on BIM | |
CN207905343U (en) | A kind of fastener locking device for scaffold | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN110565929B (en) | Scaffold for construction of large-specification wall paving piece of building outer wall | |
CN213174721U (en) | Climbing frame positioned by inclined top support | |
CN211341656U (en) | Support frame that construction fitment was used | |
CN101575908A (en) | Light scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 451191 Longhu, Henan, Xinzheng Town, Wenchang Road, No. 1, No. Applicant after: Qi Shuhong Applicant after: Guang Hui Applicant after: Cao Limei Applicant after: Sun Xiaoju Address before: 450000 Zhengzhou, Jinshui District, Henan, North Ring Road, No. 36 attached to No. 2003 Applicant before: Qi Shuhong Applicant before: Guang Hui Applicant before: Cao Limei Applicant before: Sun Xiaoju |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 Termination date: 20200324 |
|
CF01 | Termination of patent right due to non-payment of annual fee |