CN105804203B - 深埋大直径废弃污水管道的封堵方法 - Google Patents
深埋大直径废弃污水管道的封堵方法 Download PDFInfo
- Publication number
- CN105804203B CN105804203B CN201610203200.6A CN201610203200A CN105804203B CN 105804203 B CN105804203 B CN 105804203B CN 201610203200 A CN201610203200 A CN 201610203200A CN 105804203 B CN105804203 B CN 105804203B
- Authority
- CN
- China
- Prior art keywords
- sewage conduct
- concrete
- drill bit
- construction
- sewage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种深埋大直径废弃污水管道的封堵方法,首先确定封堵位置,选择直径大于污水管道外径25~50mm的钻头垂直钻孔,钻头穿过污水管道底部500mm;采用装载机用素土进行回填,并分层夯实,素土回填至高于管道顶部500mm处;选择与污水管道外径相同的钻头在回填土中钻孔至污水管道底部500mm;下放导管,采用混凝土进行浇筑封堵,至混凝土面高出污水管道顶面500mm为止,完成施工。本发明方法封堵施工时无需人员下井作业,减少了人员下井作业的风险,采用素土加混凝土塞封堵施工,利用夯实的素土对浇筑的混凝土浆进行围挡,减少了封堵混凝土使用量,浇筑后的混凝土形成管塞,无需砖砌施工,大大节约了施工成本。
Description
技术领域
本发明涉及废弃污水管道的处理,尤其是涉及一种深埋大直径废弃管道的封堵方法。
背景技术
城市内大型排污管道由于所运输介质等特点一般埋设较深(地下8米左右)。在当今城市高速发展的今天,地铁及地下空间的开发利用,较多地方都会与已埋设的地下管道发生冲突,需要对原有管路进行迁改。由于大型排污管道管径较粗(均在一米以上),废弃的管道如果不进行封堵,会对后续工程施工造成影响(如在钻孔灌注桩施工时会造成泥浆大量流失,混凝土无法灌注至设计标高)。对此,需要对废弃的污水管道进行封堵。现有的封堵方法主要是依靠人工从检查井处进行封堵:对待封堵的检查井现场勘察后,根据井深、管径及井内水深等数据拟定施工方案,井上预先拌合好封堵用的混合料及砖块,沿井壁送至井下,作业人员携带工具下到井底进行操作。由于污水管道较深,井下环境恶劣,空气不通畅,可能存在CH4、CO等有毒气体,虽然要求下井前要做到“水排干,气换清”, 并按要求做好污水管道上游可能来水、下游回水冲击井下作业人员的防范措施,采用有效的硫化氢测试仪测得工作点及相邻近点硫化氢绝对值10微克以下并保持原通风措施不变方可下井作业,但是传统的封堵方法不仅人员下井封堵前准备工作多,且还需要有经验的专业队伍,成本较高,并且在各种充足的准备条件下人员下井作业风险仍然很大。
发明内容
本发明的目的在于提供一种施工简单、安全的深埋大直径废弃污水管道的封堵方法。
为实现上述目的,本发明可采取下述技术方案:
本发明所述的深埋大直径废弃污水管道的封堵方法,包括下述步骤:
第一步,根据地面检查井,探明废弃污水管道的位置,放线标记,确定封堵位置;
第二步,选择直径大于污水管道外径25~50mm的钻头,利用旋挖钻机垂直该污水管道中心轴线方向钻孔,使钻头穿过污水管道底部500mm;
第三步,采用装载机用素土进行回填,并用旋挖钻机分层夯实,素土回填至高于管道顶部500mm处;
第四步,选择与污水管道外径相同的钻头安装在旋挖钻机上,在回填土中钻孔至污水管道底部500mm;
第五步,下放导管,采用混凝土进行浇筑封堵,至混凝土面高出污水管道顶面500mm为止,完成施工。
本发明的优点在于封堵施工时无需人员下井作业,减少了人员下井作业的风险,采用素土(普通黄土)加混凝土塞封堵施工,利用夯实的素土对浇筑的混凝土浆进行围挡,减少了封堵混凝土使用量,浇筑后的混凝土形成管塞,无需砖砌施工,大大节约了施工成本。
具体实施方式
下面通过具体实例对本发明封堵方法做更加详细的描述。
如郑州市地铁5号线紫荆山路站施工时,原路段下方埋设有钢筋混凝土污水管道,该污水管道埋深约7.7米,管径1200mm,壁厚15cm,管道位置与车站主体结构基坑的围护桩相冲突,因此对该污水管道实施了改迁。管道改迁完成后,原污水管道废除,废弃的污水管道造成钻孔灌注桩施工时泥浆的大量流失,使混凝土无法灌注至设计标高,需要对废弃的污水管道进行封堵处理。
本次封堵施工按照本发明的封堵方法进行。
机械准备:YTR280C旋挖钻机配直径1500mm合金钻头和1200mm钻头,Z50装载机配合施工。
人员准备:现场浇注桩施工作业队6人,技术管理人员、安全员、测量员、施工员共计5人。
材料准备:素土3M3,C30混凝土3M3。
第一步,根据地面检查井,探明废弃污水管道的位置,放线标记,确定封堵位置;
第二步,在确认无其他管线影响的情况下,旋挖钻机安装直径1500mm合金钻头,垂直该污水管道中心轴线方向向下钻孔,使钻头穿过污水管道底部500mm左右,保证钻头完全穿过污水管道;
第三步,采用Z50装载机进行素土回填,并用旋挖钻机进行分层夯实,素土回填至高于管道顶部500mm处;
第四步,旋挖钻机更换直径1200mm钻头,在回填土中钻孔至污水管道底部500mm左右;
第五步,下放导管,采用C30混凝土进行浇筑封堵,保证混凝土面高出污水管道顶面500mm以上,并且观察30分钟,混凝土面无下降,完成施工;如果出现下降现象,再次进行混凝土浇筑,直至混凝土面无下降且高出污水管道顶面500mm以上为止。
Claims (1)
1.一种深埋大直径废弃污水管道的封堵方法,其特征在于:包括下述步骤:
第一步,根据地面检查井,探明废弃污水管道的位置,放线标记,确定封堵位置;
第二步,选择直径大于污水管道外径25~50mm的钻头,利用旋挖钻机垂直该污水管道中心轴线方向钻孔,使钻头穿过污水管道底部500mm;
第三步,采用装载机用素土进行回填,并用旋挖钻机分层夯实,素土回填至高于管道顶部500mm处;
第四步,选择与污水管道外径相同的钻头安装在旋挖钻机上,在回填土中钻孔至污水管道底部500mm;
第五步,下放导管,采用混凝土进行浇筑封堵,至混凝土面高出污水管道顶面500mm为止,完成施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610203200.6A CN105804203B (zh) | 2016-04-05 | 2016-04-05 | 深埋大直径废弃污水管道的封堵方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610203200.6A CN105804203B (zh) | 2016-04-05 | 2016-04-05 | 深埋大直径废弃污水管道的封堵方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105804203A CN105804203A (zh) | 2016-07-27 |
CN105804203B true CN105804203B (zh) | 2018-08-03 |
Family
ID=56459523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610203200.6A Active CN105804203B (zh) | 2016-04-05 | 2016-04-05 | 深埋大直径废弃污水管道的封堵方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804203B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110701421A (zh) * | 2019-08-29 | 2020-01-17 | 中国二冶集团有限公司 | 一种大直径管道封堵水源的方法 |
CN113653150B (zh) * | 2021-09-17 | 2023-01-24 | 北京城乡建设集团有限责任公司 | 一种回转钻机钻穿污水管线的施工方法 |
CN113982086B (zh) * | 2021-11-03 | 2024-05-24 | 北京城乡建设集团有限责任公司 | 一种基于水泥硬度的回转钻机施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060055250A (ko) * | 2004-11-18 | 2006-05-23 | 김상한 | Pront-wire jacking |
CN103362204A (zh) * | 2012-04-09 | 2013-10-23 | 苏州园林营造工程有限公司 | 雨污水管道封堵方法 |
CN103615044A (zh) * | 2013-12-13 | 2014-03-05 | 中冶建工集团有限公司 | 一种小直径混凝土排水管道渗漏内套管封堵方法 |
CN104452793A (zh) * | 2015-01-09 | 2015-03-25 | 郑州市市政工程总公司 | 泡沫混凝土处理城市高架桥基础处废弃污水管道施工工艺 |
-
2016
- 2016-04-05 CN CN201610203200.6A patent/CN105804203B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060055250A (ko) * | 2004-11-18 | 2006-05-23 | 김상한 | Pront-wire jacking |
CN103362204A (zh) * | 2012-04-09 | 2013-10-23 | 苏州园林营造工程有限公司 | 雨污水管道封堵方法 |
CN103615044A (zh) * | 2013-12-13 | 2014-03-05 | 中冶建工集团有限公司 | 一种小直径混凝土排水管道渗漏内套管封堵方法 |
CN104452793A (zh) * | 2015-01-09 | 2015-03-25 | 郑州市市政工程总公司 | 泡沫混凝土处理城市高架桥基础处废弃污水管道施工工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN105804203A (zh) | 2016-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101737060B (zh) | 土质下穿隧道超大直径管幕施工方法 | |
CN104846829B (zh) | 预留盾构穿越复合式基坑围护墙及其施工方法 | |
CN109026010B (zh) | 一种矿山渗井注浆型凿井施工方法 | |
CN205172598U (zh) | 管幕旋喷桩支护结构 | |
CN103835723B (zh) | 井筒穿越采空区地层的综合预治理方法 | |
CN104295239A (zh) | 一种旋挖钻机硬岩地层成孔的方法 | |
CN113445498A (zh) | 复杂地质岩溶孔桩基础施工工艺 | |
CN105040775B (zh) | 深层承压自流井封堵系统与方法 | |
CN110735653A (zh) | 一种针对火成岩富水断层的深孔后退式注浆堵水施工方法 | |
CN110130936B (zh) | 一种盾构掘进过程中突遇未处理溶洞或裂隙的施工方法 | |
CN111287653A (zh) | 水平定向钻硬岩大口径正向扩孔施工方法 | |
CN105804203B (zh) | 深埋大直径废弃污水管道的封堵方法 | |
CN107983761A (zh) | 重金属与VOCs复合污染土壤的修复施工方法 | |
CN110344400A (zh) | 旋挖钻机遇坚硬岩成孔成桩施工工艺 | |
CN105970918A (zh) | 一种大粒径卵石砂土且渗水严重地质条件下的桩基成孔的施工工艺 | |
CN103835648A (zh) | 一种通过地面注浆改善岩层性能反井钻井工艺 | |
CN108590706A (zh) | 一种用于特长单线铁路隧道多臂凿岩台车帷幕注浆施工技术 | |
CN108265706A (zh) | 一种在溶洞地质内的工程桩及成桩工艺 | |
CN106122589A (zh) | 一种土压平衡法 | |
CN107246007A (zh) | 一种cfg桩的施工方法 | |
CN101793153A (zh) | 盾构近距离穿越大口径管线的施工方法 | |
CN108952727B (zh) | 一种大倾角竖直裂隙地层的注浆堵水方法 | |
CN106837382A (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN104315251B (zh) | 土石组合地质条件下人工顶管施工方法 | |
CN115369860A (zh) | 一种临近地铁超长隔离桩施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |