CN105803950B - A kind of reaction frame for steel wire rope prestressed anchor cable stretching - Google Patents
A kind of reaction frame for steel wire rope prestressed anchor cable stretching Download PDFInfo
- Publication number
- CN105803950B CN105803950B CN201610343721.1A CN201610343721A CN105803950B CN 105803950 B CN105803950 B CN 105803950B CN 201610343721 A CN201610343721 A CN 201610343721A CN 105803950 B CN105803950 B CN 105803950B
- Authority
- CN
- China
- Prior art keywords
- cross beam
- counter
- wire rope
- oriented
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/16—Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention provides a kind of reaction frame for steel wire rope prestressed anchor cable stretching, including:Moved cross beam (5), can be connected with the section that is spliced of steel wire rope anchor line (19);Tensioning hydraulic jack (8), is connected with moved cross beam (5);Fixed cross beam (9), for supporting tensioning hydraulic jack (8), fixed cross beam (9) is connected with tensioning hydraulic jack (8), tensioning hydraulic jack (8) can make moved cross beam (5) relative to fixed cross beam (9) closer or far from;Counter-force column (7) is oriented to, is connected with fixed cross beam (9);Adjustment mechanism, can adjust fixed cross beam (9) relative to the one end for being oriented to counter-force column (7) or the position of the other end.The reaction frame for being used for steel wire rope prestressed anchor cable stretching has that installation rate is fast, jack synchronous, by the way that regulation of hydraulic system jack position, stretching force and elongation be accurate, the low feature of stretching process hand labor intensity.
Description
Technical field
The present invention relates to a kind of reaction frame for steel wire rope prestressed anchor cable stretching.
Background technology
The tension process of steel wire rope prestress anchorage cable reaction frame steel wire rope prestress anchorage cable suitable for cable way bridge engineering, it is existing
Mainly it is made up of steel wire rope prestress anchorage cable tension tool jack, crossbeam, steel backing plate, such a tension tool exists following
Shortcoming:
1st, the accuracy of actual elongation is poor
Existing steel wire rope prestress anchorage cable tension tool exists because two synchronous jacks can not be synchronous in stretching process
And run-off the straight phenomenon, cause the actual prestressing force of steel wire rope not reach design requirement, and the accuracy of actual elongation is poor.
2nd, tensioning security risk is big
Existing steel wire rope prestress anchorage cable tension tool is in stretching process, and jack is directly by prestress application in activity
On crossbeam, the position of jack is adjusted by placing steel backing plate in very heavy top/bottom part, steel backing plate is single uneven distribution
Individual, globality poor in stretching process, produces shearing stress between steel backing plate due to applying prestressing force, causes steel pad
Plate may be extruded at any time, and tensioning security risk is high.
3rd, tensioning is less efficient
Existing steel wire rope prestress anchorage cable tension tool must be adjusted before each tensioning by manually installed steel backing plate
The position of hydraulic jack, and the angle of adjustment prestressed anchor cable stretching that must be repeatedly, add the labor intensity of workman,
Pulling rate degree is slow, and tensioning efficiency is low.
4th, stretching process stream line axially loaded can not be ensured
Existing steel wire rope prestress anchorage cable tension tool is simple in construction, and jack is placed on resistance face by steel backing plate,
In stretching process steel backing plate install be affected by human factors it is larger, both sides install can not concordantly not ensure steel wire rope prestressed anchor
Rope axially loaded in stretching process.
Explanation of nouns:
Steel wire rope prestress anchorage cable:Force structure for connecting cable way bridge main rope.After one end decouples steel wire rope, clean
Anti-corrosion grease, is fabricated to prestressed cable anchorage section by bunch ring, isolating frame, guiding cap, is anchored in massif, the other end leads to
Cross specialty and be spliced machine and be fabricated to steel wire rope and be spliced ring, be easy to steel wire rope prestressed stretch-draw and be connected with main rope.
Tensioning:External force is applied to prestress anchorage cable by hydraulic jack, to eliminate the elasticity of steel wire rope prestress anchorage cable
Deformation, inelastic deformation, it is ensured that sag meets design requirement after cable way bridge main rope is installed.
Reaction frame:It is main to be made up of moved cross beam, fixed cross beam, guiding counter-force column, counter-force base, hydraulic system etc..
The content of the invention
In order to solve the problem of existing reaction frame tensioning security risk is big, efficiency is low, it is used for steel the invention provides one kind
The reaction frame of cord prestressed anchor cable stretching, the reaction frame for being used for steel wire rope prestressed anchor cable stretching adds guiding counter-force
Structures such as post, fixed cross beam, load-bearing pulley, and stretch-draw jack is fixed on fixed cross beam, make tension tool turn into machine-
Electric-liquid integral structure, with installation rate is fast, jack synchronous, by regulation of hydraulic system jack position, stretching force with
Elongation is accurate, the low feature of stretching process hand labor intensity, it is ensured that the construction quality of steel wire rope prestressed anchor cable stretching,
Improve the security performance of tension tool.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of reaction frame for steel wire rope prestressed anchor cable stretching, including:
Moved cross beam, can be connected with the section that is spliced of steel wire rope anchor line;
Tensioning hydraulic jack, is connected with moved cross beam;
Fixed cross beam, for supporting tensioning hydraulic jack, fixed cross beam is connected with tensioning hydraulic jack, tensioning hydraulic pressure
Jack can make moved cross beam relative to fixed cross beam closer or far from;
Counter-force column is oriented to, is connected with fixed cross beam;
Adjustment mechanism, can adjust fixed cross beam relative to the one end for being oriented to counter-force column or the position of the other end.
Tensioning hydraulic jack and to be oriented to counter-force column be two, two tensioning hydraulic jacks be located at moved cross beam and
Between fixed cross beam, moved cross beam, fixed cross beam and two tensioning hydraulic jacks are respectively positioned on two and are oriented between counter-force column.
It is in erectility that two, which are oriented to counter-force column and two hydraulic jacks, and moved cross beam is located at the upper of fixed cross beam
Side, the two ends of moved cross beam are oriented to counter-force column with two correspondingly and are connected, and the two ends of fixed cross beam are also one-to-one
Counter-force column is oriented to two to be connected.
Being oriented to counter-force column can stretch, and the adjustment mechanism can be by controlling the flexible adjustment for being oriented to counter-force column to be oriented to
The length of counter-force column.
Being oriented to counter-force column includes shell body and round steel pipe axle, and shell body is cylindrical, and round steel pipe sleeve is located at shell body
Interior, the adjustment mechanism is to be arranged at the regulation hydraulic jack being oriented in counter-force column, and the regulation hydraulic jack can drive
One end of round steel pipe axle is flexible relative to shell body.
It is in erectility to be oriented to counter-force column, and regulation hydraulic jack is located in the upper end of shell body, round steel pipe axle position in
Adjust the lower section of hydraulic jack, the regulation hydraulic jack can adjust the lower end of round steel pipe axle stretched out relative to shell body or
The length of retraction.
The side wall of shell body is provided with multiple first pin-and-holes, the side wall of round steel pipe axle and is provided with multiple second pin-and-holes, is oriented to anti-
Power column also includes grafting pin, and grafting pin can be sequentially inserted into the first pin-and-hole of shell body and the second pin-and-hole of round steel pipe axle
Inside fix shell body and round steel pipe axle.
The two ends of fixed cross beam are provided with the holding jacket of annular, and two holding jackets are sheathed on two guiding correspondingly
The shell of counter-force column is external, and holding jacket is tubular structure, and holding jacket is bolted by two semicircular plates and constituted, lock ring
Set can be by making fixed cross beam be fixed relative to counter-force column is oriented to grafting pin contact, and the middle part of fixed cross beam is provided with use
The through hole passed through in steel wire rope anchor line.
Moved cross beam and fixed cross beam are parallel to each other, and two are oriented to counter-force column and are parallel to each other, and the middle part of moved cross beam leads to
Cross connection component to be connected with the section that is spliced, moved cross beam two ends are provided with Access Division, moved cross beam passes through two clampings
The shell bodies of portion and two guiding counter-force columns correspond clampings, and what is matched with the outer surface of shell body contained in the Access Division
Open slot, moved cross beam can be slided relative to counter-force column is oriented to.
The connection component includes cushion block, bearing and load-bearing pulley, and cushion block is fixed on the top of moved cross beam, and bearing is fixed on
The lower section of moved cross beam, load-bearing pulley is fixed on the bottom of bearing by shearing resistance pin, and the connection component is located at two tensioning liquid
Between pressure jack.
The beneficial effects of the invention are as follows:
1st, the actual elongation accuracy of tensioning is high, improves the job stability in system stretching process;
2nd, such a tension tool security performance is high;
3rd, labor strength is reduced, tensioning efficiency is improved;
4th, it ensure that steel wire rope is in axially loaded in stretching process.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and of the invention shows
Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.
Fig. 1 is the schematic perspective view for the reaction frame of steel wire rope prestressed anchor cable stretching.
Fig. 2 is the front view for the reaction frame of steel wire rope prestressed anchor cable stretching.
Fig. 3 is the left view for the reaction frame of steel wire rope prestressed anchor cable stretching.
Fig. 4 is the sectional view along A-A directions in Fig. 2.
Fig. 5 is the enlarged diagram at connection component position.
Reference in figure:
1st, cushion block;2nd, bearing;3rd, load-bearing pulley;4th, shearing resistance pin;5th, moved cross beam;6th, hydraulic jack is adjusted;7th, lead
To counter-force column;8th, tensioning hydraulic jack;9th, fixed cross beam;10th, holding jacket;11st, the second pin-and-hole;12nd, round steel pipe axle;13、
Counter-force base;14th, suspension ring;15th, hydraulic jack push rod;16th, the first pin-and-hole;17th, pin;18th, bolt;19th, steel wire rope anchor line;
20th, shell body.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase
Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of reaction frame for steel wire rope prestressed anchor cable stretching, including:
Moved cross beam 5, the annular section that is spliced that can be with steel wire rope anchor line 19 is connected;
Tensioning hydraulic jack 8, is connected with moved cross beam 5;
Fixed cross beam 9, for supporting tensioning hydraulic jack 8, fixed cross beam 9 is connected with tensioning hydraulic jack 8, tensioning
Hydraulic jack 8 can make moved cross beam 5 relative to fixed cross beam 9 closer or far from;
Counter-force column 7 is oriented to, is connected with fixed cross beam 9;
Adjustment mechanism, can adjust fixed cross beam 9 relative to be oriented to counter-force column 7 one end or the other end position, such as
Shown in Fig. 1 to Fig. 5.
In the present embodiment, being oriented to counter-force column 7 can stretch or cannot stretch, that is, be oriented to counter-force column 7 in fig. 2
The length of above-below direction can change or can not change., as shown in Figures 1 to 4, should when guiding counter-force column 7 can stretch
Adjustment mechanism can be oriented to the length of counter-force column 7 by adjusting, to adjust fixed cross beam 9 relative to guiding counter-force column 7
The position of lower end.When guiding counter-force column 7 cannot stretch, the adjustment mechanism can be by making fixed cross beam 9 along along Fig. 2
Above-below direction movement adjustment fixed cross beam 9 is relative to the upper end for being oriented to counter-force column 7 or the position of lower end.Due to fixed cross beam 9
Can be relative to the lower end movement for being oriented to counter-force column 7, so that steel pad is placed in the bottom that reaction frame is not used in when manually installed
Plate, that is, reduce the labor intensity of workman, and the safety problem of existing tension tool is solved again.
In the present embodiment, tensioning hydraulic jack 8 and guiding counter-force column 7 are two, two tensioning hydraulic jacks
Top 8 is located between moved cross beam 5 and fixed cross beam 9, moved cross beam 5, fixed cross beam 9 and two equal positions of tensioning hydraulic jack 8
Between two guiding counter-force columns 7.Specifically, it is in vertical that two, which are oriented to counter-force column 7 and two hydraulic jacks 8,
State, moved cross beam 5 is located at the top of fixed cross beam 9, and the two ends of moved cross beam 5 are oriented to counter-force column 7 with two correspondingly
Connection, the two ends of fixed cross beam 9 are also oriented to counter-force column 7 with two correspondingly and are connected, as shown in Figure 1.
In the present embodiment, being oriented to counter-force column 7 can stretch, and the adjustment mechanism can be by controlling to be oriented to counter-force column
7 flexible adjustment is oriented to the length of counter-force column 7, so as to adjust fixed cross beam 9 relative to the lower end for being oriented to counter-force column 7
Position.Being oriented to counter-force column 7 includes shell body 20 and round steel pipe axle 12, and shell body 20 is cylindrical, and round steel pipe axle 12 is sheathed on
In shell body 20, the adjustment mechanism is to be arranged at the regulation hydraulic jack 6 being oriented in counter-force column 7, the regulation hydraulic jack
Top 6 can drive the lower end of round steel pipe axle 12 flexible relative to shell body 20.
In the present embodiment, it is in erectility to be oriented to counter-force column 7, and regulation hydraulic jack 6 is located at the upper of shell body 20
In end, round steel pipe axle 12 is located at the lower section of regulation hydraulic jack 6, and the regulation hydraulic jack 6 can adjust round steel pipe axle 12
The lower end length stretching out or retract relative to shell body 20, the lower end of round steel pipe axle 12 is provided with the annular for being connected
Counter-force base 13.
In the present embodiment, along the axis direction of round steel pipe axle 12, the side wall of shell body 20 is provided with multiple first pin-and-holes 16,
Multiple second pin-and-holes 11 are provided with the side wall of round steel pipe axle 12, being oriented to counter-force column 7 also includes grafting pin 17, grafting pin 17
Make shell body 20 and round steel pipe in the second pin-and-hole 11 that the first pin-and-hole 16 of shell body 20 and round steel pipe axle 12 can be sequentially inserted into
Axle 12 is fixed.I.e. grafting pin 17 can be sequentially inserted into the first pin-and-hole 16 of shell body 20 and the second pin-and-hole 11 of round steel pipe axle 12
Round steel pipe axle 12 can not be flexible equivalent to shell body 20 again afterwards.
In the present embodiment, the two ends of fixed cross beam 9 are provided with the holding jacket 10 of annular, a pair of two holding jackets 10 1
That answers is sheathed on outside the shell body 20 of two guiding counter-force columns 7, and holding jacket 10 is the demountable structure of tubular, holding jacket 10
Internal diameter is equal to the external diameter of shell body 20, and holding jacket 10 is made up of two semicircular plates the connection of bolt 18, as shown in Figure 1 to Figure 4 institute
Show, holding jacket 10 can be by making fixed cross beam 9 be fixed relative to counter-force column 7 is oriented to the contact of grafting pin 17, i.e. as schemed
Shown in 1, steel wire rope anchor line 19 is in tensioning, and holding jacket 10 and fixed cross beam 9 after the contact of grafting pin 17 can not be again relative to leading
Slid axially to counter-force column 7, the middle part of fixed cross beam 9, which is provided with, is used for the through hole that steel wire rope anchor line 19 is passed through.
In the present embodiment, moved cross beam 5 and fixed cross beam 9 are parallel to each other, and two are oriented to counter-force column 7 and are parallel to each other,
The middle part of moved cross beam 5 is connected by connection component with being spliced section described in annular, and the two ends of moved cross beam 5 are provided with clamping
Portion, moved cross beam 5 corresponds clamping, the clamping by two Access Divisions with two shell bodies 20 for being oriented to counter-force column 7
Portion is in semi-circular shape, and the U-shaped opening groove matched with the outer surface of shell body 20 is contained in the Access Division, and moved cross beam 5 being capable of phase
Slided for being oriented to counter-force column 7.
In the present embodiment, as shown in figure 5, the connection component includes cushion block 1, bearing 2 and load-bearing pulley 3, cushion block 1 is fixed
In the top of moved cross beam 5, bearing 2 is fixed on the lower section of moved cross beam 5, and load-bearing pulley 3 is fixed on bearing by shearing resistance pin 4
2 bottom, the connection component is located between two tensioning hydraulic jacks 8.Shearing resistance pin 4 can be disassembled from bearing 2,
It is connected in order to be spliced section described in steel wire rope anchor line 19 with load-bearing pulley 3., can be with quick-replaceable so before and after each tensioning
Steel wire rope prestress anchorage cable, improves efficiency.
In the present embodiment, the hydraulic system of the reaction frame for being used for steel wire rope prestressed anchor cable stretching is by two hydraulic oil
Pump and four hydraulic jacks constitute (two tensioning hydraulic jacks 8 and two regulation hydraulic jacks 6), are oriented to counter-force column
Two hydraulic jacks (adjusting hydraulic jack 6) in 7 are used to adjust moved cross beam 5, fixed cross beam 9 and two regulation liquid
The position of jack 6, referred to as adjustment jack are pressed, the sizes and types of two regulation hydraulic jacks 6 are consistent.Fixed cross beam 9
On two hydraulic jacks (tensioning hydraulic jack 8) be used for steel wire rope anchor line 19 (steel wire rope prestress anchorage cable) tensioning,
Abbreviation stretch-draw jack, two sizes and types of tensioning hydraulic jack 8 are consistent.Two hydraulic jacks positioned at the same side make
The tensioning hydraulic jack 8 in left side and regulation hydraulic jack 6 in same oil pump, such as Fig. 4 is used to use same oil pump, right side
Tensioning hydraulic jack 8 and regulation hydraulic jack 6 use another oil pump, and oil circuit and then control and regulation are changed by switching
Tensioning hydraulic jack 8 and regulation hydraulic jack 6 work, and make the compact conformation of system, economical and practical.
In use, fixed cross beam 9 and holding jacket 10 are sheathed on outside guiding counter-force column 7 such as Fig. 1 institutes with bolt 18 first
Show, before each tensioning, according to the length of steel wire rope anchor line 19, the position of counter-force base 13 is adjusted by adjusting hydraulic jack 6
Put, just tightened but be advisable without stress with steel wire rope, hydraulic circuit switch is closed, using pin 17 from the second pin-and-hole 11 and first
Intert the past in pin-and-hole 16, prevent from being oriented to the shell body 20 of counter-force column 7 in gravity and stretching process along round steel pipe axle
12 slidings downwards, reach the purpose of adjustment stretch-draw jack 6.
After the position adjustment of tensioning hydraulic jack 8 is good, steel wire rope anchor line 19 is spliced section from the center of fixed cross beam 9
Go through, the shearing resistance pin 4 on bearing 2 is pulled out, load-bearing pulley 3 just can easily be taken off, then by steel in circular hole
The section that is spliced of cord anchor cable is enclosed on load-bearing pulley 3, and load-bearing pulley 3 and shearing resistance pin 4 are finally installed as shown in Figure 1, is completed
The installation of steel wire rope prestress anchorage cable.
After the installation of steel wire rope prestress anchorage cable 19, the hydraulic circuit of tensioning hydraulic jack 8 is opened, starts tensioning
Anchor cable.Prestress anchorage cable 19 is during tensioning, and the tensioning hydraulic jack 8 of both sides applies stress must be consistent, meanwhile, by
There is U-shaped circular groove in the two ends of moved cross beam 5, the curvature of its groove face is identical with the amount of curvature for being oriented to the outer surface of counter-force column 7, protects
The motion for having demonstrate,proved moved cross beam 5 belongs to translation, it is ensured that steel wire rope actual elongation value is accurate.
Changed by switching control oil circuit, reach two sets of tensioning hydraulic jacks 8 of control and two regulation hydraulic jacks 6
The purpose of position;Moved cross beam 5 and tensioning hydraulic jack 8 are run simultaneously, it is ensured that the accuracy of actual stretching extension value;Should
Connection component, can be with quick-replaceable steel wire rope prestress anchorage cable before and after each tensioning.
The reaction frame for being used for steel wire rope prestressed anchor cable stretching also contains suspension ring 14 and hydraulic jack in the present embodiment
Push rod 15 is pushed up, suspension ring 14 are located at the top of shell body 20, in order to which mobile this is used for the counter-force of steel wire rope prestressed anchor cable stretching
Frame.
It is described above, it is only the specific embodiment of the present invention, it is impossible to which the scope implemented is invented with its restriction, so it is equivalent
The displacement of component, or the equivalent variations made according to scope of patent protection of the present invention and modification, should all still fall within what this patent was covered
Category.In addition, between technical characteristic and technical characteristic in the present invention, between technical characteristic and technical scheme, technical scheme with
It can be used between technical scheme with independent assortment.
Claims (7)
1. a kind of reaction frame for steel wire rope prestressed anchor cable stretching, it is characterised in that described to be used for steel wire rope prestressed anchor
The reaction frame of cable stretching includes:
Moved cross beam (5), can be connected with the section that is spliced of steel wire rope anchor line (19);
Tensioning hydraulic jack (8), is connected with moved cross beam (5);
Fixed cross beam (9), for supporting tensioning hydraulic jack (8), fixed cross beam (9) is connected with tensioning hydraulic jack (8),
Tensioning hydraulic jack (8) can make moved cross beam (5) relative to fixed cross beam (9) closer or far from;
Counter-force column (7) is oriented to, is connected with fixed cross beam (9), it is in erectility to be oriented to counter-force column (7);
Adjustment mechanism, can adjust position of the fixed cross beam (9) relative to the lower end for being oriented to counter-force column (7);
Being oriented to counter-force column (7) can be stretched, and the adjustment mechanism can be led by the flexible adjustment for controlling to be oriented to counter-force column (7)
To the length of counter-force column (7);Being oriented to counter-force column (7) includes shell body (20) and round steel pipe axle (12), and shell body (20) is in
Cylindrical shape, round steel pipe axle (12) is sheathed in shell body (20), and the adjustment mechanism is to be arranged at the tune being oriented in counter-force column (7)
Save hydraulic jack (6);Adjust hydraulic jack (6) to be located in the upper end of shell body (20), round steel pipe axle (12) is located at regulation
The lower section of hydraulic jack (6), the regulation hydraulic jack (6) can adjust the lower end of round steel pipe axle (12) relative to shell body
(20) length stretched out or retracted.
2. the reaction frame according to claim 1 for steel wire rope prestressed anchor cable stretching, it is characterised in that tensioning hydraulic pressure
Jack (8) and guiding counter-force column (7) are two, and two tensioning hydraulic jacks (8) are located at moved cross beam (5) and fixed
Between crossbeam (9), moved cross beam (5), fixed cross beam (9) and two tensioning hydraulic jacks (8) are respectively positioned on two guiding counter-forces
Between column (7).
3. the reaction frame according to claim 2 for steel wire rope prestressed anchor cable stretching, it is characterised in that two guiding
Counter-force column (7) and two hydraulic jacks (8) are in erectility, and moved cross beam (5) is located at the top of fixed cross beam (9),
The two ends of moved cross beam (5) are oriented to counter-force columns (7) with two correspondingly and are connected, and the two ends of fixed cross beam (9) are also one by one
It is corresponding to be connected with two guiding counter-force columns (7).
4. the reaction frame according to claim 1 for steel wire rope prestressed anchor cable stretching, it is characterised in that shell body
(20) side wall is provided with multiple first pin-and-holes (16), the side wall of round steel pipe axle (12) and is provided with multiple second pin-and-holes (11), is oriented to
Counter-force column (7) also includes grafting pin (17), and grafting pin (17) can be sequentially inserted into the first pin-and-hole of shell body (20)
(16) and in the second pin-and-hole (11) of round steel pipe axle (12) make shell body (20) and round steel pipe axle (12) fixed.
5. the reaction frame according to claim 4 for steel wire rope prestressed anchor cable stretching, it is characterised in that fixed cross beam
(9) two ends are provided with the holding jacket (10) of annular, and two holding jackets (10) are one-to-one to be sheathed on two guiding counter-forces
Outside, holding jacket (10) is tubular structure to the shell body (20) of column (7), and holding jacket (10) passes through bolt by two semicircular plates
(18) connection composition, holding jacket (10) can be by making fixed cross beam (9) relative to guiding counter-force with grafting pin (17) contact
Column (7) is fixed, and the middle part of fixed cross beam (9), which is provided with, is used for the through hole that steel wire rope anchor line (19) is passed through.
6. the reaction frame according to claim 3 for steel wire rope prestressed anchor cable stretching, it is characterised in that moved cross beam
(5) it is parallel to each other with fixed cross beam (9), two are oriented to counter-force column (7) and are parallel to each other, and the middle part of moved cross beam (5) passes through even
Connected components are connected with the section that is spliced, and moved cross beam (5) two ends are provided with Access Division, and moved cross beam (5) passes through two cards
Socket part corresponds clamping with two shell bodies (20) for being oriented to counter-force column (7), and the Access Division is contained and shell body (20)
The open slot that outer surface matches, moved cross beam (5) can be slided relative to counter-force column (7) is oriented to.
7. the reaction frame according to claim 6 for steel wire rope prestressed anchor cable stretching, it is characterised in that the connection group
Part includes cushion block (1), bearing (2) and load-bearing pulley (3), and cushion block (1) is fixed on the top of moved cross beam (5), and bearing (2) is fixed
Lower section in moved cross beam (5), load-bearing pulley (3) is fixed on the bottom of bearing (2), the connection component by shearing resistance pin (4)
Between two tensioning hydraulic jacks (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610343721.1A CN105803950B (en) | 2016-05-23 | 2016-05-23 | A kind of reaction frame for steel wire rope prestressed anchor cable stretching |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610343721.1A CN105803950B (en) | 2016-05-23 | 2016-05-23 | A kind of reaction frame for steel wire rope prestressed anchor cable stretching |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105803950A CN105803950A (en) | 2016-07-27 |
CN105803950B true CN105803950B (en) | 2017-08-04 |
Family
ID=56451771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610343721.1A Active CN105803950B (en) | 2016-05-23 | 2016-05-23 | A kind of reaction frame for steel wire rope prestressed anchor cable stretching |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105803950B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165061A (en) * | 2017-07-04 | 2017-09-15 | 北京市市政四建设工程有限责任公司 | A kind of prestressed anchor and tensioning equipment |
CN107387140A (en) * | 2017-09-05 | 2017-11-24 | 湖南科技大学 | A kind of multi-cylinder anchor rod hydraulic tensioning equipment and anchor pole method for stretching |
CN109024307A (en) * | 2018-08-24 | 2018-12-18 | 苏交科集团股份有限公司 | A kind of lateral deviation-rectifying system of intelligence for bridge incremental launching construction |
CN109534214B (en) * | 2018-12-04 | 2024-02-23 | 华侨大学 | Gate-type reaction frame with adjustable loading height |
CN109975110B (en) * | 2019-04-29 | 2024-05-03 | 中交二公局第五工程有限公司 | Method and device for detecting bearing capacity of cable joint |
CN110725210B (en) * | 2019-05-01 | 2021-09-17 | 河南交院工程技术集团有限公司 | Inhaul cable stepping tensioning construction method and tensioning equipment |
CN114607101B (en) * | 2022-03-28 | 2024-03-22 | 天津大学 | CFRP tendon inhaul cable integral clamping piece type anchorage device for cable roof structure |
CN115922626A (en) * | 2022-11-23 | 2023-04-07 | 国网福建省电力有限公司 | Pin shaft unloading device of steel wire rope with load balancing weight |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3417865B2 (en) * | 1999-03-03 | 2003-06-16 | 株式会社ピーエス三菱 | Method of constructing structure using strut and strut structure |
CN2806645Y (en) * | 2005-06-15 | 2006-08-16 | 尚守平 | Prestressed stretching device for fiber boards |
CN203188122U (en) * | 2013-03-01 | 2013-09-11 | 浙江省交通工程建设集团有限公司 | Movable type prestress tension platform |
CN204199185U (en) * | 2014-11-06 | 2015-03-11 | 刘大鑫 | A kind of prestressed stretch-draw support |
CN204898523U (en) * | 2015-05-14 | 2015-12-23 | 北京奇力建通工程技术有限公司 | Prestressed cable stretch -draw frock reaction frame |
CN205175813U (en) * | 2016-03-03 | 2016-04-20 | 山东科技大学 | Hydraulic loading system's reaction frame |
CN205775861U (en) * | 2016-05-23 | 2016-12-07 | 中交第一公路工程局有限公司 | A kind of reaction frame for steel wire rope prestressed anchor cable stretching |
-
2016
- 2016-05-23 CN CN201610343721.1A patent/CN105803950B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105803950A (en) | 2016-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105803950B (en) | A kind of reaction frame for steel wire rope prestressed anchor cable stretching | |
CN205775861U (en) | A kind of reaction frame for steel wire rope prestressed anchor cable stretching | |
EP0017616B1 (en) | Process and apparatus for laying and fastening heavy electrical cables | |
DE68926716T2 (en) | APPARATUS FOR CONNECTING AND DETACHING SCREWED PARTS | |
DE3207957C2 (en) | Method for producing a bulge on a strand of steel wires for anchoring it in concrete components and device for carrying out this method | |
DE4216356A1 (en) | EXTENSION DEVICE FOR A TELESCOPICABLE COLUMN | |
DE2530420B2 (en) | Method and device for tensioning inclined tensioning or the like. for buildings | |
DE1484577B1 (en) | Device for driving or pulling piles, sheet piles or the like. | |
CN101264855B (en) | Inclined guy cable stretching torsion-proof jack | |
WO2015014516A1 (en) | Press frame | |
EP0142529B1 (en) | Self propelled scaffold for buildings | |
CN110444913A (en) | A kind of transmission line wire crimp and the compression bonding apparatus with it | |
DE2542012C3 (en) | Device for driving a driven pile | |
EP0254840B1 (en) | Method and device for lifting and lowering a load by a hydraulic linear motor | |
EP0163012B1 (en) | Apparatus for screwing tubes and sleeves | |
DE2215437A1 (en) | Tensioning device for tendons consisting of several wires or strands | |
DE102007057849A1 (en) | Compensation device for compensating load weight of movable measuring head, has redirecting units arranged such that sections run in opposite direction from one another so that power transmission element is redirected at one of units | |
DE3428813C2 (en) | Device for tensioning a stay cable, especially rope bridges | |
DE474153C (en) | Guide for elevators | |
DE3434020C2 (en) | ||
EP3715308A1 (en) | Stop means for suspending loads on a support means | |
CN216503074U (en) | Welding equipment with regular structure of pencil is used in factory building construction | |
CN116207620B (en) | Transverse stretching device for cable terminal head | |
JP2006125563A (en) | Wire clamp device | |
CN217215799U (en) | Cable bridge connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |