CN105780791B - Deep-well precipitation well head shut-in well construction method in underground garage foundation pit - Google Patents

Deep-well precipitation well head shut-in well construction method in underground garage foundation pit Download PDF

Info

Publication number
CN105780791B
CN105780791B CN201610144415.5A CN201610144415A CN105780791B CN 105780791 B CN105780791 B CN 105780791B CN 201610144415 A CN201610144415 A CN 201610144415A CN 105780791 B CN105780791 B CN 105780791B
Authority
CN
China
Prior art keywords
well
seal ring
foundation pit
laid
steel cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610144415.5A
Other languages
Chinese (zh)
Other versions
CN105780791A (en
Inventor
黄伟
李刚
朱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tian Shang Design Group Limited
Original Assignee
Tian Shang Design Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tian Shang Design Group Ltd filed Critical Tian Shang Design Group Ltd
Priority to CN201610144415.5A priority Critical patent/CN105780791B/en
Priority claimed from CN201410428970.1A external-priority patent/CN104196045B/en
Publication of CN105780791A publication Critical patent/CN105780791A/en
Application granted granted Critical
Publication of CN105780791B publication Critical patent/CN105780791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to the construction methods that deep-well precipitation well head in a kind of underground garage foundation pit is shunt in a well, including the following steps: 1) dewatering well is laid at position, among foundation pit;2) steel cylinder formula seal ring is laid before, bed course pours;3) building stones filling pump 40, is not crossed to continue to draw water to 50cm;4), waterproof concrete is poured into the interior seal ring on steel cylinder formula seal ring, is lower than 2cm suitable for reading;5) it, is fully welded with steel cylinder type seal ring with internal diameter steel plate border, 20mm mortar levelling layer;6), extra play waterproof is closed, bed course concrete placings, elongated waterproof layer closure;7), Base isolation system reinforcing bar is bound.Foundation pit intermediate arrangement dewatering well appropriate can efficiently lowering of watertable, accelerate construction progress, shorten the construction period, substantially reduce project cost.The waterproof and plugging construction method of precipitation well in foundation pit are easy, and operator is not required to carry out professional training, and common electric welder's work and waterproofer can be completed.

Description

Deep-well precipitation well head shut-in well construction method in underground garage foundation pit
Technical field
The present invention relates to technical field of building construction.
Background technique
With the fast development of urban construction, skyscraper is increasing, and deep foundation pit construction can also frequently encounter, and deep base The closure of hole dewatering well is the key link of entire foundation construction, it directly influences the position waterproofing quality.In big face In the engineering construction of product basement and underground garage, the foundation pit larger for width, underground water content is big, foundation pit width is larger, While foundation pit surrounding lays deep well points, dewatering well need to be also set among base plate, but this gives well head after precipitation Closure bring certain difficulty and trouble.
Summary of the invention
The technical problem to be solved in the present invention is to provide deep-well precipitations in a kind of better underground garage foundation pit of waterproof effect Well head well-sealing device and construction method.
In order to solve the above technical problems, deep-well precipitation well head well-sealing device in underground garage foundation pit of the invention, including set The dewatering well at the position among foundation pit is set, the dewatering well includes outermost supporting course, and gravel is inserted between supporting course and well casing Layer, is arranged immersible pump in well casing, and precipitation shaft mouth side upper berth is set up defences water layer, then pours Base isolation system concrete, the setting of precipitation well head Steel cylinder formula seal ring, the steel cylinder formula seal ring include stack shell and the interior waterstop and outer sealing for being welded on stack shell inner side and outer side Doughnut-shaped steel plate waterstop is arranged on the Base isolation system for band, and stone, casting concrete on stone are inserted in dewatering well lower half portion Along the position 2cm on to distance steel cartridge type seal ring, the outer waterstop is higher than interior waterstop at least 100mm, the doughnut-shaped steel plate The internal diameter of waterstop is identical as the outer waterstop maximum outside diameter on the steel cylinder formula seal ring, and setting is welded on the concrete The steel plate on edge on steel cylinder formula seal ring, the diameter of steel plate is identical as steel cylinder formula seal ring internal diameter, and the mortar of 2cm thickness is laid on steel plate Layer, it is laid with additional waterproofing layer on screed, blinding concrete is laid on additional waterproofing layer, elongated waterproof is laid on blinding concrete Layer.
The construction method that deep-well precipitation well head is shunt in a well in underground garage foundation pit of the invention, including the following steps:
1), dewatering well is laid at position among foundation pit;
2) steel cylinder formula seal ring is laid before, bed course pours;
3) building stones filling pump 40, is not crossed to continue to draw water to 50cm;
4) waterproof concrete, is poured to steel cylinder formula seal ring, is poured to the interior seal ring on steel cylinder formula seal ring, steel cylinder formula is lower than The 2cm suitable for reading of seal ring;
5), along being fully welded with steel plate border on steel cylinder formula seal ring, 20mm screed is laid on the steel plate, and levelling;
6), closure is laid with additional waterproofing layer on screed, is laid with blinding concrete, blinding concrete on additional waterproofing layer It is upper to be laid with elongated waterproof layer;
7), Base isolation system reinforcing bar is bound.
This engineering method has the following advantages compared with common dewatering construction technology:
1. foundation pit intermediate arrangement dewatering well appropriate can efficiently lowering of watertable, accelerate construction progress, shortening is applied The work duration, substantially reduce project cost.
2. the waterproof of precipitation well in foundation pit and plugging construction method are easy, operator is not required to carry out professional training, commonly Electric welder's work and waterproofer can be completed.
3. speed of application is fast, the construction of other processes is not influenced, nor affects on construction speed.
4. the material used is common used material in construction, the cost of material is low, and cost is quite cheap.
5. good water-proof effect uses multi layer waterproof construction measure, can guarantee the waterproof effect of concrete floor,
With biggish economic benefit and social benefit.
1. in terms of mass.This engineering method plugging effect is good, easy to operate, and the easily controllable construction quality of work progress will not go out Now seep water phenomenon, and plugging effect is more secure.
2. secure context.This engineering method does not need big security capital only with small machine.
3. technical aspect.This engineering method is easy to operate due to being three waterproof guard from inside to outside, is not in that infiltration is existing As plugging effect is more secure, and does not influence other processes construction.
4. economic aspect.The machinery that this engineering method uses is simple, and easy for construction, construction cost is relatively small.Main equipment Investment does not influence the construction of other processes, construction speed when being exactly that immersible pump has been embedded in the dewatering well to be sealed, but is brought It accelerates, substantially reduces the duration of precipitation in foundation pit, achieve considerable economic benefit.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is the signal of the first step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 2 is the signal of the second step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 3 is the signal of the third step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 4 is the signal of the 4th step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 5 is the signal of the 5th step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 6 is the signal of the 6th step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 7 is the signal of the 7th step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 8 is the signal of the 8th step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Fig. 9 is the signal of the 9th step of deep-well precipitation well head well-sealing device construction method in underground garage foundation pit of the present invention Figure.
Specific embodiment
Deep-well precipitation well head well-sealing device in underground garage foundation pit of the invention, the drop including position among foundation pit is arranged in Well, dewatering well include outermost supporting course 1, and gravel layer 2 is arranged on the inside of supporting course 1, screen pipe 3 is housed on the inside of gravel layer 2, Immersible pump 4 is set in screen pipe 3, and precipitation shaft mouth side upper berth is set up defences water layer 5 and Base isolation system 6, and precipitation well head setting steel cylinder formula is stopped Water ring 7, steel cylinder formula seal ring 7 include stack shell and the interior waterstop 7b and outer waterstop 7c that are welded on stack shell inner side and outer side, base Doughnut-shaped steel plate waterstop 8 is set on plinth raft plate 6, stone 9 is inserted into dewatering well lower half portion, on stone 9 casting concrete 10 to Along the position 2cm on distance steel cartridge type seal ring 7, outer waterstop 7c is higher than interior waterstop at least 100mm, doughnut-shaped steel plate waterstop 8 Internal diameter it is identical as the outer waterstop 7c maximum outside diameter on steel cylinder formula seal ring 7, setting is welded on steel cylinder formula and stops on concrete 10 The steel plate 11 on edge on water ring 7, the diameter of steel plate 11 is identical as steel cylinder formula 7 internal diameters of seal ring, and the mortar of 2cm thickness is laid on steel plate 11 Layer 12 is laid with additional waterproofing layer 13 on screed 12, is laid with blinding concrete 14 on additional waterproofing layer 13, on blinding concrete 14 It is laid with elongated waterproof layer 15.
Specific construction procedure are as follows:
1, cartridge type steel plate for sealing water makes.
(1), steel sleeve, steel sleeve height 500mm are made using the hot rolled seamless steel tube of Φ 325 × 10, placement height exists Thicken the half height of bed course.
(2), outside is fully welded waterstop respectively in cartridge type seal ring, and the two height difference is greater than 100mm.
(3), water-stopping steel cover sheet thickness 10mm, diameter are 3mm smaller than cartridge type seal ring internal diameter.
(4), Base isolation system annular steel plate water stopper, wall thickness 3mm, width 300mm, internal diameter and cartridge type seal ring are maximum It is identical at outer diameter.
2, steel cylinder formula seal ring is placed before bed course concrete placings, as shown in Figure 1.
3, Jiang Shui is evacuated to lowest water level filling stone and pump embedment 40-50cm is continued to draw water, as shown in Figure 2.
4, waterproof concrete is poured into first of cartridge type seal ring, is lower than 2cm suitable for reading, as shown in Figure 3.
5, it is fully welded with cartridge type seal ring with internal diameter steel deck-plate, as shown in Figure 4.
6,20mm thickness mortar levelling layer, as shown in Figure 5.
7, additional waterproofing layer is closed, as shown in Figure 6.
8, bed course concrete placings, as shown in Figure 7.
9, elongated waterproof layer closure, as shown in Figure 8.
10, after main structure binds, dewatering well is stopped using in Base isolation system.Base isolation system reinforcing bar binds casting in place A grade concrete is improved, as shown in Figure 9.
11, concrete curing.
Before concrete reaches initial set, progress is secondary to be rolled, and reduces Plastic Shrinkage of Concrete.Surface plastic covering film, Felt conserves expansive concrete at this, and curing time is not less than 14 days.

Claims (1)

1. deep-well precipitation well head shut-in well construction method in a kind of underground garage foundation pit, it is characterised in that: include the following steps:
1), dewatering well is laid at position among foundation pit;
2) steel cylinder formula seal ring is laid before, bed course pours;
3) building stones filling pump 40, is not crossed to continue to draw water to 50cm;
4) waterproof concrete, is poured to steel cylinder formula seal ring, is poured to the interior seal ring on steel cylinder formula seal ring, steel cylinder formula sealing is lower than The 2cm suitable for reading of ring;
5), along being fully welded with steel plate border on steel cylinder formula seal ring, 20mm screed is laid on the steel plate, and levelling;
6) it, is laid with additional waterproofing layer on screed, and is closed, blinding concrete, blinding concrete are laid on additional waterproofing layer It is upper to be laid with elongated waterproof layer, and be closed;
7), Base isolation system reinforcing bar is bound.
CN201610144415.5A 2014-08-28 2014-08-28 Deep-well precipitation well head shut-in well construction method in underground garage foundation pit Active CN105780791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610144415.5A CN105780791B (en) 2014-08-28 2014-08-28 Deep-well precipitation well head shut-in well construction method in underground garage foundation pit

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610144415.5A CN105780791B (en) 2014-08-28 2014-08-28 Deep-well precipitation well head shut-in well construction method in underground garage foundation pit
CN201410428970.1A CN104196045B (en) 2014-08-28 2014-08-28 Deep-well precipitation well head well-sealing device and method in underground garage foundation ditch

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410428970.1A Division CN104196045B (en) 2014-08-28 2014-08-28 Deep-well precipitation well head well-sealing device and method in underground garage foundation ditch

Publications (2)

Publication Number Publication Date
CN105780791A CN105780791A (en) 2016-07-20
CN105780791B true CN105780791B (en) 2019-01-29

Family

ID=56392734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610144415.5A Active CN105780791B (en) 2014-08-28 2014-08-28 Deep-well precipitation well head shut-in well construction method in underground garage foundation pit

Country Status (1)

Country Link
CN (1) CN105780791B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400822B (en) * 2016-09-23 2018-06-26 山东金城建设有限公司 Deep foundation pit precipitation well shut-in well construction method
CN111350191B (en) * 2020-03-04 2021-08-31 中交第三航务工程勘察设计院有限公司 Bucket type foundation structure pumping system and construction process thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4824435B2 (en) * 2006-03-08 2011-11-30 鹿島建設株式会社 Groundwater level lowering method
CN100412275C (en) * 2007-10-30 2008-08-20 山东天齐置业集团股份有限公司 Waterproof and plugging construction method for precipitation well in foundation pit
CN103161171B (en) * 2011-12-13 2015-09-30 中国二十冶集团有限公司 The band pump shut-in well method of Dewatering by pressure reduction well
CN202787334U (en) * 2012-07-16 2013-03-13 杭州萧宏建设集团有限公司 Sealing structure of deep well casing used during tunnel construction
CN203583504U (en) * 2013-10-23 2014-05-07 深圳市建业建筑工程有限公司 Water pumping structure for concrete layer pouring

Also Published As

Publication number Publication date
CN105780791A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN105178344B (en) The construction method of the built-in anti-float anchor rod plugging structure of sole plate precipitation of deep well
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN204343312U (en) A kind of plugging device of precipitation well in foundation pit
CN103993615B (en) A kind of large drawdown pipe well plugging structure and construction method thereof
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN205444214U (en) Deep basal pit superelevation water level precipitation well well head plugging device
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN204530732U (en) A kind of structure of the precipitation based on basement elevator shaft plash
CN105951612B (en) Stake head bug repairing and reinforcement structure and its construction method under active service bridge water
CN206319910U (en) Infiltration disposal system is reinforced in a kind of tunnel-liner
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN204530733U (en) Underground construction deep-well precipitation well head plugging structure
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN204059380U (en) Deep-well precipitation well head well-sealing device in underground garage foundation ditch
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN103498486A (en) Method for blocking post-cast strip downcast pipe well through sleeve pipe
CN212129150U (en) Deep basal pit precipitation well block structure
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN104264700A (en) Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN105780791B (en) Deep-well precipitation well head shut-in well construction method in underground garage foundation pit
CN209040133U (en) Well-covering device for dewatering well suitable for rich groundwater region
CN104196045B (en) Deep-well precipitation well head well-sealing device and method in underground garage foundation ditch
CN203768925U (en) Seal device for dewatering well in foundation pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181204

Address after: 310000 Building 2, 2988 Moganshan Road, Liangzhu street, Yuhang District, Hangzhou, Zhejiang 2-3

Applicant after: Tian Shang Design Group Limited

Address before: 266071 Room 19F, Block B, Jindu Garden, 37 Donghai West Road, Southern District, Qingdao City, Shandong Province

Applicant before: Guo Weixin

GR01 Patent grant