CN105774869B CN201610114227.8A CN201610114227A CN105774869B CN 105774869 B CN105774869 B CN 105774869B CN 201610114227 A CN201610114227 A CN 201610114227A CN 105774869 B CN105774869 B CN 105774869B
Authority
CN
China
Prior art keywords
support
bar
fixedly connected
cross bar
brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610114227.8A
Other languages
Chinese (zh)
Other versions
CN105774869A (en
Inventor
陈海龙
阳和文
李晓和
李泽民
张家春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Changxin Construction Group Co., Ltd.
Original Assignee
Hunan Changxin Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Changxin Construction Group Co Ltd filed Critical Hunan Changxin Construction Group Co Ltd
Priority to CN201610114227.8A priority Critical patent/CN105774869B/en
Priority to CN201711120447.2A priority patent/CN108001505B/en
Publication of CN105774869A publication Critical patent/CN105774869A/en
Application granted granted Critical
Publication of CN105774869B publication Critical patent/CN105774869B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B3/00Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor
    • B62B3/04Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor involving means for grappling or securing in place objects to be carried; Loading or unloading equipment
    • B62B3/06Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor involving means for grappling or securing in place objects to be carried; Loading or unloading equipment for simply clearing the load from the ground
    • B62B3/0618Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor involving means for grappling or securing in place objects to be carried; Loading or unloading equipment for simply clearing the load from the ground using fluid lifting mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B3/00Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor
    • B62B3/08Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor involving tiltably-mounted containers

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Handcart (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Invalid Beds And Related Equipment (AREA)

Abstract

A kind of building site trolley,Including bottom plate,Framework,Material-pouring device,Holder device,Air cylinder device,Positioner and lean device,Bottom plate is provided with the first support block,First roller and the first brace,Framework is provided with the first batch turning block,First push pedal,First catch bar,First cylinder,First support,First support bar,First cross bar and the first locating piece,Material-pouring device includes the second batch turning block,Second support,Elastic rod and the second cross bar,Holder device includes the 3rd support,3rd cross bar,Grip frame,Second brace,3rd brace,Second support bar,4th cross bar,3rd support bar and the 5th cross bar,Air cylinder device includes the second cylinder,Second catch bar and connecting rod,Positioner includes the first locating rack,6th cross bar and the first locating rod,The present invention can smoothly pour out the construction material in trolley,Automaticity is high,Without Manual-pushing,Greatly reduce hand labor intensity.

Description

A kind of building site trolley
Technical field
The present invention relates to building machinery technical field, more particularly to a kind of building site trolley.
Background technology
Trolley is means of transport common on current building site, is widely used in fragment of brick, sandstone and reinforcing bar lamp building material Short-distance transport.But existing trolley needs artificial promotion when construction material therein is poured out, working strength is larger, And it is more painstaking to promote, or even when construction material is more, worker, which has, pushes away motionless situation generation, have impact on engineering Be normally carried out.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
The content of the invention
It is an object of the invention to provide a kind of building site trolley that can effectively solve above-mentioned technical problem.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of building site trolley, the building site trolley include bottom plate, the framework above the bottom plate, are located at Material-pouring device on the left of the bottom plate, the holder device on the right side of the framework, the air cylinder device below the framework Positioner above the holder device and device is leaned on the left of the air cylinder device, the bottom plate is provided with The first support block for being disposed below, the first roller being arranged in first support block and positioned at first support block one First brace of side, the framework are provided with the first batch turning block on its interior, the above the first batch turning block One push pedal, the first catch bar on the right side of first push pedal, the first cylinder on the right side of first catch bar, it is located at First support on the right side of first cylinder, the first support bar below the framework, be arranged in the framework One cross bar and the first locating piece above the first batch turning block, the material-pouring device include the second batch turning block, positioned at institute State the second support below the second batch turning block, the elastic rod above the second batch turning block and positioned at the second batch turning block Second cross bar on right side, the holder device include the 3rd support, the 3rd cross bar on the right side of the 3rd support, positioned at institute State and grip frame, the second brace below the 3rd cross bar, on the left of the 3rd support on the right side of the 3rd cross bar 3rd brace, the second support bar on the left of the 3rd brace, the 4th cross bar above the 3rd brace, it is located at The 3rd support bar above 4th cross bar and the 5th cross bar above the 3rd support bar, the air cylinder device bag The second cylinder, the second catch bar above second cylinder and the connecting rod above second catch bar are included, The positioner includes the first locating rack, the 6th cross bar on the right side of first locating rack and positioned at the described first positioning The first locating rod below frame, the device that leans include the 4th brace, the projection on the right side of the 4th brace, positioned at institute State the first spring above projection, the bent stick on the right side of first spring, the buffer bar on the right side of the bent stick, Second spring on the right side of the buffer bar.
First support block is provided with two and the respectively left and right sides below the bottom plate, first support block In cuboid, the upper surface of first support block is fixedly connected with the lower surface of the bottom plate, under first support block Surface is provided with the first groove, and first roller is provided with two and is located at the lower section of first support block respectively, and described first Roller is in cylinder, and first roller is horizontal positioned, and first roller is contained in first groove and with described the One support block axle turns connection, and first brace is provided with two and is located at the right side of first support block respectively, and described first Brace is oblique, and the upper end of first brace is fixedly connected with the lower surface of the bottom plate, the lower end of first brace It is fixedly connected with the right surface of first support block.
The cross section of the first batch turning block is triangular in shape, lower surface and right surface and the frame of the first batch turning block The inner surface of body is fixedly connected, and the first batch turning block is provided with the first cavity on its interior, and first push pedal is in length Cube, first push pedal is oblique, and the lower surface of first push pedal and the upper surface slide of the first batch turning block connect Connecing, first catch bar is in cuboid, and the left end of first catch bar is fixedly connected with the right surface of first push pedal, The right-hand member of first catch bar is connected with the cylinder, the lower surface of first cylinder and the upper table of the first batch turning block Face is fixedly connected, and the first support is L-shaped, and the upper surface of one end of the first support and the first batch turning block, which is fixed, to be connected Connecing, the other end of the first support is fixedly connected with the right surface of first cylinder, and the first support bar is in cuboid, The first support bar is placed vertically, and the lower end of the first support bar is fixedly connected with the upper surface of the bottom plate, and described The upper end of one support bar is provided with the second groove, and the right-hand member of first cross bar is fixedly connected with the left surface of the framework, described The left end of first cross bar is contained in second groove and turns connection with the first support bar axle, and first locating piece is in Cuboid, the lower surface of first locating piece are fixedly connected with the upper surface of the first batch turning block.
The cross section of the second batch turning block is in a rectangular trapezoid, the left surface of the bottom plate and the right side of the second batch turning block Surface is fixedly connected, and the left surface of the second batch turning block is oblique, and the second batch turning block is provided with its interior Second cavity, the second support is L-shaped, and the lower surface of one end of the second support and the second batch turning block, which is fixed, to be connected Connect, the other end of the second support is fixedly connected with the left surface of first support block, and the elastic rod is in bending, institute State elastic rod to be made of elastomeric material, the lower end of the elastic rod is fixedly connected with the upper surface of the second batch turning block, institute The upper end for stating elastic rod is fixedly connected with the framework, and second cross bar is in cuboid, and second cross bar is horizontal positioned, institute The left end for stating the second cross bar is fixedly connected with the right surface of the second batch turning block, the right-hand member of second cross bar and described first The left surface of support bar is fixedly connected.
3rd support is L-shaped, and one end of the 3rd support is fixedly connected with the right surface of the bottom plate, and described The other end of three supports is in vertical shape, and the 3rd cross bar is in cuboid, and the 3rd cross bar is horizontal positioned, the 3rd cross bar Left end be fixedly connected with the right surface of the 3rd support, the right-hand member of the 3rd cross bar and it is described grip frame left surface consolidate Fixed connection, the gripping frame is annular in shape, and second brace is oblique, the lower end of second brace and the 3rd support Right surface be fixedly connected, the upper end of second brace is fixedly connected with the lower surface of the 3rd cross bar, described second Strut is in vertical shape, and the lower end of the second support bar is fixedly connected with the upper surface of the bottom plate, the second support bar Upper end is acted against on the right surface of the framework, and the 3rd brace is oblique, the lower end of the 3rd brace and described the The right surface of two support bars is fixedly connected, and the upper end of the 3rd brace is fixedly connected with the lower surface of the 4th cross bar, institute State that the 4th cross bar is horizontal, the right-hand member of the 4th cross bar is fixedly connected with the 3rd support, a left side for the 4th cross bar End is fixedly connected with the right surface of the second support bar, and the 3rd support bar is in cuboid, and the 3rd support bar is vertical Place, the lower end of the 3rd support bar is fixedly connected with the upper surface of the 4th cross bar, the upper end of the 3rd support bar Be fixedly connected with the lower surface of the 5th cross bar, the 5th cross bar is horizontal positioned, the right-hand member of the 5th cross bar with it is described The left surface of 3rd support is fixedly connected.
The lower surface of second cylinder is fixedly connected with the upper surface of the bottom plate, and second catch bar is in rectangular Body, second catch bar are placed vertically, and the lower end of second catch bar is connected with second cylinder, the connecting rod Upper end is fixedly connected with the right surface of the framework, and the upper shaft of the lower end of the connecting rod and second catch bar turns to connect Connect.
First locating rack is in concave shape, and one end of first locating rack is fixed with the upper surface of the framework to be connected Connect, the other end of first locating rack is acted against on the upper surface of the 3rd cross bar, and the 6th cross bar is in cuboid, institute The left end for stating the 6th cross bar is fixedly connected with the right surface of first locating rack, the lower surface of the 6th cross bar and described the The lower surface of one locating rack is in same plane, and the lower surface and the upper surface of the 3rd cross bar of the 6th cross bar connect Touch, first locating rod is in cuboid, and first locating rod is placed vertically, the lower surface of first locating rod with it is described The upper surface of 5th cross bar is fixedly connected, and the upper end of first locating rod is acted against on first locating rack.
4th brace is oblique, and the lower end of the 4th brace is fixedly connected with the upper surface of the bottom plate, institute The upper end for stating the 4th brace is acted against on the lower surface of the framework, the projection in hemispherical, the lower surface of the projection with The upper surface of the bottom plate is fixedly connected, and first spring is in vertical shape, and lower end and the projection of first spring are consolidated Fixed connection, the upper end of first spring is fixedly connected with the lower surface of the framework.
The bent stick is in bending, and the both ends of the bent stick are fixedly connected with the upper surface of the bottom plate, described curved Curved bar is acted against on the lower surface of the framework, and the buffer bar is in cuboid, and the buffer bar is placed vertically, the buffer bar Lower end be fixedly connected with the upper surface of the bottom plate, the upper end of the buffer bar is fixedly connected with the lower surface of the framework, The second spring is in vertical shape, and the lower end of the second spring is fixedly connected with the upper surface of the bottom plate, second bullet The upper end of spring is fixedly connected with the lower surface of the framework.
After adopting the above technical scheme, the invention has the advantages that:
Building site trolley structure of the present invention is simple, easy to use, can smoothly fall the construction material in trolley Go out, automaticity is high, without Manual-pushing, greatly reduces hand labor intensity, improves the effect of transport construction material Rate so that the progress of engineering can be accelerated.
Brief description of the drawings
Building site of the present invention is described further with the embodiment of trolley below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of building site trolley of the present invention.
Embodiment
As shown in figure 1, building site of the present invention trolley includes bottom plate 1, the framework 2 above the bottom plate 1, positioned at institute State the material-pouring device 3, the holder device 4 positioned at the right side of framework 2, the cylinder dress positioned at the lower section of framework 2 in the left side of bottom plate 1 Put 5 and lean device 7 positioned at the positioner 6 of the top of holder device 4 and positioned at the left side of air cylinder device 5.
As shown in figure 1, the bottom plate 1 is in cuboid, the bottom plate 1 is horizontal positioned, and the bottom plate 1, which is provided with, to be located under it First support block 11 of side, the first roller 12 for being arranged in first support block 11 and positioned at first support block 11 1 First brace 13 of side.First support block 11 is provided with two and respectively positioned at the left and right sides of the lower section of bottom plate 1, described First support block 11 is in cuboid, and the upper surface of first support block 11 is fixedly connected with the lower surface of the bottom plate 1, described The lower surface of first support block 11 is provided with the first groove 111, and first groove 111 is in semicylinder shape.First roller 12 are provided with two and are located at the lower section of first support block 11 respectively, and first roller 12 is in cylinder, first rolling Take turns 12 horizontal positioned, first roller 12 is contained in first groove 111 and turns to connect with the axle of the first support block 11 Connect so that first roller 12 can be in the internal rotation of the first groove 111.First brace 13 is provided with two and difference Positioned at the right side of first support block 11, first brace 13 is oblique, the upper end of first brace 13 with it is described The lower surface of bottom plate 1 is fixedly connected, and the lower end of first brace 13 is fixedly connected with the right surface of first support block 11.
As shown in figure 1, the cross section of the framework 2 is in hollow isosceles trapezoid, the framework 2 is provided with its interior The first batch turning block 21, the first push pedal 22 above the first batch turning block 21, positioned at the right side of first push pedal 22 First catch bar 23, the first cylinder 24 positioned at the right side of first catch bar 23, the positioned at the right side of the first cylinder 24 One support 25, the first support bar 26 positioned at the lower section of the framework 2, the first cross bar 27 being arranged in the framework 2 and it is located at First locating piece 28 of the top of the first batch turning block 21.The cross section of the first batch turning block 21 is triangular in shape, and described first The lower surface of batch turning block 21 and right surface are fixedly connected with the inner surface of the framework 2, and the first batch turning block 21 causes building The left side that material is concentrated on inside the framework 2, the first batch turning block 21 are provided with the first cavity 211 on its interior, The cross section of first cavity 211 is triangular in shape, the setting of the first cavity 211, be able to can also not only be mitigated with cost-effective The weight on the right side of framework 2 so that framework 2 mitigates the pressure on the right side of it when toppling over construction material so that topples over more light Pine.First push pedal 22 is in cuboid, and first push pedal 22 is oblique, the lower surface of first push pedal 22 with it is described The upper surface slide connection of first batch turning block 21 so that first push pedal 22 can be in the upper surface of the first batch turning block 21 Horizontally slip.First catch bar 23 is in cuboid, the left end of first catch bar 23 and the right side of first push pedal 22 Surface is fixedly connected, and the right-hand member of first catch bar 23 is connected with the cylinder 24 so that first cylinder 24 drives institute The first catch bar 23 is stated to move left and right.The lower surface of first cylinder 24 and the upper surface of the first batch turning block 21 are fixed and connected Connect.The first support 25 is L-shaped, and the upper surface of one end of the first support 25 and the first batch turning block 21, which is fixed, to be connected Connect, the other end of the first support 25 is fixedly connected with the right surface of first cylinder 24, so as to first cylinder 24 play fixation.The first support bar 26 is in cuboid, and the first support bar 26 is placed vertically, first support The lower end of bar 26 is fixedly connected with the upper surface of the bottom plate 1, and the upper end of the first support bar 26 is provided with the second groove 261, Second groove 261 is in rectangular-shape.The right-hand member of first cross bar 27 is fixedly connected with the left surface of the framework 2, institute The left end for stating the first cross bar 27 is contained in second groove 261 and turns connection with the axle of first support bar 26 so that institute Stating the first cross bar 27 and the first support bar 26 can rotate against.First locating piece 28 is in cuboid, and described first The lower surface of locating piece 28 is fixedly connected with the upper surface of the first batch turning block 21, and first locating piece 28 can prevent institute The first push pedal 22 is stated excessively to move right.
As shown in figure 1, the material-pouring device 3 includes the second batch turning block 31, the positioned at the lower section of the second batch turning block 31 Two supports 32, the elastic rod 33 above the second batch turning block 31 and the second horizontal stroke positioned at the right side of the second batch turning block 31 Bar 34.The cross section of the second batch turning block 31 is in a rectangular trapezoid, the left surface of the bottom plate 1 and the second batch turning block 31 Right surface is fixedly connected, and the left surface of the second batch turning block 31 is oblique, and the second batch turning block 31, which is provided with, is located at it The second internal cavity 311, the cross section of second cavity 311 is in a rectangular trapezoid, the setting of second cavity 311, can To play cost-effective effect.The second support 32 is L-shaped, one end of the second support 32 and the second batch turning block 31 lower surface is fixedly connected, and the other end of the second support 32 is fixedly connected with the left surface of first support block 11, So as to be played a supporting role to the second batch turning block 31.The elastic rod 33 is in bending, and the elastic rod 33 is using elasticity Materials for support, the lower end of the elastic rod 33 are fixedly connected with the upper surface of the second batch turning block 31, the elastic rod 33 Upper end is fixedly connected with the framework 2, so as to be played a supporting role to the framework 2.Second cross bar 34 is in cuboid, institute State that the second cross bar 34 is horizontal positioned, the left end of second cross bar 34 is fixedly connected with the right surface of the second batch turning block 31, The right-hand member of second cross bar 34 is fixedly connected with the left surface of the first support bar 26, so as to the second batch turning block 31 Play a supporting role.
As shown in figure 1, the holder device 4 includes the 3rd support 41, the 3rd horizontal stroke positioned at the right side of the 3rd support 41 Bar 42, the grippings frame 43 positioned at the right side of the 3rd cross bar 42, the second brace 44 below the 3rd cross bar 42, it is located at 3rd brace 45 in the left side of the 3rd support 41, the second support bar 46 positioned at the left side of the 3rd brace 45, positioned at described 4th cross bar 47 of the top of the 3rd brace 45, the 3rd support bar 48 above the 4th cross bar 47 and positioned at the described 3rd 5th cross bar 49 of the top of support bar 48.3rd support 41 is L-shaped, one end and the bottom plate 1 of the 3rd support 41 Right surface be fixedly connected, the other end of the 3rd support 41 is in vertical shape.3rd cross bar 42 is in cuboid, and described Three cross bars 42 are horizontal positioned, and the left end of the 3rd cross bar 42 is fixedly connected with the right surface of the 3rd support 41, and described The right-hand member of three cross bars 42 is fixedly connected with the left surface of the gripping frame 43.The gripping frame 43 is annular in shape, and convenient use person holds Firmly.Second brace 44 is oblique, and the right surface of the lower end of second brace 44 and the 3rd support 41, which is fixed, to be connected Connect, the upper end of second brace 44 is fixedly connected with the lower surface of the 3rd cross bar 42, so as to the 3rd cross bar 42 Play a supporting role.The second support bar 46 is in vertical shape, the lower end of the second support bar 46 and the upper table of the bottom plate 1 Face is fixedly connected, and the upper end of the second support bar 46 is acted against on the right surface of the framework 2.3rd brace 45 is in incline Ramp-like, the lower end of the 3rd brace 45 is fixedly connected with the right surface of the second support bar 46, the 3rd brace 45 Upper end is fixedly connected with the lower surface of the 4th cross bar 47.4th cross bar 47 is horizontal, the 4th cross bar 47 Right-hand member is fixedly connected with the 3rd support 41, and the left end of the 4th cross bar 47 and the right surface of the second support bar 46 are consolidated Fixed connection.3rd support bar 48 is in cuboid, and the 3rd support bar 48 is placed vertically, under the 3rd support bar 48 End is fixedly connected with the upper surface of the 4th cross bar 47, under the upper end of the 3rd support bar 48 and the 5th cross bar 49 Surface is fixedly connected.5th cross bar 49 is horizontal positioned, the right-hand member of the 5th cross bar 49 and a left side for the 3rd support 41 Surface is fixedly connected, and the left end of the 5th cross bar 49 is acted against on the right surface of the framework 2.
As shown in figure 1, the air cylinder device 5 pushes away including the second cylinder 51, second above second cylinder 51 Lever 52 and the connecting rod 53 above second catch bar 52.The lower surface of second cylinder 51 and the bottom plate 1 Upper surface be fixedly connected.Second catch bar 52 is in cuboid, and second catch bar 52 is placed vertically, and described second pushes away The lower end of lever 52 is connected with second cylinder 51 so that second cylinder 51 drives and moved down on second catch bar 52 It is dynamic.The upper end of the connecting rod 53 is fixedly connected with the right surface of the framework 2, the lower end of the connecting rod 53 and described second The upper shaft of catch bar 52 turns connection so that the connecting rod 53 can rotate against with second catch bar 52.
As shown in figure 1, the positioner 6 includes the first locating rack 61, the positioned at the right side of first locating rack 61 Six cross bars 62 and the first locating rod 63 positioned at the lower section of the first locating rack 61.First locating rack 61 is in concave shape, institute The one end for stating the first locating rack 61 is fixedly connected with the upper surface of the framework 2, and the other end of first locating rack 61 leans On the upper surface of the 3rd cross bar 42.6th cross bar 62 is in cuboid, the left end of the 6th cross bar 62 with it is described The right surface of first locating rack 61 is fixedly connected, the lower surface of the 6th cross bar 62 and the lower surface of first locating rack 61 In same plane, the lower surface of the 6th cross bar 62 and the upper surface of the 3rd cross bar 42.Described first is fixed Position bar 63 is in cuboid, and first locating rod 63 is placed vertically, and the lower surface of first locating rod 63 is horizontal with the described 5th The upper surface of bar 49 is fixedly connected, and the upper end of first locating rod 63 is acted against on first locating rack 61.
As shown in figure 1, the device 7 that leans includes the 4th brace 71, the projection positioned at the right side of the 4th brace 71, position The first spring 72 above the projection, the bent stick 73 positioned at the right side of the first spring 72, positioned at the bent stick 73 The buffer bar 74 on right side, the second spring 75 positioned at the right side of buffer bar 74.4th brace 71 is oblique, and described the The lower end of four braces 71 is fixedly connected with the upper surface of the bottom plate 1, and the upper end of the 4th brace 71 acts against the framework 2 Lower surface on, so as to being played a supporting role to the framework 2.The projection is in hemispherical, the lower surface of the projection and institute The upper surface for stating bottom plate 1 is fixedly connected.First spring 72 is in vertical shape, the lower end of first spring 72 and the projection It is fixedly connected, the upper end of first spring 72 is fixedly connected with the lower surface of the framework 2.The bent stick 73 is in bending Shape, the both ends of the bent stick 73 are fixedly connected with the upper surface of the bottom plate 1, and the bent stick 73 acts against the framework 2 Lower surface on, so as to playing cushioning effect to the framework 2, elastic deformation can occur for the bent stick 73, so as to buffer Effect is preferable.The buffer bar 74 is in cuboid, and the buffer bar 74 is placed vertically, lower end and the bottom of the buffer bar 74 The upper surface of plate 1 is fixedly connected, and the upper end of the buffer bar 74 is fixedly connected with the lower surface of the framework 2, the buffer bar 74 can occur elastic deformation, so as to play the supporting role of buffering to the framework 2.The second spring 75 is in vertical shape, The lower end of the second spring 75 is fixedly connected with the upper surface of the bottom plate 1, upper end and the frame of the second spring 75 The lower surface of body 2 is fixedly connected.
As shown in figure 1, the building site of the present invention with trolley in use, first the construction material that transports will be needed to be put into In framework 2, then hold and grip frame 43 and promote movement of the present invention, when being moved into the place for needing to transport, start the Two cylinders 51 so that the second catch bar 52 and connecting rod 53 push up the right-hand member of framework 2 so that framework 2 surrounds described first The upper end rotate counterclockwise of support bar 26, now elastic deformation occurs for elastic rod 33, so as to play support work to the framework 2 With so that the construction material in framework 2 is slipped on the left surface of the second batch turning block 31, from the left surface of the second batch turning block 31 Lower section is slid, while starts the first cylinder 24 so that the first catch bar 23 promotes the first push pedal 22 to the left so that the first push pedal 22 Construction material is promoted to the left so that construction material whole can be slipped to out of framework 2, so as to prevent construction material from staying in frame In body 2.Then the second cylinder 51 causes the second catch bar 52 and connecting rod 53 to move down so that framework 2 surrounds described first The upper end of support bar 26 turns clockwise so that framework 2 returns to original state so that the upper end of the 4th brace 71 acts against frame On the lower surface of body 2, while bent stick 73 and buffer bar 74 are acted against on the lower surface of framework 2, while the first locating rack 61 One end and the lower surface of the 6th cross bar 62 are acted against on the upper surface of the 3rd cross bar 42, so as to play preferable positioning action.Extremely This, handcart for construction site of the present invention is finished using process description.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be covered Within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (9)

1. a kind of building site trolley, building site trolley includes bottom plate, the framework above the bottom plate, positioned at institute State the material-pouring device on the left of bottom plate, the holder device on the right side of the framework, the air cylinder device below the framework, position Positioner above the holder device and lean device on the left of the air cylinder device, it is characterised in that:It is described Bottom plate is provided with the first support block being disposed below, the first roller for being arranged in first support block and positioned at described the First brace of one support block side, the framework are provided with the first batch turning block on its interior, positioned at first batch turning The first push pedal above block, the first catch bar on the right side of first push pedal, on the right side of first catch bar One cylinder, the first support on the right side of first cylinder, the first support bar below the framework, be arranged at it is described The first cross bar in framework and the first locating piece above the first batch turning block, the material-pouring device include the second batch turning Block, the second support below the second batch turning block, the elastic rod above the second batch turning block and positioned at described The second cross bar on the right side of second batch turning block, the holder device include the 3rd support, the on the right side of the 3rd support the 3rd Cross bar, grip frame, the second brace below the 3rd cross bar, positioned at the described 3rd on the right side of the 3rd cross bar The 3rd brace on the left of support, the second support bar on the left of the 3rd brace, above the 3rd brace Four cross bars, the 3rd support bar above the 4th cross bar and the 5th cross bar above the 3rd support bar, institute Stating air cylinder device includes the second cylinder, the second catch bar above second cylinder and on second catch bar The connecting rod of side, the positioner include the first locating rack, the 6th cross bar on the right side of first locating rack and are located at The first locating rod below first locating rack, the device that leans include the 4th brace, on the right side of the 4th brace Projection, the first spring above the projection, the bent stick on the right side of first spring, positioned at the bent stick The buffer bar on right side, the second spring on the right side of the buffer bar.
2. building site trolley according to claim 1, it is characterised in that:First support block is provided with two and difference The left and right sides below the bottom plate, first support block are in cuboid, the upper surface of first support block and institute The lower surface for stating bottom plate is fixedly connected, and the lower surface of first support block is provided with the first groove, and first roller is provided with two Lower section that is individual and being located at first support block respectively, first roller is in cylinder, and first roller is horizontal positioned, institute State the first roller to be contained in first groove and turn connection with the first support block axle, first brace is provided with two And respectively be located at first support block right side, first brace is oblique, the upper end of first brace with it is described The lower surface of bottom plate is fixedly connected, and the lower end of first brace is fixedly connected with the right surface of first support block.
3. building site trolley according to claim 2, it is characterised in that:The cross section of the first batch turning block is in triangle Shape, the lower surface and right surface of the first batch turning block are fixedly connected with the inner surface of the framework, on the first batch turning block Provided with the first cavity on its interior, first push pedal is in cuboid, and first push pedal is oblique, and described first pushes away The lower surface of plate is connected with the upper surface slide of the first batch turning block, and first catch bar is in cuboid, and described first pushes away The left end of lever is fixedly connected with the right surface of first push pedal, and the right-hand member of first catch bar is connected with the cylinder, The lower surface of first cylinder is fixedly connected with the upper surface of the first batch turning block, and the first support is L-shaped, and described One end of one support is fixedly connected with the upper surface of the first batch turning block, the other end of the first support and first gas The right surface of cylinder is fixedly connected, and the first support bar is in cuboid, and the first support bar is placed vertically, first support The lower end of bar is fixedly connected with the upper surface of the bottom plate, and the upper end of the first support bar is provided with the second groove, and described first The right-hand member of cross bar is fixedly connected with the left surface of the framework, the left end of first cross bar be contained in second groove and Turn connection with the first support bar axle, first locating piece is in cuboid, the lower surface of first locating piece with it is described The upper surface of first batch turning block is fixedly connected.
4. building site trolley according to claim 3, it is characterised in that:The cross section of the second batch turning block is rectangular Trapezoidal, the left surface of the bottom plate is fixedly connected with the right surface of the second batch turning block, the left surface of the second batch turning block Obliquely, the second batch turning block is provided with the second cavity on its interior, and the second support is L-shaped, and described second One end of support is fixedly connected with the lower surface of the second batch turning block, the other end of the second support and the described first support The left surface of block is fixedly connected, and the elastic rod is in bending, and the elastic rod is made of elastomeric material, the elastic rod Lower end is fixedly connected with the upper surface of the second batch turning block, and the upper end of the elastic rod is fixedly connected with the framework, described Second cross bar is in cuboid, and second cross bar is horizontal positioned, the right side of the left end of second cross bar and the second batch turning block Surface is fixedly connected, and the right-hand member of second cross bar is fixedly connected with the left surface of the first support bar.
5. building site trolley according to claim 4, it is characterised in that:3rd support is L-shaped, described 3rd One end of frame is fixedly connected with the right surface of the bottom plate, and the other end of the 3rd support is in vertical shape, the 3rd cross bar In cuboid, the 3rd cross bar is horizontal positioned, and the left end of the 3rd cross bar is fixed with the right surface of the 3rd support to be connected Connect, the right-hand member of the 3rd cross bar is fixedly connected with the left surface of the gripping frame, and the gripping frame is annular in shape, and described second is oblique Bar is oblique, and the lower end of second brace is fixedly connected with the right surface of the 3rd support, second brace it is upper End is fixedly connected with the lower surface of the 3rd cross bar, and the second support bar is in vertical shape, the lower end of the second support bar It is fixedly connected with the upper surface of the bottom plate, the upper end of the second support bar is acted against on the right surface of the framework, described 3rd brace is oblique, and the lower end of the 3rd brace is fixedly connected with the right surface of the second support bar, and the described 3rd The upper end of brace is fixedly connected with the lower surface of the 4th cross bar, and the 4th cross bar is horizontal, the 4th cross bar Right-hand member is fixedly connected with the 3rd support, and the left end of the 4th cross bar is fixed with the right surface of the second support bar to be connected Connect, the 3rd support bar is in cuboid, and the 3rd support bar is placed vertically, the lower end of the 3rd support bar and described the The upper surface of four cross bars is fixedly connected, and the upper end of the 3rd support bar is fixedly connected with the lower surface of the 5th cross bar, institute State that the 5th cross bar is horizontal positioned, the right-hand member of the 5th cross bar is fixedly connected with the left surface of the 3rd support.
6. building site trolley according to claim 5, it is characterised in that:The lower surface of second cylinder and the bottom The upper surface of plate is fixedly connected, and second catch bar is in cuboid, and second catch bar is placed vertically, and described second promotes The lower end of bar is connected with second cylinder, and the upper end of the connecting rod is fixedly connected with the right surface of the framework, the company The lower end of extension bar and the upper shaft of second catch bar turn connection.
7. building site trolley according to claim 6, it is characterised in that:First locating rack is in concave shape, described One end of first locating rack is fixedly connected with the upper surface of the framework, and the other end of first locating rack acts against described On the upper surface of three cross bars, the 6th cross bar is in cuboid, the left end of the 6th cross bar and the right side of first locating rack Surface is fixedly connected, and the lower surface of the 6th cross bar is in same plane with the lower surface of first locating rack, described The lower surface of 6th cross bar and the upper surface of the 3rd cross bar, first locating rod are in cuboid, and described first is fixed Position bar is placed vertically, and the lower surface of first locating rod is fixedly connected with the upper surface of the 5th cross bar, and described first is fixed The upper end of position bar is acted against on first locating rack.
8. building site trolley according to claim 7, it is characterised in that:4th brace is oblique, and described The lower end of four braces is fixedly connected with the upper surface of the bottom plate, and the upper end of the 4th brace acts against the following table of the framework On face, the projection is in hemispherical, and the lower surface of the projection is fixedly connected with the upper surface of the bottom plate, first spring In vertical shape, the lower end of first spring is fixedly connected with the projection, upper end and the framework of first spring Lower surface is fixedly connected.
9. building site trolley according to claim 8, it is characterised in that:The bent stick is in bending, the bending The both ends of bar are fixedly connected with the upper surface of the bottom plate, and the bent stick is acted against on the lower surface of the framework, described slow Jumper bar is in cuboid, and the buffer bar is placed vertically, and the lower end of the buffer bar is fixedly connected with the upper surface of the bottom plate, institute The upper end for stating buffer bar is fixedly connected with the lower surface of the framework, and the second spring is in vertical shape, the second spring Lower end is fixedly connected with the upper surface of the bottom plate, and the upper end of the second spring is fixedly connected with the lower surface of the framework.
CN201610114227.8A 2016-03-01 2016-03-01 A kind of building site trolley Active CN105774869B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610114227.8A CN105774869B (en) 2016-03-01 2016-03-01 A kind of building site trolley
CN201711120447.2A CN108001505B (en) 2016-03-01 2016-03-01 Trolley for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610114227.8A CN105774869B (en) 2016-03-01 2016-03-01 A kind of building site trolley

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201711120447.2A Division CN108001505B (en) 2016-03-01 2016-03-01 Trolley for construction site

Publications (2)

Publication Number Publication Date
CN105774869A CN105774869A (en) 2016-07-20
CN105774869B true CN105774869B (en) 2018-02-23

Family

ID=56386784

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201711120447.2A Active CN108001505B (en) 2016-03-01 2016-03-01 Trolley for construction site
CN201610114227.8A Active CN105774869B (en) 2016-03-01 2016-03-01 A kind of building site trolley

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201711120447.2A Active CN108001505B (en) 2016-03-01 2016-03-01 Trolley for construction site

Country Status (1)

Country Link
CN (2) CN108001505B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111332351B (en) * 2020-04-09 2020-12-11 温州市陆日智能科技有限公司 Automatic advance to arrange material and arrange abundant shallow for building site of material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0204879B1 (en) * 1985-06-14 1989-12-06 Brändle Metallbau AG Device for receiving waste material
EP1476344B1 (en) * 2002-02-20 2009-07-15 Borrmann GmbH Pallet truck
CN204525783U (en) * 2015-04-15 2015-08-05 陈国富 The multifunctional power-assisted dolly in construction site
CN204801841U (en) * 2015-06-29 2015-11-25 吕长军 Manual self -discharging electric motor car
CN105172864A (en) * 2015-07-20 2015-12-23 安徽省无为煤矿机械制造有限公司 Coal conveying cart

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7017998B2 (en) * 2002-10-25 2006-03-28 Ducharme Robert O Adaptable transport
KR20110045887A (en) * 2009-10-28 2011-05-04 김경태 Cart
CN202923679U (en) * 2012-12-11 2013-05-08 朱志明 Electric dumper truck
CN103481927A (en) * 2013-09-22 2014-01-01 黄卫峰 Cart for placing slant equipment
CN203472965U (en) * 2013-10-10 2014-03-12 黑龙江建筑职业技术学院 Electric cart capable of automatically discharging for industrial and civil buildings
CN104986192B (en) * 2015-06-19 2018-01-12 重庆市潼南区鸿盛建材厂(普通合伙) A kind of ore cart

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0204879B1 (en) * 1985-06-14 1989-12-06 Brändle Metallbau AG Device for receiving waste material
EP1476344B1 (en) * 2002-02-20 2009-07-15 Borrmann GmbH Pallet truck
CN204525783U (en) * 2015-04-15 2015-08-05 陈国富 The multifunctional power-assisted dolly in construction site
CN204801841U (en) * 2015-06-29 2015-11-25 吕长军 Manual self -discharging electric motor car
CN105172864A (en) * 2015-07-20 2015-12-23 安徽省无为煤矿机械制造有限公司 Coal conveying cart

Also Published As

Publication number Publication date
CN105774869A (en) 2016-07-20
CN108001505B (en) 2019-12-24
CN108001505A (en) 2018-05-08

Similar Documents

Publication Publication Date Title
CN105442521B (en) A kind of multi-functional rammer compacter
CN105772600B (en) A kind of building bar bending apparatus
CN105926575A (en) Tamping device used for electric power engineering construction
CN107416325A (en) A kind of efficient pipe fitting storage transporting equipment of building engineering field
CN106043387A (en) Electric dumper truck
CN105774869B (en) A kind of building site trolley
CN106238618A (en) A kind of building bar bending system
CN205502532U (en) Wall plaster device for building
CN206539648U (en) A kind of plant equipment damping device
CN106043386A (en) Efficient conveying device for building equipment
CN105144919B (en) Ground trough digging device for agriculture
CN105858512B (en) A kind of material lifting device
CN205907670U (en) Tamping device is used in electric power engineering construction
CN106352202A (en) Supporting apparatus for building machinery
CN207499374U (en) A kind of architectural engineering scaffold easy to remove
CN208792711U (en) A kind of building joint filling device
CN109833604A (en) A kind of novel dance barre
CN211780204U (en) Gas cylinder support structure
CN104386610B (en) Swing door transports equipment in place
CN207172033U (en) A kind of construction site steel pipe laying rack
CN106829287A (en) A kind of perpendicular style refuse compressor
CN207362075U (en) A kind of glass prosthetic device
CN107891104A (en) A kind of bending reinforcement processing method
CN105967073A (en) Novel agricultural lifting device
CN105537465B (en) Steel rib straightening machine for construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170926

Address after: Shushan District of Hefei City, Anhui Province, Jiangmen 230000 garden business office floor B-1014 room 10

Applicant after: HEFEI WISDOM LONGTUTENG INTELLECTUAL PROPERTY CO., LTD.

Address before: Fengyang County town of Anhui city in Chuzhou province 233100 advance team of No. 22 Qianjin Village

Applicant before: Bai Yuelong

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Chen Hailong

Inventor after: Yang Hewen

Inventor after: Li Xiaohe

Inventor after: Li Zemin

Inventor after: Zhang Jiachun

Inventor before: Bai Yuelong

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180122

Address after: 423000 Chenzhou City, Hunan province beihuou Wuling Avenue Merchants Building Room 538-539

Applicant after: Hunan Changxin Construction Group Co., Ltd.

Address before: Shushan District of Hefei City, Anhui Province, Jiangmen 230000 garden business office floor B-1014 room 10

Applicant before: HEFEI WISDOM LONGTUTENG INTELLECTUAL PROPERTY CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant