CN105756289B - The full grout sleeve of assembled architecture bar connecting - Google Patents

The full grout sleeve of assembled architecture bar connecting Download PDF

Info

Publication number
CN105756289B
CN105756289B CN201610166221.5A CN201610166221A CN105756289B CN 105756289 B CN105756289 B CN 105756289B CN 201610166221 A CN201610166221 A CN 201610166221A CN 105756289 B CN105756289 B CN 105756289B
Authority
CN
China
Prior art keywords
grout sleeve
frustum
sleeve
grout
bar connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610166221.5A
Other languages
Chinese (zh)
Other versions
CN105756289A (en
Inventor
李敏勇
甘立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaihua Gangxiang pipe Limited company
Original Assignee
Huaihua Gangxiang Pipe Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaihua Gangxiang Pipe Ltd Co filed Critical Huaihua Gangxiang Pipe Ltd Co
Priority to CN201610166221.5A priority Critical patent/CN105756289B/en
Publication of CN105756289A publication Critical patent/CN105756289A/en
Application granted granted Critical
Publication of CN105756289B publication Critical patent/CN105756289B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of full grout sleeves of assembled architecture bar connecting, wherein full grout sleeve includes the first grout sleeve, the second grout sleeve and the eccentric joint for connecting two grout sleeves of both sides, is set in one end of the first grout sleeve there are one annular groove, the first sealed carton and grout hole;Inner cone there are one being set in the other end of the first grout sleeve, silk braid is provided on the outside of corresponding first grout sleeve of inner cone section;Eccentric joint include telophragma and positioned at telophragma both sides and the first frustum and the second frustum of eccentric setting each other, the plasma discharge hole that the centre setting one of the first frustum penetrates;The structure of second grout sleeve is identical with the structure of the first grout sleeve and is coordinated with the second frustum.Between two frustums in telophragma there is eccentricity, solve the offset issue that prefabricated components occur in installation process is lifted so that work progress becomes simple and practicable.

Description

The full grout sleeve of assembled architecture bar connecting
Technical field
The present invention relates to a kind of precast concrete connection construction technical field of prefabricated concrete structure structures, Transverse steel sleeve grouting connection structure in especially a kind of precast concrete.
Background technology
Prefabricated concrete structure building is built using industrialization technology at present, and main components are prefabricated in the factory life Production, to scene after these prefabricated concrete components be mounted and connected be integrally formed, such industrial mode of production substantially subtracts Lack the wet construction amount of construction site, significantly improved speed of application, reduce environmental pollution and supplies consumption, it has also become The new direction of Building Trade in China development.The bar connecting of prefabricated concrete structure is to influence structure safety-critical, the company of reinforcing bar Connecing construction technology also has construction quality and installation effectiveness a large effect, ensure quality, improve work efficiency be building industrialization not The disconnected target pursued.National sector standard《Prefabricated concrete structure technical regulation》JGJ1 is to the reinforcing bar that is used in precast construction Connection method has carried out pertinent regulations, and middle sleeve grouting connection is the method that key node mainly uses, and can be applied to frame The bar connecting at section and frame joint is poured after column, shear wall, prefabricated coupling beam horizontal force reinforcing bar.National sector standard JG/ T398《Bar connecting grout sleeve》The related technology requirement of grout sleeve is proposed, related provincial standard alsies specify prefabricated Grout sleeve connects the position deviation of reinforcing bar, JGJ/T398 standards regulation grout sleeve internal diameter with grout sleeve in concrete component Minimum value just contains the site error of reinforcing bar and grout sleeve, the grouting set in the prefabricated components (column, wall) vertically installed As defined in the position satisfaction of cylinder and connection reinforcing bar during dimensional accuracy, it just can guarantee that prefabricated post, the connection main reinforcement of shear wall are smoothly inserted Enter in the grout sleeve on connected component.
But the horizontal reinforcement that further encounters of assembling frame structure connects, such as prefabricated coupling beam reinforcing bar is poured after in section Connection, prefabricated post and composite beam it is whole in assembling1Bar connecting in formula frame joint, the bar connecting of this position is with erecting It is different to the bar connecting of the prefabricated components of installation.Precast beam unit is to hang onto support structure from the top down when mounted The position of part, it is extremely to control the level and high and low position of two prefabricated components in the range of 2mm~3mm when component is in place Difficult, in addition also all there are deviations for the position of the connection reinforcing bar in the appearance and size and component of prefabricated components, therefore, a pair of pre- After component processed is in place, the axis maximum deviation of level docking reinforcing bar would generally be more than the inclined of the connection reinforcing bar of vertical prefabricated components Difference, the full grout sleeve connection that certain reinforcing bar misalignment of axe can be accommodated using both ends is generally accepted method in the world, But full grout sleeve connection brings the problem of new again.First, it is to bring joint area concreting difficulty and density The problem of.Vertically connection grout sleeve minimum diameter size is big as defined in the inner cavity size ratio standard of full grouting chamber sleeve for beam Some, could preferably meet the needs of horizontal reinforcement connection.And increase barrel bore diameter, sleeve outer diameter must be increased, After sleeve outer diameter increases, since connector arrange in same section, the gap between grout sleeve arranged in parallel is compared to connected Gap between reinforcing bar is much smaller, and the full grout sleeve total length designed by the ribbed of China's reinforcing bar is up to 16~20 times of reinforcing bars Diameter d, if the length of the full grout sleeve of 32mm reinforcing bars is likely to be breached 640mm, between adjacent sleeve in the range of 640mm Gap it is smaller when, which increases or even causes region concreting difficult, pours rear coagulation The density hidden danger of soil increases.Secondly, the installation exercise space needed using full grout sleeve is larger, in the cast-in-place area of precast construction Domain space smaller part, full grout sleeve are difficult to apply.For example, at the prefabricated integral frame node of prefabricated post and composite beam, Sometimes reinforcing bar intersects intensive, and the pouring quality of concrete, therefore the steel in the region are all cannot be guaranteed using Bar Anchorage connection Influential point of tendons will be first installed using sleeve grouting connection, when full grout sleeve use of existing integral structure on the vertical muscle of beam at one end, Sleeve is axially moveable 0.5 times of length sleeve again after component is in place, is set on the connection reinforcing bar of other end component, so at least The operating space of 1.5 times of length sleeves is needed, if the sectional dimension of pillar is less than 1.5 times of length sleeves, node space is not Foot, full grout sleeve are just difficult to apply.The reason of similary, the full grout sleeve of integral structure are applied in prefabricated coupling beam horizontal force When being poured after reinforcing bar section, which is also at least 1.5 times of grout sleeve length, for this purpose, the template and template that use Engineering, the workload of casting concrete are also bigger, increase site operation cost.These problems can all limit China's assembled The application of frame structure or technology development.
Invention content
In order to solve the deficiencies in the prior art, present invention be designed to provide one kind can quickly, facilitate connection Operation, and reduce construction time, the full grout sleeve of bar connecting for improving construction quality.The present invention solves its technical problem institute The technical solution used for:
The full grout sleeve of assembled architecture bar connecting, which is characterized in that
The first grout sleeve, the second grout sleeve including both sides and the bias for connecting two grout sleeves connect Head, wherein,
The length of first grout sleeve is ten times or more of its diameter, set in one end of the first grout sleeve there are one Annular groove, the interior card of the annular groove put the first sealed carton, and the first sealed carton is punching press steel part, in the punching press steel part Middle part set there are one the unidirectional taper hole for holding reinforcing bar and being inserted into, and be provided with one on the inside of the first grout sleeve annular groove A grout hole;Inner cone there are one being set in the other end of the first grout sleeve, sets on the outside of corresponding first grout sleeve of inner cone section One end external screw thread is equipped with, a silk braid is screwed at external screw thread;The centre setting one of first frustum penetrates the first frustum With telophragma and extend to outside plasma discharge hole;It is provided with from grout hole to plasma discharge hole and sets on the first grout sleeve inner wall The spiral groove put;The outer surface of first grout sleeve and the second grout sleeve is provided with annular recess.
The eccentric joint include telophragma and positioned at telophragma both sides and the first frustum of eccentric setting and each other Two frustums, wherein, between 5 to 20 millimeters, the root of first frustum is designed as the eccentric spacing of two frustum axial lines Helicitic texture, and the diameter of the helicitic texture is more than the base diameter of the first frustum, and helicitic texture and the first frustum it Between region for one fastening transitional region;
The helicitic texture of first grout sleeve and the first frustum is attached by the silk braid;
The structure of second grout sleeve is identical with the structure of the first grout sleeve, and is coordinated with the second frustum.
Further, the eccentric joint is a series, and eccentric size H is from 0.5 to 3 centimetre.
Further, it is divided into one model of every 0.5 centimetre of setting between the eccentric size H.
Further, the profile of the telophragma is made of the semi arch and two intermediate straightways at both ends, therein The center of circle of the center of circle of two frustums respectively with two circular arcs overlaps.
Further, the taper of the inner cone is 3 degree.
Further, the first sealed carton thickness is 1 millimeter of spring steel material.
Further, first grout sleeve, the second grout sleeve and eccentric joint are galvanizing component.
Full grout sleeve carries out the construction method of grouting connection, it is characterised in that:Sequence follows the steps below:
1) connected reinforcing bar is first plugged on to the first grout sleeve for being equipped with the first sealed carton and second respectively to fill It starches in sleeve, and screws a silk braid respectively on two sleeves, complete Primary Location;
2) hoisting prefabricated component, after prefabricated components in place after, measure the eccentricity between corresponding reinforcing bar, it is suitable to select Eccentric joint, for use,
3) the first grout sleeve with the first frustum on eccentric joint is docked, then rotate silk braid and fastened, then incited somebody to action, Second grout sleeve with the second frustum on eccentric joint is docked, then rotate silk braid and is fastened, completes full grout sleeve Preliminary connection;
4) grouting connection is carried out, until slurries are oozed out in the gap between prefabricated components and main structure body,
5) it conserves.
The beneficial effects of the invention are as follows:
Two above-mentioned sleeves carry out pre-connection, and the process with the reinforcing bar in two prefabricated components and main structure body respectively It completes in the factory, link efficiency can be improved, improve site operation efficiency.
Between two frustums in above-mentioned telophragma there is eccentricity, solve prefabricated components in installation process is lifted The offset issue of appearance so that work progress becomes simple and practicable.
The presence of telophragma and silk braid can improve the intensity of middle transition join domain, avoid being broken here, Improve whole intensity.
Description of the drawings
Fig. 1 is the stereogram of the present invention.
Fig. 2 is the disconnection figure of the present invention.
Fig. 3 is the sectional view of the present invention.
Fig. 4 is usage state diagram of the present invention.
Fig. 5 is the schematic diagram of eccentric joint.
Fig. 6 is the stereogram of eccentric joint.
Fig. 7 is the stereogram of the first grout sleeve.
Fig. 8 is the schematic diagram that prefabricated components connection is carried out using the present invention.
In figure:1 first grout sleeve, 11 annular grooves, 12 first sealed cartons, 13 punching press angles, 14 grout holes, in 15 It bores, 16 spiral grooves, 17 annular recess, 2 second grout sleeves, 3 eccentric joints, 31 first frustums, 32 second frustums, among 33 Disk, 34 helicitic textures, 35 fastening transitional regions, 36 plasma discharge holes, 4 reinforcing bars, 5 silk braids, 61 prefabricated components, 62 main structure bodies.
Specific embodiment
As shown in Figures 1 to 7, the full grout sleeve of the bar connecting of the present embodiment, the first grout sleeve 1 including both sides With the second grout sleeve 2 and the eccentric joint 3 for connecting two grout sleeves, wherein, the first grout sleeve 1 and Grout hole is respectively arranged on two grout sleeves 2, two-stage grouting sleeve is attached by eccentric joint 3, passes through eccentric joint Realize that the punching reinforcing bar of dislocation realizes connection.
Specifically,
First grout sleeve, 1 structure is as follows, and with reference to figure 2, turning is carried out using a diameter of seamless steel pipe of 20 centimetres Processing, length are 10 times or more of diameter, i.e., 20 centimetres, whole zinc-plated, itself has certain antiseptic property, wherein first One end turning of grout sleeve 1 forms an annular groove 11, and for placing the first sealed carton 12, the first sealed carton uses Steel disc, thickness are 1 millimeter or so, are stamping parts, and internally form a punching press angle 13 so that reinforcing bar can be inserted smoothly Enter, facilitate the connection of reinforcing bar.And with certain unidirectional passability, the bonding strength of reinforcing steel bar 4 and sleeve.
It is set close to the inside of the first grout sleeve annular groove there are one grout hole 14, for the perfusion of slurry.
One inner cone 15 is formed by turning in the other end of the first grout sleeve 1, the taper of wherein inner cone is smaller, generally 3 degree are set as, taper is conducive to centering, while is provided with spiral shell outside one end on the outside of corresponding first grout sleeve of inner cone section Line 16 screws a silk braid at external screw thread, for use.
Eccentric joint 3, the first frustum 31 and the second frustum 32 including telophragma 33 and positioned at telophragma both sides, wherein, Telophragma 33 is made of the disk of two eccentric settings, and profile has the semi arch at both ends and two intermediate straightway groups Into, the center of circle of two frustums therein overlaps respectively with two centers of circle, the spacing of two of which frustum between 5 to 20 millimeters, Meet general eccentric setting needs.
The root of the first above-mentioned frustum 31 is designed as helicitic texture 34, and the diameter of the helicitic texture is more than the first frustum Base diameter, and the region between 34 and first frustum of helicitic texture for one fastening transitional region 35, be diameter dimension It is slightly less than the cylindric of helicitic texture.
The helicitic texture 34 of first grout sleeve 1 and telophragma is attached by silk braid 5, forms thread fitting, tool There is axial constraint power.
It drills simultaneously in the centre of the first frustum 31, which penetrates the first frustum and telophragma, and extends to outside, A plasma discharge hole 36 is formed, for the discharge of slurry.
The spiral groove 16 set from grout hole to plasma discharge hole is provided on the first grout sleeve inner wall;Can have Effect causes slurry to form progressive path internal, and sleeve inner is avoided vacuum area occur, improves grouting effect.
The structure of the second above-mentioned grout sleeve 2 is identical with the structure of the first grout sleeve, and is matched with the second frustum It closes, concrete structure is not repeating.
Above-mentioned eccentric joint 3 is a series, and eccentric size H differs from 0.5 to 3 centimetre, and is divided into every 0.5 li Rice forms a variety of series such as 0.5,15,1,2.5,2,3, can be selected according to the centering degree of reinforcing bar in wallboard.
Connected reinforcing bar 4 is first plugged on to the inner cavity of the first grout sleeve 1 and the second grout sleeve 2 in advance respectively during construction It is interior, suitable eccentric joint 3 is then selected according to the position that reinforcing bar between prefabricated panel and main structure body deviates, by the second grouting Sleeve respectively docks eccentric joint with the first grout sleeve, is then fastened using silk braid 5, finally carries out grouting company It connects.
The outer profile of silk braid 5 can be set as hexa-prism, can be operated using spanner, spiral shell can be reduced in this way The number of rotary barrel when connecing, operating space narrow constructional difficulties brought during solving the problems, such as construction, improves work efficiency, and Conical opening docking is opposite to be easier to, convenient for construction.
During two-stage grouting sleeve is connected by silk braid with pyramidal structure, and intermediate eccentric joint solves reinforcing bar centering The eccentricity issues of generation.
The above-mentioned working procedure for carrying out grouting connection is as follows:
1) connected reinforcing bar 4 is first plugged on to the first grout sleeve for being equipped with the first sealed carton and second respectively to fill It starches in sleeve, and screws a silk braid 5 respectively on two sleeves, complete Primary Location;
2) hoisting prefabricated component 61, after prefabricated components in place after, measure the eccentricity between corresponding reinforcing bar, it is suitable to select Eccentric joint, for example, eccentric is 0.8 millimeter, select the eccentric joint close to the eccentricity, then select the bias for 1 millimeter Connector, for use,
3) the first grout sleeve with the first frustum on eccentric joint is docked, then rotate silk braid and fastened, then incited somebody to action, Second grout sleeve with the second frustum on eccentric joint is docked, then rotate silk braid and is fastened, completes full grout sleeve Preliminary connection;
4) grouting connection is carried out, until oozing out slurries in the gap between prefabricated components and main structure body, represents slurries Internal and between prefabricated components 61 and main structure body 62 gap is filled up;
5) it conserves, the results are shown in Figure 6.
Embodiment two in order to improve the bond strength with the slurry that is in the milk of the first grout sleeve, is set in the outer surface of sleeve The protrusion of present situation or annular recess 17 are put, with reference to figure 7.
The above-described embodiments are merely illustrative of preferred embodiments of the present invention, not to the model of the present invention It encloses and is defined, under the premise of design spirit of the present invention is not departed from, various changes of the relevant technical staff in the field to the present invention Shape and improvement should all expand as determined by claims of the present invention in protection domain.

Claims (9)

1. the full grout sleeve of assembled architecture bar connecting, which is characterized in that
Including the first grout sleeve (1), the second grout sleeve (2) and the eccentric joint for connecting two grout sleeves (3), wherein,
It is set in one end of the first grout sleeve (1) there are one annular groove (11), the interior card of the annular groove puts the first sealing card Piece (12), the first sealed carton be punching press steel part, set in the middle part of the punching press steel part there are one hold reinforcing bar be inserted into unidirectional cone Hole, and close to the setting of the inside of the first grout sleeve annular groove there are one grout hole (14);In the first grout sleeve (1) The other end is set there are one inner cone (15), is provided with one end external screw thread (16) on the outside of corresponding first grout sleeve of inner cone section, outside A silk braid is screwed at screw thread;
The eccentric joint (3) including telophragma (33) and positioned at telophragma both sides and the first frustum of eccentric setting each other (31) and the second frustum (32), wherein, the eccentric spacing of two frustum axial lines is between 5 to 20 millimeters, first frustum (31) root be helicitic texture (34), and the diameter of the helicitic texture (34) be more than the first frustum base diameter, and Region between helicitic texture (34) and the first frustum is a fastening transitional region (35);The center of first frustum (31) Position setting one penetrates the first frustum and telophragma and extends to the plasma discharge hole (36) in outside;In the first grout sleeve inner wall On be provided with the spiral groove set from grout hole to plasma discharge hole;
The helicitic texture (34) of first grout sleeve (1) and the first frustum is attached by the silk braid (5);Second grouting The structure of sleeve (2) is identical with the structure of the first grout sleeve and is coordinated with the second frustum.
2. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that the bias connects Head (3) is a series, and eccentric size H is from 0.5 to 3 centimetre.
3. the full grout sleeve of assembled architecture bar connecting according to claim 2, which is characterized in that the eccentric ruler One model of every 0.5 centimetre of setting is divided between very little H.
4. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that the telophragma Profile be made of the semi arch and two intermediate straightways at both ends, the centers of circle of two frustums therein respectively with two circular arcs The center of circle overlap.
5. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that the inner cone Taper is 3 degree.
6. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that described first is close Seal the spring steel material that card thickness is 1 millimeter.
7. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that described first fills It is galvanizing component to starch sleeve (1), the second grout sleeve (2) and eccentric joint (3).
8. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that described first The outer surface of grout sleeve and the second grout sleeve is provided with annular recess.
9. the full grout sleeve of assembled architecture bar connecting according to claim 1, which is characterized in that described first fills The length for starching sleeve (1) is ten times or more of its diameter.
CN201610166221.5A 2016-03-22 2016-03-22 The full grout sleeve of assembled architecture bar connecting Expired - Fee Related CN105756289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610166221.5A CN105756289B (en) 2016-03-22 2016-03-22 The full grout sleeve of assembled architecture bar connecting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610166221.5A CN105756289B (en) 2016-03-22 2016-03-22 The full grout sleeve of assembled architecture bar connecting

Publications (2)

Publication Number Publication Date
CN105756289A CN105756289A (en) 2016-07-13
CN105756289B true CN105756289B (en) 2018-06-22

Family

ID=56345601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610166221.5A Expired - Fee Related CN105756289B (en) 2016-03-22 2016-03-22 The full grout sleeve of assembled architecture bar connecting

Country Status (1)

Country Link
CN (1) CN105756289B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382232B (en) * 2021-12-23 2023-06-20 重庆拓达建设(集团)有限公司 Grouting sleeve and construction process applied to grouting sleeve

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999005375A1 (en) * 1997-07-28 1999-02-04 Gyeng Ok Chung Structure for jointing reinforcing bars
GB2357132A (en) * 1999-12-08 2001-06-13 Suntisuk Plooksawasdi A connector for joining concrete reinforcing bars
KR100984243B1 (en) * 2010-06-15 2010-10-04 김용근 Reinforcing bar coupler using an oval shaped rotational wedge
CN103216044A (en) * 2012-01-20 2013-07-24 中冶建筑研究总院有限公司 Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit
CN103866921A (en) * 2014-03-26 2014-06-18 王睿敏 Rebar connecting piece between prefabricated reinforced concrete components, manufacturing method and construction method
CN203701433U (en) * 2014-01-23 2014-07-09 河北联合大学 Lateral welding lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN105201147A (en) * 2015-10-14 2015-12-30 沈阳建筑大学 Full-grouting sleeve adopting eccentric connection of reinforcing steel bars and usage method of sleeve

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999005375A1 (en) * 1997-07-28 1999-02-04 Gyeng Ok Chung Structure for jointing reinforcing bars
GB2357132A (en) * 1999-12-08 2001-06-13 Suntisuk Plooksawasdi A connector for joining concrete reinforcing bars
KR100984243B1 (en) * 2010-06-15 2010-10-04 김용근 Reinforcing bar coupler using an oval shaped rotational wedge
CN103216044A (en) * 2012-01-20 2013-07-24 中冶建筑研究总院有限公司 Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit
CN203701433U (en) * 2014-01-23 2014-07-09 河北联合大学 Lateral welding lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN103866921A (en) * 2014-03-26 2014-06-18 王睿敏 Rebar connecting piece between prefabricated reinforced concrete components, manufacturing method and construction method
CN105201147A (en) * 2015-10-14 2015-12-30 沈阳建筑大学 Full-grouting sleeve adopting eccentric connection of reinforcing steel bars and usage method of sleeve

Also Published As

Publication number Publication date
CN105756289A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN103452246B (en) The grouting deformed steel pipe box cylinder that the slurry anchor docking of a kind of reinforcing bar connects
CN104533021B (en) Full grouting sleeve for connecting steel bars
CN103104040B (en) A kind of assembling frame bean column node and construction method adopting vertical connection
CN206337641U (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN105781019B (en) Assembled architecture bar connecting full grout sleeve and grouting method
CN205476074U (en) Assembled steel pipe concrete combination column
CN204456669U (en) The full grout sleeve of a kind of bar connecting
CN106759947A (en) Assembly concrete-filled steel tube post post connected mode
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN105756289B (en) The full grout sleeve of assembled architecture bar connecting
CN205955067U (en) Prefabricated coincide wallboard of outband moulding
CN203701435U (en) Composite connection joint for grouting connection and compression connection
CN103953163A (en) Reinforced connector formed by low alloy steel in casting and machining manners
CN206957065U (en) Universal steel concrete supporting component
CN205804771U (en) A kind of reinforcing bar grout sleeve
CN210067238U (en) Half grout sleeve
CN107461003A (en) Universal steel concrete supporting component
JP2010242327A (en) Precast pile cap structure, and method for joining the same
CN102852167B (en) Single-pile vertical static test pile head steel bar connection node and construction method thereof
CN206189456U (en) Three cabin piping lanes
CN207048188U (en) A kind of reinforcing bar is partly in the milk branch sleeve
CN206667492U (en) A kind of prefabricated composite wallboard and the laterally attached structure of precast stair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Minyong

Inventor after: Gan Lihua

Inventor before: Chen Huafeng

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180327

Address after: 418116 Huaihua City, Hunan province Hongjiang City Shuang Xi Zhen Yan Jia Tuan Cun

Applicant after: Huaihua Gangxiang pipe Limited company

Address before: 250014 Shandong City, Ji'nan province Lixia District, Lin Road, No. 9, Fu Fu Garden, building 4, unit 39, 602

Applicant before: JINAN LUFANGZHIHE INFORMATION TECHNOLOGY CO., LTD.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: All-grouting sleeve for assembled building reinforcement connection and grouting method

Effective date of registration: 20191220

Granted publication date: 20180622

Pledgee: Hongjiang sub branch of China Construction Bank Co., Ltd

Pledgor: Huaihua Gangxiang pipe Limited company

Registration number: Y2019980001211

PE01 Entry into force of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20210322

CF01 Termination of patent right due to non-payment of annual fee