CN105756287B - 劲性钢骨梁马凳筋反吊布筋施工方法 - Google Patents
劲性钢骨梁马凳筋反吊布筋施工方法 Download PDFInfo
- Publication number
- CN105756287B CN105756287B CN201610170928.3A CN201610170928A CN105756287B CN 105756287 B CN105756287 B CN 105756287B CN 201610170928 A CN201610170928 A CN 201610170928A CN 105756287 B CN105756287 B CN 105756287B
- Authority
- CN
- China
- Prior art keywords
- muscle
- supporting steel
- steel bar
- stiffness
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
- E04C5/065—Light-weight girders, e.g. with precast parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
劲性钢骨梁马凳筋反吊布筋施工方法,涉及建筑行业钢筋绑扎技术。该方法调整梁板模板支设顺序,先进行劲性钢骨梁梁底钢筋绑扎,将马凳筋预先与钢骨吊设固定,采用反吊马凳筋作吊挂,之后将纵向钢筋由内至外分层排置,逐层绑扎固定于托筋上下侧,完成大型钢骨梁梁底纵向多层布筋,临时固定完成后,以梁底纵筋为参照,按照常规方法进行后续钢筋绑扎,最后补充支设梁底及梁侧模板。本劲性钢骨梁钢筋绑扎方法解除了型钢钢骨对梁底钢筋绑扎的空间操作局限,现场实际操作性强;作业空间开放,便于监管;形成的骨架稳定平整,保护层厚度可控;可充分利用钢骨梁或者其表抗剪栓钉的设置条件进行临时固定承重,提高了现场的实施性和针对性。
Description
技术领域
本发明涉及建筑行业钢筋绑扎技术,特别涉及一种适用于劲性钢骨梁梁底纵向钢筋的快速绑扎与固定施工方法。
背景技术
随着近年大型建筑理念与工程技术的突破,劲性框架结构以其高效的承载截面比愈来愈被复杂工程结构所吸纳应用,通过在常规钢筋混凝土框架构件的基础上,内置型钢钢骨,使得二者协同受力、性能互补,不仅有效控制大型混凝土构件的截面尺寸,而且受力性能集中优异,并具备较高的耐火耐久性。但在具体的施工过程中,由于工序上型钢钢骨安装必须先于钢筋混凝土至少一个流水步距,空间受限于内置的型钢钢骨以及其表抗剪栓钉,钢筋骨架无法按照常规构件的工艺绑扎,尤其是劲性钢骨梁梁底单层以及多层布筋施工。
现行的劲性钢骨梁梁底纵筋绑扎的方法是:先支设梁底模板,而后在底模平台上排布梁底钢筋,控制箍定距定位,之后梁顶架立筋绑扎形成安装骨架,继而按设计要求纵向加密箍筋设置,最终完成骨架的系统绑扎,但此种方法安装的钢筋骨架受自重影响较大,骨架极易弯曲走形,保护层厚度不易保证,更为不利的是该绑扎方法受限于梁底模与钢骨及其表抗剪栓钉间的净距,操作空间十分狭小,既滞碍了人工绑扎的作业效率,也提高了钢筋施工质量的风险。
发明内容
本发明为了提高现行大体量劲性钢骨梁钢筋绑扎的操作性,确保工艺质量,针对当前钢筋绑扎诸多问题因素,对劲性钢骨梁梁底钢筋绑扎施工方法进行了技术改进,形成一种适用于大体量劲性钢骨梁纵向多层快易布筋的马凳筋反吊钢筋绑扎施工方法。
本发明为实现上述目的所采取技术方案是:劲性钢骨梁马凳筋反吊布筋施工方法,其特征在于:包括以下步骤:
第一步:将马凳筋反吊固定于劲性钢骨的下方;
第二步:将梁底纵筋临时固定于马凳筋底部的下侧,完成单层布筋;
第三步:继续将梁底纵筋临时固定于马凳筋底部的上侧,将内封闭箍的底部与位于马凳筋底部的梁底纵筋固定连接,将梁顶纵筋固定于内封闭箍的顶部内侧;
第四步:将外封闭箍的底部固定连接于内封闭箍的底部外侧,外封闭箍的顶部固定连接于内封闭箍的顶部外侧;
第五步:以梁底纵筋为参照,按照常规方法进行后续钢筋绑扎,最后补充支设梁底及梁侧模板。
进一步地,在底筋单层排布或钢骨保护层厚度较小时,所述马凳筋为一字型吊筋,马凳筋与位于劲性钢骨底部的抗剪栓钉焊接固定。
进一步地,在底筋多层排布或钢骨保护层厚度较大时,所述马凳筋为U型托筋,马凳筋的上端与劲性钢骨的底部翼缘焊接固定。
进一步地,所述梁底纵筋的钢筋直径为16-40mm。
进一步地,所述马凳筋的排布间距为0.6-1.5m。
本发明具有以下有益效果:
1、本劲性钢骨梁钢筋绑扎方法解除了型钢钢骨对梁底钢筋绑扎的空间操作局限,现场实际操作性强;
2、由于本方法在钢筋绑扎阶段未支设模板,作业空间开放,钢筋绑扎及其连接的工艺质量均可受控,便于监管;
3、此方法重点控制梁底钢筋,并以此为基准平台进行梁顶钢筋以及箍筋的绑扎施工,形成的骨架稳定平整,保护层厚度可控;
4、本方法可充分利用钢骨梁或者其表抗剪栓钉的设置条件进行临时固定承重,提高了现场的实施性和针对性;
5、本梁体钢筋绑扎方法适用范围广,可广泛用于大型劲性钢骨梁梁底纵向钢筋的快速绑扎与骨架的固定施工。
附图说明
图1是劲性钢骨梁马凳筋反吊单层布筋的结构示意图(主视图)。
图2是劲性钢骨梁马凳筋反吊单层布筋的结构示意图(立体图)。
图3是劲性钢骨梁马凳筋反吊单层布筋的流程示意图。
图4是劲性钢骨梁马凳筋反吊多层布筋的结构示意图(主视图)。
图5是劲性钢骨梁马凳筋反吊多层布筋的结构示意图(立体图)。
图6是劲性钢骨梁马凳筋反吊多层布筋的流程示意图。
图中:劲性钢骨1、抗剪栓钉2、马凳筋3、梁底纵筋4、梁顶纵筋5、内封闭箍6、外封闭箍7。
具体实施方式
下面结合附图与实施例对本发明做详细说明,但本发明并不局限于具体实施例。
实施例1
如图1、图2所示,本实施例中所述的劲性钢骨梁马凳筋反吊布筋施工方法为底筋单层布筋,马凳筋3为一字型吊筋,马凳筋3与位于劲性钢骨1底部的抗剪栓钉2焊接固定,具体包括以下步骤:
第一步:如图3-a所示,将马凳筋3反吊固定于劲性钢骨1的下方,排布间距为1.5m;
第二步:如图3-b所示,将钢筋直径为16mm的梁底纵筋4临时固定于马凳筋3底部的下侧,完成单层布筋,固定可采用绑扎方式。
劲性钢骨梁马凳筋反吊单层布筋施工方法同样适用于钢骨保护层厚度较小的情况。
实施例2
如图4、图5所示,本实施例中所述的劲性钢骨梁马凳筋反吊布筋施工方法为底筋多层布筋,马凳筋3为U型托筋,马凳筋3的上端与劲性钢骨1的底部翼缘焊接固定,具体包括以下步骤:
第一步:如图6-a所示,将马凳筋3反吊固定于劲性钢骨1的下方,排布间距为0.6m;
第二步:如图6-b所示,将钢筋直径为28mm的梁底纵筋4临时固定于马凳筋3底部的下侧,固定可采用绑扎方式;
第三步:如图6-c所示,继续将梁底纵筋4临时固定于马凳筋3底部的上侧,将内封闭箍6的底部与位于马凳筋3底部的梁底纵筋4固定连接,将梁顶纵筋4固定于内封闭箍6的顶部内侧;
第四步:如图6-d所示,将外封闭箍7的底部固定连接于内封闭箍6的底部外侧,外封闭箍7的顶部固定连接于内封闭箍6的顶部外侧;
第五步:如图6-e所示,以梁底纵筋4为参照,按照常规方法进行后续钢筋绑扎,最后补充支设梁底及梁侧模板。
劲性钢骨梁马凳筋反吊多层布筋施工方法同样适用于钢骨保护层厚度较大的情况。
实施例3
本实施例中所述的劲性钢骨梁马凳筋反吊布筋施工方法与实施例1中相同,不同的技术参数为:梁底纵筋4的直径为20mm。
实施例4
本实施例中所述的劲性钢骨梁马凳筋反吊布筋施工方法与实施例2中相同,不同的技术参数为:马凳筋3的排布间距为1.0m;梁底纵筋4的直径为20mm。
实施例5
本实施例中所述的劲性钢骨梁马凳筋反吊布筋施工方法与实施例2中相同,不同的技术参数为:马凳筋3的排布间距为1.5m;梁底纵筋4的直径为40mm。
以上内容是结合优选技术方案对本发明所做的进一步详细说明,不能认定发明的具体实施仅限于这些说明。对本发明所属技术领域的普通技术人员来说,在不脱离本发明的构思的前提下,还可以做出简单的推演及替换,都应当视为本发明的保护范围。
Claims (3)
1.劲性钢骨梁马凳筋反吊布筋施工方法,其特征在于:包括以下步骤:
第一步:将马凳筋(3)反吊固定于劲性钢骨(1)的下方;
第二步:将梁底纵筋(4)临时固定于马凳筋(3)底部的下侧,完成单层布筋;
第三步:继续将梁底纵筋(4)临时固定于马凳筋(3)底部的上侧,将内封闭箍(6)的底部与位于马凳筋(3)底部的梁底纵筋(4)固定连接,将梁顶纵筋(5)固定于内封闭箍(6)的顶部内侧;
第四步:将外封闭箍(7)的底部固定连接于内封闭箍(6)的底部外侧,外封闭箍(7)的顶部固定连接于内封闭箍(6)的顶部外侧;
第五步:以梁底纵筋(4)为参照,按照常规方法进行后续钢筋绑扎,最后补充支设梁底及梁侧模板;
在底筋单层排布或钢骨保护层厚度较小时,所述马凳筋(3)为一字型吊筋,马凳筋(3)与位于劲性钢骨(1)底部的抗剪栓钉(2)焊接固定;
或者,在底筋多层排布或钢骨保护层厚度较大时,所述马凳筋(3)为U型托筋,马凳筋(3)的上端与劲性钢骨(1)的底部翼缘焊接固定。
2.根据权利要求1所述的劲性钢骨梁马凳筋反吊布筋施工方法,其特征在于:所述梁底纵筋(4)的钢筋直径为16-40mm。
3.根据权利要求1所述的劲性钢骨梁马凳筋反吊布筋施工方法,其特征在于:所述马凳筋(3)的排布间距为0.6-1.5m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610170928.3A CN105756287B (zh) | 2016-03-24 | 2016-03-24 | 劲性钢骨梁马凳筋反吊布筋施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610170928.3A CN105756287B (zh) | 2016-03-24 | 2016-03-24 | 劲性钢骨梁马凳筋反吊布筋施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105756287A CN105756287A (zh) | 2016-07-13 |
CN105756287B true CN105756287B (zh) | 2018-02-06 |
Family
ID=56346229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610170928.3A Active CN105756287B (zh) | 2016-03-24 | 2016-03-24 | 劲性钢骨梁马凳筋反吊布筋施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105756287B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245770B (zh) * | 2016-08-31 | 2018-09-04 | 中国建筑第八工程局有限公司 | 宽体变截面环形劲性梁施工方法 |
CN107035067B (zh) * | 2017-06-12 | 2022-06-17 | 中建一局集团第一建筑有限公司 | 一种劲性梁的变截面结构及其施工方法 |
CN107724688A (zh) * | 2017-11-20 | 2018-02-23 | 中国二冶集团有限公司 | 一种梁筋绑扎辅助支架 |
CN110586815B (zh) * | 2019-10-14 | 2024-05-14 | 上海建工四建集团有限公司 | 一种尺寸可调型的多层钢筋网高精度加工胎架及使用方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100957591B1 (ko) * | 2009-08-24 | 2010-05-14 | (주)씨엠파트너스건축사사무소 | 공간부가 형성된 콘크리트 블록과 이의 제조방법 및 공간부가 형성된 콘크리트 블록을 이용한 철골보와 이의 시공방법 |
CN104251039A (zh) * | 2013-06-29 | 2014-12-31 | 清华大学 | 一种钢骨混凝土-钢梁混合连梁及其施工方法 |
CN203613643U (zh) * | 2013-10-22 | 2014-05-28 | 广东南海国际建筑设计有限公司 | 一种超高层建筑的多塔楼高位转换结构 |
CN104674999A (zh) * | 2013-11-27 | 2015-06-03 | 五冶集团上海有限公司 | 坡屋面间隔支模与混凝土浇筑方法 |
CN204001436U (zh) * | 2014-05-15 | 2014-12-10 | 中国建筑第六工程局有限公司 | 一种保证梁底保护层、梁高及板厚的施工结构 |
-
2016
- 2016-03-24 CN CN201610170928.3A patent/CN105756287B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105756287A (zh) | 2016-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105756287B (zh) | 劲性钢骨梁马凳筋反吊布筋施工方法 | |
CN202706332U (zh) | 一种型钢混凝土组合结构柱脚 | |
CN105649330B (zh) | 一种利用钢筋笼作骨架的外挂支模系统及其使用方法 | |
CN106351445B (zh) | 一种劲性混凝土斜墙模板组合支撑加固系统及安装施工方法 | |
CN204152207U (zh) | 吊模模板的加固构造 | |
CN102251481A (zh) | 铁路桥墩分层施工方法及施工装置 | |
CN205907855U (zh) | 一种钢管板组合钢板剪力墙 | |
CN208280453U (zh) | 型钢混凝土梁拉筋施工装置 | |
CN203187288U (zh) | 一种箱梁吊架 | |
CN107130624A (zh) | 一种圆沉箱墙体钢筋笼整体绑扎吊装法 | |
CN102434001B (zh) | 钢梁-钢管砼柱与钢筋砼梁穿心连接节点构造施工方法 | |
CN206690311U (zh) | 用于钢筋骨架绑扎的胎具 | |
CN110206168A (zh) | 一种型钢柱混凝土梁柱节点施工方法 | |
CN106760528A (zh) | 一种混凝土免拆模施工新工艺 | |
CN103774758B (zh) | 箱型钢管柱与剪力墙端柱之间的连接方法及连接结构 | |
CN109235774A (zh) | 一种耗能柱及其施工方法 | |
CN108748655A (zh) | 一种用于小箱梁的网片化钢筋骨架笼 | |
CN206396633U (zh) | 一种桥梁用装配式钢制防撞护栏 | |
CN206110166U (zh) | 一种板式暗支撑高刚性设备基础平台结构 | |
CN206667546U (zh) | 一种型钢混凝土后加楼板结构 | |
CN107842192B (zh) | 一种建筑工程外悬挑脚手架封闭盖板的制作及安装方法 | |
CN103726590A (zh) | 底部加强型钢管混凝土边框双钢板内焊软钢板组合剪力墙 | |
CN108590194B (zh) | 一种装配式叠合板间连梁钢筋绑扎方法 | |
CN208899638U (zh) | 采用钢管连接机构的预制柱与一体预制梁板装配节点 | |
CN107700819B (zh) | 塔柱施工内爬架及采用塔柱施工内爬架的塔柱施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230426 Address after: No.235, 237, Golgi Road, Shahekou District, Dalian, Liaoning, 116021 Patentee after: DALIAN BRANCH OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Corp.,Ltd. Address before: 200135 No. 1568, Century Avenue, Pudong New Area, Shanghai Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd. |
|
TR01 | Transfer of patent right |