CN105755920B - Prefabrication and assembly construction concrete and its assembly method - Google Patents
Prefabrication and assembly construction concrete and its assembly method Download PDFInfo
- Publication number
- CN105755920B CN105755920B CN201610229931.8A CN201610229931A CN105755920B CN 105755920 B CN105755920 B CN 105755920B CN 201610229931 A CN201610229931 A CN 201610229931A CN 105755920 B CN105755920 B CN 105755920B
- Authority
- CN
- China
- Prior art keywords
- precast
- prefabrication
- concrete
- assembly
- assembly construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/06—Pavings made of prefabricated single units made of units with cement or like binders
- E01C5/065—Pavings made of prefabricated single units made of units with cement or like binders characterised by their structure or component materials, e.g. concrete layers of different structure, special additives
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/005—Individual couplings or spacer elements for joining the prefabricated units
- E01C5/006—Individual spacer elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Road Paving Structures (AREA)
Abstract
A kind of prefabrication and assembly construction concrete of present invention offer and its assembly method.The prefabrication and assembly construction concrete includes:Polylith precast slab and a plurality of precast concrete beam;The precast concrete beam is connected across the both sides of at least two pieces precast slabs of continuous laying, and at least two concrete slabs of continuous laying are fixedly connected by the precast concrete beam, to form the overall structure layer of bearing load.The present invention in precast slab both sides by being arranged precast concrete beam, in assembly, leveling can be carried out to precast slab using precast concrete beam, to ensure that the structure sheaf of assembly has good flatness.
Description
Technical field
The present invention relates to highway engineering technology and airport pavement engineering technology more particularly to a kind of prefabrication and assembly construction concrete knots
Structure layer and its assembly method.
Background technology
If at present the country cement concrete road base based on cast in situs, site operation will produce a large amount of waste water,
Exhaust gas, waste residue, the construction operation time is long, and construction machinery volume of traffic is big, and personnel specialty degree is low, when needing long after cast in situs
Between the unfavorable factors such as maintenance.Due to economic fast development, it is necessary to expressway construction faster, it is firmer, more environmentally friendly.
In recent years, prefabricated construction is widely used in building industry, keeps the construction of building trade more environmentally protective,
Construction quality gets better protection, and substantially reduces the construction period.In transportation industry, prefabricated assembled road surface is prefabricated
Field concentration pre-casting concrete flag, then concrete prefabricated board that intensity is reached to design requirement are transported to construction site, dress
Cement concrete pavement with formation.
But common prefabricated assembled road surface, that there are surface evenness is poor, road deck function of surface hole is more, influence
The defects of road surface globality.
Invention content
The technical problem to be solved by the invention is to provide a kind of prefabrication and assembly construction concrete for being easy to ensure structure flatness
Structure sheaf.
A kind of prefabrication and assembly construction concrete provided by the invention, including:
Polylith precast slab and a plurality of precast concrete beam;
The precast concrete beam is connected across the both sides of at least two pieces precast slabs of continuous laying, described prefabricated mixed
At least two concrete slabs of continuous laying are fixedly connected by solidifying Tu Liang, to form the overall structure layer of bearing load.
For above-mentioned prefabrication and assembly construction concrete, in one possible implementation, the precast slab
Both sides be respectively arranged with step structure, the precast concrete beam bridges the upper surface of the step structure.
For above-mentioned prefabrication and assembly construction concrete, in one possible implementation, the precast slab
Step structure in be embedded at least two fixed links.Preferably, the fixed link is exposed from the upper surface of the step structure
Height be less than or equal to from the upper surface of the step structure to the upper surface of the precast slab height.
For above-mentioned prefabrication and assembly construction concrete, in one possible implementation, the precast concrete beam
In be provided with through-hole corresponding with the fixed link position.
For above-mentioned prefabrication and assembly construction concrete, in one possible implementation, the fixed link pass through pair
The precast concrete beam is fixed on the step structure by the through-hole answered.
For above-mentioned prefabrication and assembly construction concrete, in one possible implementation, in the precast concrete
There is fixing groove positioned at the top of the through-hole in beam, gasket is installed in the fixing groove, and pass through nut and the pad
The precast concrete beam is fixed on the step structure by piece.
For above-mentioned prefabrication and assembly construction concrete, in one possible implementation, in the step structure
It is provided with the built-in fitting for lifting and being in the milk.
The present invention also provides a kind of assembly method of prefabrication and assembly construction concrete, the prefabrication and assembly construction concrete structures
Layer is the prefabrication and assembly construction concrete of any one structure in the embodiment of the present invention, the method includes:
Polylith precast slab is lifted into the designated position in construction area;
The top that a plurality of precast concrete beam is lifted by crane to the polylith precast slab, by a plurality of precast concrete
Beam is placed on the step structure of the both sides of the polylith precast slab;
After the precast slab and the precast concrete beam leveling and fixing, the precast slab is dismantled
With the suspender in the precast concrete beam, and by suspender install duct be in the milk.
The present invention in precast slab both sides by being arranged precast concrete beam, in assembly, can utilize prefabricated mixed
Solidifying Tu Liang carries out leveling and fixation to precast slab, to ensure that the structure sheaf after assembly has good flatness.
In addition, using the precast slab of the prefabricated assembly structural layer of the invention being laid with after leveling fixation, it may
There are certain gap between prefabricated board and base, then grouting material is poured under prefabricated board by grout hole, to ensure
Prefabricated board and base combine closely, and keep the brace foundation of prefabricated assembly structural layer more closely knit, to ensure that holding for structure sheaf
Carry power.
Description of the drawings
Including in the description and the attached drawing of a part for constitution instruction and specification together illustrate the present invention's
Exemplary embodiment, feature and aspect, and principle for explaining the present invention.
Fig. 1 is the installation condition schematic diagram of the prefabrication and assembly construction concrete of the embodiment of the present invention one;
Fig. 2 be the embodiment of the present invention one prefabrication and assembly construction concrete in precast slab a kind of exemplary construction
Vertical view;
Fig. 3 be the embodiment of the present invention one prefabrication and assembly construction concrete in precast slab a kind of exemplary construction
Side view;
Fig. 4 is the part A enlarged drawing of Fig. 3;
Fig. 5 be the embodiment of the present invention one prefabrication and assembly construction concrete in precast concrete beam a kind of exemplary construction
Vertical view;
Fig. 6 is the vertical view of the prefabrication and assembly construction concrete structure layer segment assembling effect of the embodiment of the present invention one;
Fig. 7 is the schematic diagram of the fixed form of the prefabrication and assembly construction concrete of the embodiment of the present invention two;
Fig. 8 is the flow chart of the assembly method of the prefabrication and assembly construction concrete of the embodiment of the present invention three.
Specific implementation mode
Below with reference to attached drawing various exemplary embodiments, feature and the aspect that the present invention will be described in detail.It is identical in attached drawing
Reference numeral indicate functionally the same or similar component.Although the various aspects of embodiment are shown in the accompanying drawings, remove
It non-specifically points out, it is not necessary to attached drawing drawn to scale.In addition, in order to better illustrate the present invention, specific implementation mode below
In give numerous details.It will be appreciated by those skilled in the art that without certain details, the present invention equally can be with
Implement.In some instances, method well known to those skilled in the art, means are not described in detail, in order to highlight this
The purport of invention.
Embodiment one
Fig. 1 is the installation condition schematic diagram of the prefabrication and assembly construction concrete of the embodiment of the present invention one, and Fig. 2 is the present invention
The vertical view of a kind of exemplary construction of precast slab in the prefabrication and assembly construction concrete of embodiment one, Fig. 3 are this hair
The side view of a kind of exemplary construction of precast slab in the prefabrication and assembly construction concrete of bright embodiment one.Fig. 4 is Fig. 3
Part A enlarged drawing.Fig. 5 shows for one kind of precast concrete beam in the prefabrication and assembly construction concrete of the embodiment of the present invention one
The vertical view of example structure, Fig. 6 are the vertical view of the prefabrication and assembly construction concrete structure layer segment assembling effect of the embodiment of the present invention one.
As shown in Figures 1 to 5, which may include mainly:Polylith precast slab 11
(can abbreviation prefabricated board) and a plurality of precast concrete beam 12 (can abbreviation precast beam).Wherein, precast concrete beam 12 bridges
In the both sides (Fig. 1 only shows side) of at least two pieces precast slabs 11 of continuous laying, the precast concrete beam 12 will
At least two concrete slabs 11 of continuous laying are fixedly connected, to form the overall structure layer of bearing load.
It is connected across on two pieces of prefabricated boards in one piece of precast beam it should be noted that, although Fig. 1 and Fig. 6 are illustrated only, but this
Field technology personnel are appreciated that one piece of precast beam can also be connected across on more than two pieces prefabricated boards, specifically can be according to prefabricated
The length and width of beam, length of prefabricated board etc. are configured.Also, installation site of the precast beam in prefabricated board both sides can be right
Claim, it can also be asymmetric.In addition, if construction area is longer road surface, airfield runway etc., along the length of construction area
It can be with the multigroup precast beam of continuous laying and prefabricated section, in the position of every two pieces of prefabricated boards linking, preferably by one group of precast beam
Bridging, with ensure assemble after road surface or airfield pavement it is smooth.
As shown in Figure 3 and Figure 4, in one possible implementation, the both sides of the precast slab 11 are set respectively
It is equipped with step structure 110, the precast concrete beam 12 bridges the upper surface of the step structure 110.
In one possible implementation, at least two are embedded in the step structure 110 of the precast slab 11
Root fixed link 111.
Wherein, the quantity of pre-buried fixed link 111 can be set according to the length of prefabricated board in the step structure 110 of prefabricated board
It sets, in general, pre-buried at least two fixed links 111 in the side step structure 110 of each prefabricated board, a prefabricated board in Fig. 1
Pre-buried 6 fixed links 111 in side.It is understood that the quantity of above-mentioned fixed link 111 is only a kind of example and unrestricted,
It can flexibly be selected according to the length of prefabricated board and the endurance of precast beam.As shown in figure 5, fixed link 111 is preferably but unlimited
In the screw rod or bolt etc. that are embedded in prefabricated board.
As shown in Figure 3, it is preferred that the height H1 that the fixed link 111 is exposed from the upper surface of the step structure 110 is small
Height H2 in or equal to from the upper surface of the step structure 110 to the upper surface of the precast slab 11.This
Sample avoids fixed link from being higher by the structure sheaf after assembly, causes traffic safety hidden danger.
As shown in Figure 1, in one possible implementation, being provided in the step structure 110 for lifting and filling
The built-in fitting 113 of slurry.Hole for hoist can be reserved on prefabricated board after setting built-in fitting 113 and is used for mounting hanger, and lifting appliance can
It is installed with being sling precast slab 11 by suspender.In addition, suspender is taken out from built-in fitting, it is pre- in prefabricated board
It boxes out and is combined with the mounting hole in precast beam, the operations such as subsequent grouting can be carried out.The process specifically lifted may refer to down
State the associated description of embodiment of the method.
Embodiment two
Fig. 7 is the schematic diagram of the fixed form of the prefabrication and assembly construction concrete of the embodiment of the present invention two.In embodiment
On the basis of one, as shown in Fig. 7, Fig. 5 and Fig. 1, the prefabrication and assembly construction concrete of the present embodiment, the precast concrete beam
Through-hole corresponding with 111 position of the fixed link 122 is provided in 12.For example, fixed link 111 is bolt or screw rod, Ke Yi
It is reserved and the matched bolt hole of fixed link in precast beam.
In one possible implementation, as shown in Figure 1 and Figure 5, the fixed link 111 passes through corresponding through-hole 122
The precast concrete beam 12 is fixed on the step structure 110.
In one possible implementation, as shown in fig. 7, being located at the through-hole in the precast concrete beam 12
122 top has fixing groove 123, gasket 124 is equipped in the fixing groove 123, and pass through nut 31 and the gasket
124 are fixed on the precast concrete beam 12 on the step structure 110.The advantages of this fixed form be avoid it is prefabricated
The case where plate caused by deviation and beam can not be installed and the height difference between contiguous prefabricated plate is conveniently adjusted to ensure structure sheaf
Flatness.
In addition, as shown in figure 5, grout hole 127 and suspension centre 128 can also be reserved in precast beam.Wherein, it is assembling process
In, lifting appliance can be sling precast beam in 128 position of suspension centre at precast beam both ends.And in precast beam and prefabricated board dress
After leveling, it can be poured between precast beam and prefabricated board and prefabrication and assembly construction concrete structure from grout hole 127 by grouting material
Gap between layer and base.
Embodiment three
Fig. 8 is the flow chart of the assembly method of the prefabrication and assembly construction concrete of the embodiment of the present invention three.Such as Fig. 8 institutes
Show, for the prefabrication and assembly construction concrete of any one structure in above-described embodiment, assembly method may include:
Step 801, the designated position being lifted into polylith precast slab in construction area;
Step 802, the top that a plurality of precast concrete beam is lifted by crane to the polylith precast slab, will be described a plurality of pre-
Beams of concrete processed is placed into the both sides of the polylith precast slab;
Step 803, will the precast slab and the precast concrete beam leveling and after fixing, dismounting is described prefabricated
On the step structure of concrete slab and the suspender in the precast concrete beam;
Step 804 is in the milk by suspender installation duct.
Specifically, concentration pre-casting concrete slab and beams of concrete first outside construction area.It is strong to reach design by health
After degree, prefabricated board and transporting precast beams are lain against prefabricated board by corresponding lifting appliance referring to Fig. 6 to construction site
In the base of leveling, adjust prefabricated Board position adjacent two pieces of prefabricated boards are carried out it is just flat, then to contiguous prefabricated plate seam crossing into
Row essence is flat, precast beam is placed on step structure after the completion of the flat work of essence, and make the spiral shell on the screw rod and precast beam on prefabricated board
Hole corresponds, and then by the connection of nut and screw rod, the contiguous prefabricated plate after leveling is fixed together.Finally by pre-
Grouting material is poured into the gap between prefabrication and assembly construction concrete and base by the grout hole stayed.It can be according to the strong of grouting material
Degree requires to determine the time of open to traffic.
The present invention and the comparison on common prefabrication and assembly construction road surface have the following advantages that:
The linking of common prefabricated assembly structural layer is that the transmission rod of seam crossing or ribbet is leaned on to be attached, structure sheaf
Difficulty of construction is big, globality is poor, not can solve surface evenness problem.The prefabrication and assembly construction being laid with using the present invention
Formula structure sheaf is directed to this defect of common prefabricated construction layer, fixes the prefabricated board after leveling by precast beam, makes dress
Structure sheaf after matching has higher flatness;And by pour into grouting material fill prefabrication and assembly construction concrete and base it
Between gap, ensure that the globality and bearing capacity of structure.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (8)
1. a kind of prefabrication and assembly construction concrete, which is characterized in that including:Polylith precast slab and a plurality of concrete
Tu Liang;
The both sides of the precast slab are respectively arranged with step structure, and the precast concrete beam is connected across continuous laying
The upper surface of the step structure of the both sides of at least two pieces precast slabs, the precast concrete beam by continuous laying at least
Two concrete slabs are fixedly connected, to form the overall structure layer of bearing load.
2. prefabrication and assembly construction concrete according to claim 1, which is characterized in that the platform of the precast slab
At least two fixed links are embedded in stage structure.
3. prefabrication and assembly construction concrete according to claim 2, which is characterized in that the fixed link is from the step
The height that the upper surface of structure is exposed is less than or equal to from the upper surface of the step structure to the upper of the precast slab
Height between surface.
4. prefabrication and assembly construction concrete according to claim 3, which is characterized in that set in the precast concrete beam
It is equipped with through-hole corresponding with the fixed link position.
5. prefabrication and assembly construction concrete according to claim 4, which is characterized in that the fixed link passes through corresponding
The precast concrete beam is fixed on the step structure by through-hole.
6. prefabrication and assembly construction concrete according to claim 5, which is characterized in that in the precast concrete beam
There is fixing groove positioned at the top of the through-hole, gasket is installed in the fixing groove, and will by nut and the gasket
The precast concrete beam is fixed on the step structure.
7. prefabrication and assembly construction concrete according to any one of claim 1 to 6, which is characterized in that at described
The built-in fitting for lifting and being in the milk is provided in stage structure.
8. a kind of assembly method of prefabrication and assembly construction concrete, which is characterized in that the prefabrication and assembly construction concrete
For the prefabrication and assembly construction concrete described in any one of claim 1 to 7, the method includes:
Polylith precast slab is lifted into the designated position in construction area;
The a plurality of precast concrete beam is put in the top that a plurality of precast concrete beam is lifted by crane to the polylith precast slab
On the step structure for setting the both sides of the polylith precast slab;
After the precast slab and the precast concrete beam leveling and fixing, the precast slab and institute are dismantled
The suspender in precast concrete beam is stated, and duct is installed by suspender and is in the milk.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610229931.8A CN105755920B (en) | 2016-04-14 | 2016-04-14 | Prefabrication and assembly construction concrete and its assembly method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610229931.8A CN105755920B (en) | 2016-04-14 | 2016-04-14 | Prefabrication and assembly construction concrete and its assembly method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105755920A CN105755920A (en) | 2016-07-13 |
CN105755920B true CN105755920B (en) | 2018-08-10 |
Family
ID=56333878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610229931.8A Active CN105755920B (en) | 2016-04-14 | 2016-04-14 | Prefabrication and assembly construction concrete and its assembly method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105755920B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121107B (en) * | 2016-08-17 | 2018-11-02 | 沈阳建筑大学 | Assemble type concrete slab and its plate dry type connection method |
CN113215887A (en) * | 2021-05-10 | 2021-08-06 | 上海市城市建设设计研究总院(集团)有限公司 | Prefabricated lean concrete base plate unit convenient to hoist and manufacturing method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2392807Y (en) * | 1999-08-30 | 2000-08-23 | 容文添 | General combined road structural member |
US6164026A (en) * | 1997-09-25 | 2000-12-26 | New Jersey Institute Of Technology | Raised access floor |
CN2549036Y (en) * | 2002-06-06 | 2003-05-07 | 张远清 | Combined road-surface prefabs |
KR100571048B1 (en) * | 2005-08-30 | 2006-04-14 | 최병만 | Method for constructing blind person guide block on crosswalk(crosswalk) |
KR20120123759A (en) * | 2011-05-02 | 2012-11-12 | 남궁민우 | A connecting apparatus of deck |
CN204589751U (en) * | 2015-02-13 | 2015-08-26 | 上海建工七建集团有限公司 | Assembling temporary road structure |
CN205529742U (en) * | 2016-04-14 | 2016-08-31 | 北京九州有道交通科技有限公司 | Prefabricated assembly concrete structure inter -layer |
-
2016
- 2016-04-14 CN CN201610229931.8A patent/CN105755920B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6164026A (en) * | 1997-09-25 | 2000-12-26 | New Jersey Institute Of Technology | Raised access floor |
CN2392807Y (en) * | 1999-08-30 | 2000-08-23 | 容文添 | General combined road structural member |
CN2549036Y (en) * | 2002-06-06 | 2003-05-07 | 张远清 | Combined road-surface prefabs |
KR100571048B1 (en) * | 2005-08-30 | 2006-04-14 | 최병만 | Method for constructing blind person guide block on crosswalk(crosswalk) |
KR20120123759A (en) * | 2011-05-02 | 2012-11-12 | 남궁민우 | A connecting apparatus of deck |
CN204589751U (en) * | 2015-02-13 | 2015-08-26 | 上海建工七建集团有限公司 | Assembling temporary road structure |
CN205529742U (en) * | 2016-04-14 | 2016-08-31 | 北京九州有道交通科技有限公司 | Prefabricated assembly concrete structure inter -layer |
Also Published As
Publication number | Publication date |
---|---|
CN105755920A (en) | 2016-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101781879B (en) | Construction method of single-pylon cable-stayed bridge without dorsal cables | |
CN105735076B (en) | Sleeper beam formula prefabrication and assembly construction concrete and its assembly method | |
CN104727226B (en) | Construction method for steel-concrete composite girder | |
CN109083320A (en) | Combine prefabricated panel and laminated floor slab structure and laminated floor slab construction method | |
CN102587296A (en) | Self-balancing external prestressing strengthening method for bridge structure | |
CN205025086U (en) | Strength nature skeleton concrete beam construction suspend template in midair | |
CN205529742U (en) | Prefabricated assembly concrete structure inter -layer | |
CN109518864A (en) | A kind of inversion steel bar girder concrete folding plate and its construction method | |
CN101781878A (en) | Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof | |
CN109025268A (en) | Kitchen and toilet concrete flanging construction method | |
CN209703525U (en) | A kind of side slope precast assembly lattice girder connected by wet seam | |
CN205576955U (en) | Raft foundation's reinforced structure is displaced into to strip footing | |
CN105755920B (en) | Prefabrication and assembly construction concrete and its assembly method | |
CN102337782A (en) | Lift system for constructing truss platform on top of tall and large space and construction method for lift system | |
CN106012849B (en) | A kind of cantilever casting beam straightway steel bar overall binding construction method for hanging and bridge | |
CN105780623B (en) | Composite structure layer and its laying method | |
CN114541632A (en) | Construction method for using laminated slab for prefabricated building roof layer floor slab | |
CN109914666A (en) | Profiled sheet Combined concrete flooring large area pouring construction method | |
KR101404481B1 (en) | Bridge construction method using road decking panel at limited space for girder manufacturing | |
CN208884808U (en) | Combine prefabricated panel and laminated floor slab structure | |
CN105780624B (en) | composite structure layer and its laying method | |
CN208363460U (en) | The steel reinforced concrete assembling stair of section are poured after a kind of setting | |
CN205529743U (en) | Prefabricated assembly concrete structure inter -layer of sleeper beam formula | |
CN207957611U (en) | A kind of small members are mobile and install equipment | |
CN207177027U (en) | One kind is inverted steel bar girder concrete folding plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |