CN105740221A CN201610100304.4A CN201610100304A CN105740221A CN 105740221 A CN105740221 A CN 105740221A CN 201610100304 A CN201610100304 A CN 201610100304A CN 105740221 A CN105740221 A CN 105740221A
Authority
CN
China
Prior art keywords
line
water turbine
mixed
turbine
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610100304.4A
Other languages
Chinese (zh)
Inventor
董宏成
田迅
蒋登云
孙文彬
刘丁
陈向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201610100304.4A priority Critical patent/CN105740221A/en
Publication of CN105740221A publication Critical patent/CN105740221A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/174Form filling; Merging
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/20Drawing from basic elements, e.g. lines or circles
    • G06T11/206Drawing of charts or graphs

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Computational Linguistics (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Artificial Intelligence (AREA)
  • Economics (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Hydraulic Turbines (AREA)

Abstract

The invention relates to a three-dimensional model conversion technology, aims to solve the problems of high workload, numerous human influence factors, low working efficiency and low drawing precision due to the need for making an auxiliary line during conversion of an integrated characteristic curve of a mixed-flow type model water turbine into an integrated operation characteristic curve of a mixed-flow type prototype water turbine at present, and provides a method for generating the integrated operation characteristic curve of the mixed-flow type prototype water turbine. The method comprises the steps of according to the integrated characteristic curve of the model water turbine, calculating coordinates of points on curves such as an equal efficiency curve, an equal output curve, an equal draft height curve, an equal guide vane opening curve, an equal pressure pulsation curve and the like of the prototype water turbine through computer software; based on this, drawing corresponding isoplethic curves, output limiting curves and the like of the prototype water turbine on H-P and Q-H plane coordinate graphs; and further obtaining operation region partitions of the mixed-flow type prototype water turbine. The method is suitable for converting the integrated characteristic curve of the mixed-flow type model water turbine into the integrated operation characteristic curve of the mixed-flow type prototype water turbine.

Description

A kind of method generating mixed-flow prototype water turbine operating combined characteristic
Technical field
The present invention relates to threedimensional model transformation technology, be converted into mixed particularly to a kind of mixed-flow model turbine combined characteristic The method of streaming prototype water turbine operating combined characteristic.
Background technology
Prototype water turbine, refers to be become by the changes mechanical energy of current in power station the mechanical energy of runner, makes runner and main shaft overcome respectively The machine planting resistance and continuously run, is referred to as " heart " in power station, and its safe and highly efficient operation is to hydroelectric power plant's economic benefit Performance there is conclusive effect.Prototype water turbine is to be transformed by model turbine by the principle of similitude, therefore prototype water wheels Machine operating combined characteristic is also to be obtained through Similarity Transformation and correction by model turbine combined characteristic.
Prototype water turbine operating combined characteristic is the important evidence of Optimized Scheduling of Hydroelectric Power.In order to according to network load, upstream Come the water yield and water levels of upstream and downstream etc. reasonably to distribute actual the exerting oneself of each unit in hydroelectric power plant and obtain optimal economic benefit, scheduling unit Door and hydroelectric power plant need prototype water turbine to operate combined characteristic, with grasp comprehensively the head of prototype water turbine, flow, exert oneself, The characteristics such as efficiency, guide vane opening, cavitation, pressure fluctuation and mutual relation thereof and optimized operation region.For this reason, it may be necessary to press The principle of similitude and correction, be converted into prototype water turbine operating combined characteristic by model turbine combined characteristic.
In currently available technology, the implementation of solution the problems referred to above immediate with the present invention is: in order to by mixed-flow model water wheels Machine combined characteristic is converted into mixed-flow prototype water turbine operating combined characteristic, needs first to draw respectively in plane coordinates figure Efficiency boost line η under head HT=f (PP), draught-height boost line Hs=f (PP), guide vane opening line boost line a0=f (PP), remake some horizontal lines and intersect with boost line, each intersection point is moved to H-PPIn coordinate diagram and the most smooth be linked to be song Line, be corresponding isoefficiency curve, etc. draught-height line, etc. guide vane opening line.
In prior art, mixed-flow model turbine combined characteristic is converted into mixed-flow prototype water turbine operating overall characteristic During curve, owing to the most commonly used way is to need first to draw the efficiency boost line under each head H in plane coordinates figure ηT=f (PP), draught-height boost line Hs=f (PP), guide vane opening line boost line a0=f (PP), remake some horizontal lines with Boost line intersects, and each intersection point is moved to H-PPIn coordinate diagram and the most smooth be linked to be curve, just can obtain required isoefficiency curve, Etc. draught-height line, etc. guide vane opening line.The method workload is big, artifical influence factor is many, work efficiency and cartographic accuracy low, Failing to give full play to the advantage of computer-aided design, the curve of drafting also cannot meet the requirement of set optimization scheduling, is unfavorable for Power plant safety and the performance of economic benefit.
Summary of the invention
The invention aims to solve, in prior art, mixed-flow model turbine combined characteristic to be converted into mixed-flow Prototype water turbine operating combined characteristic time, workload is big, artifical influence factor is many, work efficiency and cartographic accuracy low, paint The curve of system also cannot meet the requirement of set optimization scheduling, the problem being unfavorable for the performance of power plant safety and economic benefit.
For reaching above-mentioned purpose, the present invention provides a kind of method generating mixed-flow prototype water turbine operating combined characteristic, bag Include following steps:
Coordinate calculates: in the range of hydraulic turbine operating head, chooses some evenly spaced heads, calculates each head pair respectively Prototype water turbine unit speed n answered11pAnd corresponding model turbine unit speed n11m;According to each model turbine list described Position rotating speed n11mMake each isoefficiency curve in parallel lines and model turbine combined characteristic figure, etc. aperture line, equal pressure pulsation line, The blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape is nascent and development line intersects, and reads each contour intersection point corresponding Model turbine unit speed n11m, specific discharge Q11m, efficiency etam, guide vane opening a0m;Utilize the principle of similitude and revise public affairs Formula, calculates the efficiency eta of prototype water turbine corresponding under each headp, flow Qp, exert oneself Pp, aperture a0p, obtain prototype water wheels The coordinate η of point on each isoefficiency curve of machinepi=f (Ppij,Hij) and ηpi=f (Hij,Qpij), the coordinate of point on the guide vane opening line such as each a0i=f (Ppij,Hij) and a0i=f (Hij,Qpij) and equal pressure pulsation line, the blade water inlet positive back side, limit cavitation inception line or the separation of flow Line, vortex tape are come into being and the coordinate of point on development line;
Mixed-flow prototype water turbine isoefficiency curve is drawn: in the range of hydraulic turbine operating head, make model turbine unit speed n11m Parallel lines are tangent with each isoefficiency curve turning point of model combined characteristic figure, calculate each point of contact coordinate ηpi=f (Ppi,Hi) and ηpi=f (Hi,Qpi), described point of contact coordinate is prototype water turbine each isoefficiency curve turning point;By calculated described prototype water wheels Point and described turning point on each isoefficiency curve of machine are drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and connect Become smooth curve, described in the smooth curve that is linked to be the isoefficiency curve of prototype water turbine;Calculate model turbine best efficiency point Corresponding prototype water turbine peak efficiency point coordinates ηpmax=f (Popt,Hd) and ηpmax=f (Hd,Qopt), and be drawn in respectively H-P, On Q-H plane coordinates figure, it is the peak efficiency operating point of prototype water turbine;
Mixed-flow prototype water turbine etc. goes out the line of force and draws: the H-P plane at mixed-flow prototype water turbine operating combined characteristic is sat In marking on a map, make P=Pmax, P=PrAnd P ≈ 0.9Pr、P≈0.8Pr、……、P≈0.3Pr、P≈0.2PrFlat etc. exerting oneself Line intersects with the isoefficiency curve of prototype water turbine, reads the head H of each intersection point;Formula Q=P/ (gH η) is utilized to calculate each intersection point Flow Q, obtain (P, η, H, Q) value of each intersection point;The point P in the line of force is gone out by each etc.i=f (Hij,Qij) suitable according to take a little Sequence is drawn on Q-H plane coordinates figure and is linked to be smooth curve, is prototype water turbine etc. and goes out the line of force, PrRepresent nominal output;
The draught-height lines such as mixed-flow prototype water turbine are drawn: according to hydraulic turbine operating head H scope and model cavitation factor sigmamGreatly Little and distribution situation, drafts several suitable draught-height H every 1~2msValue;Utilize formulaCalculate different HsCorresponding prototype water turbine working head H and unit speed n11p And corresponding model turbine unit speed n11m;Utilize model turbine unit speed n11mMake parallel lines comprehensive with model turbine Performance diagram respectively waits cavitation coefficient, cavitation factor, Toma coefficient line intersect, read the efficiency eta of intersection pointmWith specific discharge Q11m;Calculate prototype water turbine Exert oneself P and flow Q and the draught-height line such as each on the coordinate H of pointsi=f (Ppij,Hij) and Hsi=f (Hij,Qij);Each grade is inhaled The point gone out on altitude line is drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and is linked to be smooth curve, is former The draught-height lines such as the type hydraulic turbine;
Mixed-flow prototype water turbine restraining line of exerting oneself is drawn: rated head is sent out the point of nominal output and at minimum head, maximum stator The force that goes out of aperture is linked to be a straight line, is output of hydraulic turbine restraining line;
The guide vane opening line such as mixed-flow prototype water turbine is drawn: by the coordinate of point on the guide vane opening line such as each of mixed-flow prototype water turbine a0i=f (Ppij,Hij) and a0i=f (Hij,Qpij) be drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and be linked to be Smooth curve, i.e. obtains the aperture lines such as prototype water turbine is corresponding;
Mixed-flow prototype water turbine equal pressure pulsation line is drawn: the coordinate of point on line of being pulsed by each equal pressure of mixed-flow prototype water turbine It is drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and is linked to be smooth curve, i.e. obtaining mixed-flow prototype water turbine Corresponding equal pressure pulsation line;
The mixed-flow prototype water turbine blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape is nascent and development line is drawn: will The each blade water inlet positive back side, limit cavitation inception line of mixed-flow prototype water turbine or separation of flow line, vortex tape be nascent and the coordinate of development line etc. It is drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and is linked to be smooth curve, i.e. obtaining mixed-flow prototype water turbine The corresponding blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape be nascent and development line.
Further, during restraining line of exerting oneself is drawn, for being provided with the unit of EIAJ, the method for drafting of its restraining line of exerting oneself is as follows: The point of nominal output is sent out and in minimum head, the going out of maximum guide vane opening by sending out a point for minimum head for EIAJ, rated head Force is linked to be straight line, is output of hydraulic turbine restraining line.
Specifically, for Francis turbine, also including that operation area is drawn, described operation area includes stable operation district, mistake Loading zone, do not recommend Operational Zone, allow Operational Zone, forbid Operational Zone and vortex rope district, each operation area described is according to prototype water Turbine etc. draught-height line, restraining line of exerting oneself, equal pressure pulsation line, blade water inlet the positive back side, limit cavitation inception line or separation of flow line, Vortex tape is nascent and development line etc. comprehensively determines.
Preferably, when choosing some evenly spaced heads, the head number chosen is 8 to 12, in selected head Comprise minimum head, rated head and maximum head.The quantity of a kind of preferred head number is 10.
The invention has the beneficial effects as follows:
It is bent that the mixed-flow model turbine combined characteristic using the present invention is converted into mixed-flow prototype water turbine operating overall characteristic The method of line, eliminates and makees efficiency boost line ηT=f (PP), etc. draught-height boost line Hs=f (PP), etc. guide vane opening line auxiliary Index contour a0=f (PP) etc. intermediate link, fully saved make prototype water turbine combined characteristic time, improve drawing effect Rate;
When coordinate calculates, give full play to the powerful calculating of computer EXCEL software, drawing advantage, by model corresponding for each head Unit speed of hydraulic turbine n11m, specific discharge Q11m, efficiency etam, aperture a0mEtc. inserting in EXCEL table, i.e. available relevant public Formula, calculates the efficiency eta of prototype water turbine in EXCEL table automaticallyp, flow Qp, exert oneself Pp, aperture a0pDeng and be depicted as Corresponding equivalent curve;
Specify that on Q-H plane coordinates figure draw mixed-flow prototype water turbine operating combined characteristic method and etc. go out the line of force Calculating, method for drafting, for traffic department and hydroelectric power plant utilize mixed-flow prototype water turbine operating combined characteristic reasonably distribute Actual the exerting oneself of each unit provides technical support;
Specify that each isoefficiency curve turning point (i.e. peak or (with) minimum point of mixed-flow model combined characteristic figure) choosing The method taking and being converted into mixed-flow prototype water turbine each isoefficiency curve turning point, for rationally determining each equivalence of mixed-flow prototype water turbine The peak of rate line or (with) minimum point and the scope of curve and shape provide foundation;
Specify that the method that mixed-flow model turbine best efficiency point is converted into mixed-flow prototype water turbine best efficiency point, for closing Reason determines that the peak efficiency operating point of mixed-flow prototype water turbine provides foundation.
Specify that mixed-flow prototype water turbine equal pressure pulsation line, the blade water inlet positive back side, limit cavitation inception line or separation of flow line, Ye Dao Coming into being and the method for drafting of development line in whirlpool, division and drafting for mixed-flow prototype water turbine operation area provide foundation.
Detailed description of the invention:
Below to the present invention to be converted into the operating of mixed-flow prototype water turbine according to mixed-flow model turbine combined characteristic comprehensive Characteristic method is further elaborated.
The present invention solves in prior art, mixed-flow model turbine combined characteristic is converted into mixed-flow prototype water turbine Operating combined characteristic time, workload is big, artifical influence factor is many, work efficiency and cartographic accuracy low, the curve of drafting is also The requirement of set optimization scheduling, the problem being unfavorable for the performance of power plant safety and economic benefit, it is provided that one both may be used cannot be met Save and make boost line to significantly reduce workload and artifical influence factor, it is also possible to give full play to the advantage of computer-aided design, To improve work efficiency and cartographic accuracy, to meet the requirement that set optimization is dispatched, and technology simple, convenient to carry out solves Scheme.The idiographic flow of the program is as follows.
1, list calculates: 1) in the range of hydraulic turbine operating head, takes some evenly spaced heads, typically takes 8~12, And comprise minimum head, rated head and maximum head.Calculate the prototype water turbine unit speed that each head is corresponding respectively n11pAnd corresponding model turbine unit speed n11m, with each n11mValue is made in parallel lines and model turbine combined characteristic figure Each isoefficiency curve, etc. guide vane opening line, equal pressure pulsation line and the blade water inlet positive back side, limit cavitation inception line or separation of flow line, leaf Whirlpool, road is nascent and development line etc. is intersected, by model turbine unit speed n corresponding for each intersection point11m, specific discharge Q11m, efficiency etam、 Aperture a0mEtc. inserting in EXCEL table;2) principle of similitude and correction formula, row EXCEL table is utilized to calculate correspondence under each head The efficiency eta of prototype water turbinep, flow Qp, exert oneself Pp, aperture a0pDeng, obtain point on each isoefficiency curve of prototype water turbine Coordinate ηpi=f (Ppij,Hij) and ηpi=f (Hij,Qpij), the coordinate a of point on the guide vane opening line such as each0i=f (Ppij,Hij) and a0i=f (Hij,Qpij) and equal pressure pulsation line, the blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape are nascent and The coordinate of development line etc..
2, isoefficiency curve is drawn:
1) in the range of hydraulic turbine operating head, model turbine unit speed n is made11mParallel lines and model combined characteristic figure Each isoefficiency curve turning point is tangent, and isoefficiency curve turning point is peak and/or the minimum point of model turbine combined characteristic, Calculate each point of contact coordinate ηpi=f (Ppi,Hi) and ηpi=f (Hi,Qpi), described point of contact coordinate is each isoefficiency curve of prototype water turbine Turning point;
2) point on each isoefficiency curve of calculated prototype water turbine and described turning point are drawn in respectively according to the order taken a little On H-P, Q-H plane coordinates figure and be linked to be smooth curve, described in the smooth curve that is linked to be prototype water turbine etc. efficiency Line;
3) the prototype water turbine peak efficiency point coordinates η that model turbine best efficiency point is corresponding is calculatedpmax=f (Popt,Hd) and ηpmax=f (Hd,Qopt), and be drawn in respectively on H-P, Q-H plane coordinates figure, it is the peak efficiency work of prototype water turbine Make a little.
3, etc. go out the line of force to draw:
In the H-P plane coordinates figure of mixed-flow prototype water turbine operating combined characteristic, make P=Pmax、 P=PrAnd P ≈ 0.9Pr、P≈0.8Pr、……、P≈0.3Pr、P≈0.2PrEtc. exert oneself parallel lines and prototype water turbine etc. Efficiency line intersects, and reads the head H of each intersection point;Utilize formula Q=P/ (gH η) to calculate the flow Q of each intersection point, obtain each intersection point (P, η, H, Q) value;The point P in the line of force is gone out by each etc.i=f (Hij,Qij) it is drawn in Q-H plane coordinates according to the order taken a little On figure and be linked to be smooth curve, it is mixed-flow prototype water turbine etc. and goes out the line of force.
4, etc. draught-height line is drawn:
1) according to hydraulic turbine operating head H scope and model cavitation factor sigmamSize and distribution situation, draft several every 1~2m Suitably draught-height HsValue;
2) formula is utilizedCalculate different HsCorresponding prototype water turbine working head H With unit speed n11pAnd corresponding model turbine unit speed n11m
3) model turbine unit speed n is utilized11mMake parallel lines and respectively wait cavitation coefficient, cavitation factor, Toma coefficient in model turbine combined characteristic figure Line intersects, and reads the efficiency eta of intersection pointmWith specific discharge Q11m
4) the coordinate H of point on exert oneself P and flow Q and the draught-height line such as each of prototype water turbine is calculatedsi=f (Ppij,Hij) and Hsi=f (Hij,Qij);
5) point on the draught-height line such as each is drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and is linked to be light Sliding curve, is the draught-height lines such as prototype water turbine.
5, exert oneself restraining line draw:
Restraining line of exerting oneself is made up of generator output restraining line and output of hydraulic turbine restraining line two parts.Go out at the above unit of rated head Power is limited by the specified active power of electromotor, for straight line;Limited by hydraulic turbine maximum guide vane opening or cavitation corrosion below rated head System.Easy method for drafting is rated head to be sent out the point of nominal output and is linked to be in the force that goes out of minimum head, maximum guide vane opening One straight line, is output of hydraulic turbine restraining line.For being provided with the unit of EIAJ, send out EIAJ minimum head and more than Unit output is limited by electromotor maximum active power, for straight line;Below the minimum head sending out EIAJ by the hydraulic turbine Big guide vane opening or cavitation corrosion limit.Easy method for drafting is that a point for minimum head for EIAJ, rated head are sent out specified and gone out The point of power and be linked to be straight line in the force that goes out of minimum head, maximum guide vane opening, is output of hydraulic turbine restraining line.Work as the hydraulic turbine Exert oneself when being limited by cavitation corrosion condition, draught-height restraining line should be drawn simultaneously.
6, etc. guide vane opening line is drawn: by the coordinate a of point on the calculated guide vane opening line such as respectively0i=f (Ppij,Hij) and a0i=f (Hij,Qpij) be drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and be linked to be smooth curve, i.e. obtain former The guide vane opening lines such as the type hydraulic turbine is corresponding.
7, equal pressure pulsation line is drawn: be drawn in respectively according to the order taken a little by the coordinate of point on calculated each equal pressure pulsation line On H-P, Q-H plane coordinates figure and be linked to be smooth curve, i.e. obtain mixed-flow prototype water turbine equal pressure pulsation line.
8, the blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape is nascent and development line is drawn: by calculated respectively The blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape be nascent and on development line, the coordinate of point is drawn respectively according to the order taken a little On H-P, Q-H plane coordinates figure and be linked to be smooth curve, just i.e. obtaining mixed-flow prototype water turbine corresponding blade water inlet limit Back side cavitation inception line or separation of flow line, vortex tape be nascent and development line.
For Francis turbine, be the most also painted with stable operation district, overload district, do not recommend Operational Zone, allow Operational Zone, Forbid Operational Zone, vortex rope district etc., these Operational Zones can according to prototype water turbine etc. draught-height line, restraining line of exerting oneself, equal pressure Pulsation line, the blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape be nascent and development line etc. comprehensively determines, to instruct With operation and the scheduling optimizing the hydraulic turbine.

Claims (4)

1. the method generating mixed-flow prototype water turbine operating combined characteristic, it is characterised in that comprise the steps:
Coordinate calculates: in the range of hydraulic turbine operating head, chooses some evenly spaced heads, calculates each head pair respectively Prototype water turbine unit speed n answered11pAnd corresponding model turbine unit speed n11m;According to each model turbine list described Position rotating speed n11mMake each isoefficiency curve in parallel lines and model turbine combined characteristic figure, etc. guide vane opening line, equal pressure arteries and veins Moving-wire, the blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape is nascent and development line intersects, and reads each contour and hands over Model turbine unit speed n that point is corresponding11m, specific discharge Q11m, efficiency etam, aperture a0m;Utilize the principle of similitude and correction Formula, calculates the efficiency eta of prototype water turbine corresponding under each headp, flow Qp, exert oneself Pp, aperture a0p, obtain prototype water The coordinate η of point on each isoefficiency curve of turbinepi=f (Ppij,Hij) and ηpi=f (Hij,Qpij), the seat of point on the guide vane opening line such as each Mark a0i=f (Ppij,Hij) and a0i=f (Hij,Qpij) and equal pressure pulsation line, the blade water inlet positive back side, limit cavitation inception line or de- Streamline, vortex tape are come into being and the coordinate of point on development line;
Mixed-flow prototype water turbine isoefficiency curve is drawn: in the range of hydraulic turbine operating head, make model turbine unit speed n11m Parallel lines are tangent with each isoefficiency curve turning point of model combined characteristic figure, calculate each point of contact coordinate ηpi=f (Ppi,Hi) and ηpi=f (Hi,Qpi), described point of contact coordinate is prototype water turbine each isoefficiency curve turning point;By calculated described prototype water wheels Point and described turning point on each isoefficiency curve of machine are drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and connect Become smooth curve, described in the smooth curve that is linked to be the isoefficiency curve of prototype water turbine;Calculate model turbine best efficiency point Corresponding prototype water turbine peak efficiency point coordinates ηpmax=f (Popt,Hd) and ηpmax=f (Hd,Qopt), and be drawn in respectively H-P, On Q-H plane coordinates figure, it is the peak efficiency operating point of prototype water turbine;
Mixed-flow prototype water turbine etc. goes out the line of force and draws: the H-P plane at mixed-flow prototype water turbine operating combined characteristic is sat In marking on a map, make P=Pmax, P=PrAnd P ≈ 0.9Pr、P≈0.8Pr、……、P≈0.3Pr、P≈0.2PrFlat etc. exerting oneself Line intersects with the isoefficiency curve of prototype water turbine, reads the head H of each intersection point;Formula Q=P/ (gH η) is utilized to calculate each intersection point Flow Q, obtain (P, η, H, Q) value of each intersection point;The point P in the line of force is gone out by each etc.i=f (Hij,Qij) suitable according to take a little Sequence is drawn on Q-H plane coordinates figure and is linked to be smooth curve, is prototype water turbine etc. and goes out the line of force, wherein PmaxRepresent that maximum goes out Power, PrRepresent nominal output;
The draught-heights such as mixed-flow prototype water turbine are drawn: according to hydraulic turbine operating head H scope and model cavitation factor sigmamSize And distribution situation, draft several suitable draught-height H every 1~2msValue;Utilize formulaCalculate different HsCorresponding prototype water turbine working head H and unit speed n11p And corresponding model turbine unit speed n11m;Utilize model turbine unit speed n11mMake parallel lines comprehensive with model turbine Performance diagram respectively waits cavitation coefficient, cavitation factor, Toma coefficient line intersect, read the efficiency eta of intersection pointmWith specific discharge Q11m;Calculate prototype water turbine Exert oneself P and flow Q and the draught-height line such as each on the coordinate H of pointsi=f (Ppij,Hij) and Hsi=f (Hij,Qij);Each grade is inhaled The point gone out on altitude line is drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and is linked to be smooth curve, is former The draught-height lines such as the type hydraulic turbine;
Mixed-flow prototype water turbine restraining line of exerting oneself is drawn: rated head is sent out the point of nominal output and at minimum head, maximum stator The force that goes out of aperture is linked to be a straight line, is output of hydraulic turbine restraining line;
The guide vane opening line such as mixed-flow prototype water turbine is drawn: by the coordinate of point on the guide vane opening line such as each of mixed-flow prototype water turbine a0i=f (Ppij,Hij) and a0i=f (Hij,Qpij) be drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and be linked to be Smooth curve, i.e. obtains the guide vane opening lines such as prototype water turbine is corresponding;
Mixed-flow prototype water turbine equal pressure pulsation line is drawn: the coordinate of point on line of being pulsed by each equal pressure of mixed-flow prototype water turbine It is drawn in respectively on H-P, Q-H plane coordinates figure according to the order taken a little and is linked to be smooth curve, i.e. obtaining mixed-flow prototype water turbine Corresponding equal pressure pulsation line;
The mixed-flow prototype water turbine blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape is nascent and development line is drawn: will The blade water inlet positive back side, the limit cavitation inception line of mixed-flow prototype water turbine or separation of flow line, vortex tape be nascent and the coordinate of development line etc. depends on Take order a little be drawn in respectively on H-P, Q-H plane coordinates figure and be linked to be smooth curve, i.e. obtain mixed-flow prototype water turbine phase The blade water inlet positive back side, the limit cavitation inception line answered or separation of flow line, vortex tape be nascent and development line.
2. the method generating mixed-flow prototype water turbine operating combined characteristic as claimed in claim 1, it is characterised in that Exerting oneself in the drafting of restraining line, for being provided with the unit of EIAJ, the method for drafting of its restraining line of exerting oneself is as follows: will send out an EIAJ The point of minimum head, rated head send out the point of nominal output and be linked to be straight line in the force that goes out of minimum head, maximum guide vane opening, It is output of hydraulic turbine restraining line.
3. the method generating mixed-flow prototype water turbine operating combined characteristic as claimed in claim 1, it is characterised in that For Francis turbine, also including that operation area is drawn, described operation area includes stable operation district, overload district, does not pushes away Recommending Operational Zone, permission Operational Zone, forbid Operational Zone and vortex rope district, each operation area described is according to the sucking-off such as grade of prototype water turbine Altitude line, restraining line of exerting oneself, equal pressure pulsation line, the blade water inlet positive back side, limit cavitation inception line or separation of flow line, vortex tape are come into being And development line etc. comprehensively determines.
A kind of method generating mixed-flow prototype water turbine operating combined characteristic the most as claimed in claim 1, its feature exists In, when choosing some evenly spaced heads, the head number chosen is 8 to 12, comprises minimum in selected head Head, rated head and maximum head.
CN201610100304.4A 2016-02-24 2016-02-24 Method for generating integrated operation characteristic curve of mixed-flow type prototype water turbine Pending CN105740221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610100304.4A CN105740221A (en) 2016-02-24 2016-02-24 Method for generating integrated operation characteristic curve of mixed-flow type prototype water turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610100304.4A CN105740221A (en) 2016-02-24 2016-02-24 Method for generating integrated operation characteristic curve of mixed-flow type prototype water turbine

Publications (1)

Publication Number Publication Date
CN105740221A true CN105740221A (en) 2016-07-06

Family

ID=56249392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610100304.4A Pending CN105740221A (en) 2016-02-24 2016-02-24 Method for generating integrated operation characteristic curve of mixed-flow type prototype water turbine

Country Status (1)

Country Link
CN (1) CN105740221A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122566A (en) * 2017-05-12 2017-09-01 武汉大学 Combined characteristic acquisition methods based on wave power generation hydraulic PTO system
CN107153753A (en) * 2017-06-26 2017-09-12 中国电建集团成都勘测设计研究院有限公司 A kind of method of Francis turbine basic parameter estimation
CN108416527A (en) * 2018-03-15 2018-08-17 中国电建集团成都勘测设计研究院有限公司 Vertical shaft movable propeller turbine plant cavitation coefficient computational methods
CN110610034A (en) * 2019-08-28 2019-12-24 中国电建集团华东勘测设计研究院有限公司 Generation method of hydraulic characteristics of mixed-flow water turbine
CN111275792A (en) * 2020-02-26 2020-06-12 江苏大学 New method for drawing axial surface streamline of mixed-flow water turbine
CN112113620A (en) * 2020-09-15 2020-12-22 甘肃盛御水利水电科技有限公司 Flow on-line monitoring system of hydraulic power plant

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010011708A1 (en) * 2010-03-15 2011-09-15 Rudolf Huttary Turbine with passive blade adjustment
CN105260580A (en) * 2015-11-25 2016-01-20 哈尔滨电机厂有限责任公司 Method for determining pressure pulsation amplitude of draft tube of mixed-flow water turbine
CN105631126A (en) * 2015-12-28 2016-06-01 中国电建集团成都勘测设计研究院有限公司 Method for generating operating overall characteristic curve of prototype turbine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010011708A1 (en) * 2010-03-15 2011-09-15 Rudolf Huttary Turbine with passive blade adjustment
CN105260580A (en) * 2015-11-25 2016-01-20 哈尔滨电机厂有限责任公司 Method for determining pressure pulsation amplitude of draft tube of mixed-flow water turbine
CN105631126A (en) * 2015-12-28 2016-06-01 中国电建集团成都勘测设计研究院有限公司 Method for generating operating overall characteristic curve of prototype turbine

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122566A (en) * 2017-05-12 2017-09-01 武汉大学 Combined characteristic acquisition methods based on wave power generation hydraulic PTO system
CN107122566B (en) * 2017-05-12 2020-06-19 武汉大学 Comprehensive characteristic curve acquisition method based on wave power generation hydraulic PTO system
CN107153753A (en) * 2017-06-26 2017-09-12 中国电建集团成都勘测设计研究院有限公司 A kind of method of Francis turbine basic parameter estimation
CN107153753B (en) * 2017-06-26 2020-10-09 中国电建集团成都勘测设计研究院有限公司 Method for estimating basic parameters of mixed-flow water turbine
CN108416527A (en) * 2018-03-15 2018-08-17 中国电建集团成都勘测设计研究院有限公司 Vertical shaft movable propeller turbine plant cavitation coefficient computational methods
CN108416527B (en) * 2018-03-15 2021-08-10 中国电建集团成都勘测设计研究院有限公司 Method for calculating power station cavitation coefficient of vertical shaft axial flow Kaplan turbine
CN110610034A (en) * 2019-08-28 2019-12-24 中国电建集团华东勘测设计研究院有限公司 Generation method of hydraulic characteristics of mixed-flow water turbine
CN110610034B (en) * 2019-08-28 2023-09-22 中国电建集团华东勘测设计研究院有限公司 Method for generating hydraulic characteristics of mixed-flow water turbine
CN111275792A (en) * 2020-02-26 2020-06-12 江苏大学 New method for drawing axial surface streamline of mixed-flow water turbine
CN111275792B (en) * 2020-02-26 2023-12-15 江苏大学 Method for drawing axial surface streamline of mixed-flow turbine
CN112113620A (en) * 2020-09-15 2020-12-22 甘肃盛御水利水电科技有限公司 Flow on-line monitoring system of hydraulic power plant

Similar Documents

Publication Publication Date Title
CN105631126B (en) A method of it generating prototype water turbine and operates combined characteristic
CN105740221A (en) Method for generating integrated operation characteristic curve of mixed-flow type prototype water turbine
CN108832658A (en) A kind of wind power penetration limit calculation method considering frequency constraint and wind-powered electricity generation frequency modulation
CN105201916B (en) A kind of spatial guide blade centrifugal pump Hydraulic Design Method
CN104917204B (en) A kind of active power of wind power field optimal control method
CN104392284B (en) A kind of big-and-middle small power station based on scenario analysis can dissolve in short term electricity maximum coordination optimization dispatching method
CN104036073B (en) Double-fed wind power plant dynamic equivalence modeling method suitable for active power characteristic analysis
CN103020742A (en) Short-term optimization scheduling method for cascade hydropower stations with multiple limited operation areas
CN103500370B (en) Dynamic wind power plant wind direction coordinate precomputation system method for building up
CN104269855B (en) Rapid site reactive voltage adjusting method adaptable to multiple energy accesses
CN104537445B (en) One kind net saves many power supplys of two-stage and coordinates peak regulating method in short term
CN105279709A (en) Power grid day-ahead optimization scheduling method based on thermal inertia of hot water network
CN104182808A (en) New energy plant station power generation schedule making method based on equal-proportion power generation limitation
CN108062606B (en) Virtual power plant scheduling optimization method based on Riemann integral
CN104699888B (en) A kind of hydraulic turbine design method based on pump turbine
CN105205564A (en) Wind power plant wind curtailment electric quantity statistical system and method based on anemometer tower neural network
CN106919730A (en) A kind of wind power plant wake flow of the use sea land distribution factor determines method
CN105804913A (en) Adjusting method and device for pump serving as water turbine
CN109236726A (en) A kind of higher specific speed axial-flow pump impeller angle of outlet and Thickness Design Method
CN103427445B (en) Thermal power load shedding peak shaving method based on load reconstruction strategy
CN105824989B (en) A method of it generating rotary propeller type prototype water turbine and operates combined characteristic
CN102315650A (en) Optimizing method for power supply volume of micro gas turbine adopting microgrid under grid-connected mode
CN106481527A (en) A kind of independently-powered water pump water management system of wind energy
CN105761322B (en) The generation method of Pelton wheel prototype combined characteristic
CN105069188A (en) Modeling method for unit combination model in power system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160706