CN105735327B - A kind of construction method of river course or construction cofferdam bank protection - Google Patents
A kind of construction method of river course or construction cofferdam bank protection Download PDFInfo
- Publication number
- CN105735327B CN105735327B CN201610227522.4A CN201610227522A CN105735327B CN 105735327 B CN105735327 B CN 105735327B CN 201610227522 A CN201610227522 A CN 201610227522A CN 105735327 B CN105735327 B CN 105735327B
- Authority
- CN
- China
- Prior art keywords
- geotextiles
- lower floor
- construction
- bank protection
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/122—Flexible prefabricated covering elements, e.g. mats, strips
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/0009—PE
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses a kind of river course or construction cofferdam bank protection, including the lower floor's geotextiles being laid on domatic, upper strata geotextiles are provided with the filling bed of material, fill bed of material upper berth and be provided with upper strata geotextiles, upper strata geotextiles and lower floor's geotextiles by some connection lacing wires are connected to form entirety, and the upper end of upper strata geotextiles and lower floor's geotextiles is fixed at the top of bank protection body.The invention also discloses the construction method of the bank protection.According to river course of the present invention or construction cofferdam bank protection by river course or filling cofferdam and arranging, paving cloth, roll backfill, geotextiles filling bank protection can be quickly realized.Structure of the present invention is novel, is easy to construction, can disposably solve antiseepage protection question.It is applied in construction of hydro project, simple and short time limit of constructing, and can save construction investment, and remove simple, quick.
Description
Technical field
The present invention relates to the protection technology field in river course and construction of hydro project cofferdam, particularly a kind of river course and construction are enclosed
Weir bank protection and construction method.
Background technology
At present, the bank protection on river course and construction cofferdam is applied mostly using the mode such as stone-laying or concrete plate, small pattern bag sand structure
Work is numerous and diverse and cost is high.
The content of the invention
In order to overcome shortcoming of the prior art, the present invention provides a kind of river course or construction cofferdam bank protection and method.
The technical solution adopted for the present invention to solve the technical problems is:
One aspect of the present invention provides a kind of river course or construction cofferdam bank protection, including the lower floor geotechnique being laid on domatic
Cloth, lower floor's geotextiles are provided with upper strata geotextiles, upper strata geotextiles and lower floor's geotextiles provided with the filling bed of material, filling bed of material upper berth
Connect to form entirety by some connection lacing wires, the upper ends of upper strata geotextiles and lower floor's geotextiles is fixed at the top of bank protection body.
According to river course of the present invention or construction cofferdam bank protection by river course or filling cofferdam and arranging, paving cloth, roll
Backfill, can quickly realize that geotextiles fill bank protection.The upper end of upper and lower layer geotextiles is fixed at the top of bank protection body, and lower end is extended to
Inserts is backfilled between bank protection body bottom, two layers of geotextiles, inserts can play a part of antiseepage protection, and pass through some connections
Upper and lower layer geotextiles are connected to form entirety by lacing wire, so that, structure of the present invention is novel, is easy to construction, can disposably solve antiseepage
Protection question.It is applied in construction of hydro project, simple and short time limit of constructing, and can save construction investment, and remove simple, fast
It is prompt.
In addition, river course according to embodiments of the present invention or construction cofferdam bank protection can also have following additional technical feature:
It is preferred that, the filling bed of material includes the loam layer of lower floor and the sand bed of material on upper strata.
It is preferred that, connection lacing wire is equipped with from top to bottom between the upper and lower layer geotextiles.
It is preferred that, at least one horizontal geotextiles reinforcement, soil are equipped with the upper strata geotextiles and lower floor's geotextiles
Connection fastener is connected with work cloth reinforcement, upper and lower layer geotextiles connect to form entirety by connection fastener with connection lacing wire.
It is preferred that, it is provided with coping block at the top of the bank protection body, coping block is pressed in the upper of upper strata geotextiles and lower floor's geotextiles
End.
Another aspect of the present invention provides the construction method of a kind of river course or construction cofferdam bank protection, and step is as follows:
First the domatic top layer to former river course or construction cofferdam is compacted, leveling is handled, and treats that the gradient in river course or cofferdam reaches
To after requiring, lower floor's geotextiles are laid at an upper portion thereof, and now connection lacing wire lower end is fixed together with lower floor geotextiles, and
Erected with falsework, then in lower floor, geotextiles higher slice fills loam and the sand bed of material, removes falsework, and top layer is filled out
Soil carries out smooth, compacting, and connection lacing wire upper end and upper strata geotextiles is affixed, and one layer of prefabricating coping block is placed at the top of bank protection body
Bear down on one, prevent geotextiles from sliding, complete slope protection construction.
It is preferred that, the connection lacing wire includes tightrope, and the two ends of tightrope connect upper and lower layer geotextiles, tightrope overcoat respectively
There is sleeve.
It is preferred that, the length of described sleeve pipe is less than the length of tightrope.
It is preferred that, described sleeve pipe is polyethylene pipe.
It is preferred that, upper and lower layer geotextiles are preset with connection fastener.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description
Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become from description of the accompanying drawings below to embodiment is combined
Substantially and be readily appreciated that, wherein:
Fig. 1 is the facade structures figure of present example;
Fig. 2 is the bank protection front view of present example.
Description of reference numerals:
1st, upper strata geotextiles, 2, geotextiles reinforcement, 3, the sand bed of material, 4, loam layer, 5, lower floor's geotextiles, 6, connection draws
Muscle, 7, connection fastener, 8, prefabricating coping block, 9, former river levee or fill cofferdam.
Embodiment
Embodiments of the invention are described below in detail, wherein same or similar label represents same or like from beginning to end
Element or element with same or like function.The embodiments described below with reference to the accompanying drawings are exemplary, it is intended to
For explaining the present invention, and it is not considered as limiting the invention.
River course according to embodiments of the present invention or construction cofferdam bank protection and construction method described with reference to the accompanying drawings.Fig. 1-
2 be the river course of the embodiment of the present invention or the structural representation of construction cofferdam (filling cofferdam) bank protection, and it is a kind of Novel slope protection knot
Structure, including upper strata geotextiles 1, lower floor's geotextiles 5, the filling bed of material and connection lacing wire 6.
Lower floor's geotextiles 5 be laid on former river levee or fill cofferdam 9 it is domatic on, lower floor's geotextiles 5 provided with filling the bed of material,
Fill the bed of material and can select the materials such as antiseepage, erosion control, for substituting the inserts of mould bag in the prior art.Filling bed of material upper berth is provided with
Some connection lacing wires 6 that pass through of upper strata geotextiles 1, upper strata geotextiles 1 and lower floor's geotextiles 5 connect formation entirety.Upper strata geotechnique
The upper end of cloth 1 and lower floor's geotextiles 5 is fixed at the top of bank protection body, and the lower end of upper strata geotextiles 1 and lower floor's geotextiles 5 extends to shield
Slopes bottom, upper strata geotextiles 1 are extended to extend outwardly one section behind bank protection body bottom, so as to strengthen the effect of protection.
As an example of the present embodiment, the filling bed of material includes the loam layer 4 of lower floor and the sand bed of material on upper strata
3.Because the bank protection of the present embodiment is overall using upper and lower layer geotextiles 1,5 and the connection connection formation of lacing wire 6, to prevent inserts
May between upper and lower layer geotechnique 1,5 slide downward, lower floor loam layer 4 both played antiseepage effect, can also after construction with even
Connect lacing wire 6 to bond together, so as to prevent it from gliding.And the sand bed of material 3 on upper strata plays a part of erosion control, wave resistance, Neng Goufang
Only destruction of the external force to loam layer 4, it is ensured that loam layer 4 is not destroyed with being connected the adhesive structure of lacing wire 6.Advantageously, upper and lower layer
Connection lacing wire 6 is equipped between geotextiles 1,5 from top to bottom, if the sand bed of material 3 of so upper part on upper strata glides, can be increased
The thickness of bottom sub-sand earth material layer 3, and connect lacing wire 6 and keep the thickness between upper and lower layer geotextiles 1,5 constant, so that favorably
Glided in preventing the sand bed of material 3.
Further to strengthen being equipped with least one in the fastness of connection lacing wire 6, upper strata geotextiles 1 and lower floor's geotextiles 5
Connection fastener 7 is connected with the horizontal geotextiles reinforcement 2 of bar, geotextiles reinforcement 2, upper and lower layer geotextiles 1,5 pass through connection fastener
7 form overall with the connection connection of lacing wire 6.In addition, geotextiles reinforcement 2 is laterally located in upper and lower layer geotextiles 1,5, be conducive to preventing
Only the sand bed of material 3 glides.
As a specific example of the present embodiment, one layer of prefabricating coping block 8, prefabricating coping block 8 are placed at the top of bank protection body
The upper end of upper strata geotextiles 1 and lower floor's geotextiles 5 is pressed in, prevents geotextiles from sliding.
The river course of the present embodiment or the construction method of construction cofferdam bank protection, step are as follows:
As requested, first the domatic top layer in former river course or construction cofferdam is compacted, leveling is handled, and treats river course or cofferdam
The gradient reach after requirement (referring to the requirement in river course or cofferdam, the requirement of non-slope protection construction), lay at an upper portion thereof lower floor geotechnique
The connection lower end of lacing wire 6, is now fixed together by cloth 5 with lower floor geotextiles 5, and is erected with falsework, then in subsoil
The higher slice of work cloth 5 fills loam and the sand bed of material 3, removes falsework, and smooth, compacting is carried out to skin soil layer, connection is drawn
The upper end of muscle 6 and upper strata geotextiles 1 are affixed, and one layer of prefabricating coping block 8 is placed at the top of bank protection body and is beared down on one, prevents geotextiles from sliding,
Complete slope protection construction, you being formed can antiseepage, the Novel slope protection of wave resistance.
Above-mentioned connection fastener 7 can make together with geotextiles, also with glue can be bonded in geotechnique after geotextiles are formed
On cloth reinforcement 2.
Connection lacing wire 6 can add the two ends of tightrope pattern, i.e. tightrope to connect upper and lower layer respectively using in minor diameter polyethylene pipe
Polyethylene pipe is socketed outside geotextiles 5, tightrope.The effect of polyethylene pipe:(1) falsework is erected by polyethylene pipe when constructing,
It is more convenient than the simple tightrope that erects;(2) after constructing, relative to tightrope, polyethylene pipe surface area is big, is bonded with loam layer 4 more firm
Gu;Meanwhile, when the sand bed of material 3 on upper strata geotextiles 1 or upper strata is moved, tightrope movement is driven, and tightrope is set in poly- second
In alkene pipe, influenceed so that the bonding between polyethylene pipe and loam layer 4 is not moved by tightrope;(3) when removing, tightrope and earth
The not direct adhesion of soil layer 4, it is easier to separate geotextiles with loam layer 4.Advantageously, the length of polyethylene pipe is less than the length of tightrope
Degree.Polyethylene pipe is located at loam layer 4, prevents polyethylene pipe from exposing from the sand bed of material 3.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means to combine specific features, structure, material or the spy that the embodiment or example are described
Point is contained at least one embodiment of the present invention or example.In this manual, to the schematic representation of above-mentioned term not
Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office
What combined in an appropriate manner in one or more embodiments or example.In addition, those skilled in the art can say this
Not be the same as Example or example described in bright book are engaged and combined.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not
In the case of departing from the principle and objective of the present invention a variety of change, modification, replacement and modification can be carried out to these embodiments, this
The scope of invention is limited by claim and its equivalent.
Claims (9)
1. the construction method in a kind of river course or construction cofferdam bank protection, it is characterised in that the river course or construction cofferdam bank protection includes
Lower floor's geotextiles on domatic are laid on, lower floor's geotextiles are provided with upper strata geotextiles provided with the filling bed of material, filling bed of material upper berth,
Upper strata geotextiles and lower floor's geotextiles by some connection lacing wires connect to form entirety, upper strata geotextiles and lower floor's geotextiles
Upper end is fixed at the top of bank protection body;
Step is as follows:
First the domatic top layer to former river course or construction cofferdam be compacted, leveling processing, treating the gradient in river course or cofferdam, reach will
After asking, lower floor's geotextiles are laid at an upper portion thereof, and now connection lacing wire lower end is fixed together with lower floor geotextiles, and with facing
When support erect, then in lower floor, geotextiles higher slice fills loam and the sand bed of material, removes falsework, and skin soil layer is entered
Row is smooth, compacting, and connection lacing wire upper end and upper strata geotextiles is affixed, and one layer of prefabricating coping block pressure is placed at the top of bank protection body
Top, prevents geotextiles from sliding, and completes slope protection construction.
2. construction method according to claim 1, it is characterised in that the connection lacing wire includes tightrope, the two ends of tightrope
Connect respectively and be cased with sleeve outside upper and lower layer geotextiles, tightrope.
3. construction method according to claim 2, it is characterised in that the length of described sleeve pipe is less than the length of tightrope.
4. the construction method according to Claims 2 or 3, it is characterised in that described sleeve pipe is polyethylene pipe.
5. construction method according to claim 1, it is characterised in that upper and lower layer geotextiles are preset with connection fastener.
6. construction method according to claim 1, it is characterised in that the filling bed of material includes the loam layer of lower floor and upper
The sand bed of material of layer.
7. construction method according to claim 1, it is characterised in that be equipped with from top to bottom between upper and lower layer geotextiles
Connect lacing wire.
8. construction method according to claim 1, it is characterised in that be all provided with the upper strata geotextiles and lower floor's geotextiles
Have and be connected with connection fastener at least one horizontal geotextiles reinforcement, geotextiles reinforcement, upper and lower layer geotextiles pass through junction button
Part connects to form entirety with connection lacing wire.
9. construction method according to claim 1, it is characterised in that coping block, coping block are provided with the top of the bank protection body
It is pressed in the upper end of upper strata geotextiles and lower floor's geotextiles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610227522.4A CN105735327B (en) | 2016-04-13 | 2016-04-13 | A kind of construction method of river course or construction cofferdam bank protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610227522.4A CN105735327B (en) | 2016-04-13 | 2016-04-13 | A kind of construction method of river course or construction cofferdam bank protection |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105735327A CN105735327A (en) | 2016-07-06 |
CN105735327B true CN105735327B (en) | 2017-09-15 |
Family
ID=56254125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610227522.4A Expired - Fee Related CN105735327B (en) | 2016-04-13 | 2016-04-13 | A kind of construction method of river course or construction cofferdam bank protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105735327B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797608B (en) * | 2018-06-21 | 2021-01-01 | 江苏地基工程有限公司 | Assembled bamboo skin foundation pit slope protection and construction method thereof |
CN111236151A (en) * | 2020-01-14 | 2020-06-05 | 沧州昊海水利工程质量检测有限公司 | River course slope protection laying construction method for hydraulic engineering |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2856175Y (en) * | 2005-11-15 | 2007-01-10 | 唐红 | Earthworking reinforced bar ecological wall |
CN201106180Y (en) * | 2007-11-01 | 2008-08-27 | 苏学孟 | Soap soil cloth structure |
KR20090065039A (en) * | 2007-12-17 | 2009-06-22 | 최경동 | A vegetation slope structure |
CN101555693A (en) * | 2009-03-27 | 2009-10-14 | 朱海龙 | Reinforced core-enveloped structural slope protector |
CN102051881A (en) * | 2010-11-02 | 2011-05-11 | 孙涛 | Flexible surface layer soil nailing wall support system and construction method thereof |
CN205604266U (en) * | 2016-04-13 | 2016-09-28 | 山东省水利科学研究院 | River course or construction cofferdam bank protection |
-
2016
- 2016-04-13 CN CN201610227522.4A patent/CN105735327B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2856175Y (en) * | 2005-11-15 | 2007-01-10 | 唐红 | Earthworking reinforced bar ecological wall |
CN201106180Y (en) * | 2007-11-01 | 2008-08-27 | 苏学孟 | Soap soil cloth structure |
KR20090065039A (en) * | 2007-12-17 | 2009-06-22 | 최경동 | A vegetation slope structure |
CN101555693A (en) * | 2009-03-27 | 2009-10-14 | 朱海龙 | Reinforced core-enveloped structural slope protector |
CN102051881A (en) * | 2010-11-02 | 2011-05-11 | 孙涛 | Flexible surface layer soil nailing wall support system and construction method thereof |
CN205604266U (en) * | 2016-04-13 | 2016-09-28 | 山东省水利科学研究院 | River course or construction cofferdam bank protection |
Also Published As
Publication number | Publication date |
---|---|
CN105735327A (en) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201148621Y (en) | Miniature anti-slide pile composite structure | |
CN105297571B (en) | A kind of mud stone filled-up ground structure and its construction method | |
CN105735327B (en) | A kind of construction method of river course or construction cofferdam bank protection | |
CN105002927B (en) | A kind of construction method of execavated rockmass barricade loaded filter | |
CN205604266U (en) | River course or construction cofferdam bank protection | |
CN110439612A (en) | A kind of mould bag barricade and construction method | |
CN105672064B (en) | A kind of high-speed railway subgrade cable trough and shoulder protector construction method | |
CN108729437A (en) | Composite, water-drain isolating pad, bedding waterproof/drainage structure and side slope are layered waterproof/drainage structure | |
CN106759345A (en) | A kind of taper pile construction equipment and taper pile base pit stand construction | |
CN105350513A (en) | Novel construction method for end-bearing type composite consolidated foundation | |
CN101418574B (en) | Construction method for reinforcing grade beam | |
CN107190772A (en) | A kind of underground pipe gallery base configuration and its construction method | |
CN101748708B (en) | 4.5 or 4 meter high toe board structure of concrete-face rick-fill dam and construction method thereof | |
CN201891130U (en) | Flexible precast block retaining wall structure | |
CN105507227A (en) | Novel construction method of large-diameter composite structure pile consolidated foundation | |
CN205314083U (en) | Novel ground is consolidated in stake of major diameter composite construction | |
CN107503370A (en) | The high barricade of one planting sand well combined type reinforced earth and preparation method | |
CN207552833U (en) | A kind of elevated bridge basal perimeter ground road structure | |
CN208415020U (en) | A kind of roadbed composite structure | |
CN207452938U (en) | Composite foundation reinforced cantilever retaining wall structure | |
CN110424202A (en) | Border on the sea roadbed wave prevention structure and its construction method | |
CN205314120U (en) | Novel side hinders formula combination strengthening ground | |
CN208762998U (en) | Composite, water-drain isolating pad, bedding waterproof/drainage structure and side slope are layered waterproof/drainage structure | |
CN210886796U (en) | Subgrade is consolidated to weak soil | |
CN104452667B (en) | A kind of river course reinforced earth retaining wall structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170915 Termination date: 20190413 |