CN105735128B - Main arch ring geometric control mould - Google Patents

Main arch ring geometric control mould Download PDF

Info

Publication number
CN105735128B
CN105735128B CN201410744030.3A CN201410744030A CN105735128B CN 105735128 B CN105735128 B CN 105735128B CN 201410744030 A CN201410744030 A CN 201410744030A CN 105735128 B CN105735128 B CN 105735128B
Authority
CN
China
Prior art keywords
chevron
cage bar
main arch
arch ring
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410744030.3A
Other languages
Chinese (zh)
Other versions
CN105735128A (en
Inventor
任宗福
苏洪彬
陈琳
邵友建
汤中良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Yellow River Construction Group Co Ltd
Original Assignee
Jinan Yellow River Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Yellow River Construction Group Co Ltd filed Critical Jinan Yellow River Construction Group Co Ltd
Priority to CN201410744030.3A priority Critical patent/CN105735128B/en
Publication of CN105735128A publication Critical patent/CN105735128A/en
Application granted granted Critical
Publication of CN105735128B publication Critical patent/CN105735128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of main arch ring geometric control mould, including top cage bar in the same plane, bottom cage bar, multiple first chevrons and multiple second chevrons, top cage bar and bottom cage bar are formed all in accordance with main arch ring span and camber bending, the opening of the first chevron and the second chevron is towards bottom cage bar, arcuately zone length direction, first chevron and the second chevron are sequentially alternately arranged, the tip of the first chevron is fixedly connected with top cage bar, two openends of the first chevron are fixedly connected with bottom cage bar, two openends of the second chevron are fixedly connected with bottom cage bar, two adjacent open ends for being belonging respectively to the first chevron and the second chevron overlap with the fixed connection point of bottom cage bar.Main arch ring alignment control mould structure is consolidated using the stability of triangle, resistance capacity to deformation is strong, can effectively solve the problems, such as that main arch ring alignment control is difficult.

Description

Main arch ring geometric control mould
Technical field
The present invention relates to cast-in-situ steel reinforced concrete arch bridge and main arch ring technical field of construction, and in particular to a kind of main arch ring outward appearance Alignment control mould.
Background technology
In the work progress of arch bridge, main arch ring construction is the emphasis of bridge construction, and in the work progress of main arch ring The linear unmanageable problem of arch ring is frequently run onto, especially in the construction method of clay model arch tire.Because the side of hanging wire construction Method has unstable and difficulty to control, and great inconvenience is brought to construction, usually because arch tire and bed die are linear inaccurate, causes Whole main arch ring alignment control is bad, influences the presentation quality of arch bridge.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of main arch ring geometric control mould, can effectively solve master Linear problem rambunctious in arch ring work progress.
In order to solve the above-mentioned technical problem, the technical scheme is that:
A kind of main arch ring geometric control mould, including top cage bar, bottom cage bar, multiple first in the same plane Chevron and multiple second chevrons, top cage bar and bottom cage bar are formed all in accordance with main arch ring span and camber bending, push up cage bar and bottom Radial direction spacing between cage bar is equal to the main arch ring thickness of removal top side protective layer, the arc formed between top cage bar and bottom cage bar Region with removal top side protective layer main arch loop-shaped coincide, the opening of the first chevron and the second chevron towards bottom cage bar, Arcuately zone length direction, the first chevron and the second chevron are sequentially alternately arranged, and tip and the top cage bar of the first chevron are consolidated Fixed connection, two openends of the first chevron are fixedly connected with bottom cage bar, and two openends of the second chevron are solid with bottom cage bar Fixed connection, two adjacent open ends for being belonging respectively to the first chevron and the second chevron overlap with the fixed connection point of bottom cage bar.
The symmetrical centre of above-mentioned main arch ring geometric control mould, the symmetrical center line of the first chevron and the second chevron The equal radial arrangement of line.
Above-mentioned main arch ring geometric control mould, comes for the first chevron positioned at arc area length direction two ends Say, its tip is fixedly connected with cage bar end is pushed up, and an openend is fixedly connected with bottom cage bar end, another openend and bottom Cage bar is fixedly connected.
Above-mentioned main arch ring geometric control mould, the second chevron is small compared with the first chevron, and the second chevron tip is located at top Between cage bar and bottom cage bar.
Above-mentioned main arch ring geometric control mould, the first chevron is more one compared with the second chevron.
It is whole using the connection of the first chevron, the first chevron and the triangle structure of cage bar between top cage bar and bottom cage bar Body intensity is high, the second chevron equally with the triangle structure of cage bar, further improve bulk strength.Using the stabilization of triangle Property consolidate main arch ring alignment control mould structure, resistance capacity to deformation is strong, can effectively solve main arch ring alignment control difficult Problem.
Brief description of the drawings
The present invention is described in more detail below in conjunction with the accompanying drawings:
Fig. 1 is structural representation of the invention.
In figure:1 top cage bar, 2 bottom cage bars, 3 first chevrons, 4 second chevrons.
Specific embodiment
As shown in figure 1, main arch ring geometric control mould include top cage bar 1 in the same plane, bottom cage bar 2, Multiple first chevrons 3 and multiple second chevrons 4.Top cage bar and bottom cage bar are formed all in accordance with main arch ring span and camber bending, Radial direction spacing between top cage bar and bottom cage bar is equal to the arch ring thickness of removal top side protective layer, shape between top cage bar and bottom cage bar Into arc area with removal top side protective layer main arch loop-shaped coincide.The equal direction in opening of the first chevron and the second chevron Bottom cage bar, arcuately zone length direction, the first chevron and the second chevron are sequentially alternately arranged.First chevron tip with Top cage bar is fixedly connected, and two openends of the first chevron are fixedly connected with bottom cage bar, two openends of the second chevron with Bottom cage bar is fixedly connected, and is belonging respectively to two adjacent open ends and the fixed connection point of bottom cage bar of the first chevron and the second chevron Overlap.
Specifically, the equal radial arrangement of the symmetrical center line of the symmetrical center line of the first chevron and the second chevron.
Specifically, for the first chevron positioned at arc area length direction two ends, its sophisticated and top cage bar end It is fixedly connected, an openend is fixedly connected with bottom cage bar end, and another openend is fixedly connected with bottom cage bar.
Specifically, the second chevron is small compared with the first chevron, and the second chevron tip is located between top cage bar and bottom cage bar.
Specifically, the first chevron is more one compared with the second chevron.
Main arch ring geometric control Mold Making process:
Bottom cage bar is made according to main arch ring span and camber first, main arch ring thickness subtracts top side protective layer thickness and is top Radial direction spacing between cage bar and bottom cage bar, then makes top cage bar, is connected using the first chevron between top cage bar and bottom cage bar Connect, the first chevron and the triangle structure of cage bar, bulk strength is high, and finally, the second chevron is connected with cage bar, the second V-arrangement Part equally with the triangle structure of cage bar, further improve bulk strength.Mould uses the modelling of simply supported beam, with stabilization Firm characteristic, and with simple structure, it is light, easily controllable the characteristics of use.
Main arch ring geometric control method:
In bed die work progress, main arch ring geometric control mould is stuck on arch tire or bed die can just be found out partially Difference, thickness of protection tier can also be controlled during arch ring reinforcing bar side is pricked.It is particularly suited for clay model arch tire method construction In the method for main arch ring, both can be used to control bottom to encircle the linear of tire, can control the linear of bed die that reinforcing bar can also be controlled to protect again Covering thickness, reduces the error problem that hanging wire construction brings.

Claims (5)

1. a kind of main arch ring geometric control mould, it is characterised in that:Including top cage bar in the same plane, bottom master Muscle, multiple first chevrons and multiple second chevrons, top cage bar and bottom cage bar are formed all in accordance with main arch ring span and camber bending, Radial direction spacing between top cage bar and bottom cage bar is equal to the main arch ring thickness of removal top side protective layer, between top cage bar and bottom cage bar The arc area of formation coincide with the main arch loop-shaped of removal top side protective layer, the equal court in opening of the first chevron and the second chevron To bottom cage bar, arcuately zone length direction, the first chevron and the second chevron are sequentially alternately arranged, the tip of the first chevron It is fixedly connected with top cage bar, two openends of the first chevron are fixedly connected with bottom cage bar, and two openends of the second chevron are equal It is fixedly connected with bottom cage bar, is belonging respectively to the first chevron and two adjacent open ends of the second chevron and being fixedly connected for bottom cage bar Point overlaps.
2. main arch ring geometric control mould according to claim 1, it is characterised in that:First chevron it is symmetrical in The equal radial arrangement of symmetrical center line of heart line and the second chevron.
3. main arch ring geometric control mould according to claim 1 and 2, it is characterised in that:For positioned at arcuate segments For first chevron at length of field direction two ends, its tip is fixedly connected with top cage bar end, an openend and bottom cage bar end Portion is fixedly connected, and another openend is fixedly connected with bottom cage bar.
4. main arch ring geometric control mould according to claim 1, it is characterised in that:Second chevron is compared with the first V-arrangement Part is small, and the second chevron tip is located between top cage bar and bottom cage bar.
5. main arch ring geometric control mould according to claim 1, it is characterised in that:First chevron is compared with the second V-arrangement Part is more one.
CN201410744030.3A 2014-12-09 2014-12-09 Main arch ring geometric control mould Active CN105735128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410744030.3A CN105735128B (en) 2014-12-09 2014-12-09 Main arch ring geometric control mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410744030.3A CN105735128B (en) 2014-12-09 2014-12-09 Main arch ring geometric control mould

Publications (2)

Publication Number Publication Date
CN105735128A CN105735128A (en) 2016-07-06
CN105735128B true CN105735128B (en) 2017-07-07

Family

ID=56237816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410744030.3A Active CN105735128B (en) 2014-12-09 2014-12-09 Main arch ring geometric control mould

Country Status (1)

Country Link
CN (1) CN105735128B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004204572A (en) * 2002-12-26 2004-07-22 Shimizu Corp Construction method of arched structure
CN202369931U (en) * 2011-12-29 2012-08-08 浙江大东吴集团建设有限公司 Arch ring bracket
RU2485243C1 (en) * 2011-12-23 2013-06-20 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Arched span
CN103243691A (en) * 2013-04-24 2013-08-14 葛洲坝集团第五工程有限公司 Prefabricated steel formwork for gallery top arch of dam absorption basin
CN104099871A (en) * 2014-06-19 2014-10-15 中铁十一局集团第二工程有限公司 Arching structure of high large-span bridge bailey beams and construction method thereof
CN204298744U (en) * 2014-12-09 2015-04-29 济南黄河路桥工程公司 Main arch ring geometric control mould

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004204572A (en) * 2002-12-26 2004-07-22 Shimizu Corp Construction method of arched structure
RU2485243C1 (en) * 2011-12-23 2013-06-20 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Arched span
CN202369931U (en) * 2011-12-29 2012-08-08 浙江大东吴集团建设有限公司 Arch ring bracket
CN103243691A (en) * 2013-04-24 2013-08-14 葛洲坝集团第五工程有限公司 Prefabricated steel formwork for gallery top arch of dam absorption basin
CN104099871A (en) * 2014-06-19 2014-10-15 中铁十一局集团第二工程有限公司 Arching structure of high large-span bridge bailey beams and construction method thereof
CN204298744U (en) * 2014-12-09 2015-04-29 济南黄河路桥工程公司 Main arch ring geometric control mould

Also Published As

Publication number Publication date
CN105735128A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN204715211U (en) Stiff skeleton and adopt the Sarasota constructing structure of this stiff skeleton
CN105735128B (en) Main arch ring geometric control mould
CN104747191B (en) Pit shaft and the construction method of shaft station attachment structure
US1179853A (en) Pole-joint and method of making same.
CN204298744U (en) Main arch ring geometric control mould
KR20150057630A (en) Pneumatic tire comprising bead core having double H-beam section structure
WO2016106484A1 (en) Integrated elastic centralizer and manufacturing method thereof
CN107398514A (en) Overhead transmission line bracing wire makes combination unit
CN204589820U (en) A kind of Xiang Liang external mold travel mechanism
CN203765186U (en) Novel double-layered flux-cored wire
CN107081409A (en) A kind of plaster mold strengthens method and device
CN106147800B (en) A kind of coke oven flue lining construction method
CN214887131U (en) Coal slime pier column
CN105793007B (en) The shaping dies and manufacturing method of liner
CN204185019U (en) Integral type winding roll
CN211691464U (en) Reinforced support frame for lower beam template
CN204174537U (en) A kind of stoplog downward mobile formwork bridge fabrication machine
CN209509315U (en) One kind can the fixed device of two row's muscle of breakaway-element Vierendeel girder
CN106881892A (en) A kind of tire production green tire transfer system
US2418383A (en) Bar stock and reinforcing bar
CN102747728A (en) Prestressed centrifugal square pile
CN219143169U (en) Induction rubber-insulated-wire cable
CN209536790U (en) Middle packet prefabricated section hanging ring and its production tooling
CN203145007U (en) Pre-tensioning prestressed concrete solid pile
CN206000081U (en) A kind of prestressed steel bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: The northern section of Huanggang Flyover District of Shandong province Ji'nan City Road 250000 No. 1

Applicant after: Jinan Yellow River Construction Group Co., Ltd.

Address before: 250032 Ji'nan City, Central District, Shandong City, the town of Li Li Li River District, No. sixteen District, building No. 3, building No. 8

Applicant before: Jinan Huanghe Luqiao Engineering Company

GR01 Patent grant
GR01 Patent grant