WO2016106484A1 - Integrated elastic centralizer and manufacturing method thereof - Google Patents

Integrated elastic centralizer and manufacturing method thereof Download PDF

Info

Publication number
WO2016106484A1
WO2016106484A1 PCT/CN2014/095270 CN2014095270W WO2016106484A1 WO 2016106484 A1 WO2016106484 A1 WO 2016106484A1 CN 2014095270 W CN2014095270 W CN 2014095270W WO 2016106484 A1 WO2016106484 A1 WO 2016106484A1
Authority
WO
WIPO (PCT)
Prior art keywords
centralizer
holes
rectangular
steel pipe
elastic centralizer
Prior art date
Application number
PCT/CN2014/095270
Other languages
French (fr)
Chinese (zh)
Inventor
娄来柱
Original Assignee
娄来柱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 娄来柱 filed Critical 娄来柱
Priority to PCT/CN2014/095270 priority Critical patent/WO2016106484A1/en
Publication of WO2016106484A1 publication Critical patent/WO2016106484A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers

Definitions

  • the present application relates to an elastic centralizer, and more particularly to a method for manufacturing an integral elastic centralizer and an elastic centralizer.
  • the elastic centralizer is mainly used in oil cementing operations, so that the downhole oil casing can be centered in the wellbore, and its performance has a great influence on the safety and quality of work.
  • the elastic centralizers in the prior art are monolithic, woven, etc., although the braided elastic centralizer is manufactured to be lower, but the overall strength is low, and there is a risk of falling off under poor downhole conditions, and the existing whole Most of the elastic centralizers are physically cut by the alloy steel plate and then rolled into a tubular shape by the coiling plate. During the winding process, the two types of butt joints are welded together to form a whole, and the welding method is adopted.
  • One of the objects of the method for manufacturing the integral elastic centralizer and the elastic centralizer is to solve the problem that the integral elastic centralizer has a weak weld strip in the prior art, and at the same time improve the manufacturing process of the elastic centralizer to enhance its use. performance.
  • an integral elastic centralizer comprising a circular tubular centralizer body, and a plurality of rectangular rectangles of the same size are arranged around the axis of the central wall of the centralizer body
  • the through hole has the same spacing between the adjacent rectangular through holes, and the vertical pipe wall formed between the adjacent rectangular through holes is a righting strip, and the reinforcing strip is arched outward to form a smooth arc shape.
  • the main body of the centralizer is made of spring steel material and seamless steel pipe.
  • the number of the righting bars is 3-8.
  • a method for manufacturing an elastic centralizer includes the following steps:
  • S101 providing a seamless steel pipe, and forming a plurality of rectangular through holes around the wall of the seamless steel pipe, requiring the same spacing between adjacent rectangular through holes, and the pipe wall between the adjacent rectangular through holes is a righting strip;
  • the method further comprises the steps of: finishing the inner diameter, the outer diameter, and the flatness of the end surface of the seamless steel pipe.
  • the arc of the righting strip is smooth, reducing the resistance to the running in the process, which is more conducive to the smooth entry of the casing string.
  • FIG. 1 is a schematic structural diagram of an initial state of an embodiment of the present application.
  • step S101 is a schematic structural diagram of the embodiment of the present application after step S101;
  • FIG. 3 is a schematic structural diagram of the embodiment of the present application after step S102.
  • an embodiment of the present application provides an integral elastic centralizer comprising a circular tubular centralizer body 1 , and a plurality of circumferentially centered on the wall of the centralizer body 1
  • the rectangular through holes 2 of the same size have the same spacing between the adjacent rectangular through holes 2, and the vertical pipe wall formed between the adjacent rectangular through holes 2 is the righting strip 3, and the reinforcing strips 3 are outwardly arched to form a smooth shape.
  • the arc shape is due to the special working environment of the elastic centralizer, and the centralizer body 1 is a seamless steel pipe made of spring steel.
  • the number of the righting bars is 3-8.
  • the integral elastic centralizer provided by the embodiment of the present application is manufactured by the following steps:
  • S101 providing a seamless steel pipe, and forming a plurality of rectangular through holes around the wall of the seamless steel pipe, requiring the same spacing between adjacent rectangular through holes, and the pipe wall between the adjacent rectangular through holes is a righting strip;
  • the seamless steel pipe is finished before step S101 to meet the requirements of the inner diameter, the outer warp and the end surface flatness, and the seamless steel pipe structure after finishing is as shown in FIG. 1 .
  • step S101 the rectangular through hole 2 is processed circumferentially on the wall of the seamless steel pipe, and the adjacent moment
  • the pipe wall between the through holes 2 is the righting strip 3.
  • the number of the righting bars can be changed between 3 and 8.
  • the structure after the hollowing stamping process of S101 is shown in Fig. 2. Shown.
  • step S102 is performed, that is, the seamless steel pipe after the hollow stamping is shaped under normal temperature conditions, and a special mold is inserted into the steel pipe to apply an outward force to the centering strip 3, and at the upper end of the main body 1 is applied.
  • the vertical downward force exerts a vertical upward force on the lower end of the main body 1 so that the central strip 3 is smoothly arched outwardly to form a smooth arch shape, wherein the arc of the righting strip 3 is arched It can be determined according to the needs of the process, and the structure completed by the integer is shown in Figure 3.
  • step S103 is performed to heat-treat the processed workpiece as a whole.
  • the integral elastic centralizer provided by the embodiment of the present application has no weak points at all, and the overall elastic centralizer manufactured by the traditional manufacturing process greatly improves the structural strength and has higher product reliability.

Abstract

Disclosed are an integrated elastic centralizer and a manufacturing method thereof, the centralizer comprising a cylindrical centralizer body (1), wherein several rectangular through-holes (2) of the same size are arranged on a pipe wall of the centralizer body around the axis as the center, with equal distances between adjacent rectangular through-holes, and vertical pipe walls formed between the adjacent rectangular through-holes serve as centering strips (3) which arch outwards to be in the form of a smooth arc. The integrated elastic centralizer has a high structural strength and strong reliability, and is easy to put into place in a downhole; can adapt to more harsh working environments to reduce downhole accidents caused by the failure of the centralizer; and has smooth-arc centering strips to reduce the friction and wear with other components during use.

Description

一种整体式弹性扶正器及弹性扶正器的制造方法Method for manufacturing integral elastic centralizer and elastic centralizer 技术领域Technical field
本申请涉及一种弹性扶正器,尤其指一种整体式弹性扶正器及弹性扶正器的制造方法。The present application relates to an elastic centralizer, and more particularly to a method for manufacturing an integral elastic centralizer and an elastic centralizer.
背景技术Background technique
弹性扶正器主要用于石油固井作业中,使得井下油套管在井眼中能够居中,其性能对作业的安全性和工作质量影响很大。现有技术中的弹性扶正器有整体式、编织式等,编织式的弹性扶正器虽然制造成较低,但整体强度低,在恶劣的井下条件下有脱落风险等缺点,而现有的整体式弹性扶正器大多由合金钢板经过物理切割后再经卷板整型卷成管状,卷板过程中进行塑型,然后将对接的两条缝隙焊接在一起,形成一个整体,焊接方式有的采用两条直边直接对焊,有的则在对接处加工不同的形状,以增加对焊处两条对接边的接触面积以期望增加焊接的强度。但是无论怎样处理,这种卷板焊接加工出的整体式弹性扶正器始终存在一个问题:焊接处存在潜在的薄弱条带,在复杂的井下工况下存在焊接点开裂的风险,而一旦焊接点开裂,将会给下步作业带来严重的潜在隐患,此外现有的整体式弹性扶正器的加工工艺使扶正器在加工过程中内应力分布不均,也造成产品使用性能的下降。The elastic centralizer is mainly used in oil cementing operations, so that the downhole oil casing can be centered in the wellbore, and its performance has a great influence on the safety and quality of work. The elastic centralizers in the prior art are monolithic, woven, etc., although the braided elastic centralizer is manufactured to be lower, but the overall strength is low, and there is a risk of falling off under poor downhole conditions, and the existing whole Most of the elastic centralizers are physically cut by the alloy steel plate and then rolled into a tubular shape by the coiling plate. During the winding process, the two types of butt joints are welded together to form a whole, and the welding method is adopted. Two straight edges are directly butt welded, while others are machined at different locations to increase the contact area of the two butt edges of the butt weld to increase the strength of the weld. However, no matter how it is handled, there is always a problem with the integral elastic centralizer produced by the coil welding: there is a potential weak strip at the weld, and there is a risk of cracking of the weld point under complicated downhole conditions, once the weld point Cracking will bring serious potential hazards to the next step. In addition, the existing integral elastic centralizer processing process makes the internal stress distribution of the centralizer uneven during the processing, which also causes the product performance to decline.
申请内容Application content
一种整体式弹性扶正器及弹性扶正器的制造方法,目的之一在于解决现有技术中整体式弹性扶正器存在焊缝薄弱条带的问题,同时改善弹性扶正器制造工艺,以提升其使用性能。One of the objects of the method for manufacturing the integral elastic centralizer and the elastic centralizer is to solve the problem that the integral elastic centralizer has a weak weld strip in the prior art, and at the same time improve the manufacturing process of the elastic centralizer to enhance its use. performance.
本申请采用如下技术方案:一种整体式弹性扶正器,包括圆管状的扶正器主体,所述扶正器主体的管壁上以轴线为中心环绕的设置数个相同尺寸的矩形 通孔,相邻的矩形通孔之间间距相同,相邻矩形通孔之间形成的竖直管壁为扶正条,所述扶正条向外拱起形成平滑的弧形。The present application adopts the following technical solution: an integral elastic centralizer comprising a circular tubular centralizer body, and a plurality of rectangular rectangles of the same size are arranged around the axis of the central wall of the centralizer body The through hole has the same spacing between the adjacent rectangular through holes, and the vertical pipe wall formed between the adjacent rectangular through holes is a righting strip, and the reinforcing strip is arched outward to form a smooth arc shape.
其中,所述扶正器主体由弹簧钢材质制成的无缝钢管。Wherein, the main body of the centralizer is made of spring steel material and seamless steel pipe.
其中,所述扶正条数量为3-8个。The number of the righting bars is 3-8.
一种弹性扶正器的制造方法,包括如下步骤:A method for manufacturing an elastic centralizer includes the following steps:
S101:提供无缝钢管,环绕所述无缝钢管管壁镂空冲压设置数个矩形通孔,要求相邻矩形通孔之间间距相同,相邻矩形通孔之间的管壁为扶正条;S101: providing a seamless steel pipe, and forming a plurality of rectangular through holes around the wall of the seamless steel pipe, requiring the same spacing between adjacent rectangular through holes, and the pipe wall between the adjacent rectangular through holes is a righting strip;
S102:常温状态下,对镂空冲压后的工件进行整型,使所述扶正条整体向外平滑拱起;S102: in normal temperature state, shaping the workpiece after the hollow stamping, so that the whole straightening strip is smoothly arched outward;
S103:对经过整型处理后的工件整体进行热处理。S103: heat-treating the entire workpiece after the finishing process.
其中,在步骤S101之前还包括步骤:对无缝钢管的内径、外径、端面平整度进行精加工。Wherein, before step S101, the method further comprises the steps of: finishing the inner diameter, the outer diameter, and the flatness of the end surface of the seamless steel pipe.
本申请的有益效果在于:The beneficial effects of the present application are:
1、真正一体式结构,无任何分离的组件或焊接部件、结构强度高、可靠性强,装置易于井下入位。1. The true integrated structure, without any separate components or welded parts, high structural strength, high reliability, and easy to place the device in the well.
2、可以适应更加严酷的工作环境,极大的减少了因扶正器失效导致的井下事故。2, can adapt to a more severe working environment, greatly reducing the underground accident caused by the failure of the centralizer.
3、扶正条弧度平滑,减少使用过程中的下入阻力,更利于套管管串的顺利下入。3. The arc of the righting strip is smooth, reducing the resistance to the running in the process, which is more conducive to the smooth entry of the casing string.
附图说明DRAWINGS
图1为本申请实施例的初始状态结构示意图;1 is a schematic structural diagram of an initial state of an embodiment of the present application;
图2为本申请实施例经步骤S101后结构示意图;2 is a schematic structural diagram of the embodiment of the present application after step S101;
图3为本申请实施例经步骤S102后结构示意图。FIG. 3 is a schematic structural diagram of the embodiment of the present application after step S102.
图中标号:Number in the figure:
1-扶正器主体 2-矩形通孔 3-扶正条。 1-Mainizer main body 2-rectangular through hole 3-righting strip.
具体实施方式detailed description
为使本申请的上述目的、特征和优点能够更加明显易懂,下面结合附图对本申请的具体实施方式做详细的说明。The specific embodiments of the present application will be described in detail below with reference to the accompanying drawings.
在下面的描述中阐述了很多具体细节以便于充分理解本申请,但是本申请还可以采用其他不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本申请内涵的情况下做类似推广,因此本申请不受下面公开的具体实施例的限制。In the following description, numerous specific details are set forth in order to facilitate a full understanding of the application, but the invention may be practiced in other ways than those described herein, and those skilled in the art can do without departing from the scope of the application. The invention is not limited by the specific embodiments disclosed below.
其次,本申请结合示意图进行详细描述,在详述本申请实施例时,为便于说明,表示装置结构的剖面图会不依一般比例作局部放大,而且所述示意图只是示例,其在此不应限制本申请保护的范围。此外,在实际制作中应包含长度、宽度及深度的三维空间尺寸。The present application is described in detail in conjunction with the drawings. In the detailed description of the embodiments of the present application, for the convenience of description, the sectional view of the structure of the device will not be partially enlarged, and the schematic is only an example, which should not be limited herein. The scope of protection of this application. In addition, the actual three-dimensional dimensions of length, width and depth should be included in the actual production.
参照图1-图3所示,本申请实施例提供一种整体式弹性扶正器,包括圆管状的扶正器主体1,所述扶正器主体1的管壁上以轴线为中心环绕的设置数个相同尺寸的矩形通孔2,相邻的矩形通孔2之间间距相同,相邻矩形通孔2之间形成的竖直管壁为扶正条3,所述扶正条3向外拱起形成平滑的弧形,由于弹性扶正器的工作环境特殊,所述扶正器主体1为由弹簧钢材制成的无缝钢管。Referring to FIG. 1 to FIG. 3, an embodiment of the present application provides an integral elastic centralizer comprising a circular tubular centralizer body 1 , and a plurality of circumferentially centered on the wall of the centralizer body 1 The rectangular through holes 2 of the same size have the same spacing between the adjacent rectangular through holes 2, and the vertical pipe wall formed between the adjacent rectangular through holes 2 is the righting strip 3, and the reinforcing strips 3 are outwardly arched to form a smooth shape. The arc shape is due to the special working environment of the elastic centralizer, and the centralizer body 1 is a seamless steel pipe made of spring steel.
优选的,所述扶正条数量为3-8个。Preferably, the number of the righting bars is 3-8.
参照图1-图3,本申请实施例提供的整体式弹性扶正器是通过下列步骤制成的:Referring to FIG. 1 to FIG. 3, the integral elastic centralizer provided by the embodiment of the present application is manufactured by the following steps:
S101:提供无缝钢管,环绕所述无缝钢管管壁镂空冲压设置数个矩形通孔,要求相邻矩形通孔之间间距相同,相邻矩形通孔之间的管壁为扶正条;S101: providing a seamless steel pipe, and forming a plurality of rectangular through holes around the wall of the seamless steel pipe, requiring the same spacing between adjacent rectangular through holes, and the pipe wall between the adjacent rectangular through holes is a righting strip;
S102:常温状态下,对镂空冲压后的工件进行整型,使所述扶正条整体向外平滑拱起;S102: in normal temperature state, shaping the workpiece after the hollow stamping, so that the whole straightening strip is smoothly arched outward;
S103:对经过整型处理后的工件整体进行热处理。S103: heat-treating the entire workpiece after the finishing process.
其中,优选的,在步骤S101前对无缝钢管进行精加工以满足内径、外经及端面平整度的工艺要求,经过精加工后的无缝钢管结构如图1所示。Wherein, preferably, the seamless steel pipe is finished before step S101 to meet the requirements of the inner diameter, the outer warp and the end surface flatness, and the seamless steel pipe structure after finishing is as shown in FIG. 1 .
首先,进行步骤S101,通过对无缝钢管管壁周向加工矩形通孔2,相邻矩 形通孔2之间的管壁即为扶正条3,根据扶正器尺寸、工艺及工作要求,扶正条数量可在3~8个之间变换,经过S101的镂空冲压工序后的结构如图2所示。First, in step S101, the rectangular through hole 2 is processed circumferentially on the wall of the seamless steel pipe, and the adjacent moment The pipe wall between the through holes 2 is the righting strip 3. According to the size, process and work requirements of the centralizer, the number of the righting bars can be changed between 3 and 8. The structure after the hollowing stamping process of S101 is shown in Fig. 2. Shown.
然后,进行步骤S102,即将镂空冲压后的无缝钢管在常温条件下进行整型,通过特殊模具,伸入钢管内部对扶正条3施加向外的作用力,同时在扶正条主体1的上端施加竖直向下的作用力,在扶正条主体1的下端施加竖直向上的作用力,使得扶正条3受挤压整体向外平滑拱起形成平滑的弓形,其中,扶正条3拱起的弧度可根据工艺所需来决定,整型完成的结构如图3所示。Then, step S102 is performed, that is, the seamless steel pipe after the hollow stamping is shaped under normal temperature conditions, and a special mold is inserted into the steel pipe to apply an outward force to the centering strip 3, and at the upper end of the main body 1 is applied. The vertical downward force exerts a vertical upward force on the lower end of the main body 1 so that the central strip 3 is smoothly arched outwardly to form a smooth arch shape, wherein the arc of the righting strip 3 is arched It can be determined according to the needs of the process, and the structure completed by the integer is shown in Figure 3.
最后,进行步骤S103,将加工好的工件整体进行热处理。Finally, step S103 is performed to heat-treat the processed workpiece as a whole.
本申请实施例提供的整体式弹性扶正器通体完全无任何薄弱点,相对传统的制作工艺制造的整体弹性扶正器,大大提高了结构强度,具有更高的产品可靠度。The integral elastic centralizer provided by the embodiment of the present application has no weak points at all, and the overall elastic centralizer manufactured by the traditional manufacturing process greatly improves the structural strength and has higher product reliability.
在以上的描述中阐述了很多具体细节以便于充分理解本申请。但是以上描述仅是本申请的较佳实施例而已,本申请能够以很多不同于此描述的其它方式来实施,因此本申请不受上面公开的具体实施的限制。同时任何熟悉本领域技术人员在不脱离本申请技术方案范围情况下,都可利用上述揭示的方法和技术内容对本申请技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例。凡是未脱离本申请技术方案的内容,依据本申请的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本申请技术方案保护的范围内。 Numerous specific details are set forth in the above description in order to provide a thorough understanding of the application. However, the above description is only a preferred embodiment of the present application, and the present application can be implemented in many other ways than the description, and thus the present application is not limited by the specific embodiments disclosed above. At the same time, any person skilled in the art can make many possible changes and modifications to the technical solutions of the present application by using the methods and technical contents disclosed above, or modify the equivalent implementation of equivalent changes without departing from the scope of the technical solutions of the present application. example. Any simple modifications, equivalent changes, and modifications made to the above embodiments in accordance with the technical spirit of the present application are still within the scope of the technical solutions of the present application.

Claims (5)

  1. 一种整体式弹性扶正器,包括圆管状的扶正器主体,所述扶正器主体的管壁上以轴线为中心环绕的设置数个相同尺寸的矩形通孔,相邻的矩形通孔之间间距相同,相邻矩形通孔之间形成的竖直管壁为扶正条,所述扶正条向外拱起形成平滑的弧形。An integral elastic centralizer comprising a circular tubular centralizer body, wherein a plurality of rectangular through holes of the same size are arranged around the axis of the central wall of the centralizer body, and the spacing between adjacent rectangular through holes Similarly, the vertical tube wall formed between the adjacent rectangular through holes is a righting strip, and the righting strip is arched outward to form a smooth curved shape.
  2. 如权利要求1所述的一种整体式弹性扶正器,其中,所述扶正器主体由弹簧钢材质制成的无缝钢管。The integral elastic centralizer according to claim 1, wherein the centralizer main body is a seamless steel pipe made of spring steel material.
  3. 如权利要求1所述的一种整体式弹性扶正器,其中,所述扶正条数量为3-8个。A one-piece elastic centralizer according to claim 1, wherein the number of the righting bars is 3-8.
  4. 一种弹性扶正器的制造方法,包括如下步骤:A method for manufacturing an elastic centralizer includes the following steps:
    S101:提供无缝钢管,环绕所述无缝钢管管壁镂空冲压设置数个矩形通孔,要求相邻矩形通孔之间间距相同,相邻矩形通孔之间的管壁为扶正条;S101: providing a seamless steel pipe, and forming a plurality of rectangular through holes around the wall of the seamless steel pipe, requiring the same spacing between adjacent rectangular through holes, and the pipe wall between the adjacent rectangular through holes is a righting strip;
    S102:常温状态下,对镂空冲压后的工件进行整型,使所述扶正条整体向外平滑拱起;S102: in normal temperature state, shaping the workpiece after the hollow stamping, so that the whole straightening strip is smoothly arched outward;
    S103:对经过整型处理后的工件整体进行热处理。S103: heat-treating the entire workpiece after the finishing process.
  5. 如权利要求4所述的一种弹性扶正器的制造方法,其中,在步骤S101之前还包括步骤:对无缝钢管的内径、外径、端面平整度进行精加工。 The method of manufacturing an elastic centralizer according to claim 4, further comprising the step of finishing the inner diameter, the outer diameter, and the end surface flatness of the seamless steel pipe before the step S101.
PCT/CN2014/095270 2014-12-29 2014-12-29 Integrated elastic centralizer and manufacturing method thereof WO2016106484A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/095270 WO2016106484A1 (en) 2014-12-29 2014-12-29 Integrated elastic centralizer and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/095270 WO2016106484A1 (en) 2014-12-29 2014-12-29 Integrated elastic centralizer and manufacturing method thereof

Publications (1)

Publication Number Publication Date
WO2016106484A1 true WO2016106484A1 (en) 2016-07-07

Family

ID=56283774

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/095270 WO2016106484A1 (en) 2014-12-29 2014-12-29 Integrated elastic centralizer and manufacturing method thereof

Country Status (1)

Country Link
WO (1) WO2016106484A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108161351A (en) * 2017-12-19 2018-06-15 西南石油大学 A kind of processing method of monoblock type oil pipe
CN113802997A (en) * 2020-06-12 2021-12-17 中国石油化工股份有限公司 Integral elastic centralizer and manufacturing method thereof
CN114799777A (en) * 2022-06-30 2022-07-29 成都航天万欣科技有限公司 Method for processing special-shaped long strip-shaped curved surface part

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009006528A1 (en) * 2007-07-02 2009-01-08 Davis-Lynch, Inc. Centering structure for tubular member and method of making same
US20110146971A1 (en) * 2007-05-16 2011-06-23 Frank's International, Inc. Low Clearance Centralizer and Method of Making Centralizer
CN203066894U (en) * 2013-01-08 2013-07-17 四川省贝特石油技术有限公司 Integrated elastic centering guide
CN203066893U (en) * 2013-01-08 2013-07-17 四川省贝特石油技术有限公司 Centering device for reaming well section
CN203114198U (en) * 2013-02-07 2013-08-07 陕西纽兰德实业有限公司 Arc rib elastic centralizer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110146971A1 (en) * 2007-05-16 2011-06-23 Frank's International, Inc. Low Clearance Centralizer and Method of Making Centralizer
WO2009006528A1 (en) * 2007-07-02 2009-01-08 Davis-Lynch, Inc. Centering structure for tubular member and method of making same
CN203066894U (en) * 2013-01-08 2013-07-17 四川省贝特石油技术有限公司 Integrated elastic centering guide
CN203066893U (en) * 2013-01-08 2013-07-17 四川省贝特石油技术有限公司 Centering device for reaming well section
CN203114198U (en) * 2013-02-07 2013-08-07 陕西纽兰德实业有限公司 Arc rib elastic centralizer

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108161351A (en) * 2017-12-19 2018-06-15 西南石油大学 A kind of processing method of monoblock type oil pipe
CN113802997A (en) * 2020-06-12 2021-12-17 中国石油化工股份有限公司 Integral elastic centralizer and manufacturing method thereof
CN114799777A (en) * 2022-06-30 2022-07-29 成都航天万欣科技有限公司 Method for processing special-shaped long strip-shaped curved surface part

Similar Documents

Publication Publication Date Title
WO2016106484A1 (en) Integrated elastic centralizer and manufacturing method thereof
US3312285A (en) Well pipe centralizer
CN104816076A (en) Tube-to-tube butt welding technological method of coiled tube
CA2792346A1 (en) Yieldable support prop and method
CN203847019U (en) Limiting type hydraulic casing pipe straightening tool
MY189438A (en) Annular barrier having a downhole expandable tubular
US20180305997A1 (en) Central shaft for bridge plug, bridge plug and setting method for the same
CN107597889A (en) A kind of semi-closed structure thin-wall barrel hot sizing device
CN104785650B (en) Expanding mechanism of expanding machine
CN206230084U (en) A kind of locating and clamping apparatus for steel pipe cutting
CN205422632U (en) Cage anchoring slips and packer slip mechanism
BR112012021887B1 (en) PROCESS FOR THE PRODUCTION OF A TOOL FOR HOT WORK
US20120306199A1 (en) Tubular component for hydrocarbon well exploration
CN209212192U (en) Underground deformed casing idler wheel reshaper
US8006770B2 (en) Expandable casing with enhanced collapse resistance and sealing capability
CN202951743U (en) Central push rod of anchor chain ring bending machine
CN206309331U (en) Casing hanger
CN109977561A (en) A kind of design method of asymmetric double step ring rolling blank dimension
CN104495534A (en) Pipe core skid resistance anchoring device for vertical wire wrapping machine for prestressed concrete cylinder pipe
CN205078192U (en) Oil drilling rod
CN105312848A (en) Forging method for double-arm hanging ring
CN205422568U (en) Sleeve pipe gyro wheel centralizer
CN203973073U (en) Mining hydraulic individual prop post friction welded joint alive structure
CN206604961U (en) One kind treats Coiling Welded Pipe edge palintrope frock
CN210358632U (en) Finishing equipment for roundness of pipe end of steel pipe

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14909297

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 14/12/2017)

122 Ep: pct application non-entry in european phase

Ref document number: 14909297

Country of ref document: EP

Kind code of ref document: A1