CN105722630B - The welded joint structure of thick-wall large-diameter pipe and its welding procedure method - Google Patents

The welded joint structure of thick-wall large-diameter pipe and its welding procedure method Download PDF

Info

Publication number
CN105722630B
CN105722630B CN201480062611.7A CN201480062611A CN105722630B CN 105722630 B CN105722630 B CN 105722630B CN 201480062611 A CN201480062611 A CN 201480062611A CN 105722630 B CN105722630 B CN 105722630B
Authority
CN
China
Prior art keywords
thick
diameter pipe
intermediate member
wall large
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201480062611.7A
Other languages
Chinese (zh)
Other versions
CN105722630A (en
Inventor
东海林刚
佐藤恭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Mitsubishi Hitachi Power Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Hitachi Power Systems Ltd filed Critical Mitsubishi Hitachi Power Systems Ltd
Publication of CN105722630A publication Critical patent/CN105722630A/en
Application granted granted Critical
Publication of CN105722630B publication Critical patent/CN105722630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C19/00Alloys based on nickel or cobalt
    • C22C19/03Alloys based on nickel or cobalt based on nickel
    • C22C19/05Alloys based on nickel or cobalt based on nickel with chromium
    • C22C19/051Alloys based on nickel or cobalt based on nickel with chromium and Mo or W
    • C22C19/053Alloys based on nickel or cobalt based on nickel with chromium and Mo or W with the maximum Cr content being at least 30% but less than 40%
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/04Component parts or details of steam boilers applicable to more than one kind or type of steam boiler and characterised by material, e.g. use of special steel alloy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/10Pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/08Non-ferrous metals or alloys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/18Dissimilar materials
    • B23K2103/26Alloys of Nickel and Cobalt and Chromium

Abstract

To by containing Cr in terms of weight %:20~35%, Mo:0.1~10%, Al:0.1~3%, Ti:0.11~3%, Ni:The intermediate member that the width that the Ni base system alloys of surplus are formed by a pair of of thick-wall large-diameter main pipe (1) and same material is about 60mm implements hot-working or cold working in advance respectively, after the range of part at least to becoming final weld part included in the scene for being provided with boiler implements solution treatment, it is finally welded between the intermediate member at the scene for being provided with boiler, the welded joint structure of the thick-wall large-diameter pipe of high reliability can be obtained by this method.

Description

The welded joint structure of thick-wall large-diameter pipe and its welding procedure method
Technical field
The present invention relates to a kind of welded joint structure of thick-wall large-diameter pipe and its welding method, the welderings of the thick-wall large-diameter pipe It connects joint structure to be formed by Ni base system alloys, is used for the ultra supercritical pressure of new generation that main steam temperature reaches 700 DEG C or so In header, main steam pipe and reheated steam pipe of the high-temperature portion of the main machine of electric equipment, i.e. boiler etc.;More particularly to When the scene for being provided with boiler does not have as manufacturing works large-scale Equipment for Heating Processing, the aforementioned scene for being provided with boiler into The welded joint structure and its welding procedure method of reheat crack(ing) are not likely to produce when the welding of the final weld part of row.
Background technology
In the high-temperature portion of aforementioned generating equipment boiler, heat-transfer pipe, piping use heat resisting steel mostly.Among these, collection The large-diameter pipes such as flow tube, main steam pipe and reheated steam pipe use always 2.25~11%Cr series heat-resistant steels.In recent years, exist Under the background for inhibiting carbon dioxide discharge, especially in coal-fired steam power plant, constantly carried to improve generating efficiency The temperature for the steam that height generates in aforementioned boiler, now, what is operated is that the coal-fired firepower that main steam temperature is 600 DEG C is sent out Electric equipment.
In addition, for the purpose for further increasing generating efficiency, the generating equipment that main steam temperature is 700 DEG C is being carried out Exploitation.In the high-temperature area of such vapor (steam) temperature, existing heat resisting steel in terms of intensity and corrosion resistance there are problem, It can not use, therefore, it is necessary to use solution strengthening type or the Ni base system alloys of the high intensity of precipitation strength type.
In the boiler for the generating equipment for being 700 DEG C for aforementioned main steam temperature by the Ni base system alloys of these high intensity When, it is ensured using carrying out quenched to the metal structure of Ni base system alloys using strengthening mechanisms such as solution strengthening, precipitation strengths The material of elevated temperature strength, but when for actual machine, due to the analysis in metallic crystal (sometimes referred to simply as following crystallize) crystal grain Go out hardening constituent, to which the intensity in crystal grain becomes higher than the intensity of crystal boundary.Therefore, creep is easy to concentrate on crystal boundary, with existing material Material is compared, and the sensibility of reheat crack(ing) caused by thermal cycle when for by welding is got higher sometimes.
In addition, in the header of the high-temperature portion of the boiler of aforementioned generating equipment, main steam pipe and reheated steam pipe etc. The Ni based alloys of the aforementioned high intensity used are the thick-wall large-diameter pipe of such as wall thickness 20mm or more, diameter 165.2mm or more, but preceding Header, main steam pipe and reheated steam pipe etc. is stated to use with several meters~tens of meters of length.It should be noted that In the main steam pipe of the high-temperature portion of the boiler of the mounted generating equipment using current material, reheated steam pipe, using straight The steam pipe of diameter 500,600mm or larger diameter.
As aforementioned high intensity Ni base system alloys, there are the Alloy617 (52Ni-22Cr-13Co- of such as solution strengthening type Alloy263 (50Ni-20Cr-20Co-6Mo-2Ti-Al), the Alloy740 (50Ni- of 9Mo-Ti-1Al, precipitation strength type 25Cr-20Co-2Nb-2Ti-Al)。
In the process that these alloys are made to the wall thickness large-diameter pipe of such as wall thickness 20mm or more, outer diameter 165.2mm or more, The ingot casting for obtaining target product length, wall thickness is manufactured first, is then fully processed using applications such as forgings and is gradually produced Product size, aforementioned high intensity Ni base system alloys are high-strength alloy, therefore are difficult under the usual manufacturing capacity of material producer The product of long size is produced, such as it is 3m products below to be generally up to about energy factory length, therefore, degree of finish becomes to compare It is small.It should be noted that degree of finish is the final length of original length before the processing indicated by aforementioned ingot casting, thickness to product It spends, the index of the deflection of thickness.
In general, having the tendency that the degree of finish the big more easily becomes sappy structure, recrystallization temperature is lower.Before manufacture When stating the thick-wall large-diameter pipe of high intensity Ni base system alloys, size of microcrystal becomes such as 200~300 μm of thicker coarse grain.To The thick-wall large-diameter pipe of material producer manufacture is bought by boiler producer, and size of microcrystal when boiler producer buys is as previously described for for example 200~300 μm of thicker coarse grain.
At the position for concentrating such high intensity Ni base system alloys for structure upper stress, due to coarsening crystal grain Ductility and toughness reduce, be initially generated at fine crack at crystal grain boundary propagate needed for limit stress reduce, to It is easy to propagate fine crack under smaller stress.
There are the welderings at multiple positions in the thick-wall large-diameter pipe used as main steam pipe, reheated steam pipe especially in boiler There is the welding heat affected zone for bearing to weld caused thermal cycle, but this near the weld part of aforementioned welding point in connector The crystal grain at place coarsening more than non-solder portion, and then also it is noted following problem:Due to there is residual stress when welding, because The risk (Port テ Application シ ヤ Le) that reheat crack(ing) occurs in this is high.
Fig. 3 is shown in the weldering for being provided with the site operation of the boiler of aforementioned thick-wall large-diameter pipe (such as Alloy617) and being formed The imaginary drawing of the issuable reheat crack(ing) of heat affected zone of socket part.The weldering of thick-wall large-diameter pipe 1 will be included shown in Fig. 3 (A) The amplification of sectional view near the weld part of socket part 2 is illustrated in Fig. 3 (B).
In Fig. 3, in the state of heat treatment after welding, bent with material since the inner face side in weld part 2 exists The heat affected zone 3 for taking the residual stress of the comparable stretching of stress and being generated due to being welded is than basic stitch coarse Tissue, weld part 2 easy tos produce reheat crack(ing) 4 made of the construction at the scene of thick-wall large-diameter pipe 1,1.
In order to avoid reheat crack(ing) 4 shown in Fig. 3 (B), in addition in weld part and including welding heat affected model after welding It encloses other than reduction of the heat treatment to seek the stress of weld part 2 after interior welded, it is expected that being improved as follows:Make weld part And the size of microcrystal grain refined of the thick-wall large-diameter pipe 1 comprising welding heat affected range.But aforementioned high intensity Ni base system alloys Thick-wall large-diameter pipe 1,1 to be bought from material producer when the tissue of state use, therefore size of microcrystal is larger, for for example 200~300 μm, in turn, coarsening progress occurs for the welding heat affected zone of final weld part, although can reduce welding in reality The stress in portion 2, but size of microcrystal is almost unchanged.
In addition, thick-wall large-diameter pipe (the hereinafter sometimes referred to installing pipe used in actual machine.) weld part, sweating heat When generating reheat crack(ing) in the range of to a certain degree of influence portion will include usually the part in bad portion caused by crackle After removal, use same material prepare as green wood short tube, be provided with boiler scene by welding will install material and newly Material connects.For example, using long tube necessary length is cut into and the new pipe that makes is as aforementioned short tube.
In order to remove the residual stress after welding to the weld part and welding heat affected zone of aforementioned installing pipe and short tube, It needs to carry out solution treatment or Stabilizing Heat Treatment.The material of these thick-wall large-diameter pipes formed by the Ni base system alloys of high intensity The solid solution temperature of itself is very high at 1200 DEG C or so, in turn, in order to make material entirety thermally equivalent, heating and cooling When temperature gradient be restricted, the retention time must also be set as such as 1 hour or so, thus for carry out solution treatment and Speech, needs the long period.In addition, although Stabilizing Heat Treatment is lower than aforementioned solid solution temperature, it also requires being 900 DEG C or more High temperature, the retention time needs to be set as time longer than the solution treatment time (such as needing 1 hour per 25mm wall thickness).
For such heat treatment condition, the operation that actually carries out be technically difficulty is high, in terms of operating environment with The operation of difficulty.For example, actual heat treatment operation position is mostly the higher position of boiler, therefore need to take foot certainly Enough Security Countermeasures, and due to the heat treatment for extreme high-temperature, in the setting place of heating power supply, the heating wires There is limitation in terms of length, in turn, needs to match to be ready for use on to keep sufficient thermal insulating material of high temperature etc. for a long time.To not have In the welding at the scene of the setting boiler of standby necessary Equipment for Heating Processing, it is expected that by under the high temperature such as solution treatment, stabilization processes The number being heat-treated for a long time is set as enough and minimum numbers.
Present applicant has proposed the patented inventions for being related to following welding method:In order to prevent boiler stainless steel tube (but Aforementioned high intensity Ni base systems alloy) material year in year out new weld part reheat crack(ing), by the conduct of length 20mm or more The short tube of green wood is respectively welded at the weld part of material year in year out, the pipe inner face side progress grinding or smooth or right to weld part Weld part is implemented, for the annealing except destressing, to weld between green wood, to reduce the residual stress (patent document of weld part 1)。
Existing technical literature
Patent document
Patent document 1:No. 4303159 bulletins of Japanese Patent No.
Invention content
The subject that the invention solves
It (52Ni-22Cr-13Co-9Mo-Ti-1Al, is precipitated by force in aforementioned high intensity Ni base systems alloy, such as Alloy617 Alloy263 (50Ni-20Cr-20Co-6Mo-2Ti-Al), the Alloy740 (50Ni-25Cr-20Co-2Nb-2Ti-Al) of change type In the case of, as described above, manufactured thick-wall large-diameter pipe size of microcrystal occur coarse, especially aforementioned size of microcrystal by Heat when welding influences and further coarsening.Will be between the thick-wall large-diameter pipe of such aforementioned high intensity Ni base system alloys When as final weld part, know:The tissue of state when due to being bought from material producer uses, size of microcrystal compared with Greatly, it is such as 200~300 μm, in turn, the welding heat affected zone coarsening of final weld part is in progress, although passing through welding High temperature afterwards, prolonged heat treatment can reduce the stress of weld part, but size of microcrystal is almost unchanged, generates reheat crack(ing) Risk becomes larger.
In addition, being produced in the installing pipe used in actual machine near the weld part or weld part of crackle Welding heat affected zone when being repaired, the joint structure for needing the generation risk that reheat crack(ing) is made small.
Problem of the present invention is that provide the thick-wall large-diameter pipe for preventing the Ni base system alloys by high intensity from being formed, The welded joint structure and welding procedure method of the reheat crack(ing) easy tod produce at the weld part that boiler setting is formed in situ.
Means for solving the problems
For the above subject of the present invention, field welding joints structure and the welding procedure side of a kind of high reliability are provided Method.
Invention described in scheme 1 is a kind of welded joint structure of thick-wall large-diameter pipe, which is characterized in that by following Ni base system alloys be formed by a pair of of wall thickness be 20mm or more, a diameter of 165.2mm or more thick-wall large-diameter pipe main body (1) and with Thick-wall large-diameter pipe main body (1) same material and compared to the thick-wall large-diameter pipe main body (1) be short tube intermediate member (5) Implement the mechanical processing comprising hot-working or cold working in advance and make, at least to becoming most included in the scene for being provided with boiler After the range of the part of whole weld part implements solution treatment, it will be arranged between the end of aforementioned a pair of of intermediate member (5,5) side There is the scene of boiler finally to be welded and obtained, the Ni base systems alloy contains Cr in terms of weight %:20~35%, Mo:0.1 ~10%, A1:0.1~3%, Ti:0.1~3%, Ni:Surplus, the intermediate member (5) and the thick-wall large-diameter pipe main body (1) It compares, degree of finish is high and by grain refined.
Invention described in scheme 2 is the welded joint structure of the thick-wall large-diameter pipe according to scheme 1, which is characterized in that Implement solution treatment, included in be provided with boiler scene become final weld part part ranging from include by heavy wall it is big The overall length of intermediate member (5) after diameter pipe main body (1) and intermediate member (5) welding and the weldering with thick-wall large-diameter pipe main body (1) The range of socket part.
Invention described in scheme 3 is the welded joint structure of the thick-wall large-diameter pipe according to scheme 1, which is characterized in that Implement solution treatment, included in be provided with boiler scene become final weld part part ranging from intermediate member (5) Entirety, after the whole implementation solution treatment of the intermediate member (5), by thick-wall large-diameter pipe main body (1) and intermediate member (5) Welding, in order to remove or mitigate residual stress when welding, to the weldering comprising thick-wall large-diameter pipe main body (1) and intermediate member (5) The range of socket part implements solution treatment or implements the heat treatment carried out at a temperature of less than the solid solution temperature, then will It is finally welded at boiler setting scene between the end of a pair of of intermediate member (5,5) side, to obtain.
Invention described in scheme 4 is a kind of welding procedure method of thick-wall large-diameter pipe, which is characterized in that by following Ni Base system alloy be formed by a pair of of wall thickness be 20mm or more, the thick-wall large-diameter pipe main body of a diameter of 165.2mm or more (1) and with institute State thick-wall large-diameter pipe main body (1) same material and pre- compared to the intermediate member (5) that the thick-wall large-diameter pipe main body (1) is short tube First implement the mechanical processing comprising hot-working or cold working and make, at least to becoming final included in the scene for being provided with boiler After the range of the part of weld part implements solution treatment, boiler will be provided between aforementioned a pair of of intermediate member (5,5) side It is finally welded at scene.Contain Cr in terms of weight %:20~35%, Mo:0.1~10%, Al:0.1~3%, Ti:0.1~ 3%, Ni:Surplus, for the intermediate member (5) compared with the thick-wall large-diameter pipe main body (1), degree of finish is high and by grain refined.
Invention described in scheme 5 is the welding procedure method of the thick-wall large-diameter pipe according to scheme 4, which is characterized in that Implement solution treatment, included in be provided with boiler scene become final weld part part ranging from include by heavy wall it is big The overall length of intermediate member (5) after diameter pipe main body (1) and intermediate member (5) welding and the weldering with thick-wall large-diameter pipe main body (1) The range of socket part.
Invention described in scheme 6 is the welding procedure method of the thick-wall large-diameter pipe according to scheme 4, which is characterized in that Implement solution treatment, included in be provided with boiler scene become final weld part part ranging from intermediate member (5) Entirety, after the whole implementation solution treatment of aforementioned intermediate member (5), by thick-wall large-diameter pipe main body (1) and intermediate member (5) Welding, in order to remove or mitigate residual stress when welding, to the weldering comprising thick-wall large-diameter pipe main body (1) and intermediate member (5) After the range of socket part implements solution treatment or implements the heat treatment carried out at a temperature of less than the solid solution temperature, by one It is finally welded at boiler setting scene between the end of intermediate member (5,5) side.
The effect of invention
Invention described in scheme 1,4 according to the present invention, a new generation to reaching 700 DEG C for main steam temperature is super to face Header, main steam pipe and the reheated steam pipe of boundary's pressure electric equipment formed by high intensity Ni base system alloys etc., metal The welding point formed at the scene for organizing the thick-wall large-diameter pipe 1 being made of coarse grain structure, uses advance with same material A pair of of the intermediate member 5,5 implemented the mechanical processing comprising hot-working or cold working and made, to aforementioned intermediate member 5,5 After the range implementation solution treatment for the part for becoming final weld part at the scene for being provided with boiler, by aforementioned centre It is finally welded between component 5, the generation of reheat crack(ing) can be prevented, and can scene be set in boiler and be easy to carry out welding Operation.
It should be noted that the thick-wall large-diameter pipes such as the header used in boiler, main steam pipe and reheated steam pipe (sometimes referred to as installing pipe) 1 leads to that degree of finish is low, forms coarse grain structure due to the manufacturing capacity of material producer, and intermediate structure Part 5 is comparably thinner particulate due to that can obtain high degree of finish for short tube, with aforementioned installing pipe 1, and being capable of shape At Deformation structure, in turn, by solution treatment, Aforesaid deformation has organized the formation of thinner sappy structure, thus in the foregoing between After being welded between component 5, reheat crack(ing) will not be generated being heat-treated.
According to the invention described in scheme 2,5, other than the The effect of invention described in scheme 1,4, by by aforementioned centre The length of component 5 is set as carrying out solution treatment to the weld part of comprising 5 overall length of intermediate member and 1 side of installing pipe at the scene Length, aforementioned intermediate member 5 is welded to aforementioned thick-wall large-diameter pipe 1, then aforementioned range carry out solution treatment, so as to So that aforementioned intermediate member 5 is generated sappy structure, is heat-treated even if the final weld part not between aforementioned intermediate member 5 Not will produce reheat crack(ing), it can be achieved that welded reliability raising.
According to the invention described in scheme 3,6, other than the The effect of invention described in scheme 1,4, due in advance to aforementioned Intermediate member 5 is whole to be dissolved, therefore grain refined tissue is generated in 5 entirety of intermediate member, even if being provided with showing for boiler Final weld part of the field not between aforementioned intermediate member 5 is heat-treated, and will not generate reheat crack(ing), it can be achieved that welding knot The raising of the reliability of structure.In turn, it by the aforementioned thick-wall large-diameter pipe 1 of last stage and can also have passed through in aforementioned solution treatment Between component 5 weld after heat treatment be set below under solid solution temperature, main purpose be reduction residual stress it is steady Fixedization is heat-treated.By being set as aforementioned Stabilizing Heat Treatment, compared with the case where carrying out solution treatment, thick-wall large-diameter can be reduced The coarse grains of the welding heat affected zone of 5 side of aforementioned intermediate member of pipe 1.
Description of the drawings
Fig. 1 is the welded joint structure and welding procedure method for the Ni base system alloy thick-wall large-diameter pipes for showing embodiment 1 Figure.
Fig. 2 is the welded joint structure and welding procedure method for the Ni base system alloy thick-wall large-diameter pipes for showing embodiment 2 Figure.
Fig. 3 is the welded joint structure and welding procedure method for illustrating Ni base systems alloy thick-wall large-diameter pipe in the prior art The problem of figure.
Specific implementation mode
The embodiment of the present invention is illustrated together with attached drawing below.
It should be noted that Fig. 1 and embodiment shown in Fig. 2 are in the case of novel setting and to having used Structure repaired in the case of can adapt to.
Embodiment 1
Fig. 1 be illustrate that the present embodiment, as capital equipment, the i.e. pot in ultra supercritical pressure electric equipment of new generation The welded joint structure of thick-wall large-diameter pipe in stove and welding procedure method, the pipe weld part construction until final welding The figure of situation.
First, as shown in Fig. 1 (A), to by Ni base system alloys (Alloy617;52Ni-22Cr-13Co-9Mo-Ti-1Al) The thick-wall large-diameter pipe 1,1 that a pair of of wall thickness is formed by as 20mm, a diameter of 165.2mm, length 3m is respectively welded by material producer The wall thickness formed by same material made is the intermediate member (short tube) 5,5 of 20mm, a diameter of 165.2mm, length 150mm.
It should be noted that being obtained as follows in steel pipe manufacturing firm of the aforementioned thick-wall large-diameter pipe 1 in material producer:By casting The cylinder of major diameter is made to be hot-forged for ingot, and the processing such as hot extrusion, drawing is carried out to it and forms long cylindrical shape, last profit It is machined into and the surfaces externally and internally of oxidation is cut, be refined to design size.It should be noted that the pipe that diameter is smaller Sometimes it is manufactured also by cold working.To which the degree of finish of the aforementioned thick-wall large-diameter pipe 1 of making is relatively low, and size of microcrystal compares Slightly, it is 200 μm~300 μm.
In addition, aforementioned intermediate member 5 can also be manufactured in previous materials producer, in order to improve degree of finish and shape in the present invention At Deformation structure, made by hot forging or cold forging in forging producer.First, length and shape are gone out by forging and molding, it is interior Processing is formed to make by reaming in diameter.With following feature:Size of microcrystal is 100 μm~200 μm, with aforementioned heavy wall Large-diameter pipe 1 is comparably particulate, but is the Deformation structure with multiple sliding surfaces in crystal grain.
Then, at least will include whole aforementioned intermediate member 5 and aforementioned thick-wall large-diameter pipe 1 and preceding as shown in Fig. 1 (B) The range for stating the weld part 6 of intermediate member 5 implements the solution treatment of stipulated time at a temperature of 1175 ± 20 DEG C of holding, to Deformation structure's grain refined of intermediate member 5 can be made to 100 μm hereinafter, the residual stress of weld part 6 can be removed simultaneously, thus The sensibility of reheat crack(ing) can be reduced.It should be noted that the aforementioned retention time is such as 1 hour or so, need for should Time obtained by time is added with the time needed for heating and cooling.
In addition, as the Ni base system alloys used in the embodiment of the present invention, in addition to above-mentioned Alloy617 (52Ni-22Cr- Other than 13Co-9Mo-Ti-1Al), Alloy263 (50Ni-20Cr-20Co-6Mo-2Ti-Al) or Alloy740 can also be used The Ni such as (50Ni-25Cr-20Co-2Nb-2Ti-Al) base system alloys.
It should be noted that closing the length (L) of the intermediate member 5 being made of short tube in an embodiment of the present invention, examine Consider range thermally influenced when weld part width and the welding of the final weld part in boiler setting scene, is narrow at the former In the case of the multiple-bead deposit of groove, the width of the end layer of an intermediate member 5 is about 10mm, and the latter is about 2.5 times, is located at The width of the end layer of the weld part 6 of an intermediate member 5 thereon is about 10mm, is set as three's addition, i.e. 10+25+10 =45mm or more.
In addition, the upper limit of the length of intermediate member 5 in an embodiment of the present invention is closed, firstly, it is necessary to be set as forging Producer can get the upper length limit of larger degree of finish when making, in turn, need for can to comprising 5 overall length of aforementioned intermediate member and The length of solution treatment is carried out with the range of the weld part of 1 main body of aforementioned thick-wall large-diameter pipe.If as described above, for by aforementioned heavy wall 1 main body of large-diameter pipe is endowed the intermediate member 5 of larger degree of finish (such as 20% or more), then is generated again by above-mentioned solution treatment Crystallization forms the sappy structure for being not likely to produce reheat crack(ing).
It should be noted that, although be limited to obtain the length of the whole degree of finish of intermediate member 5, but in new production, When the workshop with large-scale Equipment for Heating Processing carries out the solution treatment of Fig. 1 (B), intermediate member 5 can be set as longer.This Outside, in the case where aforementioned thick-wall large-diameter pipe 1 is installing pipe, then can be dissolved in the environment of being restricted at the scene The length of processing.
Then, it as shown in Fig. 1 (C), will be carried out finally in the scene for being provided with boiler between intermediate member 5,5 finally When welding forms weld part 7 and connects, since intermediate member 5 is sappy structure, even if without high temperature such as solution treatment Stress removal heat treatment, the sensibility of reheat crack(ing) are also low.
To which the present embodiment can be real in the boiler plant manufacturing works for having Equipment for Heating Processing or boiler setting scene The stage of Fig. 1 (A) and Fig. 1 (B) are applied, finally, the final welding that scene carries out the stage of Fig. 1 (C) is set in boiler.
Embodiment 2
Fig. 2 is the boiler of capital equipment as ultra supercritical pressure electric equipment of new generation that is illustrating that the present embodiment In thick-wall large-diameter pipe welded joint structure and welding procedure method, the pipe weld part construction shape until final welding The figure of condition.
First, as shown in Fig. 2 (A) and (C), a pair of of wall thickness 20mm, straight is formed by Ni base systems alloy (Alloy617) Diameter 165.2mm, the thick-wall large-diameter pipe 1,1 (with reference to Fig. 2 (C)) of length 3m and the wall thickness 20mm, the diameter that are formed by same material The intermediate member 5 of 165.2mm, length 250mm, similarly to Example 1 in order to improve degree of finish, formed Deformation structure and forging Producer is made by hot forging or cold forging to be made.First, length and shape are gone out by forging and molding, internal diameter is carried out by reaming Forming is to make.With following feature:Size of microcrystal is 100 μm~200 μm, is 200 μm~300 μm with size of microcrystal The aforementioned thick-wall large-diameter pipe 1 of thicker coarse grain be comparably particulate, but be the Deformation structure with multiple sliding surfaces in crystal grain. It is identical when the lower limit of the length of aforementioned intermediate member, the upper limit are with Fig. 1.
Then, whole to the intermediate member 5 being made of Deformation structure shown in Fig. 2 above-mentioned (A) to have hot place in advance The boiler plant manufacturing works for managing equipment implement solution treatment, to make intermediate member 5 integrally become as shown in Fig. 2 (B) Sappy structure.It should be noted that if having Equipment for Heating Processing, then also can solution heat treatment be carried out in place at the scene.Make It, can be by the solution treatment of implementation stipulated time at a temperature of 1175 ± 20 DEG C of holding, thus will for aforementioned solution treatment Deformation structure's grain refined of intermediate member 5 is to 100 μm or less.
Then, similarly to Example 1 that thick-wall large-diameter pipe 1,1 is short with the conduct of solution treatment as Fig. 2 (C) The intermediate member 5,5 of pipe is welded in weld part 6,6 respectively, as shown in Fig. 2 (D), with thick-wall large-diameter pipe 1,1 and intermediate member 5,5 Each weld part 6,6 or so centered on carry out solution treatment or Stabilizing Heat Treatment.
When carrying out solution treatment as aforementioned heat treatment, due to making intermediate member by the solution treatment of Fig. 2 (B) 5 entirety becomes sappy structure, thus while including 1 side of thick-wall large-diameter pipe after thick-wall large-diameter pipe 1 and intermediate member 5 weld Weld part 6 in the range of size of microcrystal coarsening also occurs, but include the crystal grain of the range of the weld part 6 of 5 side of intermediate member Grain size will not coarsening.Due to the residual stress after the welding of the range comprising aforementioned weld part by solution treatment by except It goes, therefore the problem of also reheat crack(ing) is not present in the coarsening portion of the size of microcrystal of 1 side of aforementioned thick-wall large-diameter pipe.
In addition, on the basis of the residual stress of range of the removal comprising aforementioned weld part, it is aforementioned in order to prevent to include thickness Size of microcrystal coarsening in the range of the weld part of 1 side of wall large-diameter pipe, thus it is possible to vary solution treatment and carry out stabilizing hot place Reason.Aforementioned Stabilizing Heat Treatment such as 900 DEG C or more, i.e. be less than solution treatment temperature carry out, therefore can prevent include The size of microcrystal coarsening of the range of the weld part of 1 side of thick-wall large-diameter pipe.
The heat treatment of Fig. 2 (D) also can with Fig. 1 (B) the case where in the same manner as with large-scale Equipment for Heating Processing factory or Scene carries out, in the present embodiment, need not be in 1 side of thick-wall large-diameter pipe since the grain refined of intermediate member has been carried out Weld part comprising intermediate member 5 integrally carry out solution treatment, including a part carries out, in aforementioned thick-wall large-diameter pipe In the case that 1 is installing pipe, when in the environment restricted at the scene whole to intermediate member 5 solution treatment can not be carried out Also the structure that can be used.
The residual stress when purpose of the solution treatment or Stabilizing Heat Treatment is to remove the welding of weld part 6,6.This Outside, the length about intermediate member 5 is dissolved to whole due to first passing through Fig. 2 (B) in advance, can be set as than implementing The length of the intermediate member 5 of example 1 is longer, is set as 250mm here, unlike the case where embodiment 1, is being difficult to pass through Fig. 1 (C) construction, which integrally carries out intermediate member the case where solution processing, inferior can also implement.
Finally, as shown in Fig. 2 (E), weld part 7 is formed by being welded at the scene between the intermediate member 5,5 for sappy structure, To obtain the improvement of reheat cracking susceptibility in the same manner as the joint structure of embodiment 1.
To which the present embodiment can be real in the boiler plant manufacturing works for having Equipment for Heating Processing or boiler setting scene The stage of Fig. 2 (D) is applied, the final welding that scene carries out the stage of Fig. 2 (E) finally is set in boiler.
Symbol description
1 thick-wall large-diameter pipe main pipe
Weld part between 2 main pipes
The heat affected zone of weld part between 3 main pipes
4 reheat crack(ing)s
5 intermediate members
The weld part of 6 intermediate members and thick-wall large-diameter pipe main pipe
Weld part between 7 intermediate members

Claims (6)

1. a kind of welded joint structure of thick-wall large-diameter pipe, which is characterized in that
To being formed by a pair of thickness that there is wall thickness for 20mm or more, a diameter of 165.2mm or more by following Ni base system alloys Wall large-diameter pipe main body (1) and with thick-wall large-diameter pipe main body (1) same material and compared to the thick-wall large-diameter pipe main body (1) It is made for advance mechanical processing of the implementation comprising hot-working or cold working of component of the intermediate member (5) of short tube, at least to packet It is contained in the range implementation solution treatment for being provided with the scene of boiler as the part of final weld part, then by a pair of component Intermediate member (5,5) side end between finally welded and obtained at the scene for being provided with boiler, wherein the Ni bases It is that alloy contains Cr in terms of weight %:20~35%, Mo:0.1~10%, Al:0.1~3%, Ti:0.1~3%, Ni:Surplus, For the intermediate member (5) compared with the thick-wall large-diameter pipe main body (1), degree of finish is high and by grain refined.
2. the welded joint structure of thick-wall large-diameter pipe according to claim 1, which is characterized in that implement solution treatment, Included in be provided with boiler scene become final weld part part ranging from include by thick-wall large-diameter pipe main body (1) and in Between intermediate member (5) after component (5) welding overall length and range with the weld part of thick-wall large-diameter pipe main body (1).
3. the welded joint structure of thick-wall large-diameter pipe according to claim 1, which is characterized in that
Implement solution treatment, included in be provided with boiler scene become final weld part part ranging from intermediate member (5) entirety,
After the whole implementation solution treatment of the intermediate member (5), thick-wall large-diameter pipe main body (1) and intermediate member (5) are welded It connects, in order to remove or mitigate residual stress when welding, to the welding comprising thick-wall large-diameter pipe main body (1) and intermediate member (5) The range in portion implements solution treatment or implements the heat treatment carried out at a temperature of less than the solid solution temperature, then by one It is finally welded at boiler setting scene between the end of intermediate member (5,5) side of the component, to obtain.
4. a kind of welding procedure method of thick-wall large-diameter pipe, which is characterized in that being formed by one by following Ni base system alloys To with wall thickness be 20mm or more, a diameter of 165.2mm or more thick-wall large-diameter pipe main body (1) and with the thick-wall large-diameter pipe master Body (1) same material and implement to wrap in advance compared to the component of intermediate member (5) that the thick-wall large-diameter pipe main body (1) is short tube Mechanical processing containing hot-working or cold working and make, at least to becoming final weld part included in the scene for being provided with boiler Partial range implements solution treatment, then will be provided with boiler between intermediate member (5,5) side of a pair of component It is finally welded at scene, wherein the Ni base systems alloy contains Cr in terms of weight %:20~35%, Mo:0.1~10%, Al:0.1~3%, Ti:0.1~3%, Ni:Surplus, the intermediate member (5) add compared with the thick-wall large-diameter pipe main body (1) Work degree is high and by grain refined.
5. the welding procedure method of thick-wall large-diameter pipe according to claim 4, which is characterized in that implement solution treatment, Included in be provided with boiler scene become final weld part part ranging from include by thick-wall large-diameter pipe main body (1) and in Between intermediate member (5) after component (5) welding overall length and range with the weld part of thick-wall large-diameter pipe main body (1).
6. the welding procedure method of thick-wall large-diameter pipe according to claim 4, which is characterized in that implement solution treatment, Become the entirety of the ranging from intermediate member (5) of the part of final weld part included in the scene for being provided with boiler,
After the whole implementation solution treatment of the intermediate member (5), thick-wall large-diameter pipe main body (1) and intermediate member (5) are welded It connects, in order to remove or mitigate residual stress when welding, to the welding comprising thick-wall large-diameter pipe main body (1) and intermediate member (5) The range in portion implements solution treatment or implements the heat treatment carried out at a temperature of less than the solid solution temperature, then by one It is finally welded at boiler setting scene between the end of intermediate member (5,5) side of the component.
CN201480062611.7A 2013-11-19 2014-11-17 The welded joint structure of thick-wall large-diameter pipe and its welding procedure method Active CN105722630B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2013-238842 2013-11-19
JP2013238842A JP6118714B2 (en) 2013-11-19 2013-11-19 Welded joint structure of thick-walled large-diameter pipe and its welding method
PCT/JP2014/080339 WO2015076218A1 (en) 2013-11-19 2014-11-17 Welded-joint structure in thick-walled large-diameter pipe, and welding method therefor

Publications (2)

Publication Number Publication Date
CN105722630A CN105722630A (en) 2016-06-29
CN105722630B true CN105722630B (en) 2018-10-23

Family

ID=53179481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480062611.7A Active CN105722630B (en) 2013-11-19 2014-11-17 The welded joint structure of thick-wall large-diameter pipe and its welding procedure method

Country Status (3)

Country Link
JP (1) JP6118714B2 (en)
CN (1) CN105722630B (en)
WO (1) WO2015076218A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107116361B (en) * 2017-04-25 2019-03-15 中国化学工程第三建设有限公司 The pressure testing of Steam Turbine jet chimney entirety, whole Stressless Pipeline Connection construction method
CN110883504B (en) * 2018-09-11 2021-03-26 中国石化工程建设有限公司 Method for welding and stabilizing heat treatment steel pipe
CN112475554A (en) * 2020-11-13 2021-03-12 东方电气集团东方锅炉股份有限公司 Welding process of dissimilar aging strengthening alloy pipe for 700-DEG C grade boiler

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101772586A (en) * 2008-06-18 2010-07-07 三菱重工业株式会社 Ni-base alloy-high chromium steel structure and process for producing the ni-base alloy-high chromium steel structure
CN101784685A (en) * 2007-08-31 2010-07-21 日立金属株式会社 Low-thermal-expansion ni-based super-heat-resistant alloy for boiler and having excellent high-temperature strength, and boiler component and boiler component production method using the same
CN202203922U (en) * 2011-08-08 2012-04-25 扬州安泰威合金硬面科技有限公司 Easily-welded boiler tube
CN102953760A (en) * 2011-08-23 2013-03-06 株式会社日立制作所 Ni-base alloy large member, ni-base alloy welded structure made of same, and method for manufacturing structure thereof
CN103060616A (en) * 2012-12-25 2013-04-24 钢铁研究总院 Nickel-base heat-resisting alloy

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05212538A (en) * 1992-02-04 1993-08-24 Nippon Steel Corp Steel tube for contact weld
JP4411114B2 (en) * 2004-03-24 2010-02-10 第一高周波工業株式会社 Alloy-coated boiler parts and welding methods for self-fluxing alloy-coated boiler parts
JP5203064B2 (en) * 2008-06-24 2013-06-05 バブコック日立株式会社 Welded structure of heat transfer tube made of header and nickel base alloy
JP6034041B2 (en) * 2012-04-10 2016-11-30 三菱日立パワーシステムズ株式会社 High-temperature piping and its manufacturing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101784685A (en) * 2007-08-31 2010-07-21 日立金属株式会社 Low-thermal-expansion ni-based super-heat-resistant alloy for boiler and having excellent high-temperature strength, and boiler component and boiler component production method using the same
CN102296209A (en) * 2007-08-31 2011-12-28 日立金属株式会社 Boiler piping and supercritical pressure boiler
CN101772586A (en) * 2008-06-18 2010-07-07 三菱重工业株式会社 Ni-base alloy-high chromium steel structure and process for producing the ni-base alloy-high chromium steel structure
CN202203922U (en) * 2011-08-08 2012-04-25 扬州安泰威合金硬面科技有限公司 Easily-welded boiler tube
CN102953760A (en) * 2011-08-23 2013-03-06 株式会社日立制作所 Ni-base alloy large member, ni-base alloy welded structure made of same, and method for manufacturing structure thereof
CN103060616A (en) * 2012-12-25 2013-04-24 钢铁研究总院 Nickel-base heat-resisting alloy

Also Published As

Publication number Publication date
JP6118714B2 (en) 2017-04-19
WO2015076218A1 (en) 2015-05-28
CN105722630A (en) 2016-06-29
JP2015098047A (en) 2015-05-28

Similar Documents

Publication Publication Date Title
CN108467973B (en) Nickel-chromium-tungsten high-temperature alloy seamless tube for 700 ℃ ultra-supercritical boiler and manufacturing method thereof
CN103556073B (en) A kind of 700 DEG C of level ultra supercritical coal-fired unit reheater superalloy cast tube materials and preparation method thereof
CN103993202B (en) A kind of ultra supercritical station boiler tubing nickel-base alloy and preparation method
CN103597105A (en) Thermo-mechanical processing of nickel-base alloys
CN103350173B (en) The production method of the overall heavy forging of a kind of austenitic stainless steel abnormity
JP2009506210A5 (en)
CN105722630B (en) The welded joint structure of thick-wall large-diameter pipe and its welding procedure method
CN102690995A (en) High-temperature resistant seamless steel pipe and production method thereof
JP2013001949A (en) Precipitate hardening martensitic stainless steel and long blade using the same for steam turbine
CN105689919A (en) Nickel base alloy welding wire with weld deposit metal capable of being recrystallized
CN104946932A (en) Method for manufacturing austenite series heat-resistant alloy pipe and austenite series heat-resistant alloy pipe manufactured by the method
CN103740913A (en) High-temperature forged martensitic stainless steel heat treatment method
Pandey et al. Microstructure and transverse shrinkage stress analysis in GTA welds of P91 steel pipe
JP2012092378A (en) FORGING Ni-BASED ALLOY OF STEAM TURBINE, AND FORGED COMPONENT THEREOF
JP2016512573A (en) Stainless steel for hot forging and method of hot forging using this steel
CN103484803A (en) Processing technique of nickel-based heat-resisting alloy boiler pipe
JP5525961B2 (en) Ni-based alloy for forged parts of steam turbine and forged parts of steam turbine
WO1999046419A1 (en) Bn precipitation reinforced type low carbon ferritic heat resisting steel of high weldability
CN107447088B (en) A kind of improvement martensite type refractory steel 10Cr11Co3W3NiMoVNbNB ingot casting hot forming technologies
RU147694U1 (en) BIMETALLIC PIPE FOR REDUCED STEAM PIPELINES
CN105483494B (en) Ageing strengthening sections abros of the easy processing into thick-wall seamless
CN104493059B (en) Ring-type furnace and the forging method of M2 high-speed steel
CN105648195B (en) A kind of method for improving thermal treatment quality after P91, P92 high-temperature pipe site welding
LIU et al. Material advancement used for 700 C A-USC-PP in China
WO2016111249A1 (en) Austenite-based heat-resistant steel, and turbine component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Kanagawa Prefecture, Japan

Patentee after: Mitsubishi Power Co., Ltd

Address before: Kanagawa Prefecture, Japan

Patentee before: MITSUBISHI HITACHI POWER SYSTEMS, Ltd.