Disclosure of Invention
The embodiment of the invention aims to provide a method and a system for realizing an intelligent log, and aims to solve the problems that information deviation is inconsistent with reality in the recording process by the manual construction project log recording mode, information updating is not timely, information is omitted, searching is difficult after data filing, a project cannot be traced back timely when encountering problems, and a manager cannot master project progress in real time.
The embodiment of the invention is realized in such a way that an implementation method of an intelligent log comprises the following steps:
defining log types according to the requirements of construction projects, wherein the log types comprise default logs and non-default logs, defining different log content classification versions for the default logs, generating log models of different versions according to the different log content classification versions, and then respectively setting applicable areas for the log models of different versions;
receiving a work diary transmitted by each construction department manager of the construction project by using a communication terminal, the work diary including: the method comprises the steps of obtaining a default log type, a region where a construction project is located, construction content and a construction content category;
and calling a log model matched with the working diary according to the default log type in the working diary and the area where the construction project is located, and filling the construction content in the working diary into a corresponding log content classification position in the log model according to the construction content category in the working diary to generate the construction project log of the default type.
In the method for implementing an intelligent log according to the embodiment of the present invention, after the calling a log model matched with the work diary according to the default log type in the work diary and the area where the construction project is located, and filling the construction content in the work diary in the corresponding position in the log model according to the construction content category in the work diary to generate the construction project log of the default type, the method further includes:
and receiving and storing the construction project logs of the non-default type, which are filled by the managers of each construction department of the construction project by adopting a communication terminal.
In the method for implementing an intelligent log according to the embodiment of the present invention, after receiving and storing the construction project logs of the non-default type, which are filled by the managers of each construction department of the construction project using the communication terminal, the method further includes:
and setting the browsing permission of the construction project log of the default type and/or the construction project log of the non-default type, and sharing the construction project log of the default type and/or the construction project log of the non-default type to other participants.
In the method for implementing an intelligent log according to the embodiment of the present invention, before setting the browsing permission of the construction project log of the default type and/or the construction project log of the non-default type, and sharing the construction project log of the default type and/or the construction project log of the non-default type to other participating parties, the method further includes:
and checking whether the construction project log of the default type and/or the construction project log of the non-default type are complete, and if not, performing supplementary modification on the construction project log of the default type and/or the construction project log of the non-default type.
In the implementation method of the intelligent log according to the embodiment of the invention, the construction content includes characters and/or pictures input by managers of each construction department of the construction project by adopting a communication terminal.
Another objective of the embodiments of the present invention is to provide an implementation system of an intelligent log, including a log model building module, a receiving module, and a default log generating module, where the default log generating module is connected to the log model building module and the receiving module, respectively, where:
the log model establishing module is used for customizing log types according to requirements of construction projects, wherein the log types comprise default logs and non-default logs, defining different log content classification versions for the default logs, generating log models of different versions according to the different log content classification versions, and then setting applicable areas for the log models of different versions respectively;
the receiving module is configured to receive a work diary sent by a communication terminal by a manager of each construction department of the construction project, where the work diary includes: the method comprises the steps of obtaining a default log type, a region where a construction project is located, construction content and a construction content category;
the default log generation module is used for calling a log model matched with the working diary according to the default log type in the working diary and the area where the construction project is located, and filling the construction content in the working diary in a corresponding log content classification position in the log model according to the construction content category in the working diary so as to generate the construction project log of the default type.
In the system for implementing an intelligent log according to the embodiment of the present invention, the system further includes a non-default log generating module connected to the receiving module, where the non-default log generating module is configured to:
and receiving and storing the construction project logs of the non-default type, which are filled by the managers of each construction department of the construction project by adopting a communication terminal.
In the system for implementing an intelligent log according to the embodiment of the present invention, the system further includes a storage module and an authority setting module, the storage module is connected to the default log generation module and the non-default log generation module, and the authority setting module is connected to the storage module, wherein:
the storage module is used for storing the construction project log of the default type generated by the default log generation module and the construction project log of the non-default type generated by the non-default log generation module;
the permission setting module is used for setting the browsing permission of the construction project log of the default type and/or the construction project log of the non-default type, and sharing the construction project log of the default type and/or the construction project log of the non-default type to other participating parties.
In the system for implementing the intelligent log according to the embodiment of the present invention, the system further includes a log checking and modifying module connected to the storage module, wherein:
and the log checking and modifying module is used for checking whether the construction project log of the default type and/or the construction project log of the non-default type are complete or not, and if not, performing supplementary modification on the construction project log of the default type and/or the construction project log of the non-default type.
In the system for implementing the intelligent log according to the embodiment of the present invention, the construction content includes characters and/or pictures input by managers of each construction department of the construction project by using a communication terminal.
The implementation of the method and the system for realizing the intelligent log provided by the embodiment of the invention has the following beneficial effects:
according to the method, the log types are customized according to the requirements of construction projects, the log types comprise default logs and non-default logs, different log content classification versions are defined for the default logs, different log models of different versions are generated according to the different log content classification versions, and then applicable areas are set for the log models of different versions respectively; receiving a work diary transmitted by each construction department manager of the construction project by using a communication terminal, the work diary including: the method comprises the steps of obtaining a default log type, a region where a construction project is located, construction content and a construction content category; finally, a log model matched with the work diary is called according to the default log type in the work diary and the area where the construction project is located, the construction content in the work diary is filled in the corresponding log content classification position in the log model according to the construction content category in the work diary to generate a construction project log of the default type, so that the heavy work of manually recording the construction project log in the prior art is reduced, the construction project log can be updated in time, the accuracy of the log content is ensured, a manager of the construction project can master the progress of the project, target data can be searched in real time and quickly, and the root of the problem can be tracked quickly when the construction project has problems; the construction project logs of the default type and/or the construction project logs of the non-default type are set to have browsing permission, and the construction project logs of the default type and/or the construction project logs of the non-default type are shared with other participating parties, so that the logs can be shared with other participating parties, managers of other participating parties can view the project logs in real time and know the project progress.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Fig. 1 shows a specific implementation flow of an implementation method of an intelligent log according to a first embodiment of the present invention. Referring to fig. 1, an implementation flow of the implementation method of the intelligent log provided by this embodiment is detailed as follows:
in S101, defining log types according to requirements of construction projects, wherein the log types comprise default logs and non-default logs, defining different log content classification versions for the default logs, generating log models of different versions according to the different log content classification versions, and then respectively setting applicable regions for the log models of different versions.
In this embodiment, a user may customize a plurality of different default logs and non-default logs according to own needs, and establish corresponding log models for the different default logs respectively, and since the requirements of each region on log formats may be different, the same default log may correspond to a plurality of different log models, and each log model corresponds to an applicable region. As a specific implementation example, in this embodiment, a default log and a non-default log are defined, where the default log is a construction log, and the non-default log is a security log. It should be noted that in other implementation examples, the user may add multiple default logs in a customized manner and/or add multiple non-default logs in a customized manner according to the needs of the user.
At S102, a work diary transmitted by each construction department manager of the construction project using a communication terminal is received, the work diary including: default log type, area of construction project, construction content and construction content category.
In this embodiment, the communication terminal is a mobile phone, a computer, or an IPD, and a manager of each construction department of a construction project can send a work diary to an implementation system of an intelligent log in the form of a short message, a multimedia message, or a short message through a public wireless communication network or a self-established local wireless communication network through the mobile phone, the computer, or the IPD at any time, and then the implementation system of the intelligent log receives and processes the work diary.
In S103, a log model matched with the work diary is called according to the default log type in the work diary and the area where the construction project is located, and the construction content in the work diary is filled in the corresponding log content classification position in the log model according to the construction content category in the work diary, so as to generate a construction project log of the default type.
In this embodiment, after receiving the work diaries sent by the managers of each construction department of the construction project, the system for implementing the intelligent logs analyzes and counts the work diaries sent by each construction department of the current construction project, so as to generate only one construction project log for the same default log type. For example: if the default log types in the work logs sent by managers of three different construction departments of the same current construction project are construction logs and the construction project is in the area A, the implementation system of the intelligent log firstly searches for a proper log model according to the default log types and the area to which the construction project belongs, and then fills the construction contents in the three work logs into corresponding log content classification positions in the log model according to the construction content types, so that the construction project log of the default type can be generated.
It should be noted that, in this embodiment, the construction content includes characters and/or pictures input by managers of each construction department of the construction project through a communication terminal, so that the construction condition of the construction project on the same day can be recorded more vividly, vividly and truly in a mode of combining pictures and texts, and the authenticity and traceability of the log are improved.
Optionally, after S103 in this embodiment, the method may further include:
in S104, a non-default type of construction project log filled by each construction department manager of the construction project using a communication terminal is received and stored.
In this embodiment, the construction project logs of the non-default type are filled by managers of construction departments of the construction project directly by using communication terminals, information aggregation is not required, and each construction project log of the non-default type only has one log per day.
As can be seen from the above, in the implementation method of the intelligent log provided by this embodiment, firstly, the log types are customized according to the requirements of the construction project, where the log types include a default log and a non-default log, different log content classification versions are defined for the default log, log models of different versions are generated according to the different log content classification versions, and then, applicable regions are respectively set for the log models of different versions; receiving a work diary transmitted by each construction department manager of the construction project by using a communication terminal, the work diary including: the method comprises the steps of obtaining a default log type, a region where a construction project is located, construction content and a construction content category; finally, a log model matched with the work diary is called according to the default log type in the work diary and the area where the construction project is located, the construction content in the work diary is filled in the corresponding log content classification position in the log model according to the construction content category in the work diary to generate a construction project log of the default type, so that the heavy work of manually recording the construction project log in the prior art is reduced, the construction project log can be updated in time, the accuracy of the log content is ensured, and a manager of the construction project masters the progress of the project; in addition, target data can be searched quickly in real time, and the root of a problem can be tracked quickly when the construction project has the problem.
Fig. 2 shows a specific implementation flow of an implementation method of an intelligent log according to a second embodiment of the present invention. Referring to fig. 2, in the implementation method of the two types of intelligent logs provided by this embodiment, with respect to the embodiment shown in fig. 1, after receiving and storing the construction project logs of the non-default type filled by the managers of the construction departments of the construction project by using the communication terminal, the method further includes:
in S205, it is checked whether the construction project log of the default type and/or the construction project log of the non-default type are complete, and if not, the construction project log of the default type and/or the construction project log of the non-default type are modified in a supplementary manner.
In this embodiment, after the system for implementing the intelligent log automatically generates the electronic version of the construction project log according to the received work diary, a preview interface of the construction project log may be displayed for a user to check whether the log is wrong or complete, if the log is wrong or incomplete, a modification operation instruction input by the user is received under the preview interface to modify the log, and then the modified construction project log meeting the requirements is stored in a storage module of the recording system for subsequent query and use.
In S206, the browsing permission of the construction project log of the default type and/or the construction project log of the non-default type is set, and the construction project log of the default type and/or the construction project log of the non-default type are shared to other participating parties.
In this embodiment, after the construction project log is saved, a manager can also customize the browsing permission of the log so as to conveniently share the log to other participating parties, and similarly, logs recorded by other participating parties can also be shared with each other by setting the permission of the log. Therefore, each participating party can master the construction progress of the construction project in real time.
Steps S201 to S204 in the present embodiment are completely the same as steps S101 to S104 in the embodiment shown in fig. 1, and therefore, the description thereof will not be repeated here.
As can be seen from the above, compared with the previous embodiment, in the implementation method of the intelligent log provided in this embodiment, because the browsing permission of the default type of construction project log and/or the non-default type of construction project log is set, the default type of construction project log and/or the non-default type of construction project log is shared with other participating parties, so that the log can be shared with other participating parties, and a manager of the other participating parties can also view the project log in real time to know the project progress.
Fig. 3 is a schematic structural diagram of an implementation system of an intelligent log according to a third embodiment of the present invention, where the system is configured to execute the methods provided in the embodiments shown in fig. 1 to fig. 2. Only the portions related to the present embodiment are shown for convenience of explanation.
Referring to fig. 3, the present embodiment provides an implementation system of an intelligent log, including a log model building module 1, a receiving module 2, and a default log generating module 3, where the default log generating module 3 is connected to the log model building module 1 and the receiving module 2, respectively, and where:
the log model establishing module 1 is used for customizing log types according to requirements of construction projects, wherein the log types comprise default logs and non-default logs, defining different log content classification versions for the default logs, generating log models of different versions according to the different log content classification versions, and then respectively setting applicable areas for the log models of different versions;
the receiving module 2 is configured to receive a work diary sent by a communication terminal by a manager of each construction department of the construction project, where the work diary includes: the method comprises the steps of obtaining a default log type, a region where a construction project is located, construction content and a construction content category;
the default log generating module 3 is configured to call a log model matched with the work diary according to the default log type in the work diary and the area where the construction project is located, and fill the construction content in the work diary in a corresponding log content classification position in the log model according to the construction content category in the work diary, so as to generate the construction project log of the default type.
Optionally, the system for implementing the smart log further includes a non-default log generating module 4 connected to the receiving module 2, where the non-default log generating module 4 is configured to:
and receiving and storing the construction project logs of the non-default type, which are filled by the managers of each construction department of the construction project by adopting a communication terminal.
Optionally, the system for implementing the intelligent log further includes a storage module 5 and an authority setting module 6, the storage module 5 is connected to the default log generating module 3 and the non-default log generating module 4, the authority setting module 6 is connected to the storage module 5, wherein:
the storage module 5 is configured to store the construction project log of the default type generated by the default log generation module 3 and the construction project log of the non-default type generated by the non-default log generation module 4;
the permission setting module 6 is configured to set a browsing permission of the construction project log of the default type and/or the construction project log of the non-default type, and share the construction project log of the default type and/or the construction project log of the non-default type to other participating parties.
Optionally, the system for implementing the intelligent log further includes a log checking and modifying module 7 connected to the storage module 5, wherein:
the log checking and modifying module 7 is configured to check whether the construction project log of the default type and/or the construction project log of the non-default type are complete, and if not, perform supplementary modification on the construction project log of the default type and/or the construction project log of the non-default type.
Optionally, the construction content includes characters and/or pictures input by managers of each construction department of the construction project by using a communication terminal.
It should be noted that, since each module in the system provided in the embodiment of the present invention is based on the same concept as that of the embodiment of the method of the present invention, the technical effect brought by the embodiment of the method of the present invention is the same as that of the embodiment of the method of the present invention, and specific contents may be referred to the description in the embodiment of the method of the present invention, and are not described herein again.
Therefore, it can be seen that the implementation system of the intelligent log provided by the embodiment can also reduce the heavy work of manually recording the construction project log in the prior art, and can update the construction project log in time, so as to ensure the accuracy of the log content, enable a construction project manager to master the project progress, and also can quickly find target data in real time, and quickly track the root of the problem when the construction project has a problem; in addition, the log can be shared with other participating parties, so that managers of the other participating parties can view the project log in real time and know the project progress.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.