CN105719041A - Team cooperation management client with calendar - Google Patents

Team cooperation management client with calendar Download PDF

Info

Publication number
CN105719041A
CN105719041A CN201410737870.7A CN201410737870A CN105719041A CN 105719041 A CN105719041 A CN 105719041A CN 201410737870 A CN201410737870 A CN 201410737870A CN 105719041 A CN105719041 A CN 105719041A
Authority
CN
China
Prior art keywords
task
calendar
module
schedule
tasks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410737870.7A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd
Original Assignee
CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd filed Critical CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd
Priority to CN201410737870.7A priority Critical patent/CN105719041A/en
Publication of CN105719041A publication Critical patent/CN105719041A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a team cooperation management client with a calendar. The team cooperation management client with a calendar is characterized in: by means of adding a calendar module, adding a calendar and a schedule in the calendar module so as to visually check the time schedule of the calendar or schedule and conveniently manage the personal calendar or schedule; by means of the client, dividing the projects into a plurality of tasks and accurately distributing the tasks to responsible members, wherein the responsible members perform real-time discussion by combination of a comment unit so as to promote the complete process of the tasks; and at the same time, a task publisher can check the complete status of the distributed tasks through a task module to realize instant management of the tasks. The team cooperation management client with a calendar can realize a 24-hour network office without limitation of work environment.

Description

Team collaboration's managing customer end with calendar
Background technology
Calendar and Schedule task are closely coupled, inseparable.It is the most convenient that schedule planning is generally shown with calendar form, it is therefore an objective to the schedule of clear and definite every day and task theme, if briefly the time being compared to is trunk, then task and schedule are exactly branch and leaf.By software can in combination with fine.For the personal information management of good alliance, task schedule function incorporates and incorporates currently leading GTD time management theory in software design, realize being attenuated by letter task from high to low and schedule, and the information that each task produces can be reminded and record process content;People are usually because work certain commercial activity of busy worry or appointment passes out of mind, and at this moment you can pass through to create schedule or task, set prompting cycle and time, and software will then be automatically reminded to you;Support timing open multiple webpage or send mail, timing open multiple program or file and set timing shutdown;Support that schedule and the multiple cycle of task, time, circulation, prompting next day etc. are arranged;Supporting that Pending tasks shows at my desktop, the Pending tasks policing type of support has (work plan, preparation, commercial activity, leader appoint);Supporting manual one-key operation/cancellation task, also support process progress to 100% time task is automatically complete simultaneously.It is whole process and the time merges closely.
Along with the correlation theory gradual perfection of project management Yu team collaboration, the demand of project management and team collaboration's software is also increased sharply by medium-sized and small enterprises day by day, and therefore, a team collaboration's client with calendar function can help management role or schedule well.
Summary of the invention
The present invention solves the problems referred to above, it is proposed that a kind of team collaboration's managing customer end with calendar.
The technical scheme is that a kind of team collaboration's managing customer end with calendar, including: client task module and client personal management module, it is characterized in that, also include calendaring module, described calendaring module adds calendar by clicking blank space, and select time of time that calendar starts and end, and need the member of notice, described newly-built calendar is shown in the Hitachi's classification on the right side of Hitachi's module;
Member, by entering described client task module, newly-built task, selects the execution member of assignment of allocation after task, clicks task, enters task details, notifies other member's tasks carrying progresses by commenting on unit;
Member is by entering described client personal management module, check all tasks of distributing to oneself, by pulling, currently need to completing of task is put into mission area today, start button on the left of click task, task status is labeled as and is processing state, after having processed, enter task details, notify the result of other member's tasks by commenting on unit, and processed completing of task is uploaded to service end;
Member, by entering described client task module, checks the schedule of having dispensed of task;
Further, described client task module is logical also includes the beginning and ending time that the task that arranges completes;
Further, described task completes the beginning and ending time and associates with calendaring module, is shown in the schedule classification on the right side of calendaring module, clicks and open schedule classification, check all schedules, and be shown in calendar interface by different colours lines;
Further, by screening the schedule in the schedule classification on the right side of calendaring module, the schedule checked needed for display.
Beneficial effects of the present invention: the team collaboration's managing customer end with calendar of the present invention, by adding calendaring module, Hitachi's module is added calendar and schedule, intuitively check the time schedule of calendar or schedule, convenient management individual's calendar or schedule, project is subdivided into some tasks by the client of the present invention simultaneously, accurately it is assigned to responsible member, and combine comment unit discuss in real time, the schedule of promotion task, task publisher checks the task performance dispensed by task module simultaneously, realize the instant management of task, the client of the present invention can realize 24 hours network office rooms that working environment is unrestricted.
Accompanying drawing explanation
Fig. 1 is schematic diagram provided by the invention.
Detailed description of the invention
Further appreciate that present disclosure for convenience of those skilled in the art, be described in detail in conjunction with accompanying drawing.
As shown in Figure 1, team collaboration's managing customer end with calendar provided by the invention, including task module and personal management module, also include calendaring module, described calendaring module adds calendar by clicking blank space, and select time of time that calendar starts and end, and need the member of notice, described newly-built calendar is shown in the Hitachi's classification on the right side of Hitachi's module;
Described client task module is logical also includes the beginning and ending time that the task that arranges completes;
Described task completes the beginning and ending time and associates with calendaring module, is shown in the schedule classification on the right side of calendaring module, clicks and open schedule classification, check all schedules, and be shown in calendar interface by different colours lines;
By screening the schedule in the schedule classification on the right side of calendaring module, the schedule checked needed for display.
The member of administrator role is by entering described client task module;Grassroot project A, is then decomposed into some tasks newly-built task A by project A, selects the execution member of assignment of allocation after task A, clicks task A, enters task details A, notifies other member's tasks carrying progresses by commenting on unit;
The member received an assignment passes through personal management center, check the task of distributing to oneself, by pulling, currently need to completing of task is put into mission area today, start button on the left of click task, task status is labeled as and is processing state, after having processed, enter task details, notify the result of other member's tasks by commenting on unit, and processed completing of task is uploaded to service end;
Described details unit also includes editor's subelement, mover unit and deletes subelement;
Described comment unit also includes uploading adnexa subelement, after member completes task, task is uploaded by commenting on the adnexa subelement of uploading of unit, and task is downloaded by other members by task details;
Described member's personal management module also includes asterisk function, by important documents adds the mode of asterisk, important documents is forever shown in the personal management module space of a whole page;
Manager checks the schedule of task by task module.
Beneficial effects of the present invention: the team collaboration's managing customer end with calendar of the present invention, by adding calendaring module, Hitachi's module is added calendar and schedule, intuitively check the time schedule of calendar or schedule, convenient management individual's calendar or schedule, project is subdivided into some tasks by the client of the present invention simultaneously, accurately it is assigned to responsible member, and combine comment unit discuss in real time, the schedule of promotion task, task publisher checks the task performance dispensed by task module simultaneously, realize the instant management of task, the client of the present invention can realize 24 hours network office rooms that working environment is unrestricted.

Claims (4)

1. the team collaboration's managing customer end with calendar, including: client task module and client personal management module, it is characterized in that, also include calendaring module, described calendaring module adds calendar by clicking blank space, and select time of time that calendar starts and end, and need the member of notice, described newly-built calendar is shown in the Hitachi's classification on the right side of Hitachi's module;
Member, by entering described client task module, newly-built task, selects the execution member of assignment of allocation after task, clicks task, enters task details, notifies other member's tasks carrying progresses by commenting on unit;
Member is by entering described client personal management module, check all tasks of distributing to oneself, by pulling, currently need to completing of task is put into mission area today, start button on the left of click task, task status is labeled as and is processing state, after having processed, enter task details, notify the result of other member's tasks by commenting on unit, and processed completing of task is uploaded to service end;
Member, by entering described client task module, checks the schedule of having dispensed of task.
2. the team collaboration's managing customer end with calendar according to claim 1, it is characterised in that described client task module is logical also includes the beginning and ending time that the task that arranges completes.
3. the team collaboration's managing customer end with calendar according to claim 2, it is characterized in that, described task completes the beginning and ending time and associates with calendaring module, it is shown in the schedule classification on the right side of calendaring module, schedule classification is opened in click, check all schedules, and be shown in calendar interface by different colours lines.
4. the team collaboration's managing customer end with calendar according to claim 3, it is characterised in that by screening the schedule in the schedule classification on the right side of calendaring module, the schedule checked needed for display.
CN201410737870.7A 2014-12-05 2014-12-05 Team cooperation management client with calendar Pending CN105719041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410737870.7A CN105719041A (en) 2014-12-05 2014-12-05 Team cooperation management client with calendar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410737870.7A CN105719041A (en) 2014-12-05 2014-12-05 Team cooperation management client with calendar

Publications (1)

Publication Number Publication Date
CN105719041A true CN105719041A (en) 2016-06-29

Family

ID=56143925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410737870.7A Pending CN105719041A (en) 2014-12-05 2014-12-05 Team cooperation management client with calendar

Country Status (1)

Country Link
CN (1) CN105719041A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107180085A (en) * 2017-05-09 2017-09-19 北京龙杯信息技术有限公司 Method, storage device and terminal for Task Progress management and control
CN107330623A (en) * 2017-07-03 2017-11-07 浪潮软件集团有限公司 Task allocation structure and method
CN108550018A (en) * 2018-03-13 2018-09-18 广东电网有限责任公司信息中心 A method of based on calendar mode visualization tasks management
CN111627447A (en) * 2020-06-01 2020-09-04 上海适享文化传播有限公司 Cloud sharing intelligent voice Ai speaking system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107180085A (en) * 2017-05-09 2017-09-19 北京龙杯信息技术有限公司 Method, storage device and terminal for Task Progress management and control
CN107180085B (en) * 2017-05-09 2020-08-07 北京龙杯信息技术有限公司 Method for task progress control, storage device and terminal
CN107330623A (en) * 2017-07-03 2017-11-07 浪潮软件集团有限公司 Task allocation structure and method
CN108550018A (en) * 2018-03-13 2018-09-18 广东电网有限责任公司信息中心 A method of based on calendar mode visualization tasks management
CN111627447A (en) * 2020-06-01 2020-09-04 上海适享文化传播有限公司 Cloud sharing intelligent voice Ai speaking system

Similar Documents

Publication Publication Date Title
Tamburri et al. The architect's role in community shepherding
Stray et al. Dependency management in large-scale agile: a case study of DevOps teams
CN102867219B (en) A kind of business automatic arrangement program system and method
CN105719041A (en) Team cooperation management client with calendar
CN108564273A (en) A kind of sale management system for network
US20100198648A1 (en) Dynamic meeting group organizer
WO2013122842A1 (en) Aggregating availability status information on shared calendars
CN104471595A (en) Workflow management device and workflow management method
CN104318354A (en) Task information processing method and system
CN104933495A (en) Work task assessment system on Android-based mobile terminal
WO2015026678A3 (en) Ad hoc reporting with smart lists
Abrantes et al. Preparing project based organizations for change
Bennett The benefits of communicating and collaborating in a real-time enterprise social network
CN103854165A (en) Event display system for electronic work calendar
de Santana et al. Relationships between communication structure and software architecture: an empirical investigation of the Conway's Law at the Federal University of Pernambuco
CN109492903A (en) A kind of report work application system based on webpage front-end
CN104376407A (en) Task allocation application system and method
CN105719121A (en) Team cooperation management method with calendar
Koibichuk MODELING OF THE INFLUENCE OF OFFICE DESIGN FOR ITS PROFITABILITY
Leszek et al. The Doctor is" In"--Using the Office Hours Concept to Make Limited Resources Most Effective
CN105719040A (en) Team cooperation management system
CN105719039A (en) Team cooperation management method
Pradhan et al. A survey on effectiveness of tool based software project planning
Kumar A quick scan audit of the'socio-technical'system in a leather accessories manufacturing SME
DENIĆ et al. Management of the information systems implementation project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160629

WD01 Invention patent application deemed withdrawn after publication