CN109492903A CN201811319505.9A CN201811319505A CN109492903A CN 109492903 A CN109492903 A CN 109492903A CN 201811319505 A CN201811319505 A CN 201811319505A CN 109492903 A CN109492903 A CN 109492903A
Authority
CN
China
Prior art keywords
report
work
module
report work
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811319505.9A
Other languages
Chinese (zh)
Inventor
郑希
林�建
孔帅
庞磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yijiaen Technology Co ltd
Original Assignee
Sichuan Changhong Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Changhong Electric Co Ltd filed Critical Sichuan Changhong Electric Co Ltd
Priority to CN201811319505.9A priority Critical patent/CN109492903A/en
Publication of CN109492903A publication Critical patent/CN109492903A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2221/00Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/21Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/2141Access rights, e.g. capability lists, access control lists, access tables, access matrices

Abstract

The report work application system based on webpage front-end that the invention discloses a kind of, it is related to webpage front-end and enterprise information management technical field, the system includes: report work information display module, report work module, project management module, demand and 7 task management module, distribution module, auditing module and record queries module modules, report work time shaft carries out the selection of period by way of dragging, reported the period of work that can be loaded on time shaft simultaneously, guarantee to repeat between user reports working hour, prevents the case where arbitrarily reporting work appearance.The present invention makes enterprise have intuitive presentation and data supporting to employee work duration, action and working efficiency, facilitates the personnel management and project management of enterprise, helps promotion enterprise management level, improves staffing effectiveness.

Description

A kind of report work application system based on webpage front-end
Technical field
The present invention relates to webpage front-ends and enterprise information management technical field, are a kind of based on webpage front-end specifically Report work application system.
Background technique
With the rapid development and extensive use of informationization technology, production management level and production are improved by information technology Efficiency has obtained the attention of more and more enterprises.Man-hour management as important production efficiency, the management tool of cost calculation, Importance is self-evident for enterprise.The labour saturation degree of worker, time can be improved in unified effective man-hour management Utilization rate and productivity.
In business administration, examination of the leader for subordinate's job performance is typically only capable to the subjective work to employee and carries out Examination, can not carry out fine-grained management.For the human cost of production work, can not carry out accurately calculating assessment.In order to mention The market competitiveness of high enterprise, it is necessary to establish a set of efficient Working hours management system, inefficient artificial statistical management is changed into Using information, the production management level of enterprise is helped to improve.
Summary of the invention
The report work application system based on webpage front-end that the purpose of the present invention is to provide a kind of, for solving in the prior art Leader for the examination of subordinate's job performance can only be subjective the work of employee is checked and rated, can not carry out fine-grained management with And the human cost of production work, the problem of accurately calculating assessment can not be carried out.
The present invention is solved the above problems by following technical proposals:
A kind of report work application system based on webpage front-end, the system include:
Report work module, the report work positioned at the report work information display module of system, for active user;
Work information display module is reported, is connect with report work module, daily report working hour length and state can be shown based on calendar, also It can show the task to be followed up on the same day;
Project management module, project established in the module, modified, shutoff operation and for allocation of items project at Member;
Demand and task management module, can check by project management module establish project, can be created under project or Modification item purpose demand, creates or modifies corresponding task under demand;
Distribution module is provided with the quick entrance of personnel assignment, can check through demand and the creation of task management part Task is assigned to program member by task;
Auditing module, can check the report work content of the corresponding subordinate of active user, and be audited;
Record queries module, report work record, team's report work record and crew including me report work to record three parts, respectively It can check that active user reports the report work record of work record, the report work record of project team and whole employees.
Include 7 functional modules, including report work information display module, report work module, project management module, demand and task Management module, distribution module, auditing module, record queries module.Report work information shows the data statistics including employee's monthly magazine work, El Diario working hour length and state based on calendar, and task list to be followed up and report work entrance.Reporting work module is the staff The interface for carrying out report work can create task and report work under the corresponding demand of affiliated project.Project management module can be completed Foundation, modification, the distribution operation such as personnel and closing of project.Demand and task management module can create under project and modification item Purpose demand creates below demand and modifies task, and assigns the task to program member and be responsible for.Distribution module divides task Dispensing program member provides the quick entrance of personnel assignment.Auditing module is used to audit the report work content of employee, can examine in batches Core.Record queries module includes " my record queries module ", " team's record queries module ", " crew's record queries module " three A submodule.Report work time shaft carries out the selection of period by way of dragging, while having reported the period of work that can add It is downloaded on time shaft, guarantees to repeat between user reports working hour, prevent the case where arbitrarily reporting work appearance.The present invention makes enterprise to member Work operating time, action and working efficiency have intuitive presentation and data supporting, facilitate personnel management and the project pipe of enterprise Reason helps promotion enterprise management level, improves staffing effectiveness.
Preferably, system allows the user of different rights grade to modules by dividing multiple Permission Levels to user Access and access right it is different, divided by the Permission Levels to user, the user of different stage can be allowed to access and use Permission is had nothing in common with each other, and doing so can prevent employee from playing tricks using report work of the auditing module to oneself, can promote manager's Review efficiency.
Preferably, the Permission Levels include level Four permission, three-level permission, second level permission and level-one permission, level Four permission Report work information can be used to show progressive die block row report work;Three-level permission may have access to all modules, but can only check and modify current use Project under name in an account book cannot check that crew reports work record;Second level has report work information display module, project management and demand task The access right of management module, and can modify to all items, demand and task, and can check and export crew's report Work record;Level-one permission can access and use to all modules;By different grade classifications, company's difference duty can be allowed The open corresponding level privileges of the employee of grade.
Preferably, the report work information display module includes report work processing time matrix, report work day goes through and task list to be followed up, institute State the report work working hour number that report work processing time matrix includes this day, this week and this month, normal number of days, the abnormal number of days of this week and this month With repay number of days;The report work day was gone through between one month daily report working hour of display, and with color identifier state be it is normal, abnormal or It repays;The task list to be followed up is for showing that all tasks relevant to active user, report work information display module can be clear The clear of that month report work situation for intuitively finding out active user, and can show the report work state of every day, it can be improved use The service efficiency at family, while good suggesting effect can be played to user, avoid user's from forgetting report work.
Preferably, the project management module passes through the user interface presentation bulleted list related to user of card, can Grassroot project, subitem can be deleted, edited, inquired and be added to existing project by different function buttons in list Mesh focuses on management to all items data by project management module, and for administrative staff, management is got up easily, The working efficiency of manager can significantly be improved.
Preferably, the auditing module is arranged with auditing module, audits for report work of the administrative staff to employee, All report number evidences that can check relative users under the module, without the report number one by one to each user according to turning over It reads, saves the time, promote working efficiency.
Compared with prior art, the present invention have the following advantages that and the utility model has the advantages that
(1) present invention imitates enterprise to employee work duration, action and work by the management system page of webpage Rate has intuitive presentation and data supporting, facilitates the personnel management and project management of enterprise, helps promotion enterprise management level, improves Staffing effectiveness.
(2) present invention is no longer needed to by management of webpage system by the report work work simplification of enterprise staff with paper form Form reports the data such as workload, and does not allow easy to be lost and damage also compared to paper report, while auditing paper report The work of table becomes more easily succinct, convenient for the management of enterprise, raising efficiency.
(3) present invention can intuitively find out the content and progress of team project's work from the data of system demonstration, may be used also The report number evidence that program member is checked from team project is convenient for enterprise without individually doing the data statistics and analysis of team again Management, promote the efficiency of management of enterprise.
(4) system provided by the invention can also prevent employee's falseness report work and lead to that work is reported to repeat, and directly avoid this The appearance of problem also avoids inspection and audit to report work and false report work problem is repeated naturally, improves business administration Efficiency.
Detailed description of the invention
Fig. 1 is system composed structure schematic block diagram of the invention;
Fig. 2 is the structural schematic diagram of the entry report work in the embodiment of the present invention 1;
Fig. 3 is schematic process flow diagram of the project of the present invention foundation to distribution;
Fig. 4 is present invention report work information flow schematic block diagram.
Specific embodiment
The present invention is described in further detail below with reference to embodiment, embodiments of the present invention are not limited thereto.
Embodiment 1:
In conjunction with shown in attached drawing 1-4, a kind of report work application system based on webpage front-end, comprising: report work information display module, Report work module, project management module, demand and task management module, distribution module, auditing module and record queries module.It incite somebody to action this System is applied to the management of a company, and position and the corresponding relationship of Permission Levels are the corresponding level Four permission of employee, project manager Corresponding three-level permission, Project Management Center PMO corresponds to second level permission, company leader corresponds to level-one permission.
Employee's permission can carry out report work, check report work information show and querying individual and team report work record;Project All modules can be used in manager's permission, but can only check and modify oneself project under one's name, cannot check that crew reports work note Record;PMO Enterprises Leader permission increases the access right of project management and demand task management module in employee's permissions base, And it can modify to all items, demand and task, and can check and export crew and report work record.
Report work information display module mainly includes three major businesses: report work processing time matrix, report work day are gone through, task to be followed up arranges Table.Reporting work processing time matrix includes the report work working hour number of this day, this week, this month, the normal number of days of this week and this month, abnormal number of days and Number of days is repaid, employee is facilitated to calculate oneself workload.Report work day is gone through, and with color mark Knowledge state is normal, exception or repays.There is the day between report working hour on calendar, the report work feelings on the same day can be popped up within mouse-over 1 second Condition, on a timeline between color mark is carried out different report working hours, this report work can be intuitively presented by clicking different color segments Project, demand, task, report working hour section, report work content etc..List to be followed up show relevant to oneself state be in progress and Not starting for task, the details and report work record of this task can be checked by clicking task name;Clicking status button can will carry out Neutralizing the task setting not started is the state write as, this task will be deleted from this list;Reporting work button is to be directly entered Report work interface carries out the quick entrance of report work.
Project management module is used for project manager or PMO management project, uses the user interface presentation of card work Bulleted list related to user.It clicks grassroot project and pops up dialog box, grassroot project, title, description, the iteration of edit item The information such as period, time, plan working hour, responsible person concerned and audit permission.Existing project can be by different in list Function button such as is deleted, is edited, adding sub-project at the operation.
Demand and task management module are for the demand and task under management project.It is clicked in bulleted list card a certain A project can open this purpose list of requirements card, institute in all iteration cycles of demand card meeting default choice current time There is demand.The creation that newly-built key pop-up dialog box carries out demand is clicked, the function button of list of requirements entry can be to built Good demand carries out editor and delete operation.The title of a certain demand is clicked, task list card is popped up, list can load this All built tasks under demand.Similar demand card clicks the creation that newly-built key pop-up dialog box carries out demand.Task column Each entry of table includes task names, task status, function button, can modify task status, to task carry out delete and Edit operation.For having created the personnel not distributed, task status be it is unallocated, people column can be popped up by clicking distribution key Table card, card can load the list of this all items member now.Personnel's entry is chosen, clicking distribution personnel can be by this Personnel are appointed as the person liable of current task.The entry of all items card, demand card and task cards, mouse-over 1 second The details of the entry can be popped up, afterwards so that user checks.
Auditing module is for project manager to the report work content of program member.Project card, point are loaded into auditing module Item entry is hit into the pending report work list of this purpose.User can be audited one by one or be audited in batches a plurality of report Work.
Report work module carries out report work for the staff and uses.It carries out the report work page and takes office business card from project card, click Report work key pop-up report work module dialog box carries out report work.Report work dialog box module mainly includes task names, can report working hour, sheet Secondary report working hour is long, reports phase on work day, report work time shaft, report work content etc..The current report phase on work day has been obtained first when module loading The period reported, each period can be come out by different color marks, and mouse hovers on the period can check report work Content.New report work content is not can be carried out out in the period for loading, the report work period is dragged with mouse on a timeline It is dynamic, it avoids repeating to report work problem, report work is audited convenient for auditor.The same task can carry out entry at times Work is reported, different report work contents, edlin when click different time sections can switch different content are filled within the corresponding time.
Record queries module includes that my report work record, team's report work record and crew report work record, and wherein crew reports work Record only has Enterprises Leader and PMO to check permission.My report work record and crew report work to record listed form and present, column Every a line in table represents the report work content of some task day, and every a line can be unfolded to show that the report work under this task is detailed Feelings, including content, duration, audit state etc..The report work content that do not audit can carry out destruction operation, logical for no audit The report work crossed can be reported operation again.Team's report work record is presented by reporting work day to go through with the shape of time shaft, clicks certain of calendar It can show the report work time shaft of project team personnel on the right, and the click period can pop up report work details.
Although reference be made herein to invention has been described for explanatory embodiment of the invention, and above-described embodiment is only this hair Bright preferable embodiment, embodiment of the present invention are not limited by the above embodiments, it should be appreciated that those skilled in the art Member can be designed that a lot of other modification and implementations, these modifications and implementations will fall in principle disclosed in the present application Within scope and spirit.

Claims (7)

1. a kind of report work application system based on webpage front-end, which is characterized in that the system includes:
Report work module, the report work positioned at the report work information display module of system, for active user;
Work information display module is reported, is connect with report work module, daily report working hour length and state can be shown based on calendar, can also be shown Show the task to be followed up on the same day;
Project management module establishes project in the module, is modified, shutoff operation and for allocation of items program member;
Demand and task management module can check the project established by project management module, can create or modify under project The demand of project creates or modifies corresponding task under demand;
Distribution module is provided with the quick entrance of personnel assignment, can check the task by demand and the creation of task management part, Task is assigned to program member;
Auditing module, can check the report work content of the corresponding subordinate of active user, and be audited;
Record queries module, report work record, team's report work record and crew including me are reported work to record three parts, can be looked into respectively Read that active user reports the report work record of work record, the report work record of project team and whole employees.
2. the report work application system according to claim 1 based on webpage front-end, it is characterised in that: system passes through to user Multiple Permission Levels are divided, make the user of different rights grade different to the access of modules and access right.
3. the report work application system according to claim 2 based on webpage front-end, it is characterised in that: the Permission Levels packet Level Four permission, three-level permission, second level permission and level-one permission are included, report work information display module and report work can be used in level Four permission Module;Three-level permission may have access to all modules, but can only check and modify the project of active user under one's name, cannot check that crew reports Work record;Second level have project management and demand and task management module access right, and can to all items, demand and Task is modified, and can be checked and be exported crew and report work record;Level-one permission can access and use to all modules.
4. the report work application system according to claim 1 based on webpage front-end, it is characterised in that: the report work information is aobvious Show that module includes going through and task list to be followed up on report work processing time matrix, report work day, the report work processing time matrix comprising this day, this week with And the report work working hour number of this month, the normal number of days of this week and this month, abnormal number of days and repay number of days;The report work day goes through display one Between a month daily report working hour, and it is normal, exception with color identifier state or repays;The task list to be followed up is for opening up Show all tasks relevant to active user.
5. the report work application system according to claim 1 based on webpage front-end, it is characterised in that: the report work module note Record content includes task names, can report long working hour, this report working hour, report phase on work day, report work time shaft and report work content.
6. the report work application system according to claim 1 based on webpage front-end, it is characterised in that: the project management mould Block by the user interface presentation bulleted list related to user of card, can grassroot project, existing project can be in list Sub-project is deleted, is edited, inquired and added by different function buttons.
7. the report work application system according to claim 1 based on webpage front-end, it is characterised in that: under the auditing module It is provided with auditing module, is audited for report work of the administrative staff to employee.
CN201811319505.9A 2018-11-07 2018-11-07 A kind of report work application system based on webpage front-end Pending CN109492903A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811319505.9A CN109492903A (en) 2018-11-07 2018-11-07 A kind of report work application system based on webpage front-end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811319505.9A CN109492903A (en) 2018-11-07 2018-11-07 A kind of report work application system based on webpage front-end

Publications (1)

Publication Number Publication Date
CN109492903A true CN109492903A (en) 2019-03-19

Family

ID=65695165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811319505.9A Pending CN109492903A (en) 2018-11-07 2018-11-07 A kind of report work application system based on webpage front-end

Country Status (1)

Country Link
CN (1) CN109492903A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111242421A (en) * 2019-12-27 2020-06-05 北京合力亿捷科技股份有限公司 Method and system for carrying project management by IM group
CN112465363A (en) * 2020-12-03 2021-03-09 合肥天源迪科信息技术有限公司 Task management platform and method
CN112465363B (en) * 2020-12-03 2024-04-16 合肥天源迪科信息技术有限公司 Task management platform and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180101805A1 (en) * 2016-10-07 2018-04-12 Eunjung PARK System and method for goal-oriented big data business analatics framework
CN107909356A (en) * 2017-12-27 2018-04-13 哈工大机器人集团重庆普耀信息产业发展有限公司 Project management system and its method
CN108345978A (en) * 2017-01-23 2018-07-31 易族智汇(北京)科技有限公司 A kind of device and method in metering computer work person's working hour
CN108460571A (en) * 2017-12-25 2018-08-28 北京中人网信息咨询股份有限公司 A kind of team's collaboration of big, medium-sized and small enterprises and project management tool

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180101805A1 (en) * 2016-10-07 2018-04-12 Eunjung PARK System and method for goal-oriented big data business analatics framework
CN108345978A (en) * 2017-01-23 2018-07-31 易族智汇(北京)科技有限公司 A kind of device and method in metering computer work person's working hour
CN108460571A (en) * 2017-12-25 2018-08-28 北京中人网信息咨询股份有限公司 A kind of team's collaboration of big, medium-sized and small enterprises and project management tool
CN107909356A (en) * 2017-12-27 2018-04-13 哈工大机器人集团重庆普耀信息产业发展有限公司 Project management system and its method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡红: "项目进度管理系统的设计与实现", 《万方数据知识服务平台》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111242421A (en) * 2019-12-27 2020-06-05 北京合力亿捷科技股份有限公司 Method and system for carrying project management by IM group
CN112465363A (en) * 2020-12-03 2021-03-09 合肥天源迪科信息技术有限公司 Task management platform and method
CN112465363B (en) * 2020-12-03 2024-04-16 合肥天源迪科信息技术有限公司 Task management platform and method

Similar Documents

Publication Publication Date Title
US6678671B1 (en) System for linking a resource management system with an event of a project in a project management system and a method therefor
Rinaldi et al. Improving the efficiency of public administrations through business process reengineering and simulation: A case study
Krishna et al. Implementing public information systems in developing countries: Learning from a success story
US7801755B2 (en) Management hierarchy for enterprise applications and methods and systems for generating reports using same
US20070150327A1 (en) Project management method and system
CN101552842B (en) Call center application data and interoperation architecture for a telecommunication service center
US20100114672A1 (en) Employee Talent Review Management Module
Hunnius et al. Competency requirements for transformational e-government
US20090292739A1 (en) Methods and Systems for Service Tracking and Timeline Updating
US20140324499A1 (en) System and method for automatic shrinkage forecasting
CA2772824C (en) Role mapping and training tool
JP2020205124A (en) Information processor and program
CN109492903A (en) A kind of report work application system based on webpage front-end
CA2323268A1 (en) A system for linking a booking of a resource with events of a project and a method therefor
Hien et al. Determinants influencing the quality of accounting information systems: A case study of small and medium enterprises in Ho Chi Minh City
US20180330332A1 (en) Centralized time entry platform
Holmes et al. How social workers spend their time: an analysis of the key issues that impact upon practice pre and post implementation of the integrated children's system
Paim et al. Structuring a process management center of excellence
Kien Sia et al. Transforming the tax collector: reengineering the Inland Revenue Authority of Singapore
Lakshmi Narayan et al. Tracking Methodology for Fast Retrieval of Data and Its Feasibility Study
Stroll et al. Empirical measurement of innovation diffusion: A new approach
JP5068514B2 (en) Personnel system creation system and personnel system creation method
AU2014200681A1 (en) A project management method and system
US20090006163A1 (en) Method and System for Allocating Member Compensation
Vogelezang et al. Estimating Packaged Software Implementations: The First Part of a Framework

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200110

Address after: 518000 unit 01, 23 / F, Changhong science and technology building, No. 12, South Science and technology zone, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Applicant after: SHENZHEN YIJIAEN TECHNOLOGY Co.,Ltd.

Address before: 621000 Mianyang province high tech Zone, East Hing Road, No. 35 cotton

Applicant before: SICHUAN CHANGHONG ELECTRIC Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319

RJ01 Rejection of invention patent application after publication