CN105719040A - 团队协作管理系统 - Google Patents

团队协作管理系统 Download PDF

Info

Publication number
CN105719040A
CN105719040A CN201410737867.5A CN201410737867A CN105719040A CN 105719040 A CN105719040 A CN 105719040A CN 201410737867 A CN201410737867 A CN 201410737867A CN 105719040 A CN105719040 A CN 105719040A
Authority
CN
China
Prior art keywords
task
management system
tasks
unit
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410737867.5A
Other languages
English (en)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd
Original Assignee
CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd filed Critical CHENGDU COLORYWAY SOFTWARE DESIGN Co Ltd
Priority to CN201410737867.5A priority Critical patent/CN105719040A/zh
Publication of CN105719040A publication Critical patent/CN105719040A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种团队协作管理系统,通过将项目细分为若干任务,精确分配到负责成员,并结合评论单元进行实时讨论,促进任务的完成,同时任务发布者通过任务模块查看已分配出去的任务完成情况,实现任务的即时管理,本发明的系统可以实现工作环境不受限的24小时网络办公室。

Description

团队协作管理系统
背景技术
项目的生命周期是描述项目从开始到结束所经历的各个阶段,最一般的划分是将项目分为"识别需求、提出解决方案、执行项目、结束项目"四个阶段,而且项目是由一系列独特的、复杂的并相互关联的活动组成,这些活动有着一个明确的目标或目的,必须在特定的时间、预算、资源限定内,依据规范完成。随着项目管理与团队协作的相关理论逐步完善,中小企业对项目管理以及团队协作软件的需求也日益激增。然而由于目前市场上常见的项目管理软件都是针对大型企业设计以及开发,并且多数都是需要安装的软件版本,对于中小企业来说这种软件不仅价格昂贵,而且安装及使用十分不便,维护成本更是高昂。急需开发一款安装使用方便、价格实惠的在线项目管理工具,以满足中小企业日常的项目管理及团队协作需求。
发明内容
本发明为解决上述问题,提出了一种团队协作管理系统。
本发明的技术方案为:一种团队协作管理系统,包括:客户端任务模块和客户端个人管理模块;成员通过进入所述客户端任务模块,新建任务,在任务后面选择指定分配的执行成员,点击任务,进入任务详情,通过评论单元通知其他成员任务执行进度;
成员通过进入所述客户端个人管理模块,查看所有分配给自己的任务,通过拖拽将当前需完成的任务放到今日任务区域,点击任务左侧的开始按钮,将任务状态标记为正在处理状态,处理完成后,进入任务详情,通过评论单元通知其他成员任务的处理结果,并将已处理完成的任务上传至服务端;
成员通过进入所述客户端任务模块,查看已分配出去的任务的完成进度;
进一步地,所述任务进度包括任务建立、任务分配以及任务完成等信息;
进一步地,所述评论单元还包括上传附件子单元,成员完成任务后,通过评论单元的上传附件子单元将任务上传,其他成员通过任务详情对任务进行下载;
更进一步地,所述成员个人管理模块还包括星标功能,通过将重要文档加星标的方式,将重要文档永久显示于个人管理模块版面。
本发明的有益效果:本发明的团队协作管理系统,通过将项目细分为若干任务,精确分配到负责成员,并结合评论单元进行实时讨论,促进任务的完成进度,同时任务发布者通过任务模块查看已分配出去的任务完成情况,实现任务的即时管理,本发明的系统可以实现工作环境不受限的24小时网络办公室。
附图说明
图1为本发明提供的示意图。
具体实施方式
为方便本领域技术人员进一步了解本发明的内容,现结合附图进行详细说明。
如图1所示,本发明提供的团队协作管理系统,包括任务模块和个人管理模块,管理员角色的成员通过进入所述客户端任务模块;新建项目A,然后将项目A分解为若干任务,并新建任务A,在任务A后面选择指定分配的执行成员,点击任务A,进入任务详情A,通过评论单元通知其他成员任务执行进度;
接受任务的成员通过个人管理中心,查看已分配给自己的任务,通过拖拽将当前需完成的任务放到今日任务区域,点击任务左侧的开始按钮,将任务状态标记为正在处理状态,处理完成后,进入任务详情,通过评论单元通知其他成员任务的处理结果,并将已处理完成的任务上传至服务端;
所述详情单元还包括编辑子单元、移动子单元以及删除子单元;
所述评论单元还包括上传附件子单元,成员完成任务后,通过评论单元的上传附件子单元将任务上传,其他成员通过任务详情对任务进行下载;
所述成员个人管理模块还包括星标功能,通过将重要文档加星标的方式,将重要文档永久显示于个人管理模块版面;
管理员通过任务模块查看任务的完成进度。
本发明的有益效果:本发明的团队协作管理系统,通过将项目细分为若干任务,精确分配到负责成员,并结合评论单元进行实时讨论,促进任务的完成进度,同时任务发布者通过任务模块查看已分配出去的任务完成情况,实现任务的即时管理,本发明的系统可以实现工作环境不受限的24小时网络办公室。

Claims (4)

1.一种团队协作管理系统,其特征在于,包括:客户端任务模块和客户端个人管理模块;成员通过进入所述客户端任务模块,新建任务,在任务后面选择指定分配的执行成员,点击任务,进入任务详情,通过评论单元通知其他成员任务执行进度;
成员通过进入所述客户端个人管理模块,查看所有分配给自己的任务,通过拖拽将当前需完成的任务放到今日任务区域,点击任务左侧的开始按钮,将任务状态标记为正在处理状态,处理完成后,进入任务详情,通过评论单元通知其他成员任务的处理结果,并将已处理完成的任务上传至服务端;
成员通过进入所述客户端任务模块,查看已分配出去的任务的完成进度。
2.根据权利要求1所述的团队协作管理系统,其特征在于,所述任务进度包括任务建立、任务分配以及任务完成等信息。
3.根据权利要求1所述的团队协作管理系统,其特征在于,所述评论单元还包括上传附件子单元,成员完成任务后,通过评论单元的上传附件子单元将任务上传,其他成员通过任务详情对任务进行下载。
4.根据权利要求1所述的团队协作管理系统,其特征在于,所述成员个人管理模块还包括星标单元,通过将重要文档加星标的方式,将重要文档永久显示于个人管理模块版面。
CN201410737867.5A 2014-12-05 2014-12-05 团队协作管理系统 Pending CN105719040A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410737867.5A CN105719040A (zh) 2014-12-05 2014-12-05 团队协作管理系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410737867.5A CN105719040A (zh) 2014-12-05 2014-12-05 团队协作管理系统

Publications (1)

Publication Number Publication Date
CN105719040A true CN105719040A (zh) 2016-06-29

Family

ID=56143958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410737867.5A Pending CN105719040A (zh) 2014-12-05 2014-12-05 团队协作管理系统

Country Status (1)

Country Link
CN (1) CN105719040A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114462775A (zh) * 2021-12-27 2022-05-10 上海佩琪信息技术有限公司 一种灵活用工系统及信息处理方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114462775A (zh) * 2021-12-27 2022-05-10 上海佩琪信息技术有限公司 一种灵活用工系统及信息处理方法
CN114462775B (zh) * 2021-12-27 2024-02-13 上海佩琪信息技术有限公司 一种灵活用工系统及信息处理方法

Similar Documents

Publication Publication Date Title
Gronau Enterprise resource planning
Hewlett et al. Extreme jobs: the dangerous allure of the 70-hour workweek.
WO2008021433A3 (en) Design tool and methodology for enterprise software applications
GB2509471A (en) Performance data in a worker profile aggregated by a job distribution platform for workers that perform crowd sourced tasks
WO2014047461A3 (en) Systems and methods for workflow automation
PL405872A1 (pl) Sposób, program i system konwersji modeli danych systemu zasilania
SG10201809484SA (en) Methods and systems for managing community information
WO2020060181A3 (ko) 인적 자원 정보 활용 시스템 및 그 운영 방법
GB2538198A (en) Efficient resource utilization in data centers
CN110880090A (zh) 一种航空零件制造数字化管理系统
CN105719041A (zh) 带日历的团队协作管理客户端
CN105320508A (zh) 一种实现业务集成工作流引擎的系统
CN105719040A (zh) 团队协作管理系统
CN105719039A (zh) 团队协作管理方法
CN105719038A (zh) 带成员管理的团队协作系统
Lyytimäki et al. Knowledge brokerage at the science-policy interface: New perspectives on tools for policy appraisal
فائق محمد سرحان et al. Statistical evaluation of the affective factors on the process of preparing time schedules for Iraqi construction projects
CN108960763A (zh) 一种日历模式的多任务管理与分派方法
Tefera Building Construction Productivity of Labour Improvement Model Designing for Defense Construction Enterprise
Memon et al. Coupling of a continuum ice sheet model and a discrete element calving model using a scientific workflow system
AU2014101400A4 (en) Project Management System
Baranovska et al. DEVELOPMENT OF EVOLUTION CRITERIA FOR SOFTWARE LIFE CYCLE MODELS
TH2001000276A (th) ระบบและวิธีการเฝ้าสังเกตความก้าวหน้าและการปฏิบัติการ
Larsen et al. The structural coherence of problem-based projects: Roundtable discussion
CN105654221A (zh) 成员管理方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160629

WD01 Invention patent application deemed withdrawn after publication