AU2014101400A4 - Project Management System - Google Patents
Project Management System Download PDFInfo
- Publication number
- AU2014101400A4 AU2014101400A4 AU2014101400A AU2014101400A AU2014101400A4 AU 2014101400 A4 AU2014101400 A4 AU 2014101400A4 AU 2014101400 A AU2014101400 A AU 2014101400A AU 2014101400 A AU2014101400 A AU 2014101400A AU 2014101400 A4 AU2014101400 A4 AU 2014101400A4
- Authority
- AU
- Australia
- Prior art keywords
- online
- responsive
- site
- data
- online responsive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a system for project management personnel, allowing very quick and easy capturing of data, times, employees, work summaries, daily activities etc. The system also allows communication between the users and creates an environment of collaboration within the organization and is applicable to Human Resource management, site safety and providing access to documentation.
Description
EDITORIAL NOTE 2014101400 There is one page of description only Foremanage CONCEPT DESCRIPTION Foremanage is a system designed as the right hand tool for project management personnel. The system allows very quick and easy capturing of data, times, employees, work summaries, daily activities, etc to give a real feel for the company owners and directors wanting to know where there money is being spent or where there employees are working and/or spending their time. The system also allows communication between the users and creates an environment of collaboration within the organization. Its capabilities are to stretch to Human Resource management, site safety and providing access to documentation.
Claims (8)
1. Online responsive employee time management system to record timesheets for hours and/ or days worked and works performed.
2. Check-in and Check-out function with GPS tracking facility
3. Online responsive daily diaries
4. Online responsive employee roster management with live update
5. Notification and collaboration system for users
6. Online responsive documentation for project and site management from tool box talks, site inductions, site safety data and insurances, coordination meetings etc to assist in the timely collection of data
7. Reporting system for collected data
8. Online responsive Quantity control system for projects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2014101400A AU2014101400A4 (en) | 2014-11-26 | 2014-11-26 | Project Management System |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2014101400A AU2014101400A4 (en) | 2014-11-26 | 2014-11-26 | Project Management System |
Publications (1)
Publication Number | Publication Date |
---|---|
AU2014101400A4 true AU2014101400A4 (en) | 2015-01-15 |
Family
ID=52339780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2014101400A Ceased AU2014101400A4 (en) | 2014-11-26 | 2014-11-26 | Project Management System |
Country Status (1)
Country | Link |
---|---|
AU (1) | AU2014101400A4 (en) |
-
2014
- 2014-11-26 AU AU2014101400A patent/AU2014101400A4/en not_active Ceased
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR090787A1 (en) | WORK FLOW SYSTEM FOR WELL PLANNING, METHOD AND COMPUTER PROGRAM PRODUCT | |
Piasecki et al. | Corporate social responsibility: The challenges and constraints | |
AU2014101400A4 (en) | Project Management System | |
GB2524221A (en) | System and method for assigning employees to cash registers | |
문광수 et al. | The effect of behavior based safety (BBS) program on safety climate and safety behaviors: A field study | |
Ahmed et al. | Socio-Business Consideration of Garment Workers in Bangladesh: A Statistical Review | |
Abidin et al. | Occupational safety and health management system in Malaysia: Comparison between OHSAS 18001: 2007 and MS 1722: 2011 | |
Lyytimäki et al. | Knowledge brokerage at the science-policy interface: New perspectives on tools for policy appraisal | |
فائق محمد سرحان et al. | Statistical evaluation of the affective factors on the process of preparing time schedules for Iraqi construction projects | |
Hanuar et al. | Implementation of The Fourth Industrial Revolution (IR 4.0) For Controlling Workers’ Safety at Construction Site | |
AU2014100199A4 (en) | Total aged care procurement model | |
CN103942644A (en) | Personnel management system | |
AU2013100593A4 (en) | Streamlined Staff Training and Performance Determination Model | |
CN103164684B (en) | Handheld intelligent safety supervisor | |
None | Brief 73 Health Physics Enrollments and Degrees Survey, 2013 Data | |
Bikmurzina et al. | Corporate Security Department of PJSC" Lukoil" As Mechanism Of Economic Security Management | |
Durbin | Weapon Systems Annual AssessmentLimited Use of Knowledge-based Practices Continues to Undercut DOD's Investments (GAO-19-336SP) | |
Waetuto et al. | THE IMPLEMENTATION OF OCCUPATIONAL SAFETY AND HEALTH POLICY (OSH) AT STATE ELECTRICITY COMPANY (PLN) BRANCH KUPANG | |
Jung-Yu | Impact of Psychological Contract Violation on Employee Well-being: The Case of Service Industry Employees in Taiwan | |
Hadi et al. | Communication as a Change Management in the Implementing of Government Organization Programs Case Study: Implementation of The Non-cash Distribution System on The Program Keluarga Harapan by Ministry of Social Affairs in 2016 | |
AKSENOV et al. | STANDARD AND LEGAL REGULATION OF ANALYTICAL WORK IN PENAL SYSTEM | |
Dhamodharan et al. | Trade unions and unorganised workers | |
Yang et al. | STLE LOCAL SECTION MEETING CALENDAR | |
Abdolwahhab et al. | Research of management methods at the pharmacy | |
Remondino et al. | MANAGEMENT INCENTIVES IN UNLISTED COMPANIES: AN EMPIRICAL INVESTIGATION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGI | Letters patent sealed or granted (innovation patent) | ||
MK22 | Patent ceased section 143a(d), or expired - non payment of renewal fee or expiry |