CN105714845A - Device for rapidly installing embedded bolts of cement kiln tail tower - Google Patents

Device for rapidly installing embedded bolts of cement kiln tail tower Download PDF

Info

Publication number
CN105714845A
CN105714845A CN201610239102.8A CN201610239102A CN105714845A CN 105714845 A CN105714845 A CN 105714845A CN 201610239102 A CN201610239102 A CN 201610239102A CN 105714845 A CN105714845 A CN 105714845A
Authority
CN
China
Prior art keywords
circular
flange
section steel
channel
cement kiln
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610239102.8A
Other languages
Chinese (zh)
Other versions
CN105714845B (en
Inventor
张道华
陈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201610239102.8A priority Critical patent/CN105714845B/en
Publication of CN105714845A publication Critical patent/CN105714845A/en
Application granted granted Critical
Publication of CN105714845B publication Critical patent/CN105714845B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The invention discloses a device for rapidly installing embedded bolts of a cement kiln tail tower. The problems that existing embedded bolts are low in installation efficiency and low in precision are solved. The device comprises supporting frames, box iron flanges connected with the supporting frames and used for fixing the bottom ends of the bolts, and round flanges used for fixing the upper ends of the bolts. Each box iron flange comprises ring-shaped box iron and holes formed in the ring-shaped box iron. The tops of the supporting frames are connected with the ring-shaped box iron. The embedded bolts can be fixed through the round flanges and the box iron flanges, subsequent pouring is facilitated, all the bolts can be fixed at the same time, the distance between the bolts can be ensured, and the phenomenon that the bolts incline in the pouring process is avoided.

Description

A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt
Technical field
The present invention relates to the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt.
Background technology
In dry cement production line is constructed, according to design drawing requirement, carry out installing to four groups of large-scale pre-embedded bolts in kiln tail preheater tower foundation and fix, in order to meet design drawing and use functional requirement.In conventional construction method preheater tower foundation, the installation accuracy of pre-embedded bolt is low, particularly between bolt group, every distance easy sideslip when concrete vibrating between group bolt, and is not readily reachable by design and code requirement;Not only construction speed is slow, and brings bigger difficulty to follow-up pylon Steel Structure Installation, eventually affects the use function of equipment.
Summary of the invention
In order to improve the problems referred to above, it is an object of the invention to provide the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt.
To achieve these goals, the technical solution used in the present invention is as follows:
The device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt, including bracing frame, is connected with bracing frame and for fixing the channel-section steel flange of bolt bottom, and for fixing the circular flange of bolt upper end;Described channel-section steel flange includes annular channel-section steel, and is arranged at the eyelet on annular channel-section steel;Support frame as described above top is connected with annular channel-section steel.
Further, support frame as described above, channel-section steel flange, circular flange are four;Described four circular flanges are connected by two longitudinally connected angle steel and two lateral connection angle steel, and four circular flanges, two longitudinally connected angle steel, two lateral connection angle steel collectively constitute a rectangle;The cross connecting piece being connected with four circular flanges it is provided with in the middle of described rectangle;A channel-section steel flange and bracing frame it is equipped with below each circular flange.
Yet further, described channel-section steel flange is provided with eight eyelets, and described circular flange is provided with eight through holes matched with the eyelet on steel tank flange.
Further, support frame as described above includes supporting leg, is arranged at the circular support platform at supporting leg top, and is placed on the circular baffle plate supported outside platform;The gap for placing trough steel flange is left between described circular support platform and circular baffle plate;Described circular support platform is connected by multiple connecting plates with the bottom of circular baffle plate;All connecting plates are uniformly distributed in circular support platform surrounding.
It addition, described leg and connecting plate are fixedly linked.
The present invention compared with prior art, has the following advantages and beneficial effect:
Pre-embedded bolt is fixed by the present invention by circular flange and channel-section steel flange, facilitate follow-up building, and can fix all bolts simultaneously, and be able to ensure that the spacing between bolt, it is to avoid occur that in casting process the situation of tilt bolt occurs.
Speed of application of the present invention is fast, reliable in quality, and is assemble on ground, easy to operate, safety is high.
Accompanying drawing explanation
Fig. 1 is the structural representation after the present invention installs bolt.
Fig. 2 is the top view after four circular flanges of the present invention are connected.
Fig. 3 is circular flange structural representation in the present invention.
Fig. 4 is the structural representation of channel-section steel flange in the present invention.
Fig. 5 is the top view of Fig. 4.
Fig. 6 is the structural representation of bracing frame in the present invention.
Fig. 7 is the top view of Fig. 6.
Wherein, the parts name that in accompanying drawing, labelling is corresponding is called: 1-bracing frame, 2-channel-section steel flange, 3-circular flange, 4-annular channel-section steel, 5-eyelet, the longitudinally connected angle steel of 6-, 7-lateral connection angle steel, 8-cross connecting piece, 9-supporting leg, 10-circular support platform, 11-circular baffle plate, 12-connecting plate, 13-bolt.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described, and embodiments of the present invention include but not limited to the following example.
Embodiment
As shown in Fig. 1~7, the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt, including bracing frame 1, it is connected with bracing frame and for fixing the channel-section steel flange 2 of bolt bottom, and for fixing the circular flange 3 of bolt upper end;Described channel-section steel flange includes annular channel-section steel 4, and is arranged at the eyelet 5 on annular channel-section steel;Support frame as described above top is connected with annular channel-section steel.
Pass through said apparatus, bolt 13 can be fixed, it is easy to follow-up build work, particularly, first bracing frame is lifted into installation site, and is fixed on the basis of both sides casting concrete, then pre-buried bolt will be needed to be fixed with channel-section steel flange and circular flange on the ground, then the bolt assembled, channel-section steel flange, circular flange are lifted into bracing frame place, and channel-section steel flange and bracing frame are fixed, this makes it possible to carry out building work.
Owing to kiln tower needs four groups of bolts, so support frame as described above, channel-section steel flange, circular flange are four;Described four circular flanges are connected with two lateral connection angle steel 7 by two longitudinally connected angle steel 6, and four circular flanges, two longitudinally connected angle steel, two lateral connection angle steel collectively constitute a rectangle;The cross connecting piece 8 being connected with four circular flanges it is provided with in the middle of described rectangle;A channel-section steel flange and bracing frame it is equipped with below each circular flange.
By above-mentioned setting, it can be ensured that often organize bolt, channel-section steel flange, circular flange maintenance standing relatively;It is particularly due on circular flange and is provided with longitudinally connected angle steel, lateral connection angle steel and cross connecting piece, four circular flanges can be fixed by these three equipment, avoid four circular flange shift relative so that often organize bolt, channel-section steel flange, circular flange position will not offset in casting process.
Specifically, described channel-section steel flange is provided with eight eyelets, and described circular flange is provided with eight through holes matched with the eyelet on steel tank flange.Pass through said apparatus, it is possible to one-time fix eight bolts, convenient to operation.
Specifically, support frame as described above includes supporting leg 9, is arranged at the circular support platform 10 at supporting leg top, and is placed on the circular baffle plate 11 supported outside platform;The gap for placing trough steel flange is left between described circular support platform and circular baffle plate;Described circular support platform is connected by multiple connecting plates 12 with the bottom of circular baffle plate;All connecting plates are uniformly distributed in circular support platform surrounding.
By arranging the bracing frame of said structure, can be directly placed in the gap between circular support platform and circular baffle plate by channel-section steel flange to be fixed, bolt channel-section steel flange so can be made to remain stable in gap, will not be subjected to displacement, so that it is guaranteed that will not offset.Certainly the fastness between channel-section steel flange and bracing frame is reinforced also by welding or other modes.
Specifically, described leg and connecting plate are fixedly linked, and certain leg also all can be connected with support platform and connecting plate.
According to above-described embodiment, the present invention just can be realized well.What deserves to be explained is; under premise based on said structure design, for solving same technical problem, even if some making in the present invention are without substantial change or polishing; the essence of the technical scheme adopted is still the same with the present invention, therefore it should also be as in protection scope of the present invention.

Claims (5)

1. the device of a Fast Installation cement kiln end pylon pre-embedded bolt, it is characterised in that include bracing frame (1), is connected with bracing frame and for fixing the channel-section steel flange (2) of bolt bottom, and for fixing the circular flange (3) of bolt upper end;Described channel-section steel flange includes annular channel-section steel (4), and is arranged at the eyelet (5) on annular channel-section steel;Support frame as described above top is connected with annular channel-section steel.
2. the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt according to claim 1, it is characterised in that support frame as described above, channel-section steel flange, circular flange are four;Described four circular flanges are connected with two lateral connection angle steel (7) by two longitudinally connected angle steel (6), and four circular flanges, two longitudinally connected angle steel, two lateral connection angle steel collectively constitute a rectangle;The cross connecting piece (8) being connected with four circular flanges it is provided with in the middle of described rectangle;A channel-section steel flange and bracing frame it is equipped with below each circular flange.
3. the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt according to claim 2, it is characterised in that described channel-section steel flange is provided with eight eyelets, and described circular flange is provided with eight through holes matched with the eyelet on steel tank flange.
4. the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt according to claim 3, it is characterized in that, support frame as described above includes supporting leg (9), is arranged at the circular support platform (10) at supporting leg top, and is placed on the circular baffle plate (11) supported outside platform;The gap for placing trough steel flange is left between described circular support platform and circular baffle plate;Described circular support platform is connected by multiple connecting plates (12) with the bottom of circular baffle plate;All connecting plates are uniformly distributed in circular support platform surrounding.
5. want the device of a kind of Fast Installation cement kiln end pylon pre-embedded bolt described in 4 according to right, it is characterised in that described leg and connecting plate are fixedly linked.
CN201610239102.8A 2016-04-15 2016-04-15 A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt Active CN105714845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610239102.8A CN105714845B (en) 2016-04-15 2016-04-15 A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610239102.8A CN105714845B (en) 2016-04-15 2016-04-15 A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt

Publications (2)

Publication Number Publication Date
CN105714845A true CN105714845A (en) 2016-06-29
CN105714845B CN105714845B (en) 2018-01-02

Family

ID=56160291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610239102.8A Active CN105714845B (en) 2016-04-15 2016-04-15 A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt

Country Status (1)

Country Link
CN (1) CN105714845B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202081427U (en) * 2011-05-26 2011-12-21 中国建筑第七工程局有限公司 Embedded bolt positioning device for tower crane foundation
CN203878604U (en) * 2014-03-25 2014-10-15 中国建筑第八工程局有限公司 Pre-buried screw rod support
CN204040056U (en) * 2014-06-26 2014-12-24 中国建筑第八工程局有限公司 A kind of location and installation support of pre-embedded anchoring bolts
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing
CN105019470A (en) * 2015-08-03 2015-11-04 共享钢构有限责任公司 Method for pre-burying of large group of foundation bolts
KR20160025961A (en) * 2014-08-28 2016-03-09 피씨에스솔루션 주식회사 Assembly type anchor
CN205676914U (en) * 2016-04-15 2016-11-09 中国五冶集团有限公司 A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202081427U (en) * 2011-05-26 2011-12-21 中国建筑第七工程局有限公司 Embedded bolt positioning device for tower crane foundation
CN203878604U (en) * 2014-03-25 2014-10-15 中国建筑第八工程局有限公司 Pre-buried screw rod support
CN204040056U (en) * 2014-06-26 2014-12-24 中国建筑第八工程局有限公司 A kind of location and installation support of pre-embedded anchoring bolts
KR20160025961A (en) * 2014-08-28 2016-03-09 피씨에스솔루션 주식회사 Assembly type anchor
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing
CN105019470A (en) * 2015-08-03 2015-11-04 共享钢构有限责任公司 Method for pre-burying of large group of foundation bolts
CN205676914U (en) * 2016-04-15 2016-11-09 中国五冶集团有限公司 A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt

Also Published As

Publication number Publication date
CN105714845B (en) 2018-01-02

Similar Documents

Publication Publication Date Title
CN104018514B (en) Large Towers kind equipment basis pre-embedded anchoring bolts inversion construction method
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN105544397A (en) High concrete pier construction formwork device
CN103343639B (en) A kind of sliding mode system of efficient adjustment
CN105569054A (en) Device and method for controlling direction and elevation of lattice column below ground
CN202139255U (en) Tooling platform for assembling converter body equipment
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN202658590U (en) Integral assembled drilling platform
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN205205683U (en) High mound construction formwork device of concrete
CN110748156B (en) Sliding positioning top supporting structure of large silo and construction method thereof
CN211006346U (en) Cast-in-place support of side span of dismouting of being convenient for suitable for bridge
CN103790376A (en) Wall framework applied to hyperboloid building construction and wall construction method
CN103334584B (en) Template regulating system for sliding form system
CN105714845A (en) Device for rapidly installing embedded bolts of cement kiln tail tower
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN109537863A (en) Operating platform support frame and operating platform
CN104372948A (en) Elevator shaft formwork lifting frame
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN205676914U (en) A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt
KR101181493B1 (en) Improved support system
CN203383563U (en) Fast assembled communication iron tower
CN203222810U (en) Steel column and base structure system
CN209686833U (en) Operating platform support frame and operating platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant