CN105714766A - 一种提高湿陷性黄土场地地基承载力的施工方法 - Google Patents
一种提高湿陷性黄土场地地基承载力的施工方法 Download PDFInfo
- Publication number
- CN105714766A CN105714766A CN201610098917.9A CN201610098917A CN105714766A CN 105714766 A CN105714766 A CN 105714766A CN 201610098917 A CN201610098917 A CN 201610098917A CN 105714766 A CN105714766 A CN 105714766A
- Authority
- CN
- China
- Prior art keywords
- soil
- bearing capacity
- construction method
- collapsible loess
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
- E02D3/123—Consolidating by placing solidifying or pore-filling substances in the soil and compacting the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0037—Clays
- E02D2300/0039—Clays mixed with additives
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明属于土建地基领域,具体是一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于,包括以下步骤:步骤一,钻取桩孔;步骤二,向所述桩孔内分段填入水泥与土的混合料,并分段夯实成挤土桩。有益效果是利用水泥与土的混合料分段夯实成的挤土桩对桩周土体的挤密作用来消除地基土体的湿陷性,同时提高湿陷性黄土场地地基承载力,简便、可靠,大大简化常用的地基处理形式,满足工程建筑需求。
Description
技术领域
本发明属于土建地基领域,具体是一种提高湿陷性黄土场地地基承载力的施工方法。
背景技术
在我国西北部有大范围的湿陷性黄土分布,在工程建设时,需按相关规范进行地基处理,全部或部分消除地基的湿陷性,以提高其承载力及水稳性。常用的方法是采用灰土挤密桩和土挤密桩对地基进行加固处理。
依据规范要求,灰土挤密桩复合地基的承载力特征值不宜大于处理前的2.0倍,并不宜大于250kPa。而在实际工程中,灰土挤密桩和土挤密桩复合地基的承载力偏小,不能满足建筑需求,常采用多桩型复合地基进行处理。如此一来,就对湿陷性黄土地区的工程地基处理的复杂性带来了不利的影响
发明内容
本发明所要解决的技术问题是提供一种简便、可靠,简化常用的地基处理形式,并能有效地消除湿陷性黄土场地地基土体的湿陷性,满足工程建筑需求的提高湿陷性黄土场地地基承载力的施工方法。
本发明解决上述技术问题的技术方案如下:一种提高湿陷性黄土场地地基承载力的施工方法,包括以下步骤:
步骤一,钻取桩孔;
步骤二,向所述桩孔内分段填入水泥与土的混合料,并分段夯实成挤土桩。
本发明的有益效果是:利用水泥与土的混合料分段夯实成的挤土桩对桩周土体的挤密作用来消除地基土体的湿陷性,同时提高湿陷性黄土场地地基承载力,简便、可靠,大大简化常用的地基处理形式,满足工程建筑需求。
在上述技术方案的基础上,本发明还可以做如下改进。
进一步,步骤一中的钻取桩孔采用振动沉管、锤击沉管或冲击成孔,确保桩孔结构可靠性的同时提高桩孔成孔的效率。
进一步,步骤二中的分段夯实成挤土桩采用机械分段夯实成挤土桩,提高挤土桩的成桩效率,同时确保挤土桩的结构可靠性。
进一步,步骤二中的分段夯实成挤土桩采用重锤分段夯实成挤土桩,进一步提高挤土桩的成桩效率,同时确保挤土桩的结构可靠性。
进一步,步骤二中的水泥与土的混合料的压实系数不小于0.93,确保挤土桩对桩周土体的挤密作用,有效地消除湿陷性黄土场地地基土体的湿陷性并提高湿陷性黄土场地地基承载力。
进一步,步骤二中的水泥为普通硅酸盐水泥,土为过10~20mm筛、有机质含量不超过5%的粉质粘土,二者以6∶1混合成混合料,确保水泥与土的混合料分段夯实成的挤土桩对桩周土体的挤密作用。
具体实施方式
以下对本发明的原理和特征进行描述,所举实例只用于解释本发明,并非用于限定本发明的范围。
以工程施工现场处在非自重湿陷性黄土地区、基底下有7.0米的非自重湿陷性黄土层、湿陷系数0.020~0.022、设计要求基底平均荷载360kPa的施工环境为例。
一种提高湿陷性黄土场地地基承载力的施工方法,步骤一,采用冲击钻成桩孔,桩孔直径350mm;步骤二,向桩孔内分段填入水泥与土的混合料,(水泥为普通硅酸盐水泥,土为过10~20mm筛、有机质含量不超过5%的粉质粘土,二者以6∶1混合成混合料,每立方土掺水泥220kg~240kg),并分段采用重锤夯实成挤土桩,其中水泥与土的混合料的压实系数为0.95,最终的成桩直径不小于400mm。经静载荷试验确定,该复合地基的承载力特征值满足360kPa的设计要求;后采取桩间土进行土工试验,确定处理后的地基土湿陷系数均小于0.015,满足工程建筑需求。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (6)
1.一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于,包括以下步骤:
步骤一,钻取桩孔;
步骤二,向所述桩孔内分段填入水泥与土的混合料,并分段夯实成挤土桩。
2.根据权利要求1所述的一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于:步骤一中的钻取桩孔采用振动沉管、锤击沉管或冲击成孔。
3.根据权利要求1或2所述的一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于:步骤二中的分段夯实成挤土桩采用机械分段夯实成挤土桩。
4.根据权利要求3所述的一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于:步骤二中的分段夯实成挤土桩采用重锤分段夯实成挤土桩。
5.根据权利要求1或2所述的一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于:步骤二中的水泥与土的混合料的压实系数不小于0.93。
6.根据权利要求1或2所述的一种提高湿陷性黄土场地地基承载力的施工方法,其特征在于:步骤二中的水泥为普通硅酸盐水泥,土为过10~20mm筛、有机质含量不超过5%的粉质粘土,二者以6∶1混合成混合料。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610098917.9A CN105714766A (zh) | 2016-02-23 | 2016-02-23 | 一种提高湿陷性黄土场地地基承载力的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610098917.9A CN105714766A (zh) | 2016-02-23 | 2016-02-23 | 一种提高湿陷性黄土场地地基承载力的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105714766A true CN105714766A (zh) | 2016-06-29 |
Family
ID=56156153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610098917.9A Pending CN105714766A (zh) | 2016-02-23 | 2016-02-23 | 一种提高湿陷性黄土场地地基承载力的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105714766A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113463618A (zh) * | 2021-07-14 | 2021-10-01 | 安徽森通建设工程有限公司 | 一种建筑工程上的地基加固方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010112028A (ja) * | 2008-11-05 | 2010-05-20 | Shusuke Ito | 地耐力増強工法および該工法に使用する装置 |
CN102359101A (zh) * | 2011-07-28 | 2012-02-22 | 江苏建筑职业技术学院 | 一种湿陷性土的地基处理方法 |
CN104404838A (zh) * | 2014-11-20 | 2015-03-11 | 中铁八局集团有限公司 | 速度200km以上铁路湿陷性黄土路基基底处理方法 |
-
2016
- 2016-02-23 CN CN201610098917.9A patent/CN105714766A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010112028A (ja) * | 2008-11-05 | 2010-05-20 | Shusuke Ito | 地耐力増強工法および該工法に使用する装置 |
CN102359101A (zh) * | 2011-07-28 | 2012-02-22 | 江苏建筑职业技术学院 | 一种湿陷性土的地基处理方法 |
CN104404838A (zh) * | 2014-11-20 | 2015-03-11 | 中铁八局集团有限公司 | 速度200km以上铁路湿陷性黄土路基基底处理方法 |
Non-Patent Citations (1)
Title |
---|
崔京浩: "《第十二届全国结构工程学术会议论文集第II册》", 31 October 2003 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113463618A (zh) * | 2021-07-14 | 2021-10-01 | 安徽森通建设工程有限公司 | 一种建筑工程上的地基加固方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109208625B (zh) | 一种地下桩基础溶洞加强加固种山施工方法 | |
WO2018210019A1 (zh) | 潜孔冲击旋喷复合桩成桩方法 | |
WO2021082767A1 (zh) | 一种基于增强纤维和偏高岭土的加压灌注桩的施工方法 | |
CN105625294A (zh) | 一种复合地基及其施工方法 | |
CN102691296A (zh) | 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法 | |
CN204401385U (zh) | 一种处理深厚软土岩溶地基的路基结构 | |
CN102011399A (zh) | 一种基于phc桩的多重高喷扩底桩施工方法 | |
CN206070508U (zh) | 一种加固地基基础的装置 | |
CN104746505A (zh) | 强夯压密注浆联合处理杂填土地基方法 | |
CN206204972U (zh) | 一种兼作井点降水的预制管桩 | |
CN104988914A (zh) | 一种水域环境下的钻孔灌注桩断桩处理方法 | |
CN101793027B (zh) | 一种桩心注浆静压锚杆桩 | |
CN106480878A (zh) | 一种上、下部扩大型水泥土复合管桩 | |
WO2017133373A1 (zh) | 一种用于桩基的小直径桩簇及其施工方法 | |
CN210562162U (zh) | 一种预制管桩裂纹修复装置 | |
CN104746512A (zh) | 一种水泥土劲性复合桩及其成桩方法 | |
CN104674800A (zh) | 一种采用复合固化剂的高压旋喷桩在泥炭质土层中的成桩方法 | |
CN104005416A (zh) | 一种用于高陡边坡素填土反压条件下大直径孔桩塌孔的处理方法 | |
CN101597903A (zh) | 一种用于基坑支护的筒体浆芯桩施工方法 | |
CN106869153A (zh) | 一种井点降水快速处理软地基的方法 | |
CN105714766A (zh) | 一种提高湿陷性黄土场地地基承载力的施工方法 | |
CN208545745U (zh) | 带分级扩大头的碎石注浆桩 | |
CN208293556U (zh) | 一种吹填软土地基真空动力固结复合排水系统 | |
CN206233232U (zh) | 一种上、下部扩大型水泥土复合管桩 | |
CN201635072U (zh) | 一种桩心注浆静压锚杆桩成桩装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160629 |
|
RJ01 | Rejection of invention patent application after publication |