CN105710540A - U-steel butt joint process - Google Patents

U-steel butt joint process Download PDF

Info

Publication number
CN105710540A
CN105710540A CN201410723747.XA CN201410723747A CN105710540A CN 105710540 A CN105710540 A CN 105710540A CN 201410723747 A CN201410723747 A CN 201410723747A CN 105710540 A CN105710540 A CN 105710540A
Authority
CN
China
Prior art keywords
welding
channel
steel
section steel
conducted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410723747.XA
Other languages
Chinese (zh)
Inventor
张刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Ling Yi Machinery Co Ltd
Original Assignee
Chongqing Ling Yi Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Ling Yi Machinery Co Ltd filed Critical Chongqing Ling Yi Machinery Co Ltd
Priority to CN201410723747.XA priority Critical patent/CN105710540A/en
Publication of CN105710540A publication Critical patent/CN105710540A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a U-steel butt joint process. The U-steel butt joint process comprises the following steps that 1, lineation is conducted; 2, cutting is conducted, specifically, blanking is conducted through a semi-automatic flame cutting machine along lines, after blanking is conducted, 45-degree single V-shaped grooves are formed in the inner side surface of the U-steel through the semi-automatic flame cutting machine or a grinding machine, and cutting surfaces should be smooth, flat and free of notches; 3, assembling is conducted; 4, welding is conducted, specifically, gas shielded welding is adopted, the U-steel should be subjected to back-to-back spot welding in pairs before welding in order to reduce welding deformation, the groove sides on a wing plate are welded at first, and then the grooves in a ventral plate are welded; and after the groove sides are welded, the U-steel subjected to spot welding in pairs is opened, the back surface of the U-steel is subjected to gouging back chipping, then welding is continued, and the post-welding surplus height should be less than 2 mm; and 5, when the two pieces of U-steel are combined, full-length welding is required, and the butt joint clearance is required to be 500 mm or above. According to the U-steel butt joint process, the process is reasonable, the manufacturing cost is low, arrangement of all parameters is reasonable and coordinated, and the product quality and the production efficiency can be effectively improved.

Description

A kind of channel-section steel butt-joint process
Technical field
The present invention relates to a kind of channel-section steel butt-joint process.
Background technology
Existing channel-section steel butt-joint process exists that procedure arrangement is unreasonable, operation is various, and technological parameter selects unreasonable, and the collocation of each technological parameter is unreasonable and operator's skill requirement is higher so that production cost is higher, product quality is on the low side, yield rate is not high.
Summary of the invention
Because the drawbacks described above of prior art, the technical problem to be solved be to provide a kind of operation rationally, the channel-section steel butt-joint process of low cost of manufacture.
For achieving the above object, the invention provides
A kind of channel-section steel butt-joint process, comprises the steps:
1), line:
A) according to the length dimension after docking, line on the angle steel preparing docking, two requirements should be met before line:
A1) ensure that the minimum length of docking channel-section steel is greater than 500mm;
A2) length direction should leave the surplus of 2 ~ 3mm;
B) principle rule is that the line of cut on two wing plates of channel-section steel should be perpendicular to web, and on web, line of cut should angle at 45 °;
2), cutting: with semiautomatic flame cutting machine along line blanking, open 45 ° of single V-butts with semiautomatic flame cutting machine or abrasive machine at channel-section steel medial surface after blanking;Facet should be smooth, non-notch;
3), assembled:
Preparing assembled channel-section steel back-off on platform two before assembled, then adjust linearity and the gap of two channel-section steels, spot welding is fixed;
4), welding:
Employing gas shielded arc welding welds, for reducing welding deformation, should be spot-welded together back-to-back in pairs by channel-section steel before weldering, and first the groove side on weldering wing plate, then welds the groove of web, after groove side has been welded;Being opened into the channel-section steel to spot welding, back side gouge back chipping, then proceed to welding, postwelding reinforcement should be less than 2mm;
5) when, two channel-section steels are involutory, it is desirable to full weld, and butt joint gap requires at more than 500mm.
The invention has the beneficial effects as follows: operation of the present invention is reasonable, low cost of manufacture, each parameter collocation reasonable coordination, it is possible to be effectively improved product quality and production efficiency.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described:
A kind of channel-section steel butt-joint process, comprises the steps:
1), line:
A) according to the length dimension after docking, line on the angle steel preparing docking, two requirements should be met before line:
A1) ensure that the minimum length of docking channel-section steel is greater than 500mm;
A2) length direction should leave the surplus of 2 ~ 3mm;
B) principle rule is that the line of cut on two wing plates of channel-section steel should be perpendicular to web, and on web, line of cut should angle at 45 °;
2), cutting: with semiautomatic flame cutting machine along line blanking, open 45 ° of single V-butts with semiautomatic flame cutting machine or abrasive machine at channel-section steel medial surface after blanking;Facet should be smooth, non-notch;
3), assembled:
Preparing assembled channel-section steel back-off on platform two before assembled, then adjust linearity and the gap of two channel-section steels, spot welding is fixed;
4), welding:
Employing gas shielded arc welding welds, for reducing welding deformation, should be spot-welded together back-to-back in pairs by channel-section steel before weldering, and first the groove side on weldering wing plate, then welds the groove of web, after groove side has been welded;Being opened into the channel-section steel to spot welding, back side gouge back chipping, then proceed to welding, postwelding reinforcement should be less than 2mm;
5) when, two channel-section steels are involutory, it is desirable to full weld, and butt joint gap requires at more than 500mm.

Claims (1)

1. a channel-section steel butt-joint process, it is characterised in that comprise the steps:
1), line:
A) according to the length dimension after docking, line on the angle steel preparing docking, two requirements should be met before line:
A1) ensure that the minimum length of docking channel-section steel is greater than 500mm;
A2) length direction should leave the surplus of 2 ~ 3mm;
B) principle rule is that the line of cut on two wing plates of channel-section steel should be perpendicular to web, and on web, line of cut should angle at 45 °;
2), cutting: with semiautomatic flame cutting machine along line blanking, open 45 ° of single V-butts with semiautomatic flame cutting machine or abrasive machine at channel-section steel medial surface after blanking;Facet should be smooth, non-notch;
3), assembled:
Preparing assembled channel-section steel back-off on platform two before assembled, then adjust linearity and the gap of two channel-section steels, spot welding is fixed;
4), welding:
Employing gas shielded arc welding welds, for reducing welding deformation, should be spot-welded together back-to-back in pairs by channel-section steel before weldering, and first the groove side on weldering wing plate, then welds the groove of web, after groove side has been welded;Being opened into the channel-section steel to spot welding, back side gouge back chipping, then proceed to welding, postwelding reinforcement should be less than 2mm;
5) when, two channel-section steels are involutory, it is desirable to full weld, and butt joint gap requires at more than 500mm.
CN201410723747.XA 2014-12-04 2014-12-04 U-steel butt joint process Pending CN105710540A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410723747.XA CN105710540A (en) 2014-12-04 2014-12-04 U-steel butt joint process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410723747.XA CN105710540A (en) 2014-12-04 2014-12-04 U-steel butt joint process

Publications (1)

Publication Number Publication Date
CN105710540A true CN105710540A (en) 2016-06-29

Family

ID=56146744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410723747.XA Pending CN105710540A (en) 2014-12-04 2014-12-04 U-steel butt joint process

Country Status (1)

Country Link
CN (1) CN105710540A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108788647A (en) * 2018-06-25 2018-11-13 深圳金鑫绿建股份有限公司 The technique and equipment led to using channel steel splicing side
CN110593404A (en) * 2019-09-19 2019-12-20 何淑敏 Steel structural section connecting component

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108788647A (en) * 2018-06-25 2018-11-13 深圳金鑫绿建股份有限公司 The technique and equipment led to using channel steel splicing side
CN110593404A (en) * 2019-09-19 2019-12-20 何淑敏 Steel structural section connecting component

Similar Documents

Publication Publication Date Title
CA2790168C (en) Method of and apparatus for hybrid welding with multiple heat sources
CN104959725B (en) A kind of large-scale variable thickness part electron beam welding deformation control method
CN103008898B (en) The welding method of tack-weld method, welding method and box beam
CN105710497A (en) Splicing technology of H-shaped steel
CN102756242A (en) Method for welding carbon steel heads
CN105728886A (en) Flame cutting technology
CN102019513B (en) Thick metal plate back gouging-free welding groove and machining process
CN107570874A (en) Laser-arc hybrid welding process
CN105710540A (en) U-steel butt joint process
CN101569953A (en) Technique for welding angle steel with penetration weld non-standard specification
CN103934541A (en) Electro-gas welding technology suitable for thick plates with thickness ranging from 20 mm to 45 mm
CN105728894A (en) Welding process for dome-roof storage tank
CN105643125A (en) Butt-joint process for T-shaped steel
CN103317211A (en) All-position TIG automatic welding technology method for framework side cross beam circular tube
CN105710488A (en) Welding process
CN202540744U (en) Quadrangular welding machine
CN102059466A (en) Machining method for preventing welding deformation of plate-type metallic workpieces
CN204148728U (en) A kind of groove being applicable to single face welding and double face shaping
CN105364430A (en) Laser welding method capable of realizing synchronous rolling of edge joints of sheets
CN115647535A (en) Double-side double-arc welding method for complex curved surface component of special vehicle
CN103506746B (en) A kind of anti-deformation processing method of apparatus for fixing transformer pulling plate magnet isolation tank and specific purpose tool
CN102848088A (en) Welding method of transformer oil tank
CN105345231A (en) Large-thickness martensitic heat-resistant steel clapboard electron beam composite narrow-gap metal active gas (MAG) welding method
US20130240490A1 (en) Welding method
CN105710506A (en) Angle steel butt joint process

Legal Events

Date Code Title Description
C06 Publication